Вы находитесь на странице: 1из 44

%

Estación La Tola C pista 0.9 80%


Código M-002 C cancha 0.2 0%
Tr (años) 10 coef 2.6 C terreno 0.25 20%
tc (min) 4
c ponderado 0.77

5 - 45 min 79.908 Tr tc^ -0.3142 ITR = 373.33 lts/ha


Duración
lluvias 45 - 1440 min 755.57 Tr tc^ -0.9093 ITR = 1547.01 lts/ha
Tabla 4. Cálculos Hidráulicos de la Red

ÁREA EQUIVALENTE DIS

CALLES O Área Parcial A Tiempo de Coef. de Intensidad q q dis


POZO No. Longitud (m)
PERFIL (Ha) Concent. (min) escurrim. C Parcial AxC Acumulada I/0.36 (L/s/Ha) (L/s) (L/s) f (mm)

A1 34.50 0.0268 4.00 0.58 0.016 0.016 373.331 5.803 7.253 110
Colector 1

Colector 1 32.43 0.00 6.37 0.00 0.000 0.000 322.514 24.240 30.300 200
pozo 1

A2 34.50 0.0274 4.00 0.51 0.014 0.014 373.331 5.217 6.521 110
Colector 1

A3 45.23 0.0480 4.00 0.38 0.018 0.018 373.331 6.805 8.506 110
Colector 1

A4 45.23 0.0452 4.00 0.38 0.017 0.017 373.331 6.416 8.020 110
Colector 1

pozo 1 34.50 0.0000 4.33 0.00 0.000 0.000 364.158 24.240 30.300 200
pozo 2

pozo 2 50.00 0.0000 7.458 0 0.000 0.000 306.962 53.178 66.473 250
pozo 3

A5 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 3
A6 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 3

A7 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 3

A8 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 3

A9 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 3

A10 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 3
295.15 66.93 50.00
CÁLCULOS HIDRÁULICOS DE LA RED

ÁREA EQUIVALENTE DIS

CALLES O Área Parcial A Tiempo de Coef. de Intensidad q q dis


POZO No. Longitud (m)
PERFIL (Ha) Concent. (min) escurrim. C Parcial AxC Acumulada I/0.36 (L/s/Ha) (L/s) (L/s) f (mm)

A11 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 3

A12 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 3

A13 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 3

A14 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 3

Colector 4 32.43 0.0000 6.44 0.00 0.000 0.000 321.475 25.593 31.992 200
Pozo 4

A15 34.50 0.0268 4.00 0.58 0.016 0.016 373.331 5.803 7.253 110
Colector 4

A16 34.50 0.0274 4.00 0.51 0.014 0.014 373.331 5.217 6.521 110
Colector 4

A 17 34.50 0.0366 4.00 0.38 0.014 0.014 373.331 5.191 6.488 110
Colector 4
A 18 10.73 0.0114 4.00 0.41 0.005 0.005 373.331 1.742 2.177 110
Colector 4

A 19 34.50 0.0366 4.00 0.32 0.012 0.012 373.331 4.371 5.464 110
Colector 4

A 20 10.73 0.0114 4.00 0.77 0.009 0.009 373.331 3.271 4.088 110
Colector 4

pozo 4 50.00 0.0000 7.46 0.00 0.000 0.000 306.962 54.532 68.165 250
pozo 5

A 21 34.50 0.034 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 5
284.42 32.43 50.00 1542.44 198.72
CÁLCULOS HIDRÁULICOS DE LA RED
191.65 69.00 771.22 99.36 100.00
ÁREA EQUIVALENTE DIS

CALLES O Área Parcial A Tiempo de Coef. de Intensidad q q dis


POZO No. Longitud (m)
PERFIL (Ha) Concent. (min) escurrim. C Parcial AxC Acumulada I/0.36 (L/s/Ha) (L/s) (L/s) f (mm)

A 22 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 5

A 23 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 5

A 24 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 5

A 25 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 5

A 26 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 5

A 27 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 5

A 28 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 5

A 29 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 5
A 30 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 5

