Section property
Icomposite = 1.33E+11 mm 4
g= 25 kN/m3
Area per tendon = 100.1 mm2
Steel relaxation = 2.5 %
Prestress tendons
Primary moment due to differiental temperature: section top = 2.42 MPa (+ve comp)
Girder top = -1.1 MPa
Girder bottom = 3.64 MPa
SLS
BM
Traffic (LL + OL + FP)
Position 1A 2A 4 Girder DL Deck DL Others DL
Day = 300
At transfer At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -4.27 29.57 -3.64 25.73 -3.64 25.73 -3.64 25.73 -3.64 25.73
Debond - 1 -4.27 29.57 -3.64 25.73 -3.64 25.73 -3.64 25.73 -3.64 25.73
Debond - 2 -1.84 21.40 -1.53 18.62 -1.53 18.62 -1.53 18.62 -1.53 18.62
Debond - 3 -0.22 15.96 -0.12 13.88 -0.12 13.88 -0.12 13.88 -0.12 13.88
Debond - 4 0.79 12.03 0.76 10.46 0.76 10.46 0.76 10.46 0.76 10.46
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Position
0.00 0.79 12.03 0.76 10.46 0.00 0.76 10.46 2.42 -0.34 14.12 0.00 0.39 11.68
2.23 -1.59 27.42 1.63 21.50 1.96 2.81 18.10 4.38 1.71 21.75 2.73 2.91 17.98
4.46 0.50 25.74 5.71 18.22 3.46 7.80 12.22 5.88 6.70 15.88 4.78 8.23 11.15
6.69 1.99 24.55 8.62 15.89 4.51 11.33 8.08 6.93 10.23 11.73 6.18 11.98 6.39
8.92 2.89 23.83 10.36 14.49 5.08 13.42 5.69 7.50 12.32 9.34 6.90 14.15 3.75
11.15 3.18 23.59 10.94 14.03 5.24 14.09 4.95 7.66 12.99 8.60 7.07 14.84 2.98
13.38 2.89 23.83 10.36 14.49 5.07 13.41 5.71 7.49 12.31 9.37 6.88 14.14 3.79
15.61 1.99 24.55 8.62 15.89 4.48 11.32 8.12 6.90 10.22 11.77 6.14 11.95 6.46
17.84 0.50 25.74 5.71 18.22 3.46 7.80 12.23 5.88 6.70 15.88 4.75 8.21 11.20
20.07 -1.59 27.42 1.63 21.50 1.93 2.79 18.15 4.35 1.69 21.80 2.66 2.86 18.11
22.30 0.79 12.03 0.76 10.46 0.00 0.76 10.46 2.42 -0.34 14.12 0.00 0.39 11.68
Stress satisfactory? OK NG OK OK OK OK OK OK OK OK OK OK OK
Day = 1,000
-- At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -4.27 29.57 -3.47 24.60 -3.47 24.60 -3.47 24.60 -3.47 24.60
Debond - 1 -4.27 29.57 -3.47 24.60 -3.47 24.60 -3.47 24.60 -3.47 24.60
Debond - 2 -1.84 21.40 -1.45 17.80 -1.45 17.80 -1.45 17.80 -1.45 17.80
Debond - 3 -0.22 15.96 -0.10 13.27 -0.10 13.27 -0.10 13.27 -0.10 13.27
Debond - 4 0.79 12.03 0.74 10.00 0.74 10.00 0.74 10.00 0.74 10.00
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Position
0.00 -- -- -- -- 0.00 0.74 10.00 2.42 -0.36 13.66 0.00 0.37 11.22
2.23 -- -- -- -- 1.96 2.98 16.97 4.38 1.88 20.62 2.73 3.08 16.85
4.46 -- -- -- -- 3.46 7.97 11.09 5.88 6.87 14.75 4.78 8.40 10.02
6.69 -- -- -- -- 4.51 11.50 6.95 6.93 10.40 10.60 6.18 12.15 5.26
8.92 -- -- -- -- 5.08 13.59 4.56 7.50 12.49 8.21 6.90 14.32 2.62
11.15 -- -- -- -- 5.24 14.26 3.82 7.66 13.16 7.47 7.07 15.01 1.85
13.38 -- -- -- -- 5.07 13.58 4.58 7.49 12.48 8.24 6.88 14.31 2.66
15.61 -- -- -- -- 4.48 11.49 6.99 6.90 10.39 10.64 6.14 12.12 5.33
17.84 -- -- -- -- 3.46 7.97 11.10 5.88 6.87 14.75 4.75 8.38 10.07
20.07 -- -- -- -- 1.93 2.96 17.02 4.35 1.86 20.67 2.66 3.03 16.98
22.30 -- -- -- -- 0.00 0.74 10.00 2.42 -0.36 13.66 0.00 0.37 11.22
Stress satisfactory? -- -- -- -- OK OK OK OK OK OK OK OK OK
Day = 10,000
-- At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -4.27 29.57 -3.23 22.99 -3.23 22.99 -3.23 22.99 -3.23 22.99
Debond - 1 -4.27 29.57 -3.23 22.99 -3.23 22.99 -3.23 22.99 -3.23 22.99
Debond - 2 -1.84 21.40 -1.34 16.64 -1.34 16.64 -1.34 16.64 -1.34 16.64
Debond - 3 -0.22 15.96 -0.08 12.41 -0.08 12.41 -0.08 12.41 -0.08 12.41
Debond - 4 0.79 12.03 0.70 9.35 0.70 9.35 0.70 9.35 0.70 9.35
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Load comb 1A Load comb 2A Load comb 4
Position Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
0.00 -- -- -- -- 0.00 0.70 9.35 2.42 -0.40 13.01 0.00 0.34 10.57
2.23 -- -- -- -- 1.96 3.22 15.36 4.38 2.12 19.02 2.73 3.32 15.24
4.46 -- -- -- -- 3.46 8.21 9.49 5.88 7.11 13.14 4.78 8.64 8.41
6.69 -- -- -- -- 4.51 11.75 5.34 6.93 10.65 9.00 6.18 12.39 3.65
8.92 -- -- -- -- 5.08 13.83 2.95 7.50 12.73 6.60 6.90 14.56 1.01
11.15 -- -- -- -- 5.24 14.51 2.21 7.66 13.41 5.86 7.07 15.25 0.24
13.38 -- -- -- -- 5.07 13.82 2.97 7.49 12.72 6.63 6.88 14.55 1.05
