Вы находитесь на странице: 1из 25

Análisis de Cargas para Bodegas

Carga Muerta
Lámina KR-18 Cal 24 5.92 kg/m²
Colchoneta 3" Fibra Vidrio 1 kg/m²
Sobrecarga 10 kg/m²
Suma Techumbre 16.92 kg/m²

Carga Viva
Pendiente > 5%
Carga Viva Máxima 40 kg/m²
Carga Viva Instantanea 20 kg/m²
Análisis de Viento a Θ = 0 Grados Area Tri Ka
Pz = Pe - Pi 10 1
Pe = Cpe*Ka*Kl*Qz 25 0.9
Pi = Qz*Cpi 100 0.8
Qz = 150.7 kg/m²
Cpi (PA) = -0.3
Cpi (PC) = -0.2

PUERTA ABIERTA

Muro Barlovento (Muro C)


Eje Ka Kl Cpe Qz Pe Pi Pd Ancho Tributario (m) Area Tributaria (m²)
1 1 1 0.8 150.7 120.56 -45.21 165.77 2.5 12.5
2 1 1 0.8 150.7 120.56 -45.21 165.77 5 25
3 1 1 0.8 150.7 120.56 -45.21 165.77 5 25
4 1 1 0.8 150.7 120.56 -45.21 165.77 5 25
5 1 1 0.8 150.7 120.56 -45.21 165.77 5 25
6 1 1 0.8 150.7 120.56 -45.21 165.77 5 25
7 1 1 0.8 150.7 120.56 -45.21 165.77 5 25
8 1 1 0.8 150.7 120.56 -45.21 165.77 5 25
9 1 1 0.8 150.7 120.56 -45.21 165.77 5 25
10 1 1 0.8 150.7 120.56 -45.21 165.77 5 25
11 1 1 0.8 150.7 120.56 -45.21 165.77 2.5 12.5

Muro Sotavento (Muro D)


Eje Ka Kl Cpe Qz Pe Pi Pd Ancho Tributario (m) Area Tributaria (m²)
1 1 1 -0.5 150.7 -75.35 -45.21 -30.14 2.5 12.5
2 1 1 -0.5 150.7 -75.35 -45.21 -30.14 5 25
3 1 1 -0.5 150.7 -75.35 -45.21 -30.14 5 25
4 1 1 -0.5 150.7 -75.35 -45.21 -30.14 5 25
5 1 1 -0.5 150.7 -75.35 -45.21 -30.14 5 25
6 1 1 -0.5 150.7 -75.35 -45.21 -30.14 5 25
7 1 1 -0.5 150.7 -75.35 -45.21 -30.14 5 25
8 1 1 -0.5 150.7 -75.35 -45.21 -30.14 5 25
9 1 1 -0.5 150.7 -75.35 -45.21 -30.14 5 25
10 1 1 -0.5 150.7 -75.35 -45.21 -30.14 5 25
11 1 1 -0.5 150.7 -75.35 -45.21 -30.14 2.5 12.5

Muro Lateral (Muro A)


Eje Ka Kl Cpe Qz Pe Pi Pd Ancho Tributario (m) Area Tributaria (m²)
A 0.98 1 -0.65 150.7 -95.715096 -45.21 -50.50509567 2.5 13.43
B 0.91 1 -0.65 150.7 -89.028034 -45.21 -43.81803433 3.75 23.67
C 0.98 1 -0.51 150.7 -75.447955 -45.21 -30.237955 2.5 12.75
D 1.00 1 -0.5 150.7 -75.35 -45.21 -30.14 2.5 8.78
E 0.98 1 -0.44 150.7 -65.092353 -45.21 -19.88235333 2.5 12.75
F 0.91 1 -0.3 150.7 -41.089862 -45.21 4.120138 3.75 23.67
G 0.98 1 -0.28 150.7 -41.231118 -45.21 3.978881867 2.5 13.43

Muro Lateral (Muro B)


