Академический Документы
Профессиональный Документы
Культура Документы
3rd St
Av
e ffe
rs on (S Jackson St)
Je I-5
Bo
re
Yesler Way
n
T
Av
eS
18’ 12’ 11’ 14’ 11’ 12’ 18’
Sidewalk and Drive Drive Streetcar Drive Drive Sidewalk and
furniture zone lane lane platform lane lane furniture zone
S Main St RapidRide buses serve new
station pairs; local buses 60’
continue to serve existing stops Curb to curb
2n
dA
S Jackson St 96’
ve
Right-of-way
E
xt
Chinatown-International District
Neighborhood Greenway (by BMP)
Maynard Ave S
Ra
4th Ave S
S King St
5th Ave S
6th Ave S
7th Ave S
8th Ave S
12th Ave S
• New Stops for RapidRide Buses
in
ier
I-5
• Trolley Wire Improvements to Allow RapidRide Buses to Pass Local Buses
Ave
I
S Weller St
• Transit Signal Priority
S
0 1/16 1/8 1/4 Mile
• Operational Improvements at Intersections
St
on (S Jackson St)
Av
ers
eff
e
J I-5
Yesler Way
T
Bo
eS
S Jackson St 96’
ve
Right-of-way
xtE
Chinatown-International District
Neighborhood Greenway (by BMP)
Maynard Ave S
5th Ave S
6th Ave S
7th Ave S
8th Ave S
12th Ave S
I-5
rA
and Reliability
ve
I
S Weller St
• Transit Signal Priority
S
3rd Ave S/4th Ave S/S Jackson St (3rd Ave to Rainier Ave S)
Rainier RapidRide Other Transit Existing AAA Bike Facilities Planned AAA Bike Facilities
Proposed Rainier
(not part of Rainier RapidRide project)
Existing Bus Stop
RapidRide Alignment Unchanged Protected Bike Lane
(local service only) Neighborhood Greenway
Existing Bus Stop Upgraded
to RapidRide Station
Link Light Rail
New RapidRide Station