15.61 -- -- -- -- 4.48 11.73 5.38 6.90 10.63 9.04 6.14 12.37 3.72
17.84 -- -- -- -- 3.46 8.21 9.49 5.88 7.11 13.14 4.75 8.62 8.46
20.07 -- -- -- -- 1.93 3.20 15.41 4.35 2.10 19.07 2.66 3.28 15.37
22.30 -- -- -- -- 0.00 0.70 9.35 2.42 -0.40 13.01 0.00 0.34 10.57
Stress satisfactory? -- -- -- -- OK OK OK OK OK OK OK OK OK
0.00 -2821.4398 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.23 -6134.7125 -801.52 -426.62 -883.48 -248.63 -237.45 -253.01 -739.09 -1799.29 -1313.53 -1881.25
4.46 -6134.7125 -1515.14 -806.46 -1606.57 -442.02 -422.12 -402.06 -1266.20 -3224.51 -2325.90 -3315.94
6.69 -6134.7125 -2030.62 -1080.84 -2110.86 -580.15 -554.04 -497.26 -1631.45 -4233.07 -3038.57 -4313.31
8.92 -6134.7125 -2298.60 -1223.48 -2352.45 -663.03 -633.19 -557.10 -1853.31 -4800.57 -3447.45 -4854.42
11.15 -6134.7125 -2364.41 -1258.50 -2404.32 -690.65 -659.57 -576.96 -1927.18 -4966.10 -3571.12 -5006.01
13.38 -6134.7125 -2288.59 -1218.14 -2341.99 -663.03 -633.19 -557.09 -1853.30 -4790.55 -3442.11 -4843.95
15.61 -6134.7125 -2015.23 -1072.64 -2091.31 -580.15 -554.04 -497.25 -1631.44 -4217.67 -3030.37 -4293.75
17.84 -6134.7125 -1513.16 -805.41 -1593.37 -442.02 -422.12 -402.06 -1266.20 -3222.53 -2324.84 -3302.74
20.07 -6134.7125 -781.56 -416.00 -848.99 -248.63 -237.45 -252.97 -739.05 -1779.28 -1302.86 -1846.71
22.30 -2821.4398 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Section property
Icomposite = 1.43E+11 mm 4
g= 25 kN/m3
Area per tendon = 100.1 mm2
Steel relaxation = 2.5 %
Prestress tendons
Primary moment due to differiental temperature: section top = 2.42 MPa (+ve comp)
Girder top = -1.1 MPa
Girder bottom = 3.64 MPa
SLS
BM
Traffic (LL + OL + FP)
Position 1A 2A 4 Girder DL Deck DL Others DL
Day = 300
At transfer At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -2.82 29.99 -2.42 26.31 -2.42 26.31 -2.42 26.31 -2.42 26.31
Debond - 1 -2.82 29.99 -2.42 26.31 -2.42 26.31 -2.42 26.31 -2.42 26.31
Debond - 2 -1.17 21.84 -0.97 19.16 -0.97 19.16 -0.97 19.16 -0.97 19.16
Debond - 3 -0.07 16.41 -0.01 14.39 -0.01 14.39 -0.01 14.39 -0.01 14.39
Debond - 4 0.62 12.47 0.59 10.94 0.59 10.94 0.59 10.94 0.59 10.94
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Position
0.00 0.62 12.47 0.59 10.94 0.00 0.59 10.94 2.42 -0.51 14.59 0.00 0.23 12.15
2.27 2.04 14.22 4.34 9.89 1.88 5.39 6.09 4.30 4.29 9.74 2.61 5.44 5.80
4.54 2.58 17.96 6.75 11.17 3.19 8.53 4.69 5.61 7.43 8.34 4.29 8.78 3.66
6.81 2.10 24.89 7.70 15.83 4.08 9.98 7.54 6.50 8.88 11.19 5.39 10.35 6.10
9.08 2.80 24.17 9.13 14.34 4.62 11.72 4.96 7.04 10.62 8.61 6.08 12.18 3.20
11.35 3.03 23.92 9.61 13.84 4.73 12.26 4.25 7.15 11.16 7.90 6.21 12.72 2.45
13.62 2.80 24.17 9.13 14.34 4.60 11.71 5.00 7.02 10.61 8.65 6.06 12.16 3.25
15.89 2.10 24.89 7.70 15.83 4.08 9.98 7.55 6.50 8.88 11.20 5.41 10.36 6.05
18.16 2.58 17.96 6.75 11.17 3.21 8.54 4.66 5.63 7.44 8.32 4.34 8.81 3.56
20.43 2.04 14.22 4.34 9.89 1.84 5.37 6.15 4.26 4.27 9.81 2.59 5.43 5.84
22.70 0.62 12.47 0.59 10.94 0.00 0.59 10.94 2.42 -0.51 14.59 0.00 0.23 12.15
Stress satisfactory? OK OK OK OK OK OK OK OK OK OK OK OK OK
Day = 1,000
-- At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -2.82 29.99 -2.32 25.22 -2.32 25.22 -2.32 25.22 -2.32 25.22
Debond - 1 -2.82 29.99 -2.32 25.22 -2.32 25.22 -2.32 25.22 -2.32 25.22
Debond - 2 -1.17 21.84 -0.93 18.37 -0.93 18.37 -0.93 18.37 -0.93 18.37
Debond - 3 -0.07 16.41 0.00 13.80 0.00 13.80 0.00 13.80 0.00 13.80
Debond - 4 0.62 12.47 0.58 10.49 0.58 10.49 0.58 10.49 0.58 10.49
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Position
0.00 -- -- -- -- 0.00 0.58 10.49 2.42 -0.52 14.14 0.00 0.21 11.70
2.27 -- -- -- -- 1.88 5.40 5.49 4.30 4.30 9.14 2.61 5.44 5.21
4.54 -- -- -- -- 3.19 8.58 3.89 5.61 7.48 7.54 4.29 8.83 2.87
6.81 -- -- -- -- 4.08 10.09 6.44 6.50 8.99 10.10 5.39 10.45 5.01
9.08 -- -- -- -- 4.62 11.83 3.86 7.04 10.73 7.52 6.08 12.28 2.11
11.35 -- -- -- -- 4.73 12.37 3.16 7.15 11.27 6.81 6.21 12.83 1.36
