new calculation
36.000 in
100% Excess
100 m
Lead
214.54 bbl
30.000 in Csg
309.70 lbm/ft
100 m
TOC 1
85 m
Tail
75.33 bbl
Perforation
new calculation
36.000 in Tail 30 in
100% Excess 252.40 bbl
100 m
30.000 in Csg
309.70 lbm/ft
100 m
Lead
1639.68 bbl
20.000 in Csg
Disp. Fluid1
133.00 lbm/ft
62.93 bbl
1100 m
26.000 in
130% Excess
850 m
5.000 in DP
19.50 lbm/ft
1080 m
26.000 in Tail
10% Excess 264.25 bbl
1100 m
Displ=1306 bbl
20.000 in Csg
133.00 lbm/ft
1100 m
Lead
TOT 694.34 bbl
1300 m
Drilling Mud
1306.02 bbl
17.500 in
50% Excess
2700 m Tail
818.90 bbl
13.625 in Csg
88.20 lbm/ft
2700 m
Float Collar
Need:
-6 silos (2 for Lead +4 for Tail)
-2 BMX
-add crew
-2 frac tank
-2nd pp unit
-2 air comp +cutting bottle
Cost cem +add =30k+110k=140k
Recommended add package –cost 24k+10k = 35k
234
Lead
500.07 bbl
TOT2
20.000 in Csg
950 m
133.00 lbm/f t
1100 m
Tail
13.625 in Csg 367.24 bbl
88.20 lbm/f t
2700 m
Drilling Mud
1306.02 bbl
Packer +DV
1600 m
17.500 in
50% Excess
2700 m
1st stg:
Tail -646 bbl-(68 T cement+68 T BFS=136 T Blend) +380bbl MF (61mc) +4 silos
Eq=4 silos +1BMX+1Frac tank +1 pp unit
Cost stage=11K+41K=52K cem + add
2nd stg:
Tail -370bbl @1.9sg (78T cem+222bblMF=35cm) 1BMX_1Frac tank
Lead -550 bbl @1,55sg (68T +430bbl MF=68.3 cm) 1BMX+1Frac tank
Eq=3 silos +2BMX+2Frac tank +1 pp unit
30.000 in Csg
234.30 lbm/f t
30 m
24.000 in Csg
156.00 lbm/f t Packer
350 m 1000 m
20.000 in Csg
133.00 lbm/f t
Brine influx zone
1100 m
1800 m
Packer
2000 m
TOT
1700 m
13.625 in Csg
88.20 lbm/f t Lead
2700 m 311.65 bbl
TOT
3500 m Tail
293.06 bbl
12.250 in
9.875 in Csg
40% Excess
62.80 lbm/f t
4750 m
4750 m
Untitled Wellbore
30.000 in Csg
234.30 lbm/f t
30 m
13.625 in Csg
88.20 lbm/f t
2700 m
9.875 in Csg
7.000 in Csg/Hgr
62.80 lbm/f t
32.00 lbm/f t
4750 m
5000 m
8.500 in Tail
25% Excess 43.38 bbl
5000 m
30.000 in Csg
234.30 lbm/ft
30 m
7.000 in Csg/Hgr
32.00 lbm/ft
5000 m
4.500 in Csg/Hgr
15.10 lbm/ft
5500 m
6.000 in
25% Excess Tail
5500 m 42.13 bbl
7.000 in Csg/Hgr
32.00 lbm/ft
5000 m
4.500 in Csg/Hgr
15.10 lbm/ft
5500 m
6.000 in
25% Excess Tail
5500 m 42.13 bbl