DEPARTMENT OF MARINE ENGINEERING – ITS

DESAIN III : GENERAL ARRANGEMENT & SAFETY PLAN


FORM 01
DOCUMENT OF ASSIGNMENT

Semester : Odd / Even Year :2018 Rev2 Feb. 2018


STUDENT DATA
Name of Student Giovani Lintang Dhurandoro
Student’s Register No. 04211745000030
Name of Supervisor Indra Ranu Kusuma, ST. M.Sc.
Number of Attempt(s) 1

VESSEL DATA (referring to Propeller & Shafting Arrangement Assignment Data)


Vessel Name : Harimurtikalimantaka II Type of Ships : Bulk Carrier
Cargo Capacity
Cargo Type : (Ton / kL / TEUs *) : 18180 Ton
Class Notation Sailing Area
(ref to Class Rules Vol 1) (ref to SOLAS Chap. IV) :
Endurance (Day) : 17 LPP (m) : 142.7
Service Speed (knot) : 13.5 LWL (m) : 146.9
Cb : 0.756 LOA (m) : 148.6
B (m)
Main Engine Spesification : 22
T (m)
Gear Box Spesification : 9.6
Propeller Spesification H (m) : 12
Flag State
Ctassification Society BKI/ ABS / LR / GL / BV / NK *)
Solas CH-2/II, Fire Safety Code, STCW dan ILO
Statutory
Tonnage Measurement Convention 1969

TASK DATA
Ca l cul a ti on a nd Dra wi ng of Genera l Arra ngement a ccordi ng to Sta tutory
Genera l Arra ngement a nd Cl a s s
Ca l cul a ti on a nd Dra wi ng of Ca pa ci ty Pl a n a ccordi ng to the opera ti ona l
des i gn of the s hi ps , a nd a l s o compl i a nce wi th the rul es & gui del i nes of
Ca pa ci ty Pl a n Cl a s s a nd Sta tutory
Ca l cul a ti on a nd Dra wi ng of Sa fety & Fi re Control Pl a n a ccordi ng to the
opera ti ona l des i gn of the s hi ps , a nd a l s o compl i a nce wi th the rul es &
Sa fety & Fi re Control Pl a n gui del i nes of Cl a s s a nd Sta tutory
Reports Dra wi ng Every cha pter on Reports needs to be wri tten i n Engl i s h

Student Supervisor Desain III Coordinator

Giovani Lintang D Indra Ranu Kusuma, ST. M.Sc. Ede Mehta Wardhana., S.T, M.T.
NRP. 04211745000030 NIP. 197903272003121001 NIP. 1992201711048
*) Erase the part/s that not needed.
DEPARTEMEN OF MARINE ENGINEERING – ITS
DESAIN III : GENERAL ARANGEMENT AND SAFETY
PLAN FORM 02
FORM PROGRESS

Semester : Odd / Even Year : 2018 Rev2 Feb. 2017


CHECK TARGET PARAF PARAF
NO ITEM DOCUMENT / DRAWING
LIST DOSPEM KOORD

1 Exploration of Ship Principal Dimention, Function, Distance and Cargo

2 Confirmation of Previous Design and/or Previous Data about Ship Resistance


Confirmation of Main Engine selection including Main Engine, Gear Box (if any)
3 and Propeller Until
4 Confirmation of the Vessel route with a clear time and distance of the ship week
5 Student must prepare all the reference including the standard & regulations 3
6 Confirmation of Speed Power Prediction & Engine Propeller Matching
Calculation and location selection of the Frame spacing and double bottom
7 height
Calculation and location selection for the Sterntube Bulkhead, Engine Room Until
8 Bulkhead, Cargo Space Bulkhead, and Collision Bulkhead week
Arrangement and Calculation ot the Rudder (Rudder Type & Power of Rudder
9 Machineries Needed)
5
10 Arrangement of the Decks
11 Calculation of the Crew Needs

12 Calculation and Arrangement for Accomodation and Operational Needed


Calculation and Selection of the facilities and accessibility between rooms and
13 decks
Arrangement and Calculation for Fresh water tanks, sea water tanks, and
14 Ballast tanks Until
Location Selection for the Main Engine and Flooring arrangement in the Engine Minggu
15 Room
16 Room Arrangement for Main Engine and Rudder installation 7
17 Tanks Calculation and Arrangement
18 Drawing Arrangement of Top View from Deck, Double Bottom and Tanks
PROGRESS I : (Until Tank Capacity Plan & Cargo Capacity Plan) week 7
19 Calculation and Arrangement of Ship Anchor
20 Calculation and Arrangement of Ship Anchor Chain