13.62 -- -- -- -- 4.60 11.82 3.90 7.02 10.72 7.56 6.06 12.27 2.15
15.89 -- -- -- -- 4.08 10.09 6.45 6.50 8.99 10.11 5.41 10.47 4.96
18.16 -- -- -- -- 3.21 8.59 3.87 5.63 7.49 7.52 4.34 8.86 2.76
20.43 -- -- -- -- 1.84 5.38 5.56 4.26 4.28 9.21 2.59 5.43 5.25
22.70 -- -- -- -- 0.00 0.58 10.49 2.42 -0.52 14.14 0.00 0.21 11.70
Stress satisfactory? -- -- -- -- OK OK OK OK OK OK OK OK OK
Day = 10,000
-- At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -2.82 29.99 -2.16 23.67 -2.16 23.67 -2.16 23.67 -2.16 23.67
Debond - 1 -2.82 29.99 -2.16 23.67 -2.16 23.67 -2.16 23.67 -2.16 23.67
Debond - 2 -1.17 21.84 -0.86 17.24 -0.86 17.24 -0.86 17.24 -0.86 17.24
Debond - 3 -0.07 16.41 0.01 12.95 0.01 12.95 0.01 12.95 0.01 12.95
Debond - 4 0.62 12.47 0.55 9.85 0.55 9.85 0.55 9.85 0.55 9.85
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Position
0.00 -- -- -- -- 0.00 0.55 9.85 2.42 -0.55 13.50 0.00 0.18 11.06
2.27 -- -- -- -- 1.88 5.41 4.64 4.30 4.31 8.30 2.61 5.45 4.36
4.54 -- -- -- -- 3.19 8.65 2.76 5.61 7.55 6.42 4.29 8.90 1.74
6.81 -- -- -- -- 4.08 10.24 4.89 6.50 9.14 8.55 5.39 10.61 3.46
9.08 -- -- -- -- 4.62 11.98 2.32 7.04 10.88 5.97 6.08 12.44 0.56
11.35 -- -- -- -- 4.73 12.52 1.61 7.15 11.42 5.26 6.21 12.98 -0.19
13.62 -- -- -- -- 4.60 11.97 2.35 7.02 10.87 6.01 6.06 12.42 0.60
15.89 -- -- -- -- 4.08 10.24 4.90 6.50 9.14 8.56 5.41 10.62 3.41
18.16 -- -- -- -- 3.21 8.65 2.74 5.63 7.55 6.39 4.34 8.93 1.64
20.43 -- -- -- -- 1.84 5.39 4.71 4.26 4.29 8.36 2.59 5.44 4.40
22.70 -- -- -- -- 0.00 0.55 9.85 2.42 -0.55 13.50 0.00 0.18 11.06
Stress satisfactory? -- -- -- -- OK OK OK OK OK OK OK OK OK
0.00 -2844.1472 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.27 -3633.8769 -1386.96 -738.24 -1318.96 -280.59 -295.94 -80.16 -656.69 -2273.50 -1526.27 -2205.50
4.54 -4692.1615 -2239.78 -1192.16 -2082.20 -498.83 -526.11 -190.24 -1215.18 -3880.27 -2650.38 -3722.69
6.81 -6233.2685 -2776.83 -1478.02 -2546.78 -654.71 -690.52 -282.31 -1627.54 -4974.01 -3431.07 -4743.97
9.08 -6233.2685 -3108.06 -1654.32 -2853.41 -748.24 -789.17 -334.54 -1871.95 -5635.19 -3900.66 -5380.54
11.35 -6233.2685 -3156.11 -1679.90 -2895.03 -779.42 -822.05 -352.07 -1953.54 -5793.39 -4024.15 -5532.31
13.62 -6233.2685 -3091.94 -1645.74 -2840.57 -748.24 -789.17 -334.64 -1872.05 -5619.21 -3892.21 -5367.84
15.89 -6233.2685 -2772.30 -1475.61 -2561.15 -654.71 -690.52 -282.52 -1627.75 -4969.77 -3428.91 -4758.62
18.16 -4692.1615 -2248.73 -1196.93 -2109.20 -498.83 -526.11 -190.53 -1215.47 -3889.61 -2655.49 -3750.08
20.43 -3633.8769 -1359.21 -723.47 -1308.33 -280.59 -295.94 -80.37 -656.90 -2246.03 -1511.75 -2195.15
22.70 -2844.1472 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Section property
Icomposite = 1.36E+11 mm 4
g= 25 kN/m3
Area per tendon = 100.1 mm2
Steel relaxation = 2.5 %
Prestress tendons
Primary moment due to differiental temperature: section top = 2.42 MPa (+ve comp)
Girder top = -1.1 MPa
Girder bottom = 3.64 MPa
SLS
BM
Traffic (LL + OL + FP)
Position 1A 2A 4 Girder DL Deck DL Others DL
Day = 300
At transfer At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -3.33 30.12 -2.82 26.18 -2.82 26.18 -2.82 26.18 -2.82 26.18
Debond - 1 -3.33 30.12 -2.82 26.18 -2.82 26.18 -2.82 26.18 -2.82 26.18
Debond - 2 -1.27 21.86 -1.04 19.00 -1.04 19.00 -1.04 19.00 -1.04 19.00
Debond - 3 0.10 16.36 0.15 14.22 0.15 14.22 0.15 14.22 0.15 14.22
Debond - 4 0.94 12.38 0.89 10.76 0.89 10.76 0.89 10.76 0.89 10.76
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Position
0.00 0.94 12.38 0.89 10.76 0.01 0.89 10.74 2.43 -0.21 14.39 0.01 0.53 11.94
2.33 2.70 14.11 5.45 9.63 2.15 6.73 5.74 4.57 5.63 9.40 2.90 6.81 5.59
4.66 3.35 17.86 8.38 10.86 3.68 10.55 4.21 6.10 9.45 7.86 5.05 11.00 2.93
6.99 2.74 24.87 9.52 15.50 4.71 12.31 6.98 7.13 11.21 10.63 6.45 12.97 5.04
9.32 3.61 24.12 11.28 13.98 5.33 14.43 4.34 7.75 13.33 8.00 7.24 15.20 2.09
11.65 3.90 23.87 11.86 13.48 5.47 15.10 3.58 7.89 14.00 7.23 7.42 15.89 1.26