Eje Ka Kl Cpe Qz Pe Pi Pd Ancho Tributario (m) Area Tributaria (m²)
A 0.98 1 -0.65 150.7 -95.715096 -45.21 -50.50509567 2.5 13.43
B 0.91 1 -0.65 150.7 -89.028034 -45.21 -43.81803433 3.75 23.67
C 0.95 1 -0.51 150.7 -72.696474 -45.21 -27.4864744 2.5 18.12
D 0.94 1 -0.5 150.7 -70.562763 -45.21 -25.35276333 2.5 19.53
E 0.95 1 -0.44 150.7 -62.718527 -45.21 -17.50852693 2.5 18.12
F 0.91 1 -0.3 150.7 -41.089862 -45.21 4.120138 3.75 23.67
G 0.98 1 -0.28 150.7 -41.231118 -45.21 3.978881867 2.5 13.43

Techo
Distancia Horizontal Caso 1 Caso 2 Ka Kl Qz Pe 1 Pe 2 Pi
0 - ,5h 0 - 3,25 -0.9 -0.4 0.8 1 150.7 -108.5040 -48.2240 -45.21
,5h - h 3,25 - 6.5 -0.9 -0.4 0.8 1 150.7 -108.5040 -48.2240 -45.21
h - 2h 6,5 - 13 -0.5 0 0.8 1 150.7 -60.2800 0.0000 -45.21
2h - 3h 13 - 19.5 -0.3 0.1 0.8 1 150.7 -36.1680 12.0560 -45.21
> 3h >19.5 -0.2 0.2 0.8 1 150.7 -24.1120 24.1120 -45.21

PUERTA CERRADA
Cpi = -0.2
Muro Barlovento (Muro C)
Eje Ka Kl Cpe Qz Pe Pi Pd Ancho Tributario (m) Area Tributaria (m²)
1 1 1 0.8 150.7 120.56 -30.14 150.7 2.5 12.5
2 1 1 0.8 150.7 120.56 -30.14 150.7 5 25
3 1 1 0.8 150.7 120.56 -30.14 150.7 5 25
4 1 1 0.8 150.7 120.56 -30.14 150.7 5 25
5 1 1 0.8 150.7 120.56 -30.14 150.7 5 25
6 1 1 0.8 150.7 120.56 -30.14 150.7 5 25
7 1 1 0.8 150.7 120.56 -30.14 150.7 5 25
8 1 1 0.8 150.7 120.56 -30.14 150.7 5 25
9 1 1 0.8 150.7 120.56 -30.14 150.7 5 25
10 1 1 0.8 150.7 120.56 -30.14 150.7 5 25
11 1 1 0.8 150.7 120.56 -30.14 150.7 2.5 12.5

Muro Sotavento (Muro D)


Eje Ka Kl Cpe Qz Pe Pi Pd Ancho Tributario (m) Area Tributaria (m²)
1 1 1 -0.5 150.7 -75.35 -30.14 -45.21 2.5 12.5
2 1 1 -0.5 150.7 -75.35 -30.14 -45.21 5 25
3 1 1 -0.5 150.7 -75.35 -30.14 -45.21 5 25
4 1 1 -0.5 150.7 -75.35 -30.14 -45.21 5 25
5 1 1 -0.5 150.7 -75.35 -30.14 -45.21 5 25
6 1 1 -0.5 150.7 -75.35 -30.14 -45.21 5 25
7 1 1 -0.5 150.7 -75.35 -30.14 -45.21 5 25
8 1 1 -0.5 150.7 -75.35 -30.14 -45.21 5 25
9 1 1 -0.5 150.7 -75.35 -30.14 -45.21 5 25
10 1 1 -0.5 150.7 -75.35 -30.14 -45.21 5 25
11 1 1 -0.5 150.7 -75.35 -30.14 -45.21 2.5 12.5

Muro Lateral (Muro A)


Eje Ka Kl Cpe Qz Pe Pi Pd Ancho Tributario (m) Area Tributaria (m²)
A 0.98 1 -0.65 150.7 -95.72 -30.14 -65.58 2.5 13.43
B 0.91 1 -0.65 150.7 -89.03 -30.14 -58.89 3.75 23.67
C 0.95 1 -0.51 150.7 -72.70 -30.14 -42.56 2.5 18.12
D 0.94 1 -0.5 150.7 -70.56 -30.14 -40.42 2.5 19.53
E 0.95 1 -0.44 150.7 -62.72 -30.14 -32.58 2.5 18.12
F 0.91 1 -0.3 150.7 -41.09 -30.14 -10.95 3.75 23.67
G 0.98 1 -0.28 150.7 -41.23 -30.14 -11.09 2.5 13.43

Muro Lateral (Muro B)


