Вы находитесь на странице: 1из 6

Cement

Cobbles

length width thickness Area Volume


75 1.4 4.6 1.4 483
cement
Excavation sand
75 2 1 150 gravel

Backfiling
75 0.47 1 0.47 5.28

Formwoks
75 2.28 342.0526
0.6 289.8
0.4 193.2

Class Class cement sand gravel


1,2,4 TOTAL AAA 1,1,2 14 0.4 0.79
8 2318.4 bags AA 1,1.5,2 13 0.55 0.73
0.45 130.41 cum 1,2,3 10 0.56 0.84
0.9 260.82 cum A 1,2,4 8 0.45 0.9
B 1,2.5,5 7 0.49 0.98
C 1,3,6 6 0.51 0.34
DUMADALIG, TANTANGAN, SOUTH COTABATO
Project : SLOPE PROTECTION GOING TO NUCLEUS
Location : SAN VICENTE, BANGA, SOUTH COTABATO
Subject : BILL OF MATERIALS AND ESTIMATE (Const drawings)
Date :
Duration :
UNIT COST
ITEM DESCRIPTION QTY UNITS Labor
+ Labor Only
Materi
I. CIVIL WORKS
A. SLOPE PROTECTION
1.0 Excavation 150 m3 100
2.0 Backfiling 5.28 m3 200
3.0 Cement 2318.4 bags 96
4.0 Sand 130.41 m3
200
5.0 Gravel 260.82 m3
480
6.0 Cobbles 193.2 m3 480
7.0 Formworks 342.0526 m2 136

TOTAL
SUPERVISION
PROJECT COST (LABOR AND POWER TOOLS)
0.4

TOTAL COST

15,000.00
1,056.51 500
222,566.40 240
26,082.00 500
125,193.60 1200
92,736.00 1200
46,519.16 340

PHP 529,153.67
DUMADALIG, TANTANGAN, SOUTH COTABATO
Project : SLOPE PROTECTION GOING TO NUCLEUS
Location : SAN VICENTE, BANGA, SOUTH COTABATO
Subject : BILL OF MATERIALS AND ESTIMATE (Const drawings)
Date :
Duration :
BUILDERS &
WORK FED
CONTRACTORS
UNIT TOTAL UNIT TOTAL
ITEM NO.DESCRIPTION QTY UOM MARK
COST COST COST COST
D

REMARKS