Tramo Pozo 5 69.00 0.0000 5.75 0.00 0.000 0.000 333.019 215.452 269.315 400
Central Pozo 3

A 31 34.50 0.02740 4.00 0.58 0.016 0.016 373.331 5.933 7.416 110
Colector 6

Colector 6 32.43 0.00000 6.44 0.00 0.000 0.000 321.475 24.256 30.320 200
pozo 6

A 32 34.50 0.0268 4.00 0.51 0.014 0.014 373.331 5.102 6.378 110
Colector 6
CÁLCULOS HIDRÁULICOS DE LA RED

ÁREA EQUIVALENTE DIS

CALLES O Área Parcial A Tiempo de Coef. de Intensidad q q dis


POZO No. Longitud (m)
PERFIL (Ha) Concent. (min) escurrim. C Parcial AxC Acumulada I/0.36 (L/s/Ha) (L/s) (L/s) f (mm)

A 33 45.23 0.0452 4.00 0.38 0.017 0.017 373.331 6.416 8.020 110
Colector 6

A 34 45.23 0.0480 4.00 0.38 0.018 0.018 373.331 6.805 8.506 110
Colector 6

pozo 6 34.50 0.0000 4.33 0.00 0.000 0.000 364.158 24.256 30.320 200
pozo 7

pozo 7 50.00 0.0000 7.458 0.00 0.000 0.000 306.962 53.194 66.493 250
pozo 5

A 35 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 8

A 36 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 8

A 37 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 8

A 38 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 8
A 39 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 8

A 40 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 8

A 41 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 8

A 42 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 8

A 43 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 8
CÁLCULOS HIDRÁULICOS DE LA RED

ÁREA EQUIVALENTE DIS

CALLES O Área Parcial A Tiempo de Coef. de Intensidad q q dis


POZO No. Longitud (m)
PERFIL (Ha) Concent. (min) escurrim. C Parcial AxC Acumulada I/0.36 (L/s/Ha) (L/s) (L/s) f (mm)

A 44 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 8

Colector 9 32.43 0.0000 6.44 0.00 0.000 0.000 321.475 25.609 32.011 200
Pozo 8

A45 34.50 0.0274 4.00 0.58 0.016 0.016 373.331 5.933 7.416 110
Colector 9

A46 34.50 0.0268 4.00 0.51 0.014 0.014 373.331 5.102 6.378 110
Colector 9

A 47 34.50 0.0366 4.00 0.38 0.014 0.014 373.331 5.191 6.488 110
Colector 9

A 48 10.73 0.0114 4.00 0.41 0.005 0.005 373.331 1.742 2.177 110
Colector 9

A 49 34.50 0.0366 4.00 0.32 0.012 0.012 373.331 4.371 5.464 110
Colector 9

A 50 10.73 0.0114 4.00 0.77 0.009 0.009 373.331 3.271 4.088 110
Colector 9
Pozo 8 50.00 0.0000 7.46 0.00 0.000 0.000 306.962 54.547 68.184 250
Pozo 3

A 51 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 10

A 52 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 10

A 53 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 10

A 54 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 10
CÁLCULOS HIDRÁULICOS DE LA RED

ÁREA EQUIVALENTE DIS

CALLES O Área Parcial A Tiempo de Coef. de Intensidad q q dis


POZO No. Longitud (m)
PERFIL (Ha) Concent. (min) escurrim. C Parcial AxC Acumulada I/0.36 (L/s/Ha) (L/s) (L/s) f (mm)

A 55 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 10

A 56 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 10

A 57 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 10

A 58 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 10

A 59 34.50 0.0345 4.00 0.21 0.007 0.007 373.331 2.704 3.380 110
Colector 10

A 60 10.73 0.0107 4.00 0.77 0.008 0.008 373.331 3.083 3.854 110
Colector 10

Tramo Pozo 3 26.28 0.0000 4.00 0.00 0.000 0.000 373.331 215.452 269.315 400
Final Pozo 9
2469.50
I/0,36 577.113
Hidráulicos de la Red
1 de 6
DISEÑO DE LA TUBERÍA COTAS
Long Inter
LLENA OBSERVACIO
Tiempo de flujo H (m) Salto (m) Corte
I (°/oo) Rasante Proyecto NES
V (m/s) Q (L/s) L/60V (min) Cota inter