Eje Ka Kl Cpe Qz Pe Pi Pd Ancho Tributario (m) Area Tributaria (m²)
A 0.98 1 -0.65 150.7 -95.72 -30.14 -65.58 2.5 13.43
B 0.91 1 -0.65 150.7 -89.03 -30.14 -58.89 3.75 23.67
C 0.95 1 -0.51 150.7 -72.70 -30.14 -42.56 2.5 18.12
D 0.94 1 -0.5 150.7 -70.56 -30.14 -40.42 2.5 19.53
E 0.95 1 -0.44 150.7 -62.72 -30.14 -32.58 2.5 18.12
F 0.91 1 -0.3 150.7 -41.09 -30.14 -10.95 3.75 23.67
G 0.98 1 -0.28 150.7 -41.23 -30.14 -11.09 2.5 13.43

Techo
Distancia Horizontal Caso 1 Caso 2 Ka Kl Qz Pe 1 Pe 2 Pi
0 - ,5h 0 - 3,25 -0.9 -0.4 0.8 1 150.7 -108.5040 -48.2240 -30.14
,5h - h 3,25 - 6.5 -0.9 -0.4 0.8 1 150.7 -108.5040 -48.2240 -30.14
h - 2h 6,5 - 13 -0.5 0 0.8 1 150.7 -60.2800 0.0000 -30.14
2h - 3h 13 - 19.5 -0.3 0.1 0.8 1 150.7 -36.1680 12.0560 -30.14
> 3h >19.5 -0.2 0.2 0.8 1 150.7 -24.1120 24.1120 -30.14
Fuerza (kg/m)
414.425
828.85
828.85
828.85
828.85
828.85
828.85
828.85
828.85
828.85
414.425

Fuerza (kg/m)
-75.35
-150.7
-150.7
-150.7
-150.7
-150.7
-150.7
-150.7
-150.7
-150.7
-75.35

Fuerza (kg/m) Distancia Cpe


-126.2627391667 0 - 6,5 -0.65
-164.31762875 6,5 - 13 -0.5
-75.5948875 13 - 19,5 -0.3
-75.35 > 19,5 -0.2
-49.7058833333
15.4505175
9.9472046667

Fuerza (kg/m)
-126.2627391667
-164.31762875
-68.716186 Distancia Cpe
-63.3819083333 0 - 6,5 -0.9
-43.7713173333 6,5 - 13 -0.5
15.4505175 13 - 19,5 -0.3
9.9472046667 > 19,5 -0.2

Pz 1 Pz 2
-63.2940 -3.0140
-63.2940 -3.0140
-15.0700 45.2100
9.0420 57.2660
21.0980 69.3220

PUERTA CERRADA
Cpi = 0
Muro Barlovento (Muro C)
Fuerza (kg/m) Eje Ka Kl Cpe Qz Pe Pi
376.75 1 1 1 0.8 -30.14 -24.112 0
753.5 2 1 1 0.8 -30.14 -24.112 0
753.5 3 1 1 0.8 -30.14 -24.112 0
753.5 4 1 1 0.8 -30.14 -24.112 0
753.5 5 1 1 0.8 -30.14 -24.112 0
753.5 6 1 1 0.8 -30.14 -24.112 0
753.5 7 1 1 0.8 -30.14 -24.112 0
753.5 8 1 1 0.8 -30.14 -24.112 0
753.5 9 1 1 0.8 -30.14 -24.112 0
753.5 10 1 1 0.8 -30.14 -24.112 0
376.75 11 1 1 0.8 -30.14 -24.112 0

Muro Sotavento (Muro D)


Fuerza (kg/m) Eje Ka Kl Cpe Qz Pe Pi
-113.025 1 1 1 -0.5 -30.14 15.07 0
-226.05 2 1 1 -0.5 -30.14 15.07 0
-226.05 3 1 1 -0.5 -30.14 15.07 0
-226.05 4 1 1 -0.5 -30.14 15.07 0
-226.05 5 1 1 -0.5 -30.14 15.07 0
-226.05 6 1 1 -0.5 -30.14 15.07 0
-226.05 7 1 1 -0.5 -30.14 15.07 0
-226.05 8 1 1 -0.5 -30.14 15.07 0
-226.05 9 1 1 -0.5 -30.14 15.07 0
-226.05 10 1 1 -0.5 -30.14 15.07 0
-113.025 11 1 1 -0.5 -30.14 15.07 0

