ANNEXURE-1
Observation as on 28th & 29th September 2015
Main Lable & ABB Logo Missing for server & Network Panel
All Component Identification lables are missing
KDA -DCS-MC-01, Instead of TB22 -2 & TB24- 6 no's TB was mentioned GA , whereas10 No's & 15 no's are provided in
cabinet, Same has to be updated in GA & Wiring drawing.
KDA -DCS-MC-02, Instead of TB28 -24 TB was mentioned GA , whereas 28 no's are provided in cabinet, Same has to be
updated in GA & Wiring drawing.
TB 826 - KDA- SPLC-SC-01 -1 No is missing
KDA-MCC/IRP-MC-01- 50TB's are provided ,Same to be updated in GA
In BOM 13 No's RTD module menitoned, where as 14 No's are provided , Same has to be update
In BOM 35 No's TU810 module menitoned, where as 36 No's are provided , Same has to be update
AI880 5 N0's & DI880 - 4 No's & TU834 -1 No are found shortage & Same has to be provide.
DO880-4 No's are extra & TB840 -2 No's are extra in ESD
Table Top console , Pie console Hadwired console not offered for FAT
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Complied
Same has been rectified & found ok
FAT Aship documents will be submitt for
review during site commissoining
Complied
Same has been rectified & found ok
Same has been rectified & found ok
Same has been rectified & found ok
The Same can be verified during site
commissoning.
Same has been rectified & found ok
Same has been rectified & found ok
Same has been rectified & found ok
Same has been rectified & found ok
Same has been rectified & found ok
Same has been rectified & found ok
Same has been rectified & found ok
Short supply materails will be supply before
site commissoining startup.
Short supply materails will be supply before
site commissoining startup.
GA will be update & submitt as FAT Aship
documents
GA will be update & submitt as FAT Aship
documents
Short supply materails will be supply before
site commissoining startup.
GA will be update & submitt as FAT Aship
documents
GA will be update & submitt as FAT Aship
documents
Short supply materails will be supply before
site commissoining startup.
Inspection will be conduct on 15th & 16th of
Oct
Inspection will be conduct on 15th & 16th of
Oct
Short supply materails will be supply before
site commissoining startup.
Short supply materails will be supply before
site commissoining startup.
Short supply materails will be supply before
site commissoining startup.