1. FINANCIALS SUMMARY
Processing 17,86
Shiping complete
Impermea
70% and processing,
Shipping 82,83 bilizadora
1.473,06 cash 1.031,14 441,92 packaging and FG
gran
advance warehouse only
caracas
Packaging 89,86 storm drainage
FG warehouse 68,32
Roof False Ceiling replacement
50%
only shiping and
Shipping 77,38 Tasman 576,00 cash 288,00 288,00
processing
advance
HVAC
Equipmen 90%
Processing 76,62 t 873,75 cash 786,38 87,38 only processing
Uniclima advance
50%
HVAC Instalation
169,87 852,18 cash 426,09 426,09 only processing
repositioning Simaca
advance
TOTAL 3.852,05 4.378,42 3.135,04 1.243,38
Contractors:
Impermeabilizadora Gran Caracas CA: Shiping waterproofed and repair drainage rain
processes, warehouse and packing. Request 70% deposit.
Tasman: Supply and installation of false ceiling and shiping Antiblaze in process,
requesting the 50% deposit.
Uniclima: Supply air conditioner only to the area of process, request 90% deposit.
SIMACA : Installation of air conditioning only to the processing area, requesting the 50%
deposit.
3. PROJECT DESCRIPTION
Currently, all the roof on the Manufacturing and DC/Shipping /Transport Areas
waterprofing is so deterioted at the Guatire Site, causing many water infiltration on the
rainy days/ rainy season,submiting the workers, materials and installations to a high risks
of accidents and losses. including electrical risks. The several deficiencies or inexistent air
conditioning, ventilation and exhausting systems for powders and vapors are exposing ours
workers for health risks and Avon are exposed for legal penalties to not comply with the
local Legislation/regulations.
4. QUOTATIONS/TENDERS CONSIDERED
All the values are estimated, based on evaluation executed by a specialized Consultancy
contracted for the previous evaluation of alternatives and quantities (OTEPI).
5. CIR APPROVALS