Muro Lateral (Muro A)


Fuerza (kg/m) Eje Ka Kl Cpe Qz Pe Pi
-163.94 A 0.98 1 -0.65 150.7 -95.72 0
-220.83 B 0.91 1 -0.65 150.7 -89.03 0
-106.39 C 0.95 1 -0.51 150.7 -72.70 0
-101.06 D 0.94 1 -0.5 150.7 -70.56 0
-81.45 E 0.95 1 -0.44 150.7 -62.72 0
-41.06 F 0.91 1 -0.3 150.7 -41.09 0
-27.73 G 0.98 1 -0.28 150.7 -41.23 0

Fuerza (kg/m)
-163.94
-220.83
-106.39 Muro Lateral (Muro B)
-101.06 Eje Ka Kl Cpe Qz Pe Pi
-81.45 A 0.98 1 -0.65 150.7 -95.72 0
-41.06 B 0.91 1 -0.65 150.7 -89.03 0
-27.73 C 0.95 1 -0.51 150.7 -72.70 0
D 0.94 1 -0.5 150.7 -70.56 0
E 0.95 1 -0.44 150.7 -62.72 0
Pz 1 Pz 2 F 0.91 1 -0.3 150.7 -41.09 0
-78.3640 -18.0840 G 0.98 1 -0.28 150.7 -41.23 0
-78.3640 -18.0840
-30.1400 30.1400
-6.0280 42.1960
6.0280 54.2520

Techo
Distancia Horizontal Caso 1 Caso 2 Ka Kl Qz
0 - ,5h 0 - 3,25 -0.9 -0.4 0.8 1 150.7
,5h - h 3,25 - 6.5 -0.9 -0.4 0.8 1 150.7
h - 2h 6,5 - 13 -0.5 0 0.8 1 150.7
2h - 3h 13 - 19.5 -0.3 0.1 0.8 1 150.7
> 3h >19.5 -0.2 0.2 0.8 1 150.7
ERTA CERRADA

arlovento (Muro C)
Pd Ancho Tributario (m) Area Tributaria (m²) Fuerza (kg/m)
-24.112 2.5 12.5 -60.28
-24.112 5 25 -120.56
-24.112 5 25 -120.56
-24.112 5 25 -120.56
-24.112 5 25 -120.56
-24.112 5 25 -120.56
-24.112 5 25 -120.56
-24.112 5 25 -120.56
-24.112 5 25 -120.56
-24.112 5 25 -120.56
-24.112 2.5 12.5 -60.28

otavento (Muro D)
Pd Ancho Tributario (m) Area Tributaria (m²) Fuerza (kg/m)
15.07 2.5 12.5 37.675
15.07 5 25 75.35
15.07 5 25 75.35
15.07 5 25 75.35
15.07 5 25 75.35
15.07 5 25 75.35
15.07 5 25 75.35
15.07 5 25 75.35
15.07 5 25 75.35
15.07 5 25 75.35
15.07 2.5 12.5 37.675

Lateral (Muro A)
Pd Ancho Tributario (m) Area Tributaria (m²) Fuerza (kg/m)
-95.72 2.5 13.43 -239.29
-89.03 3.75 23.67 -333.86
-72.70 2.5 18.12 -181.74
-70.56 2.5 19.53 -176.41
-62.72 2.5 18.12 -156.80
-41.09 3.75 23.67 -154.09
-41.23 2.5 13.43 -103.08

Lateral (Muro B)
Pd Ancho Tributario (m) Area Tributaria (m²) Fuerza (kg/m)
-95.715096 2.5 13.43 -239.29
-89.028034 3.75 23.67 -333.86
-72.696474 2.5 18.12 -181.74
-70.562763 2.5 19.53 -176.41
-62.718527 2.5 18.12 -156.80
-41.089862 3.75 23.67 -154.09
-41.231118 2.5 13.43 -103.08

Techo
Pe 1 Pe 2 Pi Pz 1 Pz 2
-108.5040 -48.2240 0 -108.5040 -48.2240
-108.5040 -48.2240 0 -108.5040 -48.2240
-60.2800 0.0000 0 -60.2800 0.0000
-36.1680 12.0560 0 -36.1680 12.0560
-24.1120 24.1120 0 -24.1120 24.1120
Análisis de Viento a Θ = 0 Grados Area Tri Ka
Pz = Pe - Pi 10 1
Pe = Cpe*Ka*Kl*Qz 25 0.9
Pi = Qz*Cpi 100 0.8
Cpi Puerta Cerrada
Cpie Puerta Abierta Cpi (PA) = -0.3
Qz = 150.7 kg/m² Cpi (PC) = -0.2