13.98 3.61 24.12 11.28 13.98 5.34 14.44 4.31 7.76 13.34 7.97 7.27 15.21 2.04
16.31 2.74 24.87 9.52 15.50 4.77 12.35 6.87 7.19 11.25 10.52 6.54 13.03 4.87
18.64 3.35 17.86 8.38 10.86 3.74 10.59 4.09 6.16 9.49 7.74 5.15 11.06 2.75
20.97 2.70 14.11 5.45 9.63 2.19 6.75 5.66 4.61 5.65 9.32 3.01 6.87 5.40
23.30 0.94 12.38 0.89 10.76 0.01 0.89 10.74 2.43 -0.21 14.39 0.01 0.53 11.94
Stress satisfactory? OK OK OK OK OK OK OK OK OK OK OK OK OK
Day = 1,000
-- At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -3.33 30.12 -2.69 25.02 -2.69 25.02 -2.69 25.02 -2.69 25.02
Debond - 1 -3.33 30.12 -2.69 25.02 -2.69 25.02 -2.69 25.02 -2.69 25.02
Debond - 2 -1.27 21.86 -0.98 18.16 -0.98 18.16 -0.98 18.16 -0.98 18.16
Debond - 3 0.10 16.36 0.15 13.59 0.15 13.59 0.15 13.59 0.15 13.59
Debond - 4 0.94 12.38 0.86 10.28 0.86 10.28 0.86 10.28 0.86 10.28
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Position
0.00 -- -- -- -- 0.01 0.86 10.27 2.43 -0.24 13.92 0.01 0.50 11.47
2.33 -- -- -- -- 2.15 6.73 5.12 4.57 5.63 8.77 2.90 6.81 4.96
4.66 -- -- -- -- 3.68 10.61 3.37 6.10 9.51 7.02 5.05 11.06 2.09
6.99 -- -- -- -- 4.71 12.45 5.82 7.13 11.35 9.47 6.45 13.11 3.89
9.32 -- -- -- -- 5.33 14.56 3.19 7.75 13.46 6.84 7.24 15.33 0.93
11.65 -- -- -- -- 5.47 15.23 2.42 7.89 14.13 6.07 7.42 16.02 0.10
13.98 -- -- -- -- 5.34 14.57 3.16 7.76 13.47 6.81 7.27 15.35 0.88
16.31 -- -- -- -- 4.77 12.48 5.71 7.19 11.38 9.36 6.54 13.16 3.71
18.64 -- -- -- -- 3.74 10.65 3.25 6.16 9.55 6.90 5.15 11.11 1.91
20.97 -- -- -- -- 2.19 6.75 5.04 4.61 5.65 8.69 3.01 6.87 4.77
23.30 -- -- -- -- 0.01 0.86 10.26 2.43 -0.24 13.92 0.01 0.50 11.47
Stress satisfactory? -- -- -- -- OK OK OK OK OK OK OK OK OK
Day = 10,000
-- At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -3.33 30.12 -2.50 23.37 -2.50 23.37 -2.50 23.37 -2.50 23.37
Debond - 1 -3.33 30.12 -2.50 23.37 -2.50 23.37 -2.50 23.37 -2.50 23.37
Debond - 2 -1.27 21.86 -0.90 16.97 -0.90 16.97 -0.90 16.97 -0.90 16.97
Debond - 3 0.10 16.36 0.16 12.70 0.16 12.70 0.16 12.70 0.16 12.70
Debond - 4 0.94 12.38 0.81 9.61 0.81 9.61 0.81 9.61 0.81 9.61
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Position
0.00 -- -- -- -- 0.01 0.82 9.59 2.43 -0.28 13.24 0.01 0.45 10.79
2.33 -- -- -- -- 2.15 6.73 4.23 4.57 5.63 7.88 2.90 6.81 4.07
4.66 -- -- -- -- 3.68 10.69 2.17 6.10 9.59 5.83 5.05 11.14 0.89
6.99 -- -- -- -- 4.71 12.64 4.17 7.13 11.54 7.82 6.45 13.30 2.24
9.32 -- -- -- -- 5.33 14.76 1.54 7.75 13.66 5.19 7.24 15.52 -0.72
11.65 -- -- -- -- 5.47 15.42 0.77 7.89 14.32 4.43 7.42 16.21 -1.55
13.98 -- -- -- -- 5.34 14.76 1.51 7.76 13.66 5.16 7.27 15.54 -0.76
16.31 -- -- -- -- 4.77 12.67 4.06 7.19 11.57 7.72 6.54 13.36 2.07
18.64 -- -- -- -- 3.74 10.73 2.05 6.16 9.63 5.71 5.15 11.19 0.72
20.97 -- -- -- -- 2.19 6.76 4.15 4.61 5.66 7.80 3.01 6.87 3.88
23.30 -- -- -- -- 0.01 0.82 9.59 2.43 -0.28 13.24 0.01 0.46 10.79
Stress satisfactory? -- -- -- -- OK OK OK OK OK OK OK OK OK
0.00 -2827.6 -7.56 -4.02 -7.54 0.00 0.00 0.00 0.00 -7.56 -4.02 -7.54
2.33 -3608.1 -1009.52 -537.33 -1029.88 -268.96 -277.73 -252.13 -798.83 -2087.93 -1495.92 -2108.29
4.66 -4650.8 -1793.63 -954.69 -1849.43 -478.15 -493.75 -400.90 -1372.80 -3646.91 -2602.05 -3702.71
6.99 -6161.7 -2340.24 -1245.64 -2383.31 -627.57 -648.04 -495.91 -1771.53 -4731.80 -3371.47 -4774.87
9.32 -6161.7 -2657.67 -1414.59 -2677.73 -717.23 -740.62 -556.33 -2014.17 -5376.80 -3831.60 -5396.87
11.65 -6161.7 -2719.05 -1447.27 -2735.78 -747.11 -771.48 -576.38 -2094.97 -5547.27 -3961.24 -5563.99
13.98 -6161.7 -2670.27 -1421.30 -2690.51 -717.23 -740.62 -556.34 -2014.19 -5389.42 -3838.33 -5409.67
16.31 -6161.7 -2385.36 -1269.65 -2429.44 -627.57 -648.04 -495.93 -1771.54 -4776.94 -3395.50 -4821.02
18.64 -4650.8 -1843.56 -981.27 -1895.59 -478.15 -493.75 -400.92 -1372.82 -3696.87 -2628.65 -3748.90
20.97 -3608.1 -1040.79 -553.98 -1081.42 -268.96 -277.73 -252.20 -798.89 -2119.29 -1512.65 -2159.92
23.30 -2827.6 -8.01 -4.26 -8.05 0.00 0.00 0.00 0.00 -8.01 -4.26 -8.05
Section property
