Load Calculation
FGL 20.7
Length of Tank = 30 m
Height of water = 5m
Grade of Concrete M 30
1 Weight Calculation
L&T Construction
Water & Effluent Treatment IC
Sewage Network & Decentralized Sewage Treatment Plants DOCUMENT NO. DATE
PROJECT:
for Nellore Municipal Corporation LE160315-C-WW-SW-DC-3008 10-Jan-17
DESIGNED CHECKED SHEET
STRUCTURE: Design calculation for SBR at Drivers Colony
MCL SURE
Length L= 30 m
Breadth B= 21.5 m
Height of water h= 5m
mi = 0.2x3320336.4 = 664067.2783 kg
table C1,Pg-
mc/m = 0.264tanh(3.16(h/L))/(0.866(L/h)) = 0.76
16, GSDMA
mc = 0.76x3320336.4 = 2523455.657 kg
̄̄̄
𝑚 _𝑤 =
mass of one tank wall perpendiculat to direction of loading
=21.5xtx25x1000/9.81 = 113006.5 kg
ℎ =
2.03 m
q= (𝑚_𝑖/2+𝑚 _𝑤 )𝑔/𝐵ℎ
q= 40.61 kN/m2
where
(Table 6) I= 1.5
L&T Construction
Water & Effluent Treatment IC
Sewage Network & Decentralized Sewage Treatment Plants DOCUMENT NO. DATE
PROJECT:
for Nellore Municipal Corporation LE160315-C-WW-SW-DC-3008 10-Jan-17
DESIGNED CHECKED SHEET
STRUCTURE: Design calculation for SBR at Drivers Colony
MCL SURE
where
(Table 6) I= 1.5
Damping 0.5% for Medium soil 8.814 > 0.55 (Sa/g)c = 0.154
cl 4.5.2, IS
muiltiplying factor 1.75 (Sa/g)c = 0.270
1893 part -2
cl. 4.6.3,
GSDMA
Total base shear at the bottom of wall
This lateral base shear is about 4% of total seismic weight (41304.4kN ) of tank
Stabilizing Moment
At y=h
Qcw(y = h) 0.4165
〖 (𝐴 〗 _𝑣)= 2/3
𝑍/2 𝐼/𝑅 𝑆_𝑎/𝑔
where
(Table 6) I= 1.5
will be as follows:
Base shear due to impulsive liquid mass per unit circumferential length,
𝑎_𝑖= �_𝑖/ℎ^2
(4ℎ−6ℎ_𝑖 ) = 18.18x(4x5-6x1.875)/(5^2) = 6.36 kN/m2
�_𝑖= �_𝑖/ℎ^2
(6ℎ_𝑖−2ℎ)
= 18.18x(6x1.875-2x5)/(5^2) = 0.91 kN/m2
0.91
0.65 6.36
Similarly , Equivalent linear distribution for convective pressure can be obtained as follows:
Base shear due to convective liquid mass per unit circumferential length, q c
𝑎_𝑐= �_𝑐/ℎ^2
(4ℎ−6ℎ_𝑐 ) = 7.46x(4x5-6x2.56)/(5²) = 1.38 kN/m2
�_𝑐= �_𝑐/ℎ^2
(6ℎ_𝑐−2ℎ)
= 7.46x(6x2.56-2x5)/(5²) = 1.60 kN/m2
7.46 1.60
L&T Construction
Water & Effluent Treatment IC
Sewage Network & Decentralized Sewage Treatment Plants DOCUMENT NO. DATE
PROJECT:
for Nellore Municipal Corporation LE160315-C-WW-SW-DC-3008 10-Jan-17
DESIGNED CHECKED SHEET
STRUCTURE: Design calculation for SBR at Drivers Colony
MCL SURE
1.64 1.38
Sewage Network & Decentralized Sewage Treatment Plants DESIGNED CHECKED SHEET
STRUCTURE:
for Nellore Municipal Corporation MCL SURE
Length L= 21.5 m
Breadth B= 30 m
Height of water h= 5m
mi = .27x3320336.4 = 896490.8257 kg
table C1,Pg-16,
mc/m = 0.264tanh(3.16(h/L))/(0.866(L/h)) = 0.71
GSDMA
mc =0.71x3320336.4 = 2357438.838 kg
ℎ
d = deflection of tank wall on the vertical center-line at a height