PUERTA ABIERTA

Muro Barlovento (Muro A)


Eje Ka Kl Cpe Qz Pe Pi
A 1 1 0.8 150.7 120.56 -45.21
B 1 1 0.8 150.7 120.56 -45.21
C 1 1 0.8 150.7 120.56 -45.21
D 1 1 0.8 150.7 120.56 -45.21
E 1 1 0.8 150.7 120.56 -45.21
F 1 1 0.8 150.7 120.56 -45.21
G 1 1 0.8 150.7 120.56 -45.21

Muro Sotavento (Muro B)


Eje Ka Kl Cpe Qz Pe Pi
A 1 1 -0.3 150.7 -45.21 -45.21
B 1 1 -0.3 150.7 -45.21 -45.21
C 1 1 -0.3 150.7 -45.21 -45.21
D 1 1 -0.3 150.7 -45.21 -45.21
E 1 1 -0.3 150.7 -45.21 -45.21
F 1 1 -0.3 150.7 -45.21 -45.21
G 1 1 -0.3 150.7 -45.21 -45.21

Muro Lateral (Muro D)


Eje Ka Kl Cpe Qz Pe Pi
1 0.98 1 -0.65 150.7 -96.32 -45.21
2 0.90 1 -0.62 150.7 -84.09 -45.21
3 0.90 1 -0.5 150.7 -67.82 -45.21
4 0.90 1 -0.47 150.7 -63.75 -45.21
5 0.90 1 -0.24 150.7 -32.55 -45.21
6 0.90 1 -0.2 150.7 -27.13 -45.21
7 0.90 1 -0.2 150.7 -27.13 -45.21
8 0.90 1 -0.2 150.7 -27.13 -45.21
9 0.90 1 -0.2 150.7 -27.13 -45.21
10 0.90 1 -0.2 150.7 -27.13 -45.21
11 0.98 1 -0.2 150.7 -29.64 -45.21
Muro Lateral (Muro C)
Eje Ka Kl Cpe Qz Pe Pi
1 0.98 1 -0.65 150.7 -96.32 -45.21
2 0.90 1 -0.62 150.7 -84.09 -45.21
3 0.90 1 -0.5 150.7 -67.82 -45.21
4 0.90 1 -0.47 150.7 -63.75 -45.21
5 0.90 1 -0.24 150.7 -32.55 -45.21
6 0.90 1 -0.2 150.7 -27.13 -45.21
7 0.90 1 -0.2 150.7 -27.13 -45.21
8 0.90 1 -0.2 150.7 -27.13 -45.21
9 0.90 1 -0.2 150.7 -27.13 -45.21
10 0.90 1 -0.2 150.7 -27.13 -45.21
11 0.98 1 -0.2 150.7 -29.64 -45.21

Techo
Distancia Horizontal Caso 1 Caso 2 Ka Kl Qz
0 - ,5h 0 - 3,25 -0.9 -0.4 0.8 1 150.7
,5h - h 3,25 - 6.5 -0.9 -0.4 0.8 1 150.7
h - 2h 6,5 - 13 -0.5 0 0.8 1 150.7
2h - 3h 13 - 19.5 -0.3 0.1 0.8 1 150.7
> 3h >19.5 -0.2 0.2 0.8 1 150.7

PUERTA CERRADA
Cpi = -0.2
Muro Barlovento (Muro A)
Eje Ka Kl Cpe Qz Pe Pi
A 1 1 0.8 150.7 120.56 -30.14
B 1 1 0.8 150.7 120.56 -30.14
C 1 1 0.8 150.7 120.56 -30.14
D 1 1 0.8 150.7 120.56 -30.14
E 1 1 0.8 150.7 120.56 -30.14
F 1 1 0.8 150.7 120.56 -30.14
G 1 1 0.8 150.7 120.56 -30.14

Muro Sotavento (Muro B)