Icomposite = 1.25E+11 mm 4
g= 25 kN/m3
Area per tendon = 100.1 mm2
Steel relaxation = 2.5 %
Prestress tendons
Primary moment due to differiental temperature: section top = 2.42 MPa (+ve comp)
Girder top = -1.1 MPa
Girder bottom = 3.64 MPa
SLS
BM
Traffic (LL + OL + FP)
Position 1A 2A 4 Girder DL Deck DL Others DL
Day = 300
At transfer At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -4.06 27.29 -3.46 23.82 -3.46 23.82 -3.46 23.82 -3.46 23.82
Debond - 1 -4.06 27.29 -3.46 23.82 -3.46 23.82 -3.46 23.82 -3.46 23.82
Debond - 2 -1.74 20.13 -1.43 17.56 -1.43 17.56 -1.43 17.56 -1.43 17.56
Debond - 3 0.05 14.44 0.13 12.60 0.13 12.60 0.13 12.60 0.13 12.60
Debond - 4 1.14 10.35 1.08 9.02 1.08 9.02 1.08 9.02 1.08 9.02
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Position
0.00 1.14 10.35 1.08 9.02 0.02 1.10 8.99 2.44 0.00 12.65 0.03 0.74 10.19
2.27 3.05 12.29 5.90 8.46 2.24 7.31 5.00 4.66 6.21 8.65 3.10 7.49 4.86
4.54 3.59 16.30 8.83 10.21 3.95 11.32 4.08 6.37 10.22 7.74 5.51 11.94 2.88
6.81 2.94 22.27 10.02 14.16 5.11 13.24 6.23 7.53 12.14 9.89 7.05 14.09 4.43
9.07 3.94 21.55 11.94 12.78 5.76 15.57 3.85 8.18 14.47 7.51 7.89 16.54 1.76
11.34 4.28 21.31 12.58 12.32 5.91 16.31 3.15 8.33 15.21 6.81 8.05 17.29 1.05
13.61 3.94 21.55 11.94 12.78 5.76 15.57 3.86 8.18 14.47 7.51 7.89 16.54 1.76
15.88 2.94 22.27 10.02 14.16 5.11 13.24 6.23 7.53 12.14 9.89 7.06 14.10 4.42
18.15 3.59 16.30 8.83 10.21 3.92 11.30 4.13 6.34 10.20 7.78 5.44 11.89 2.99
20.42 3.05 12.29 5.90 8.46 2.22 7.30 5.02 4.64 6.20 8.67 3.11 7.50 4.84
22.68 1.14 10.35 1.08 9.02 0.02 1.10 9.00 2.44 0.00 12.65 0.02 0.73 10.20
Stress satisfactory? OK OK OK OK OK OK OK OK OK OK OK OK OK
Day = 1,000
-- At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -4.06 27.29 -3.30 22.79 -3.30 22.79 -3.30 22.79 -3.30 22.79
Debond - 1 -4.06 27.29 -3.30 22.79 -3.30 22.79 -3.30 22.79 -3.30 22.79
Debond - 2 -1.74 20.13 -1.36 16.81 -1.36 16.81 -1.36 16.81 -1.36 16.81
Debond - 3 0.05 14.44 0.13 12.06 0.13 12.06 0.13 12.06 0.13 12.06
Debond - 4 1.14 10.35 1.05 8.64 1.05 8.64 1.05 8.64 1.05 8.64
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Position
0.00 -- -- -- -- 0.02 1.06 8.61 2.44 -0.04 12.26 0.03 0.70 9.80
2.27 -- -- -- -- 2.24 7.32 4.46 4.66 6.22 8.11 3.10 7.50 4.32
4.54 -- -- -- -- 3.95 11.39 3.33 6.37 10.29 6.98 5.51 12.01 2.12
6.81 -- -- -- -- 5.11 13.39 5.21 7.53 12.29 8.87 7.05 14.25 3.41
9.07 -- -- -- -- 5.76 15.73 2.83 8.18 14.63 6.48 7.89 16.70 0.73
11.34 -- -- -- -- 5.91 16.47 2.13 8.33 15.37 5.79 8.05 17.45 0.03
13.61 -- -- -- -- 5.76 15.72 2.84 8.18 14.62 6.49 7.89 16.70 0.74
15.88 -- -- -- -- 5.11 13.40 5.21 7.53 12.30 8.86 7.06 14.26 3.40
18.15 -- -- -- -- 3.92 11.37 3.38 6.34 10.27 7.03 5.44 11.96 2.23
20.42 -- -- -- -- 2.22 7.31 4.48 4.64 6.21 8.13 3.11 7.50 4.30
22.68 -- -- -- -- 0.02 1.06 8.61 2.44 -0.04 12.26 0.02 0.70 9.81
Stress satisfactory? -- -- -- -- OK OK OK OK OK OK OK OK OK
Day = 10,000
-- At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -4.06 27.29 -3.07 21.34 -3.07 21.34 -3.07 21.34 -3.07 21.34
Debond - 1 -4.06 27.29 -3.07 21.34 -3.07 21.34 -3.07 21.34 -3.07 21.34
Debond - 2 -1.74 20.13 -1.26 15.74 -1.26 15.74 -1.26 15.74 -1.26 15.74
Debond - 3 0.05 14.44 0.14 11.29 0.14 11.29 0.14 11.29 0.14 11.29
Debond - 4 1.14 10.35 1.00 8.09 1.00 8.09 1.00 8.09 1.00 8.09
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Position
0.00 -- -- -- -- 0.02 1.01 8.06 2.44 -0.09 11.71 0.03 0.65 9.25
2.27 -- -- -- -- 2.24 7.32 3.69 4.66 6.22 7.34 3.10 7.50 3.55
4.54 -- -- -- -- 3.95 11.49 2.26 6.37 10.39 5.91 5.51 12.11 1.05
6.81 -- -- -- -- 5.11 13.62 3.76 7.53 12.52 7.41 7.05 14.48 1.96
9.07 -- -- -- -- 5.76 15.95 1.38 8.18 14.85 5.03 7.89 16.93 -0.72
11.34 -- -- -- -- 5.91 16.69 0.68 8.33 15.59 4.33 8.05 17.67 -1.43
13.61 -- -- -- -- 5.76 15.95 1.38 8.18 14.85 5.04 7.89 16.93 -0.71
15.88 -- -- -- -- 5.11 13.62 3.76 7.53 12.52 7.41 7.06 14.48 1.95
18.15 -- -- -- -- 3.92 11.47 2.31 6.34 10.37 5.96 5.44 12.07 1.16