=30xtx25x1000/9.81 = 113006.5 kg
ℎ = 2m
q= (𝑚_𝑖/2+𝑚 _𝑤 )𝑔/𝐵ℎ
L&T Construction
Water & Effluent Treatment IC
Sewage Network & Decentralized Sewage Treatment Plants DOCUMENT NO. DATE
PROJECT:
for Nellore Municipal Corporation LE160315-C-WW-SW-DC-3008 10-Jan-17
Sewage Network & Decentralized Sewage Treatment Plants DESIGNED CHECKED SHEET
STRUCTURE:
for Nellore Municipal Corporation MCL SURE
q= (𝑚_𝑖/2+𝑚 _𝑤 )𝑔/𝐵ℎ q= 36.71 kN/m2
�= (𝑃ℎ ^3)/(3𝐸𝐼_𝑤 )
where
(Table 6) I= 1.5
Sewage Network & Decentralized Sewage Treatment Plants DESIGNED CHECKED SHEET
STRUCTURE:
for Nellore Municipal Corporation MCL SURE
(𝐴_ℎ )_𝑐= 𝑍/2 𝐼/𝑅
(𝑆_𝑎/𝑔)_𝑐
where
(Table 6) I= 1.5
Damping 0.5% for Medium soil 6.632 > 0.55 (Sa/g)c = 0.205
cl 4.5.2, IS
muiltiplying factor 1.75 (Sa/g)c = 0.359
1893 part -2
cl. 4.6.3,
GSDMA
Total base shear at the bottom of wall
This lateral base shear is about 4% of total seismic weight (41304.4kN ) of tank
Sewage Network & Decentralized Sewage Treatment Plants DESIGNED CHECKED SHEET
STRUCTURE:
for Nellore Municipal Corporation MCL SURE
Stabilizing Moment
Sewage Network & Decentralized Sewage Treatment Plants DESIGNED CHECKED SHEET
STRUCTURE:
for Nellore Municipal Corporation MCL SURE
At y=h
Qcw(y = h) 0.4165
Sewage Network & Decentralized Sewage Treatment Plants DESIGNED CHECKED SHEET
STRUCTURE:
for Nellore Municipal Corporation MCL SURE
〖 (𝐴 〗 _𝑣)= 2/3
𝑍/2 𝐼/𝑅 𝑆_𝑎/𝑔
where
(Table 6) I= 1.5
will be as follows:
Base shear due to impulsive liquid mass per unit circumferential length,
�_𝑖= ( 〖 (𝐴_ℎ )_𝑖
L&T Construction
Water & Effluent Treatment IC
Sewage Network & Decentralized Sewage Treatment Plants DOCUMENT NO. DATE
PROJECT:
for Nellore Municipal Corporation LE160315-C-WW-SW-DC-3008 10-Jan-17
Sewage Network & Decentralized Sewage Treatment Plants DESIGNED CHECKED SHEET
STRUCTURE:
for Nellore Municipal Corporation MCL SURE
𝑎_𝑖= �_𝑖/ℎ^2
(4ℎ−6ℎ_𝑖 ) = 17.59x(4x5-6x1.875)/(5^2) = 6.16 kN/m2
�_𝑖= �_𝑖/ℎ^2
(6ℎ_𝑖−2ℎ) = 17.59x(6x1.875-2x5)/(5^2) = 0.88 kN/m2
0.88
0.87 6.16
Similarly , Equivalent linear distribution for convective pressure can be obtained as follows:
Base shear due to convective liquid mass per unit circumferential length, q c
𝑎_𝑐= �_𝑐/ℎ^2
(4ℎ−6ℎ_𝑐 ) = 6.64x(4x5-6x2.605)/(5²) = 1.16 kN/m2
�_𝑐= �_𝑐/ℎ^2
(6ℎ_𝑐−2ℎ)
= 6.64x(6x2.605-2x5)/(5²) = 1.50 kN/m2
6.64 1.50
1.56 1.16
L&T Construction
Water & Effluent Treatment IC
Sewage Network & Decentralized Sewage Treatment Plants DOCUMENT NO. DATE
PROJECT:
for Nellore Municipal Corporation LE160315-C-WW-SW-DC-3008 10-Jan-17
Sewage Network & Decentralized Sewage Treatment Plants DESIGNED CHECKED SHEET
STRUCTURE:
for Nellore Municipal Corporation MCL SURE