Eje Ka Kl Cpe Qz Pe Pi
A 1 1 -0.3 150.7 -45.21 -30.14
B 1 1 -0.3 150.7 -45.21 -30.14
C 1 1 -0.3 150.7 -45.21 -30.14
D 1 1 -0.3 150.7 -45.21 -30.14
E 1 1 -0.3 150.7 -45.21 -30.14
F 1 1 -0.3 150.7 -45.21 -30.14
G 1 1 -0.3 150.7 -45.21 -30.14

Muro Lateral (Muro D)


Eje Ka Kl Cpe Qz Pe Pi
1 0.98 1 -0.65 150.7 -96.32 -30.14
2 0.90 1 -0.62 150.7 -84.09 -30.14
3 0.90 1 -0.5 150.7 -67.82 -30.14
4 0.90 1 -0.47 150.7 -63.75 -30.14
5 0.90 1 -0.24 150.7 -32.55 -30.14
6 0.90 1 -0.2 150.7 -27.13 -30.14
7 0.90 1 -0.2 150.7 -27.13 -30.14
8 0.90 1 -0.2 150.7 -27.13 -30.14
9 0.90 1 -0.2 150.7 -27.13 -30.14
10 0.90 1 -0.2 150.7 -27.13 -30.14
11 0.98 1 -0.2 150.7 -29.64 -30.14

Muro Lateral (Muro C)


Eje Ka Kl Cpe Qz Pe Pi
1 0.98 1 -0.65 150.7 -96.32 -30.14
2 0.90 1 -0.62 150.7 -84.09 -30.14
3 0.90 1 -0.5 150.7 -67.82 -30.14
4 0.90 1 -0.47 150.7 -63.75 -30.14
5 0.90 1 -0.24 150.7 -32.55 -30.14
6 0.90 1 -0.2 150.7 -27.13 -30.14
7 0.90 1 -0.2 150.7 -27.13 -30.14
8 0.90 1 -0.2 150.7 -27.13 -30.14
9 0.90 1 -0.2 150.7 -27.13 -30.14
10 0.90 1 -0.2 150.7 -27.13 -30.14
11 0.98 1 -0.2 150.7 -29.64 -30.14

Techo
Distancia Horizontal Caso 1 Caso 2 Ka Kl Qz
0 - ,5h 0 - 3,25 -0.9 -0.4 0.8 1 150.7
,5h - h 3,25 - 6.5 -0.9 -0.4 0.8 1 150.7
h - 2h 6,5 - 13 -0.5 0 0.8 1 150.7
2h - 3h 13 - 19.5 -0.3 0.1 0.8 1 150.7
> 3h >19.5 -0.2 0.2 0.8 1 150.7
ERTA ABIERTA

arlovento (Muro A)
Pd Ancho Tributario (m) Area Tributaria (m²) Fuerza (kg/m)
165.77 2.5 13.43 414.425
165.77 3.75 23.67 621.6375
165.77 2.5 18.12 414.425
165.77 2.5 19.53 414.425
165.77 2.5 18.12 414.425
165.77 3.75 23.67 621.6375
165.77 2.5 13.43 414.425

otavento (Muro B)
Pd Ancho Tributario (m) Area Tributaria (m²) Fuerza (kg/m)
0 2.5 13.43 0
0 3.75 23.67 0
0 2.5 12.75 0
0 2.5 8.78 0
0 2.5 12.75 0
0 3.75 23.67 0
0 2.5 13.43 0

Lateral (Muro D)
Pd Ancho Tributario (m) Area Tributaria (m²) Fuerza (kg/m) Distancia
-51.11 2.5 12.5 -127.78 0 - 6,5
-38.88 5 25 -194.40 6,5 - 13
-22.61 5 25 -113.03 13 - 19,5
-18.54 5 25 -92.68 > 19,5
12.66 5 25 63.29
18.08 5 25 90.42
18.08 5 25 90.42
18.08 5 25 90.42
18.08 5 25 90.42
18.08 5 25 90.42
15.57 2.5 12.5 38.93
Lateral (Muro C)
Pd Ancho Tributario (m) Area Tributaria (m²) Fuerza (kg/m) Distancia
-51.11 2.5 12.5 -127.78 0 - 6,5
-38.88 5 25 -194.40 6,5 - 13
-22.61 5 25 -113.03 13 - 19,5
-18.54 5 25 -92.68 > 19,5
12.66 5 25 63.29
18.08 5 25 90.42
18.08 5 25 90.42
18.08 5 25 90.42
18.08 5 25 90.42
18.08 5 25 90.42
15.57 2.5 12.5 38.93

