Академический Документы
Профессиональный Документы
Культура Документы
cp 6 1.00 1.00
100
ef 10 1.67 1.67
100
py 400 66.67 66.67
100
gn 5 0.83 0.83
100
GGs 94 15.67 15.67
100 Fotografía 1.-Relave final: calcopirita en mixtos con
pirita.
Parcial Libres 515 47.64 1.00 1.67 66.67 0.83 15.67
PARTICULAS MIXTAS
cp 8 1.50 1.50
100
ef 448 83.90 83.90
100
py 40 7.49 7.49
100
gn 4 0.75 0.75
100
ef2 2 0.37 0.37
100
Parcial Libres 502 46.44 1.50 83.90 7.49 0.75 0.37
Fotografía 3.-Concentrado de zinc: esfalerita en
PARTICULAS MIXTAS mixtos con galena y calcopirita.
secundario
2da Limpieza
Bulk
Tabla 4: Análisis Granulométrico Valorado
relave bulk Separacion Pb/Cu
MEDIOS DE BULK
A SK-240
cp 38 4.83 4.83
100
ef 72 9.15 9.15
100
py 549 69.76 69.76 Fotografía 8.-Alimento a flotación: presencia de
100 galena, calcopirita y esfalerita libres.
gn 5 0.64 0.64
100
GGs 109 13.85 13.85
100
ef2 1 0.13 0.13
100
Parcial Libres 774 71.60 4.83 9.15 69.76 0.64 13.85 0.13
PARTICULAS MIXTAS
aprecian en el Gráfico N° 1.
Separacion Pb/Cu 4
MEDIOS DE BULK
A SK-240
A.2 Circuito Zinc A.3 Estadística de la metalurgia de los
concentrados después de la
Según los cálculos de las pruebas optimización de los circuitos
metalúrgicas realizadas en nuestro
laboratorio de investigación se identificó Tabla 8: Estadística Metalurgia del Cobre
experimentalmente que la esfalerita tiene
alta cinética de flotación en el corto tiempo
de residencia de la etapa de flotación
rougher donde se recupera más del 90%
de Zinc, con estos resultados favorables
hallados se optimiza el circuito con la no
necesidad del uso de acondicionadores
para el alimento a flotación zinc (relave
bulk), porque nos ocasionaría a tener
gastos de mantenimiento durante la
operación.
1400
Valor U$$/TMS de conc.Pb
1375
1350
1325
1300
430
U$$/TMS de conc.Cu
420
410
400
390
Valor
380
370
23 24 25 26 27
calidad Cu(%)
440
de conc.Zn
430
420
tratamiento en 3,040 TMSD por efectos de -Evaluación y determinación de las
reducción del F80 en la alimentación al condiciones de operación del molino de
molino, e incremento del P80, producto del acuerdo a la aplicación de la Ley de Bond.
molino al circuito de flotación, en el rango
mínimo permitido por el grado de liberación
y flotabilidad, sin que se vea afectado las 3.3.1 Evaluación a condiciones
recuperaciones, sino por el contrario normales de operación del molino
incrementándolas. primario II
Capacidad
GRINDINGdeTASK diseño
:
MOLINO Ore Work Index, kWh (net)/metric ton 12.89 Specific Energy, kWh/ton 7.65
TMS TMS/hr TMH/hr*
Feed Size, F80, microns 3500 Net Power Available, kW 2686
Molino
8500 354
Product Size, P80, microns 360
172.0 Number of Mills for the Task 1
primario II Capacidad
Total Plant Throughput, ton/hr de390 diseño
Net kW / Mill 2686
MOLINO
Tabla 15:
Moly-Cop Tools TM (Version 3.0)
BOND'S LAW APPLICATION
Estimation of a Conventional Ball Mill Grinding Capacity
RemarksMOLINO PRIMARIO II
GRINDING TASK :
Ore Work Index, kWh (net)/metric ton 12.46 Specific Energy, kWh/ton 8.26
Feed Size, F80, microns 7500 Net Power Available, kW 2014
Product Size, P80, microns 165.0 Number of Mills for the Task 1
Total Plant Throughput, ton/hr 271 Net kW / Mill 2014
Mill
MILL DIMENSIONS AND OPERATING CONDITIONS : Power, kW
1649 Balls
Eff. Diameter Eff. Length Mill Speed Charge Balls Interstitial Lift 0 Overfilling
ft ft % Critical Filling,% Filling,%
Slurry Filling,% Angle, (°) 365 Slurry
14.5 23.5 77.0 32.00 32.00 100.00 29.18 2014 Net Total
L/D rpm 10.0 % Losses
1.621 15.49 2238 Gross Total
% Solids in the Mill 80.00 Charge Mill Charge Weight, tons Apparent
Ore Density, ton/m3 4.25 Volume, Ball Slurry Density
Reduciendo el F80 en 3500um del molino primario II Slurry Density, ton/m3 2.58 m3 Charge Interstitial above Balls ton/m3
se incrementa el tratamiento al molino en 390Ton/hr. Balls Density, ton/m3 7.75 35.23 163.83 36.30 0.00 5.680