20 1.090 8.45 0.528 0.690 2469.50 2469.09 0.41 0.00


2469.50 2468.40 1.10 2468.40

20 1.640 42.44 0.330 0.649 2469.50 2468.40 1.10


2469.50 2467.75 1.75

20 1.090 8.45 0.528 0.690 -0.01 2469.50 2469.09 0.41 7.75


2469.50 2468.40 1.10 2468.25

20 1.120 8.66 0.673 0.905 -0.04 2469.50 2469.09 0.41 16.99


2469.50 2468.19 1.31 2468.06

20 1.170 9.06 0.644 0.905 0.16 2469.50 2469.09 0.41 27.29


2469.50 2468.19 1.31 2467.85

20 1.640 42.44 0.351 0.690 2469.50 2467.75 1.75


2469.50 2467.06 2.44

20 1.9 77.11 0.439 1.000 1.08 2469.50 2467.06 2.44 69.00


2469.50 2466.06 3.44 2464.61

20 1.090 8.45 0.164 0.215 1.69 2469.50 2469.09 0.41 5.00


2469.50 2468.88 0.62 2466.96
20 1.090 8.45 0.528 0.690 1.22 2469.50 2469.09 0.41 5.00
2469.50 2468.40 1.10 2466.96

20 1.090 8.45 0.164 0.215 1.89 2469.50 2469.09 0.41 15.00


2469.50 2468.88 0.62 2466.76

20 1.090 8.45 0.528 0.690 1.42 2469.50 2469.09 0.41 15.00


2469.50 2468.40 1.10 2466.76

20 1.090 8.45 0.164 0.215 2.09 2469.50 2469.09 0.41 25.00


2469.50 2468.88 0.62 2466.56

20 1.090 8.45 0.528 0.690 1.62 2469.50 2469.09 0.41 25.00


2469.50 2468.40 1.10 2466.56
ÁULICOS DE LA RED
2 de 6
DISEÑO DE LA TUBERÍA COTAS
Long Inter
LLENA OBSERVACIO
Tiempo de flujo H (m) Salto (m) Corte
I (°/oo) Rasante Proyecto NES
V (m/s) Q (L/s) L/60V (min) Cota inter

20 1.090 8.45 0.164 0.215 2.29 2469.50 2469.09 0.41 35.00


2469.50 2468.88 0.62 2466.36

20 1.090 8.45 0.528 0.690 1.82 2469.50 2469.09 0.41 35.00


2469.50 2468.40 1.10 2466.36

20 1.090 8.45 0.164 0.215 2.49 2469.50 2469.09 0.41 45.00


2469.50 2468.88 0.62 2466.16

20 1.090 8.45 0.528 0.690 2.02 2469.50 2469.09 0.41 45.00


2469.50 2468.40 1.10 2466.16

20 1.640 42.44 0.330 0.649 2469.50 2468.40 1.10


2469.50 2467.75 1.75

20 1.090 8.45 0.528 0.690 2469.50 2469.09 0.41 0.00


2469.50 2468.40 1.10 2468.40

20 1.090 8.45 0.528 0.690 -0.01 2469.50 2469.09 0.41 7.88


2469.50 2468.40 1.10 2468.24

20 1.090 8.45 0.528 0.690 0.17 2469.50 2469.09 0.41 17.13


2469.50 2468.40 1.10 2468.06
20 1.090 8.45 0.164 0.215 0.65 2469.50 2469.09 0.41 17.13
2469.50 2468.88 0.62 2468.06

20 1.090 8.45 0.528 0.690 0.38 2469.50 2469.09 0.41 27.43


2469.50 2468.40 1.10 2467.85

20 1.090 8.45 0.164 0.215 0.85 2469.50 2469.09 0.41 27.43


2469.50 2468.88 0.62 2467.85

20 1.9 77.11 0.439 1.000 2469.50 2467.75 1.75


2469.50 2466.75 2.75

20 1.090 8.45 0.528 0.690 0.53 2469.50 2469.09 0.41 5.00


2469.50 2468.40 1.10 2467.65
ÁULICOS DE LA RED
3 de 6
DISEÑO DE LA TUBERÍA COTAS
Long Inter
LLENA OBSERVACIO
Tiempo de flujo H (m) Salto (m) Corte
I (°/oo) Rasante Proyecto NES
V (m/s) Q (L/s) L/60V (min) Cota inter

