Академический Документы
Профессиональный Документы
Культура Документы
OTHER CUSTOMERS
RECLOSER
THE UTILITY FEEDER
GRID
V
DISTRIBUTED
GENERATION
DISTRIBUTED
GENERATION
DISTRIBUTED
GENERATION
HV DISCONNECT
HV FUSE
8.3KV / 480V
300kVA Yg:Yg
LV DISCONNECT
LV FUSE
M REVENUE METER
INTER-TIE INTER-TIE CIRCUIT-BREAKER
PROTECTION
TO DIGESTER &
POWERHOUSE LOADS
GENERATOR GENERATOR CIRCUIT-BREAKER
PROTECTION
BIOGAS GENERATOR
180kW 480V
))) (((
8.3 kV
MINIMUM
FEEDER LOAD
~ 240kW
RECLOSERS
TERRYLAND
180kW 8.3 kV
Q
Anti-Islanding for Small NRCan Peer Review
Generation in Ontario ANF Energy Solutions Inc
25th March 2008
Off-the-Shelf Relay
a) f (Hz)
• Load: 245 kW,
60
59
pf=0.95 lag 1 9 .5 20 2 0 .5 21 2 1 .5 22
1
• DG: P=+180 kW,
b) V (p.u.)
DG bus
0 .8
Q=-31 kVAr 1 9 .5 20 2 0 .5 21 2 1 .5 22
• Islanding: t=20s 0 .2 5
c) P (MW)
0 .2 DG
0 .1 5
1 9 .5 20 2 0 .5 21 2 1 .5 22
ΔV = 25% drop, 0 .1
d) Q (MVAr)
0 .0 5
Δf = ± 1 Hz 0 DG
- 0 .0 5
ΔQ = -31 → +80 1 9 .5 20 2 0 .5 21 2 1 .5 22
0 .2 5
e) P (MW)
0 .2
Load
0 .1 5
1 9 .5 20 2 0 .5 21 2 1 .5 22
Time (sec)
Anti-Islanding for Small NRCan Peer Review
Generation in Ontario ANF Energy Solutions Inc
25th March 2008
Simulation Results: 0% mismatch
6 0 .5
a) f (Hz)
60
pf=1 1 9 .5 20 2 0 .5 21 2 1 .5 22
1 .0 5
• DG: P=+180 kW,
b) V (p.u.)
1
0 .9 5
0 .9 DG bus
Q=-31 kVAr 0 .8 5
1 9 .5 20 2 0 .5 21 2 1 .5 22
• Islanding: t=20s 0 .2
c) P (MW)
0 .1 5 DG
1 9 .5 20 2 0 .5 21 2 1 .5 22
ΔV = 15% drop, 0 .0 2
d) Q (MVAr)
Δf = + 0.5 Hz -0 .0 2
-0 .0 4
DG
ΔQ = -31 → +10 1 9 .5 20 2 0 .5 21 2 1 .5 22
0 .1 8
e) P (MW)
0 .1 6
Load
0 .1 4
1 9 .5 20 2 0 .5 21 2 1 .5 22
Time (sec)
PCC
Load 1
Utility Grid
Representation
Farm load
•Soft Start to reduce motor Load 2
transients
•VARs measured at
generator breaker, but trips DG
inter-tie breaker
Anti-Islanding for Small NRCan Peer Review
Generation in Ontario ANF Energy Solutions Inc
25th March 2008
Field Test Facility
Biogas
Engine-Generator
Current
feedback
Anti-Islanding for Small NRCan Peer Review
Generation in Ontario ANF Energy Solutions Inc
25th March 2008
Islanding Test 1: Dynamics
Relay
Grid
CB
Gen.
Current
(Inter-tie CB)
Gen.
Voltage 0.216 s
0.136 s
Grid
CB 0.230 s
Gen. ±0.5Hz
Current 0.173 s Freq. set
for Gen.
30
25
20
15
kVAr
10
0 Phase A
Phase B
-5 Phase C
Trip set-point (40Q relay) 3-Ph Q
-10
-15
0 20 40 60 80 100 120 140 160 180 200
Time (sec.)
Anti-Islanding for Small NRCan Peer Review
Generation in Ontario ANF Energy Solutions Inc
25th March 2008
Terryland Summary
• For all tests, the trip time was less than 0.25 s
• Working with the utility as a potential generic
solution for small DG (<500 kW)
• Applicable to feeders with inductive load
characteristics
• No nuisance trips during commissioning (soft start
on 15-kW agitator motor) but potentially sensitive to
motor starting transients
MINIMUM
FEEDER LOAD
~ 500kVA
12.47kV
FEPRO FARMS
499kW
12.47KV / 600V
750kVA Yg:Yg
450 kVAr
3 x 1-PHASE
RECLOSERS
))) ((( ))) (((
INTER-TIE
& WIRELESS
INTERFACE
WIRELESS
INTERFACE PROTECTION
RECLOSER
STATUSES INTER-TIE
CIRCUIT
Trip the inter-tie breaker if BREAKER
R
E
WIRELESS WIRELESS INTER-TIE
L INTERFACE INTERFACE PROTECTION
A
Y INTER-TIE
CIRCUIT
Trip the inter-tie breaker if BREAKER