20.42 -- -- -- -- 2.22 7.31 3.71 4.64 6.21 7.36 3.11 7.51 3.54
22.68 -- -- -- -- 0.02 1.01 8.06 2.44 -0.09 11.71 0.02 0.65 9.26
Stress satisfactory? -- -- -- -- OK OK OK OK OK OK OK OK OK
0.00 -2360.2 -12.35 -6.57 -12.75 0.00 0.00 0.22 0.22 -12.05 -6.30 -12.45
2.27 -3138.2 -960.83 -511.42 -985.31 -233.22 -215.34 -183.28 -631.84 -1813.82 -1269.63 -1838.30
4.54 -4172.3 -1716.79 -913.79 -1762.81 -414.61 -382.84 -315.69 -1113.14 -3219.53 -2249.56 -3265.55
6.81 -5423.1 -2216.29 -1179.66 -2246.85 -544.18 -502.47 -411.37 -1458.02 -4184.61 -2929.28 -4215.17
9.07 -5423.1 -2486.51 -1323.49 -2502.11 -621.92 -574.25 -467.65 -1663.82 -4732.67 -3320.08 -4748.27
11.34 -5423.1 -2539.83 -1351.87 -2539.72 -647.83 -598.18 -486.12 -1732.13 -4878.21 -3430.43 -4878.10
13.61 -5423.1 -2484.29 -1322.31 -2500.40 -621.92 -574.25 -467.73 -1663.90 -4730.56 -3318.99 -4746.66
15.88 -5423.1 -2216.34 -1179.69 -2249.07 -544.18 -502.47 -411.57 -1458.22 -4184.93 -2929.55 -4217.66
18.15 -4172.3 -1696.66 -903.08 -1733.51 -414.61 -382.84 -316.13 -1113.58 -3199.99 -2239.38 -3236.85
20.42 -3138.2 -950.38 -505.86 -988.36 -233.22 -215.34 -184.21 -632.77 -1804.63 -1265.19 -1842.60
22.68 -2360.2 -8.89 -4.73 -9.18 0.00 0.00 -1.24 -1.24 -10.56 -6.22 -10.85
Section property
Icomposite = 1.35E+11 mm 4
g= 25 kN/m3
Area per tendon = 100.1 mm2
Steel relaxation = 2.5 %
Prestress tendons
Primary moment due to differiental temperature: section top = 2.42 MPa (+ve comp)
Girder top = -1.1 MPa
Girder bottom = 3.64 MPa
SLS
BM
Traffic (LL + OL + FP)
Position 1A 2A 4 Girder DL Deck DL Others DL
Day = 300
At transfer At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -3.09 27.06 -2.67 23.89 -2.67 23.89 -2.67 23.89 -2.67 23.89
Debond - 1 -3.09 27.06 -2.67 23.89 -2.67 23.89 -2.67 23.89 -2.67 23.89
Debond - 2 -1.43 20.07 -1.20 17.71 -1.20 17.71 -1.20 17.71 -1.20 17.71
Debond - 3 -0.14 14.51 -0.07 12.81 -0.07 12.81 -0.07 12.81 -0.07 12.81
Debond - 4 0.65 10.50 0.63 9.26 0.63 9.26 0.63 9.26 0.63 9.26
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Position
0.00 0.65 10.50 0.63 9.26 0.02 0.64 9.23 2.44 -0.46 12.89 0.02 0.28 10.44
2.26 2.16 12.39 4.48 8.61 1.98 5.65 5.04 4.40 4.55 8.69 2.65 5.69 5.03
4.52 2.68 16.29 6.89 10.26 3.44 8.93 4.03 5.86 7.83 7.68 4.55 9.22 3.24
6.78 2.30 22.10 7.95 14.10 4.44 10.58 6.07 6.86 9.48 9.72 5.82 11.03 4.78
9.04 3.07 21.39 9.47 12.70 4.98 12.42 3.70 7.40 11.32 7.35 6.49 12.95 2.16
11.30 3.32 21.15 9.98 12.23 5.11 13.00 2.99 7.53 11.90 6.64 6.60 13.52 1.50
13.56 3.07 21.39 9.47 12.70 5.00 12.43 3.65 7.42 11.33 7.31 6.53 12.97 2.10
15.82 2.30 22.10 7.95 14.10 4.46 10.59 6.04 6.88 9.49 9.69 5.85 11.05 4.72
18.08 2.68 16.29 6.89 10.26 3.42 8.92 4.06 5.84 7.82 7.71 4.50 9.19 3.32
20.35 2.16 12.39 4.48 8.61 1.95 5.64 5.08 4.37 4.54 8.73 2.61 5.66 5.10
22.61 0.65 10.50 0.63 9.26 0.01 0.64 9.24 2.43 -0.46 12.89 0.01 0.27 10.45
Stress satisfactory? OK OK OK OK OK OK OK OK OK OK OK OK OK
Day = 1,000
-- At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -3.09 27.06 -2.56 22.94 -2.56 22.94 -2.56 22.94 -2.56 22.94
Debond - 1 -3.09 27.06 -2.56 22.94 -2.56 22.94 -2.56 22.94 -2.56 22.94
Debond - 2 -1.43 20.07 -1.15 17.01 -1.15 17.01 -1.15 17.01 -1.15 17.01
Debond - 3 -0.14 14.51 -0.06 12.30 -0.06 12.30 -0.06 12.30 -0.06 12.30
Debond - 4 0.65 10.50 0.61 8.90 0.61 8.90 0.61 8.90 0.61 8.90
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Position
0.00 -- -- -- -- 0.02 0.62 8.87 2.44 -0.48 12.52 0.02 0.26 10.08
2.26 -- -- -- -- 1.98 5.66 4.53 4.40 4.56 8.19 2.65 5.70 4.52
4.52 -- -- -- -- 3.44 8.98 3.33 5.86 7.88 6.98 4.55 9.27 2.54
6.78 -- -- -- -- 4.44 10.70 5.12 6.86 9.60 8.77 5.82 11.15 3.83
9.04 -- -- -- -- 4.98 12.53 2.75 7.40 11.43 6.40 6.49 13.06 1.22
11.30 -- -- -- -- 5.11 13.12 2.04 7.53 12.02 5.69 6.60 13.63 0.55
13.56 -- -- -- -- 5.00 12.54 2.71 7.42 11.44 6.36 6.53 13.08 1.15
15.82 -- -- -- -- 4.46 10.70 5.09 6.88 9.60 8.74 5.85 11.17 3.77
18.08 -- -- -- -- 3.42 8.97 3.36 5.84 7.87 7.01 4.50 9.24 2.62