20 1.090 8.45 0.164 0.215 1.00 2469.50 2469.09 0.41 5.00


2469.50 2468.88 0.62 2467.65

20 1.090 8.45 0.528 0.690 0.73 2469.50 2469.09 0.41 15.00


2469.50 2468.40 1.10 2467.45

20 1.090 8.45 0.164 0.215 1.20 2469.50 2469.09 0.41 15.00


2469.50 2468.88 0.62 2467.45

20 1.090 8.45 0.528 0.690 0.93 2469.50 2469.09 0.41 25.00


2469.50 2468.40 1.10 2467.25

20 1.090 8.45 0.164 0.215 1.40 2469.50 2469.09 0.41 25.00


2469.50 2468.88 0.62 2467.25

20 1.090 8.45 0.528 0.690 1.13 2469.50 2469.09 0.41 35.00


2469.50 2468.40 1.10 2467.05

20 1.090 8.45 0.164 0.215 1.60 2469.50 2469.09 0.41 35.00


2469.50 2468.88 0.62 2467.05

20 1.090 8.45 0.528 0.690 1.33 2469.50 2469.09 0.41 45.00


2469.50 2468.40 1.10 2466.85
20 1.090 8.45 0.164 0.215 1.80 2469.50 2469.09 0.41 45.00
2469.50 2468.88 0.62 2466.85

21 2.660 273.91 0.432 1.449 2469.50 2466.06 3.44


2469.50 2464.61 4.89

20 1.090 8.45 0.528 0.690 2469.50 2469.09 0.41 0.00


2469.50 2468.40 1.10 2468.40

20 1.640 42.44 0.330 0.649 2469.50 2468.40 1.10


2469.50 2467.75 1.75

20 1.090 8.45 0.528 0.690 -0.01 2469.50 2469.09 0.41 7.75


2469.50 2468.40 1.10 2468.25
ÁULICOS DE LA RED
4 de 6
DISEÑO DE LA TUBERÍA COTAS
Long Inter
LLENA OBSERVACIO
Tiempo de flujo H (m) Salto (m) Corte
I (°/oo) Rasante Proyecto NES
V (m/s) Q (L/s) L/60V (min) Cota inter

20 1.090 8.45 0.692 0.905 0.16 2469.50 2469.09 0.41 16.99


2469.50 2468.19 1.31 2468.06

20 1.090 8.45 0.692 0.905 0.25 2469.50 2469.09 0.41 27.29


2469.50 2468.19 1.31 2467.85

20 1.640 42.44 0.351 0.690 2469.50 2467.75 1.75


2469.50 2467.06 2.44

20 1.9 77.11 0.439 1.000 2469.50 2467.06 2.44


2469.50 2466.06 3.44

20 1.090 8.45 0.164 0.215 1.69 2469.50 2469.09 0.41 5.00


2469.50 2468.88 0.62 2466.96

20 1.090 8.45 0.528 0.690 1.22 2469.50 2469.09 0.41 5.00


2469.50 2468.40 1.10 2466.96

20 1.090 8.45 0.164 0.215 1.89 2469.50 2469.09 0.41 15.00


2469.50 2468.88 0.62 2466.76

20 1.090 8.45 0.528 0.690 1.42 2469.50 2469.09 0.41 15.00


2469.50 2468.40 1.10 2466.76
20 1.090 8.45 0.164 0.215 2.09 2469.50 2469.09 0.41 25.00
2469.50 2468.88 0.62 2466.56

