Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town
(80km)
IN-SITU DENSITY TEST (SAND REPLACEMENT METHOD)
BS 1377 PART9:1990 LOCATION : Km 21+540 - 21+650 LHS DATE LAID : DESCRIPTION : Subbase DATE REQUESTED : MATERIAL SOURCE : Km 17+400 RHS Borrow Pit DATE OF TEST : 2-Nov-17 LAYER NO : 1 TEST METHOD BS 1377-PART 9 (RETEST) BULK DENSITY OF SAND: 1.502
LOCATION DETAILS(CHAINAGE): 21+560 21+600 21+640
OFF SET FROM CL RHS C LHS DEPTH OF TEST (mm) 200 200 200 BULK DENSITY OF SAND (a) 1.502 1.502 1.502 SAND IN CONE (b) 2665 2665 2665 MASS OF WET SOIL FROM HOLE (g) [c] 10410 12850 12010 MASS OF SAND BEFORE POURING(g) (d) 19000 19000 19000 MASS OF SAND AFTER POURING (g) [e] 9220 8200 8310 MASS OF SAND IN HOLE (g) (f=d-e-b) 7115 8135 8025 WET DENSITY kg/m3 (g=c x a / f) 2.198 2.373 2.248
IN-SITU MOISTURE CONTENT OVEN MC OVEN MC OVEN MC OVEN MC
TIN NUMBER : (g) 1542 1542 1542
MASS OF TIN: (g) (h) 1542 1542 1542
MASS OF WET SOIL + TIN : (g) (i) 2370.0 2380.0 2390.0
MASS OF DRY SOIL + TIN (g) (j) 2305.0 2325.0 2280.0
MASS OF MOISTURE (g) (k = i - j) 65.0 55.0 110.0
MASS OF DRY SOIL (g) ( l = j - h) 763.0 783.0 738.0