21 Calculation and Arrangement of Deck Machineries Until


22 Calculation and Arrangement of room for deck machineries week
23 Calculation of Ships Displacement, DWT and LWT 9
24 Calculation for the Volume of the Cargo Holds

25 Calculation and Arrangement for Loading-Unloading Equipments and Hatch


26 Calculation and Arrangment for Tanker Loading-Unloading System
27 Calculation and Arrangement of the Ballast System

28 Arrangement of route, loading-unlading operation, endurance and fuel needed


29 Arrangement revision for fresh water tank and fuel oil tanks Until
30 Arrangement of Ladder and connection between ship decks week
31 Arrangement of rooms for ship operational and logistics 11
32 Arrangement of Ship Safety equipment
34 Arrangement of Watertight Door
35 Top View Arrangement
36 Side View Arrangement Until
37 Arrangement of Ship safety equipment (Colored Drawings) week
38 Arrangement of Ship Fire control equipment (Colored Drawings) 12
PROGRESS II : Until General Arrangement week 12
39 General Arrangement Report
40 Safety Plan & Fire Plan Report Until
Preparation of Standard & Rules Regulation based on Statutory and
week
41 Classification Society
42 Submission of Documents & Drawing of General Arrangement and Safety Plan 15
PROGRESS III : Until Safety & Fire Plan week 15
Supervisor Coordinator

Indra Ranu Kusuma, ST. M.Sc. Ede Mehta Wardhana., S.T, M.T
NIP. 197903272003121001 NIP. 1992201711048
DESAIN III: GENERAL ARRANGEMENT & SAFETY PLAN
(ME 141326) FORM 03
TASK FORM
Rev 2 Feb-17

SIGNED SIGNED
NOMOR ITEM CHECK
NO TARGET SUPERVISO COORDI
DOCUMENT / DRAWING DOCUMENT / DRAWING LIST
R NATOR
1 Doc. No. 01 - 42 13 101 005 - Estimation of the Ship Resistance & Engine Selection
RE
2 Doc. No. 02 – 42 13 101 005 - Calculation of Gross Tonnage, Amount of Crew, Fresh Week 4
GT Water, Fuel Oil and Lubricant

5 Doc. No. 05 – 42 13 101 005 - Calculation of Tank Capacity & Pay load
TC

3 Doc. No. 03 - 42 13 101 005 -


Calculation of the Machinery of Anchor, Windlas,
AM Rudder, Loading-Unloading , Week 6
and Weight of the Construction and Machineries
4 Doc. No. 04 - 42 13 101 005 - Loading-Unloading System based on the Cargo and
CH Hatch Cover
6 Dwg. No. 01 – 4213 101 005 – Drawing of Side View, Frame Spacing and Bulkhead
GA Week 7
7 Dwg no. 01 – 42 13 101 005 – Drawing of Top View of the Deck, Double Bottom and
GA Tanks
PROGRESS I : (Until Tank Capacity Plan & Cargo Capacity Plan)
8 Doc. No. 06 - 42 13 101 005 - Crew Explanation
CF
9 Doc. No. 07 – 42 13 101 005 - Room Arrangement
RP
10 Doc. No. 08 – 42 13 101 005 - Navigation Equipments & Lights Arrangement
NA Week 12
11 Doc. No. 09 – 42 13 101 005 - Calculation of Chain Locker Volume & Mud Box
CV
12 Dwg no. 01 - 42 13 101 005 – General Arrangement Drawing
GA
PROGRESS II : Until General Arrangement
13 Doc. No.10-4213 101 005-FP Arrangement of the Fire Control Plan
14 Doc. No.11-42 13 101 005-SP Arrangement of the Safety Plan

Week 15

15 Dwg no. 02 - 42 13 101 005 – Colored Drawing of Fire Control Plan & Safety Plan (All
FSP Reports & Drawings)
PROGRESS III : Until Safety & Fire Plan
Final Evaluation (Week 16)

* YY=Year Class ZZZ= Last 3 digit of your NRP

Student Supervisor Coordinator

Giovani Lintang D Indra Ranu Kusuma, ST. M.Sc. Ede Mehta Wardhana., S.T, M.T.
NRP. 04211745000030 NIP. 197903272003121001 NIP. 1992201711048

Вам также может понравиться