20 1.090 8.45 0.528 0.690 1.62 2469.50 2469.09 0.41 25.00


2469.50 2468.40 1.10 2466.56

20 1.090 8.45 0.164 0.215 2.29 2469.50 2469.09 0.41 35.00


2469.50 2468.88 0.62 2466.36

20 1.090 8.45 0.528 0.690 1.82 2469.50 2469.09 0.41 35.00


2469.50 2468.40 1.10 2466.36

20 1.090 8.45 0.164 0.215 2.49 2469.50 2469.09 0.41 45.00


2469.50 2468.88 0.62 2466.16
ÁULICOS DE LA RED
5 de 6
DISEÑO DE LA TUBERÍA COTAS
Long Inter
LLENA OBSERVACIO
Tiempo de flujo H (m) Salto (m) Corte
I (°/oo) Rasante Proyecto NES
V (m/s) Q (L/s) L/60V (min) Cota inter

20 1.090 8.45 0.528 0.690 2.02 2469.50 2469.09 0.41 45.00


2469.50 2468.40 1.10 2466.16

20 1.640 42.44 0.330 0.649 2469.50 2468.40 1.10


2469.50 2467.75 1.75

20 1.090 8.45 0.528 0.690 2469.50 2469.09 0.41


2469.50 2468.40 1.10

20 1.090 8.45 0.528 0.690 -0.01 2469.50 2469.09 0.41 7.88


2469.50 2468.40 1.10 2468.24

20 1.090 8.45 0.528 0.690 0.17 2469.50 2469.09 0.41 17.13


2469.50 2468.40 1.10 2468.06

20 1.090 8.45 0.164 0.215 0.65 2469.50 2469.09 0.41 17.13


2469.50 2468.88 0.62 2468.06

20 1.090 8.45 0.528 0.690 0.38 2469.50 2469.09 0.41 27.43


2469.50 2468.40 1.10 2467.85

20 1.090 8.45 0.164 0.215 0.85 2469.50 2469.09 0.41 27.43


2469.50 2468.88 0.62 2467.85
20 1.9 77.11 0.439 1.000 1.77 2469.50 2467.75 1.75 69.00
2469.50 2466.75 2.75 2464.61

20 1.090 8.45 0.528 0.690 0.53 2469.50 2469.09 0.41 5.00


2469.50 2468.40 1.10 2467.65

20 1.090 8.45 0.164 0.215 1.00 2469.50 2469.09 0.41 5.00


2469.50 2468.88 0.62 2467.65

20 1.090 8.45 0.528 0.690 0.73 2469.50 2469.09 0.41 15.00


2469.50 2468.40 1.10 2467.45

20 1.090 8.45 0.164 0.215 1.20 2469.50 2469.09 0.41 15.00


2469.50 2468.88 0.62 2467.45
ÁULICOS DE LA RED
6 de 6
DISEÑO DE LA TUBERÍA COTAS
Long Inter
LLENA OBSERVACIO
Tiempo de flujo H (m) Salto (m) Corte
I (°/oo) Rasante Proyecto NES
V (m/s) Q (L/s) L/60V (min) Cota inter