20.35 -- -- -- -- 1.95 5.65 4.57 4.37 4.55 8.23 2.61 5.67 4.60
22.61 -- -- -- -- 0.01 0.62 8.87 2.43 -0.48 12.52 0.01 0.25 10.08
Stress satisfactory? -- -- -- -- OK OK OK OK OK OK OK OK OK
Day = 10,000
-- At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -3.09 27.06 -2.40 21.60 -2.40 21.60 -2.40 21.60 -2.40 21.60
Debond - 1 -3.09 27.06 -2.40 21.60 -2.40 21.60 -2.40 21.60 -2.40 21.60
Debond - 2 -1.43 20.07 -1.07 16.02 -1.07 16.02 -1.07 16.02 -1.07 16.02
Debond - 3 -0.14 14.51 -0.05 11.59 -0.05 11.59 -0.05 11.59 -0.05 11.59
Debond - 4 0.65 10.50 0.59 8.38 0.59 8.38 0.59 8.38 0.59 8.38
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Position
0.00 -- -- -- -- 0.02 0.60 8.35 2.44 -0.50 12.00 0.02 0.23 9.56
2.26 -- -- -- -- 1.98 5.68 3.82 4.40 4.58 7.47 2.65 5.71 3.80
4.52 -- -- -- -- 3.44 9.06 2.33 5.86 7.96 5.99 4.55 9.35 1.54
6.78 -- -- -- -- 4.44 10.85 3.78 6.86 9.75 7.43 5.82 11.31 2.49
9.04 -- -- -- -- 4.98 12.69 1.41 7.40 11.59 5.06 6.49 13.22 -0.12
11.30 -- -- -- -- 5.11 13.28 0.70 7.53 12.18 4.35 6.60 13.79 -0.79
13.56 -- -- -- -- 5.00 12.70 1.37 7.42 11.60 5.02 6.53 13.24 -0.19
15.82 -- -- -- -- 4.46 10.86 3.75 6.88 9.76 7.41 5.85 11.33 2.43
18.08 -- -- -- -- 3.42 9.05 2.37 5.84 7.95 6.02 4.50 9.32 1.63
20.35 -- -- -- -- 1.95 5.66 3.86 4.37 4.56 7.51 2.61 5.69 3.88
22.61 -- -- -- -- 0.01 0.59 8.35 2.43 -0.51 12.01 0.01 0.23 9.57
Stress satisfactory? -- -- -- -- OK OK OK OK OK OK OK OK OK
0.00 -2377.1 -4.27 -2.27 -4.14 0.00 0.00 -3.29 -3.29 -8.71 -6.22 -8.58
2.26 -3166.7 -1163.02 -619.04 -1093.24 -261.45 -254.11 -125.90 -641.46 -2028.98 -1388.78 -1959.20
4.52 -4221.0 -1998.15 -1063.55 -1850.56 -464.80 -451.74 -231.59 -1148.14 -3548.13 -2441.31 -3400.54
6.78 -5504.7 -2560.94 -1363.11 -2352.97 -610.05 -592.91 -305.97 -1508.94 -4598.01 -3173.84 -4390.03
9.04 -5504.7 -2851.13 -1517.57 -2609.70 -697.20 -677.62 -351.78 -1726.60 -5182.04 -3589.49 -4940.61
11.30 -5504.7 -2914.39 -1551.24 -2640.12 -726.25 -705.85 -367.45 -1799.55 -5343.79 -3710.71 -5069.52
13.56 -5504.7 -2867.52 -1526.29 -2626.45 -697.20 -677.62 -352.05 -1726.87 -5198.79 -3598.53 -4957.72
15.82 -5504.7 -2571.26 -1368.60 -2368.61 -610.05 -592.91 -306.48 -1509.45 -4609.01 -3179.94 -4406.36
18.08 -4221.0 -1983.56 -1055.79 -1826.11 -464.80 -451.74 -232.34 -1148.88 -3534.55 -2434.45 -3377.10
20.35 -3166.7 -1144.49 -609.17 -1071.49 -261.45 -254.11 -126.69 -642.25 -2011.52 -1379.87 -1938.53
22.61 -2377.1 -1.57 -0.84 -1.24 0.00 0.00 -3.79 -3.79 -6.69 -5.38 -6.35
Section property
Icomposite = 1.20E+11 mm 4
g= 25 kN/m3
Area per tendon = 100.1 mm2
Steel relaxation = 2.5 %
Prestress tendons
Primary moment due to differiental temperature: section top = 2.42 MPa (+ve comp)
Girder top = -1.1 MPa
Girder bottom = 3.64 MPa
SLS
BM
Traffic (LL + OL + FP)
Position 1A 2A 4 Girder DL Deck DL Others DL
Day = 300
At transfer At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -4.84 27.47 -4.09 23.83 -4.09 23.83 -4.09 23.83 -4.09 23.83
Debond - 1 -4.84 27.47 -4.09 23.83 -4.09 23.83 -4.09 23.83 -4.09 23.83
Debond - 2 -1.99 20.18 -1.62 17.50 -1.62 17.50 -1.62 17.50 -1.62 17.50
Debond - 3 0.20 14.39 0.28 12.47 0.28 12.47 0.28 12.47 0.28 12.47
Debond - 4 1.53 10.24 1.44 8.87 1.44 8.87 1.44 8.87 1.44 8.87
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Position
0.00 1.53 10.24 1.44 8.87 0.02 1.45 8.84 2.44 0.35 12.49 0.03 1.10 10.03
2.24 3.67 12.21 6.88 8.34 2.34 8.40 4.98 4.76 7.30 8.64 3.27 8.63 4.87
4.49 4.18 16.31 10.11 10.14 4.14 12.79 4.21 6.56 11.69 7.87 5.79 13.50 3.06
6.73 3.26 22.40 11.31 14.18 5.35 14.77 6.52 7.77 13.67 10.17 7.39 15.73 4.80
8.98 4.42 21.67 13.51 12.80 6.04 17.42 4.15 8.46 16.32 7.81 8.30 18.51 2.13
11.22 4.81 21.43 14.25 12.34 6.21 18.26 3.45 8.63 17.16 7.10 8.45 19.35 1.45
13.47 4.42 21.67 13.51 12.80 6.04 17.42 4.16 8.46 16.32 7.81 8.29 18.51 2.14
15.71 3.26 22.40 11.31 14.18 5.38 14.79 6.48 7.80 13.69 10.14 7.44 15.76 4.74
17.96 4.18 16.31 10.11 10.14 4.13 12.78 4.23 6.55 11.68 7.89 5.76 13.47 3.11
