Sungai Cimahi Hulu Pengukuran Maret-April

Baku Daya
Eksisting
No Parameter Mutu BPM (kg/hari) BPA (kg/hari) Tampung
(mg/L)
(mg/L) Eksisting
1 TSS 50 69 0.653935185 0.902430556 -0.24849537
2 DO 4 6.11 0.052314815 0.07991088 -0.027596065
3 BOD 3 5.78 0.039236111 0.075594907 -0.036358796
4 COD 25 49.7 0.326967593 0.650011574 -0.323043981
5 NH3 0 0.002 0 2.61574E-05 -2.61574E-05
6 T-P 0.2 0 0.002615741 0 0.002615741

Sungai Cimahi Tengah Pengukuran Maret-April


Baku Daya
Eksisting
No Parameter Mutu BPM (kg/hari) BPA (kg/hari) Tampung
(mg/L)
(mg/L) Eksisting
1 TSS 50 41 0.700231481 0.574189815 0.126041667
2 DO 4 5.26 0.056018519 0.073664352 -0.017645833
3 BOD 3 2.6 0.042013889 0.036412037 0.005601852
4 COD 25 80.1 0.350115741 1.121770833 -0.771655093
5 NH3 0 0.002 0 2.80093E-05 -2.80093E-05
6 T-P 0.2 0 0.002800926 0 0.002800926

Sungai Cimahi Hilir Pengukuran Maret-April


Baku Daya
Eksisting
No Parameter Mutu BPM (kg/hari) BPA (kg/hari) Tampung
(mg/L)
(mg/L) Eksisting
1 TSS 50 179 0.68287037 2.444675926 -1.761805556
2 DO 4 5.12 0.05462963 0.069925926 -0.015296296
3 BOD 3 15.7 0.040972222 0.214421296 -0.173449074
4 COD 25 111 0.341435185 1.515972222 -1.174537037
5 NH3 0 0.02 0 0.000273148 -0.000273148
6 T-P 0.2 0.246 0.002731481 0.003359722 -0.000628241

Sungai Cimahi Hulu Pengukuran November


Baku Daya
Eksisting
No Parameter Mutu BPM (kg/hari) BPA (kg/hari) Tampung
(mg/L)
(mg/L) Eksisting
1 TSS 50 93 0.653935185 1.216319444 -0.562384259
2 DO 4 7 0.052314815 0.091550926 -0.039236111
3 BOD 3 12.8 0.039236111 0.167407407 -0.128171296
4 COD 25 26 0.326967593 0.340046296 -0.013078704
5 NH3 0 0.002 0 2.61574E-05 -2.61574E-05
6 T-P 0.2 0 0.002615741 0 0.002615741

Sungai Cimahi Tengah Pengukuran November


Baku Daya
Eksisting
No Parameter Mutu BPM (kg/hari) BPA (kg/hari) Tampung
(mg/L)
(mg/L) Eksisting
1 TSS 50 50 0.700231481 0.700231481 0
2 DO 4 2 0.056018519 0.028009259 0.028009259
3 BOD 3 2.4 0.042013889 0.033611111 0.008402778
4 COD 25 31 0.350115741 0.434143519 -0.084027778
5 NH3 0 0.001 0 1.40046E-05 -1.40046E-05
6 T-P 0.2 0 0.002800926 0 0.002800926

Sungai Cimahi Hilir Pengukuran November


Baku Daya
Eksisting
No Parameter Mutu BPM (kg/hari) BPA (kg/hari) Tampung
(mg/L)
(mg/L) Eksisting
1 TSS 50 144 0.700231481 2.016666667 -1.316435185
2 DO 4 5 0.056018519 0.070023148 -0.01400463
3 BOD 3 11 0.042013889 0.154050926 -0.112037037
4 COD 25 30 0.350115741 0.420138889 -0.070023148
5 NH3 0 0.013 0 0.00018206 -0.00018206
6 T-P 0.2 0.01 0.002800926 0.000140046 0.00266088

m3/detik
debit maks hulu 1.13
tengah 1.21
hilir 1.18

Contoh:
50 𝑚𝑔 1,18 𝑚3 1.000 𝐿 𝑚𝑔 86.400 𝑑𝑒𝑡𝑖𝑘
BPM TSS = 𝑥 𝑥 𝑥 𝑥 = 0.700231481kg/hari
𝐿 𝑑𝑒𝑡𝑖𝑘 𝑚3 106 𝑘𝑔 ℎ𝑎𝑟𝑖

144 𝑚𝑔 1,18 𝑚3 1.000 𝐿 𝑚𝑔 86.400 𝑑𝑒𝑡𝑖𝑘


BPA TSS = 𝑥 𝑥 𝑥 𝑥 = 2.016666667 kg/hari
𝐿 𝑑𝑒𝑡𝑖𝑘 𝑚3 106 𝑘𝑔 ℎ𝑎𝑟𝑖

Daya Tampung Eksisting = BPM – BPA

= 0.700231481kg/hari - 2.016666667 kg/hari = -1.316435185 kg/hari