20 1.090 8.45 0.528 0.690 0.93 2469.50 2469.09 0.41 25.00


2469.50 2468.40 1.10 2467.25

20 1.090 8.45 0.164 0.215 1.40 2469.50 2469.09 0.41 25.00


2469.50 2468.88 0.62 2467.25

20 1.090 8.45 0.528 0.690 1.13 2469.50 2469.09 0.41 35.00


2469.50 2468.40 1.10 2467.05

20 1.090 8.45 0.164 0.215 1.60 2469.50 2469.09 0.41 35.00


2469.50 2468.88 0.62 2467.05

20 1.090 8.45 0.528 0.690 1.33 2469.50 2469.09 0.41 45.00


2469.50 2468.40 1.10 2466.85

20 1.090 8.45 0.164 0.215 1.80 2469.50 2469.09 0.41 45.00


2469.50 2468.88 0.62 2466.85

21 2.660 273.91 0.165 0.552 2469.50 2464.61 4.89


2469.50 2464.06 5.44
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
14.145 0.2 2.829
0 0
0 0
35.673 0.3 10.7019
0 0
0 0
14.145 0.2 2.829
0 0
0 0
18.5443 0.2 3.70886
0 0
0 0
18.5443 0.2 3.70886
0 0
0 0
60.3267 0.3 18.09801
0 0
0 0
121.93 0.3 36.579
0 0
0 0
4.3993 0.2 0.87986
0 0
0 0
14.145 0.2 2.829
0 0
0 0
4.3993 0.2 0.87986
0 0
0 0
14.145 0.2 2.829
0 0
0 0
4.3993 0.2 0.87986
0 0
0 0
14.145 0.2 2.829
0 0
0 0
0 0
0 0
0
0 0
0 0
0 0
0 0
4.3993 0.2 0.87986
0 0
0 0
14.145 0.2 2.829
0 0
0 0
4.3993 0.2 0.87986
0 0
0 0
14.145 0.2 2.829
0 0
0 0
35.673 0.3 10.7019
0 0
0 0
14.145 0.2 2.829
0 0
0 0
14.145 0.2 2.829
0 0
0 0
14.145 0.2 2.829
0 0
0 0
4.3993 0.2 0.87986
0 0
0 0
14.145 0.2 2.829
0 0
0 0
4.3993 0.2 0.87986
0 0
0 0
87.43 0.3 26.229
0 0
0 0
14.145 0.2 2.829
0 0
0 0
0 0
0 0
0
0 0
0 0
0 0
0 0
4.3993 0.2 0.87986
0 0
0 0
14.145 0.2 2.829
0 0
0 0
4.3993 0.2 0.87986
0 0
0 0
14.145 0.2 2.829
0 0
0 0
4.3993 0.2 0.87986
0 0
0 0
14.145 0.2 2.829
0 0
0 0
4.3993 0.2 0.87986
0 0
0 0
14.145 0.2 2.829
0 0
0 0
4.3993 0.2 0.87986
0 0
0 0
237.2634 0.5 118.6317
0 284.18155
0 568.3631
14.145 397.85417
0 14950-6899=8051
0
35.673
0
0
14.145
0
0
0
0

0
0
0
0
18.5443
0
0
18.5443
0
0
60.3267
0
0
121.93
0
0
4.3993
0
0
14.145
0
0
4.3993
0
0
14.145
0
0
4.3993
0
0
14.145
0
0
4.3993
0
0
14.145
0
0
4.3993
0
0
0
0

0
0
0
0
14.145
0
0
35.673
0
0
14.145
0
0
14.145
0
0
14.145
0
0
4.3993
0
0
14.145
0
0
4.3993
0
0
87.43
0
0
14.145
0
0
4.3993
0
0
14.145
0
0
4.3993
0
0
0
0

0
0
0
0
14.145
0
0
4.3993
0
0
14.145
0
0
4.3993
0
0
14.145
0
0
4.3993
0
0
128.446128
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1680.17533
ITEM DESCRIPCIÓN UNIDAD CANTIDADCOSTO DIRECTOCOSTO TOTAL
1 SISTEMA DE DRENAJE
Excavaciones a Mano Varias
1.1 sin clasificar a una M3 570 18.95 10803.68
profundidad ≤ 2M en seco
1.2 Subdrenes (totales) Ml 1 53941.79 53941.79
1.3 Colectores (totales) Ml 1 393.37 393.37
Construcción de cajas de
empalme en concreto
1.4 Un 10 1001.82 10018.23
reforzado. Dimensión 50 x
50 cm.; Incluye Tapa.

TOTAL COSTO DIRECTO 75157.07


IMPREVISTOS 5% 3757.85
COSTO TOTAL DE LA OBRA 78914.92
ANALISIS DE PRECIOS UNITARIOS
CODIGO:
RUBRO: Construcción de cajas de empalme en concreto reforzado. DUNIDAD: m2
DETALLE:
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 1.00 0.30 0.30 1.42 0.43

SUBTOTAL M 0.43
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
A B C=A*B R D=C*R
PEON 3.00 3.18 9.54 1.42 13.58
MAESTRO DE OBRA 1.00 3.57 3.57 1.42 5.07