20.20 3.67 12.21 6.88 8.34 2.34 8.39 4.99 4.76 7.29 8.65 3.28 8.64 4.85
22.45 1.53 10.24 1.44 8.87 0.02 1.45 8.84 2.44 0.35 12.49 0.03 1.10 10.03
Stress satisfactory? OK OK OK OK OK OK OK OK OK OK OK OK OK
Day = 1,000
-- At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -4.84 27.47 -3.89 22.77 -3.89 22.77 -3.89 22.77 -3.89 22.77
Debond - 1 -4.84 27.47 -3.89 22.77 -3.89 22.77 -3.89 22.77 -3.89 22.77
Debond - 2 -1.99 20.18 -1.53 16.72 -1.53 16.72 -1.53 16.72 -1.53 16.72
Debond - 3 0.20 14.39 0.28 11.92 0.28 11.92 0.28 11.92 0.28 11.92
Debond - 4 1.53 10.24 1.39 8.47 1.39 8.47 1.39 8.47 1.39 8.47
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Position
0.00 -- -- -- -- 0.02 1.40 8.44 2.44 0.30 12.10 0.03 1.05 9.64
2.24 -- -- -- -- 2.34 8.40 4.43 4.76 7.30 8.08 3.27 8.63 4.31
4.49 -- -- -- -- 4.14 12.88 3.43 6.56 11.78 7.09 5.79 13.58 2.28
6.73 -- -- -- -- 5.35 14.97 5.46 7.77 13.87 9.11 7.39 15.93 3.74
8.98 -- -- -- -- 6.04 17.61 3.09 8.46 16.51 6.74 8.30 18.71 1.07
11.22 -- -- -- -- 6.21 18.46 2.39 8.63 17.36 6.04 8.45 19.54 0.38
13.47 -- -- -- -- 6.04 17.61 3.09 8.46 16.51 6.75 8.29 18.70 1.08
15.71 -- -- -- -- 5.38 14.99 5.42 7.80 13.89 9.07 7.44 15.96 3.67
17.96 -- -- -- -- 4.13 12.87 3.45 6.55 11.77 7.11 5.76 13.56 2.33
20.20 -- -- -- -- 2.34 8.39 4.44 4.76 7.29 8.09 3.28 8.64 4.29
22.45 -- -- -- -- 0.02 1.40 8.44 2.44 0.30 12.10 0.03 1.05 9.63
Stress satisfactory? -- -- -- -- OK OK OK OK OK OK OK OK OK
Day = 10,000
-- At erection
Initial section Load comb 1A Load comb 2A Load comb 4
stress at: Girder top Girder bot. Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot. Section top Girder top Girder bot.
Full tendon -4.84 27.47 -3.61 21.26 -3.61 21.26 -3.61 21.26 -3.61 21.26
Debond - 1 -4.84 27.47 -3.61 21.26 -3.61 21.26 -3.61 21.26 -3.61 21.26
Debond - 2 -1.99 20.18 -1.41 15.61 -1.41 15.61 -1.41 15.61 -1.41 15.61
Debond - 3 0.20 14.39 0.29 11.13 0.29 11.13 0.29 11.13 0.29 11.13
Debond - 4 1.53 10.24 1.32 7.91 1.32 7.91 1.32 7.91 1.32 7.91
Allowable Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten. Comp. Ten.
stress 25.20 -3.24 25.20 -3.24 20 0 22.5 -3.54 22.5 -3.54
Position
0.00 -- -- -- -- 0.02 1.33 7.88 2.44 0.23 11.53 0.03 0.97 9.07
2.24 -- -- -- -- 2.34 8.40 3.63 4.76 7.30 7.29 3.27 8.63 3.52
4.49 -- -- -- -- 4.14 13.00 2.32 6.56 11.90 5.98 5.79 13.70 1.17
6.73 -- -- -- -- 5.35 15.25 3.94 7.77 14.15 7.60 7.39 16.21 2.22
8.98 -- -- -- -- 6.04 17.89 1.58 8.46 16.79 5.23 8.30 18.99 -0.44
11.22 -- -- -- -- 6.21 18.74 0.87 8.63 17.64 4.53 8.45 19.82 -1.13
13.47 -- -- -- -- 6.04 17.89 1.58 8.46 16.79 5.23 8.29 18.98 -0.43
15.71 -- -- -- -- 5.38 15.27 3.90 7.80 14.17 7.56 7.44 16.23 2.16
17.96 -- -- -- -- 4.13 12.99 2.34 6.55 11.89 6.00 5.76 13.68 1.22
20.20 -- -- -- -- 2.34 8.40 3.64 4.76 7.30 7.30 3.28 8.64 3.50
22.45 -- -- -- -- 0.02 1.33 7.88 2.44 0.23 11.53 0.03 0.98 9.07
Stress satisfactory? -- -- -- -- OK OK OK OK OK OK OK OK OK
0.00 -2350.9 -12.32 -6.56 -12.72 0.00 0.00 0.21 0.21 -12.04 -6.31 -12.44
2.24 -3122.4 -919.27 -489.30 -948.79 -215.76 -194.48 -175.43 -585.66 -1709.91 -1192.09 -1739.43
4.49 -4145.2 -1642.97 -874.50 -1693.77 -383.57 -345.74 -301.95 -1031.25 -3035.16 -2112.00 -3085.96
6.73 -5377.8 -2114.80 -1125.64 -2149.10 -503.43 -453.78 -393.57 -1350.78 -3938.36 -2746.58 -3972.66
8.98 -5377.8 -2379.85 -1266.72 -2402.26 -575.35 -518.61 -447.40 -1541.36 -4460.68 -3116.35 -4483.10
11.22 -5377.8 -2435.57 -1296.38 -2434.41 -599.32 -540.22 -465.02 -1604.56 -4601.73 -3221.85 -4600.57
13.47 -5377.8 -2378.33 -1265.91 -2398.99 -575.35 -518.61 -447.34 -1541.30 -4459.08 -3115.47 -4479.74
15.71 -5377.8 -2129.49 -1133.46 -2165.96 -503.43 -453.78 -393.40 -1350.61 -3952.82 -2754.20 -3989.29
17.96 -4145.2 -1636.25 -870.92 -1680.56 -383.57 -345.74 -301.55 -1030.85 -3027.90 -2107.95 -3072.21
20.20 -3122.4 -917.25 -488.22 -954.93 -215.76 -194.48 -174.54 -584.78 -1706.70 -1189.95 -1744.37
22.45 -2350.9 -15.68 -8.35 -16.30 0.00 0.00 1.65 1.65 -13.46 -6.37 -14.08