Вы находитесь на странице: 1из 9

CEB CONSTRUCTION PLC CEB CONSTRUCTION PLC

T D S Description T D

1.0 Pit Excavation


1 5.6
3.4
4.13
77.93 M3
2 8.2 Backfill
0.5 17.32
4.13
33.87 M3

cartaway surplus material


44.07 (excavatedmaterial-Backfill)M3
2. Concrete work
50mm C-5 lean concrete
1 5.8
3.4
19.72 M2
19.72 Total C-5 concrete
C- 25 Concrete
5.6 for the base slab (500mm thick)
1 3.6
0.5
10.08 M2

14.4 for shear wall


1 3.4
0.25
12.24 M3

Top slab
4.8
1 2.4
0.15
1.73 M3

24.05 M3 TOTAL CONCRETE

3. Formwork
2 5.6 a. To Base Slab
0.5 5.60 M2
2 3.2
0.5 3.20 M2
2 14.4 Side Shear walls
3.4 97.92 M2
2 12.6
3.4 85.68 M2
1 4.3 Top slab
1.9 8.17 M2
1 14.4 side to top slab
0.18 2.59 M2

203.16 M2 Total form work


Page-1
CEB CONSTRUCTION PLC
S Description
Take off sheet for Steel reinforcement
SUB STRUCTURE
No. Shape Location Diam. No. of No. of C/C Length
mems Items (mm)
Base Slab
1 10 29 2 3200
2 12 23 2 6400
Shear Wall
14 49 4 4080
14 25 4 4080
10 30 4 4800
10 30 4 2400
Top Slab
12 34 1 130 4100
12 16 1 130 6500
Sub Structure Total Length in (m)
Wt/metre (Kg/m)
Weight (Kg)
Page-2
forcement
Total L. Total length of each bar in m.
in m D.6 D.8 D.10 D.12 D.14 D.16 D.20

185.6 185.6
294.4 294.4

799.7 799.68
408.0 408
576.0 576
288.0 288

139.4 139.4
104.0 104

tal Length in (m) 0 0 1049.6 537.8 1207.68 0 0


Wt/metre (Kg/m) 0.222 0.395 0.617 0.888 1.21 1.57 2.47
0 0 647.6032 477.5664 1461.2928 0 0

2586.4624
Bill of Quantity for Septic Tank

1. Excavation & Earth work Unit Qty

1.1 Excavation for septic tank


m3 77.93

Backfill with non expansive granular excavated material and well


1.2 ram in layers not exceeding 20cm thick around fthe septic tank.
m3 33.87

1.3 Cartaway surplus excavated material at a distance not exceeding 5


km from the site m3 44.07

Total to carried summary

2. Concrete Work
Supply and pouring of 100mm thick lean concrete in concrete class

2.1 C-5 under all switchyard foundation with minimum cement content
of 180 kg/m3. m3 19.7

2.2 Rienforced concrete class C25 with minimum cement content of


360kg/m3 filled in to formwork & vibrated around steel
reinforcement for septic tank. m3 24.05

2.3
Supply and fix Zigba sawn or equivalent form work for concrete m2 203.16

2.4
Steel Reinforcement according to structural drawing, price includes
cutting, bending, placing in position and tying with wires.

diam. 10mm kg 647.60

diam. 12mm kg 477.57

diam. 14mm kg 1,461.29

Total to carried Summary

GRAND TOTAL
`
Rate Amount

110.00 8,572.64

395.00 13,377.07

101.00 4,450.78

26,400.49

137.00 2,701.64

137.00 3,294.58

290.00 58,916.98

0.00

36.00 23,313.72

36.00 17,192.39

36.00 52,606.54

158,025.84

184,426.33

Вам также может понравиться