SUBTOTAL M 18.65
MATERIAL
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
A B C=A*B
Concreto de f'c 210 m3 5.00 95.00 475.00
Mortero 1:3 m3 4.00 12.25 49.00
Acero de refuerzo kg 15.00 12.25 183.75
Cemento gris kg 10.00 7.50 75.00
Platina 3/16" ml 40.00 5.00 200.00
SUBTOTAL M 982.75
TRANSPORTE
DESCRIPCION UNIDAD DISTANCIA CANTIDAD TARIFA COSTO
A B C D=A*B*C
0.00 0.00

SUBTOTAL M 0.00

TOTAL COSTO DIRECTO 1001.82


INDIRECTOS Y UTILIDADES 200.36
OTROS INDIRECTOS
COSTO TOTAL DE RUBRO 1202.19
VALOR OFERTADO 1202.19
ANALISIS DE PRECIOS UNITARIOS
CODIGO:
RUBRO: Subdrenes (totales) UNIDAD: ml
DETALLE:
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 1.00 0.30 0.30 1.42 0.43

SUBTOTAL M 0.43
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
A B C=A*B R D=C*R
PEON 4.00 3.18 12.72 1.42 18.10
MAESTRO DE OBRA 1.00 3.57 3.57 1.42 5.07

SUBTOTAL M 23.17
MATERIAL
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
A B C=A*B
Material filtrante tam. Max. 1/2" m3 400.00 5.00 2000.00
Geotextil no tejido 1800 m2 4000.00 12.25 49000.00
Tuberia perf. diam. 110mm para filtros ml 1543.00 1.33 2052.19
Tuberia perf. diam. 200mm para filtros ml 200.00 2.00 400.00
Tuberia per. diam. 250mm para filtros ml 200.00 2.33 466.00
SUBTOTAL M 53918.19
TRANSPORTE
DESCRIPCION UNIDAD DISTANCIA CANTIDAD TARIFA COSTO
A B C D=A*B*C
0.00 0.00

SUBTOTAL M 0.00

TOTAL COSTO DIRECTO 53941.79


INDIRECTOS Y UTILIDADES 10788.36
OTROS INDIRECTOS
COSTO TOTAL DE RUBRO 64730.15
VALOR OFERTADO 64730.15
ANALISIS DE PRECIOS UNITARIOS
CODIGO:
RUBRO: Colectores (totales) UNIDAD: ml
DETALLE:
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 1.00 0.30 0.30 1.42 0.43

SUBTOTAL M 0.43
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
A B C=A*B R D=C*R
PEON 4.00 3.18 12.72 1.42 18.10
MAESTRO DE OBRA 1.00 3.57 3.57 1.42 5.07

SUBTOTAL M 23.17
MATERIAL
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
A B C=A*B
Material granular (colchon) m3 56.00 2.50 140.00
Tuberia perf. diam. ml 69.00 3.33 229.77
400mm para filtros

SUBTOTAL M 369.77
TRANSPORTE
DESCRIPCION UNIDAD DISTANCIA CANTIDAD TARIFA COSTO
A B C D=A*B*C
0.00 0.00

SUBTOTAL M 0.00

TOTAL COSTO DIRECTO 393.37


INDIRECTOS Y UTILIDADES 78.67
OTROS INDIRECTOS
COSTO TOTAL DE RUBRO 472.04
VALOR OFERTADO 472.04
CODIGO:
RUBRO: Excavaciones a Mano Varias sin clasificar a una profundida UNIDAD: m3
DETALLE:
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 2.00 0.30 0.60 1.42 0.85

SUBTOTAL M 0.85
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTO
A B C=A*B R D=C*R
PEON 4.00 3.18 12.72 1.42 18.10

SUBTOTAL M 18.10
MATERIAL
DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO
A B C=A*B
0.00 0.00 0.00

SUBTOTAL M 0.00
TRANSPORTE
DESCRIPCION UNIDAD DISTANCIA CANTIDAD TARIFA COSTO
A B C D=A*B*C
0.00 0.00

SUBTOTAL M 0.00

TOTAL COSTO DIRECTO 18.95


INDIRECTOS Y UTILIDADES 3.79
OTROS INDIRECTOS
COSTO TOTAL DE RUBRO 22.74
VALOR OFERTADO 22.74