Techo
Pe 1 Pe 2 Pi Pz 1 Pz 2
-108.5040 -48.2240 -45.21 -63.2940 -3.0140
-108.5040 -48.2240 0 -108.5040 -48.2240
-60.2800 0.0000 0 -60.2800 0.0000
-36.1680 12.0560 0 -36.1680 12.0560
-24.1120 24.1120 0 -24.1120 24.1120

ERTA CERRADA

arlovento (Muro A)
Pd Ancho Tributario (m) Area Tributaria (m²) Fuerza (kg/m)
150.7 2.5 13.43 376.75
150.7 3.75 23.67 565.125
150.7 2.5 18.12 376.75
150.7 2.5 19.53 376.75
150.7 2.5 18.12 376.75
150.7 3.75 23.67 565.125
150.7 2.5 13.43 376.75

otavento (Muro B)
Pd Ancho Tributario (m) Area Tributaria (m²) Fuerza (kg/m)
-15.07 2.5 13.43 -37.675
-15.07 3.75 23.67 -56.5125
-15.07 2.5 18.12 -37.675
-15.07 2.5 19.53 -37.675
-15.07 2.5 18.12 -37.675
-15.07 3.75 23.67 -56.5125
-15.07 2.5 13.43 -37.675

Lateral (Muro D)
Pd Ancho Tributario (m) Area Tributaria (m²) Fuerza (kg/m) Distancia
-66.18 2.5 12.5 -165.46 0 - 6,5
-53.95 5 25 -269.75 6,5 - 13
-37.68 5 25 -188.38 13 - 19,5
-33.61 5 25 -168.03 > 19,5
-2.41 5 25 -12.06
3.01 5 25 15.07
3.01 5 25 15.07
3.01 5 25 15.07
3.01 5 25 15.07
3.01 5 25 15.07
0.50 2.5 12.5 1.26

Lateral (Muro C)
Pd Ancho Tributario (m) Area Tributaria (m²) Fuerza (kg/m) Distancia
-66.18 2.5 12.5 -165.46 0 - 6,5
-53.95 5 25 -269.75 6,5 - 13
-37.68 5 25 -188.38 13 - 19,5
-33.61 5 25 -168.03 > 19,5
-2.41 5 25 -12.06
3.01 5 25 15.07
3.01 5 25 15.07
3.01 5 25 15.07
3.01 5 25 15.07
3.01 5 25 15.07
0.50 2.5 12.5 1.26

Techo
Pe 1 Pe 2 Pi Pz 1 Pz 2
-108.5040 -48.2240 -30.14 -78.3640 -18.0840
-108.5040 -48.2240 -30.14 -78.3640 -18.0840
-60.2800 0.0000 -30.14 -30.1400 30.1400
-36.1680 12.0560 -30.14 -6.0280 42.1960
-24.1120 24.1120 -30.14 6.0280 54.2520
Cpe
-0.65
-0.5
-0.3
-0.2
Cpe
-0.9
-0.5
-0.3
-0.2

PUERTA CERRADA
Cpi =
Muro Barlovento (Muro A)
Eje Ka Kl Cpe Qz Pe
A 1 1 0.8 150.7 120.56
B 1 1 0.8 150.7 120.56
C 1 1 0.8 150.7 120.56
D 1 1 0.8 150.7 120.56
E 1 1 0.8 150.7 120.56
F 1 1 0.8 150.7 120.56
G 1 1 0.8 150.7 120.56

Muro Sotavento (Muro B)


Eje Ka Kl Cpe Qz Pe
A 1 1 -0.3 150.7 -45.21
B 1 1 -0.3 150.7 -45.21
C 1 1 -0.3 150.7 -45.21
D 1 1 -0.3 150.7 -45.21
E 1 1 -0.3 150.7 -45.21
F 1 1 -0.3 150.7 -45.21
G 1 1 -0.3 150.7 -45.21

Muro Lateral (Muro D)