RemarksMOLINO PRIMARIO II
GRINDING TASK :
Ore Work Index, kWh (net)/metric ton 12.89 Specific Energy, kWh/ton 6.70
Feed Size, F80, microns 3500 Net Power Available, kW 2686
Product Size, P80, microns 211.0 Number of Mills for the Task 1
Total Plant Throughput, ton/hr 446 Net kW / Mill 2686
Mill
MILL DIMENSIONS AND OPERATING CONDITIONS : Power, kW
2199 Balls
Eff. DiameterEff. Length Mill Speed Charge Balls Interstitial Lift 0 Overfilling
ft ft % Critical Filling,% Filling,%
Slurry Filling,% Angle, (°) 487 Slurry
16.5 24.0 76.0 32.00 32.00 100.00 27.84 2686 Net Total
L/D rpm 10.0 % Losses
1.455 14.33 2985 Gross Total
% Solids in the Mill 80.00 Charge Mill Charge Weight, tons Apparent
Ore Density, ton/m3 4.25 Volume, Ball Slurry Density
Slurry Density, ton/m3 2.58 m3 Charge Interstitial above Balls ton/m3
Balls Density, ton/m3 7.75 46.59 216.66 48.00 0.00 5.680
Finalmente al aumentar el P80= 211um al producto 3.3.5 Reduciendo el F80 del molino
del molino primario II se incrementa el tratamiento al
primario I
molino a 405Ton/hr
Tabla 16
Moly-Cop Tools TM (Version 3.0)
3.3.4 Evaluación a condiciones BOND'S LAW APPLICATION
normales de operación del molino Estimation of a Conventional Ball Mill Grinding Capacity
primario I
RemarksMOLINO PRIMARIO I
GRINDING TASK :
Ore Work Index, kWh (net)/metric ton 12.46 Specific Energy, kWh/ton 7.59
Feed Size, F80, microns 3500 Net Power Available, kW 2014
Product Size, P80, microns 165.0 Number of Mills for the Task 1
Finalmente al aumentar el P80= 174um al producto
Reduciendo el F80 en 3500um del molino primario I se del molino primario I se incrementa el tratamiento al
incrementa el tratamiento al molino en 295Ton/hr. molino a 305Ton/hr
Conclusiones
Tabla 18: Valorización de los concentrados -La Identificación óptima del Tamaño de los
Valores Metálicos Flotables y su pronta
extracción permiten optimizar la
performance metalúrgica la cual repercute
en lograr mejores calidades de los
productos por efectos de menor presencia
de contaminantes sobremolidos y pérdidas
de valore metálicos como lamas. -Petruk, W. (1978) “Correlation between
grain sizes in polished sections with sieving
-El beneficio económico anual solo por las data and investigation of mineral liberation
mejoras metalúrgicas que se alcanzaran en mesurements from polished sections”. Inst.
esta etapa es de $ USA 25´972, 917. Min. y Met, Transactions, C- Vol. 87, pp
272-277.
-Es posible seguir incrementando el
tonelaje de tratamiento diario, una -Petruk, W. (1986) "Predicting and
proyección por subir 1000 Ton/Día nos da measuring mineral liberations in ores and
un ingreso adicional de 1´609,000 USA al mill products, an effect of mineral textura
año solo por concepto de mejor metalurgia and grinding methods on mineral
+ $ 64´000,000 de EBBITA por las 2,000 liberations" Miner. and Metallurgical
TMSPD que esperamos alcanzar con los Process. Journal, A.I.M.E. pp. 393-403.
mismos equipos.
-WILLS B.A. MINERAL PROCESSING
-En cuanto a la metalurgia del Zn se logró TECHNOLOGY, OXFORD VI edition 1997
un resultado bastante optimo, llegando a
59.0% en la calidad de concentrado de zinc
(son pocos la empresas que alcanzan esta - Srdjan M. Bulatovic, “Handbook of
calidad con estas recuperaciones) Flotation Reagents”, Chemistry, Theory and
Practice Flotation of Sulfide Ores.Volume I
-Es posible reducir el consumo de energía
específica del molino a partir de los
- Informes internos de laboratorio
cambios realizados por este concepto.
metalúrgico de Cerro Lindo.
-- Hoy en día es posible eliminar los
acondicionadores si analizamos
correctamente la cinética de flotación y los
resultados que esperamos de estos
equipos los cuales nos permiten tener
menores inversiones en el CAPEX y OPEX
respectivamente con excelentes resultados
metalúrgicos.
AGRADECIMIENTOS
REFERENCIAS