Cpe Eje Ka Kl Cpe Qz Pe
-0.65 1 0.98 1 -0.65 150.7 -96.32
-0.5 2 0.90 1 -0.62 150.7 -84.09
-0.3 3 0.90 1 -0.5 150.7 -67.82
-0.2 4 0.90 1 -0.47 150.7 -63.75
5 0.90 1 -0.24 150.7 -32.55
6 0.90 1 -0.2 150.7 -27.13
7 0.90 1 -0.2 150.7 -27.13
8 0.90 1 -0.2 150.7 -27.13
9 0.90 1 -0.2 150.7 -27.13
10 0.90 1 -0.2 150.7 -27.13
11 0.98 1 -0.2 150.7 -29.64

Muro Lateral (Muro C)


Cpe Eje Ka Kl Cpe Qz Pe
-0.9 1 0.98 1 -0.65 150.7 -96.32
-0.5 2 0.90 1 -0.62 150.7 -84.09
-0.3 3 0.90 1 -0.5 150.7 -67.82
-0.2 4 0.90 1 -0.47 150.7 -63.75
5 0.90 1 -0.24 150.7 -32.55
6 0.90 1 -0.2 150.7 -27.13
7 0.90 1 -0.2 150.7 -27.13
8 0.90 1 -0.2 150.7 -27.13
9 0.90 1 -0.2 150.7 -27.13
10 0.90 1 -0.2 150.7 -27.13
11 0.98 1 -0.2 150.7 -29.64

Techo
Distancia Horizontal Caso 1 Caso 2 Ka Kl
0 - ,5h 0 - 3,25 -0.9 -0.4 0.8 1
,5h - h 3,25 - 6.5 -0.9 -0.4 0.8 1
h - 2h 6,5 - 13 -0.5 0 0.8 1
2h - 3h 13 - 19.5 -0.3 0.1 0.8 1
> 3h >19.5 -0.2 0.2 0.8 1
PUERTA CERRADA
0
Muro Barlovento (Muro A)
Pi Pd Ancho Tributario (m) Area Tributaria (m²) Fuerza (kg/m)
0 120.56 2.5 13.43 301.4
0 120.56 3.75 23.67 452.1
0 120.56 2.5 18.12 301.4
0 120.56 2.5 19.53 301.4
0 120.56 2.5 18.12 301.4
0 120.56 3.75 23.67 452.1
0 120.56 2.5 13.43 301.4

Muro Sotavento (Muro B)


Pi Pd Ancho Tributario (m) Area Tributaria (m²) Fuerza (kg/m)
0 -45.21 2.5 13.43 -113.025
0 -45.21 3.75 23.67 -169.5375
0 -45.21 2.5 18.12 -113.025
0 -45.21 2.5 19.53 -113.025
0 -45.21 2.5 18.12 -113.025
0 -45.21 3.75 23.67 -169.5375
0 -45.21 2.5 13.43 -113.025

Muro Lateral (Muro D)


Pi Pd Ancho Tributario (m) Area Tributaria (m²) Fuerza (kg/m)
0 -96.32 2.5 12.5 -240.81
0 -84.09 5 25 -420.45
0 -67.82 5 25 -339.08
0 -63.75 5 25 -318.73
0 -32.55 5 25 -162.76
0 -27.13 5 25 -135.63
0 -27.13 5 25 -135.63
0 -27.13 5 25 -135.63
0 -27.13 5 25 -135.63
0 -27.13 5 25 -135.63
0 -29.64 2.5 12.5 -74.09

Muro Lateral (Muro C)


Pi Pd Ancho Tributario (m) Area Tributaria (m²) Fuerza (kg/m)
0 -96.32 2.5 12.5 -240.81
0 -84.09 5 25 -420.45
0 -67.82 5 25 -339.08
0 -63.75 5 25 -318.73
0 -32.55 5 25 -162.76
0 -27.13 5 25 -135.63
0 -27.13 5 25 -135.63
0 -27.13 5 25 -135.63
0 -27.13 5 25 -135.63
0 -27.13 5 25 -135.63
0 -29.64 2.5 12.5 -74.09

Techo
Qz Pe 1 Pe 2 Pi Pz 1 Pz 2
150.7 -108.5040 -48.2240 0 -108.5040 -48.2240
150.7 -108.5040 -48.2240 0 -108.5040 -48.2240
150.7 -60.2800 0.0000 0 -60.2800 0.0000
150.7 -36.1680 12.0560 0 -36.1680 12.0560
150.7 -24.1120 24.1120 0 -24.1120 24.1120

Вам также может понравиться