: CO-13-100-100-00-PR-L-003
REQUISITION Revision :A
FOR
SP ITEM Page : 2 of 18
DESCRIPTION OF CHANGES
REQUISITION Rev. :A
FOR
SP ITEM Page : 3 of 18
REVISIONS REVISIONS
SHEET SHEET
A B C D E F G H A B C D E F G H
1 x 51
2 x 52
3 x 53
4 x 54
5 x 55
6 x 56
7 x 57
8 x 58
9 x 59
10 x 60
11 x 61
12 x 62
13 x 63
14 x 64
15 x 65
16 x 66
17 x 67
18 x 68
19 69
20 70
21 71
22 72
23 73
24 74
25 75
26 76
27 77
28 78
29 79
30 80
31 81
32 82
33 83
34 84
35 85
36 86
37 87
38 88
39 89
40 90
41 ATTACHMENT \ APPENDIX
42 1 A
43 2 B
44 3 C
45 4 D
46 5 E
47 6 F
48 7 G
49 8 H
50 9 I
PREMIER OIL NATUNA SEA B.V Doc. No. : CO-13-100-100-00-PR-L-003
REQUISITION Revision :A
FOR
SP ITEM Page : 4 of 18
CONTENTS
Description Page No
Front Page 1
Tabulation of Revised Pages 2
Description of Changes 3
Contents 4
Scope of Supply 5
Project Documents 6
Attachment :
Appendix - 1 QA 8
Appendix - 2 VDRL 12
Appendix - 3 SP Item List 13
Appendix - 3 SP Item Datasheet 14
Appendix - 4 SPIL 15
PREMIER OIL NATUNA SEA B.V Doc. No. : CO-13-100-100-00-PR-L-003
REQUISITION Revision :A
FOR
SP ITEM Page : 5 of 18
8 Nameplate
PMI requirement:
9 VENDOR shall take note of COMPANY Specification CO-13-100-100-00-SP-Q-003 and
requirement to perform positive material identification on specified alloys. Where
applicable VENDOR shall perform PMI in accordance with CO-13-100-100-00-SP-Q-
004, Specification for Positive Material Identification.
10 IMPORTANT NOTE:
All materials, equipment and major components of equipment manufactured outside of Indonesia, North America, Western Europe, Australia,
Singapore or Japan must be identified by VENDOR as such and the source is subject to Premier Oil approval.
All materials and equipment purchased by VENDOR and its subvendors/VENDORs shall be purchased from Premier Oil‘s Approved
Manufacturers List (AML).
VENDOR shall seek and obtain Premier Oil approval for any manufacturers and VENDORs that are not included in the AML.
Notes:
1. Manufacturer shall address the problem of galling between similar materials.
2. All information shall be read in conjunction with "Piping Design and Material Requirements" Doc.No. CO-13-100-900-00-SP-L-001
3. Detail requirements related to Piping properties shall be in accordance to "Piping Material Specification" Doc.No. CO-13-100-600-00-SP-L-002
PREMIER OIL NATUNA SEA B.V Doc. No. : CO-13-100-100-00-PR-L-003
REQUISITION Revision :A
FOR
SP ITEM Page : 6 of 18
1 PROJECT DOCUMENTS
1.1 Specifications
Piping Material Class Specification CO-13-100-600-00-SP-L-002 A
Piping Design and Material Requirements Specification CO-13-100-900-00-SP-L-001 A
1.2 Drawings
<Not Applicable>
Notes :
- Supplier to complete the Data Sheet (Mandatory)
and to be attached on Vendor quotation
- Deviation list from specification, company specifications, standard
and codes (Mandatory)
REQUISITION Revision :A
FOR
SP ITEM Page : 7 of 18
APPENDIX : 1
QA PROGRAM STANDARD
AND INSPECTION REQUIREMENTS
PREMIER OIL NATUNA SEA B.V Doc. No. : CO-13-100-100-00-PR-L-003
REQUISITION Revision :A
FOR
SP ITEM Page : 8 of 18
ITEM : SP ITEM
EQUIPMENT : As per SP Item Datasheet
TYPE OF INTERVENTION:
Approve (A) Approval is required from COMPANY/PURCHASER, also to be approved by VENDOR prior to submission to COMPANY.
Hold Point (H) VENDOR is requested to notify COMPANY/PURCHASER of inspection and test activity. VENDOR is not allowed to
proceed with the test / inspection unless a written waiver is given by PURCHASER.
Review, R Documents, inspection report and test result will be reviewed by PURCHASER and COMPANY.
Surveillance (S) VENDOR is not requested to notify COMPANY / PURCHASER. The COMPANY / PURCHASER inspector will monitor
work in progress, test and inspection during his visit or periodical inspection.
Witness Point (W) VENDOR is requested to notify of inspection and test activity. COMPANY/PURCHASER intends to witness, however
VENDOR can proceed with the test / inspection when the COMPANY inspector is not present at the notified time.
Note :
C = COMPANY ( Premier Oil Natuna Sea B.V)
P = CONTRACTOR
S = Supplier / VENDOR
This document is Company property. The Company lawfully reserves all rights.
PREMIER OIL NATUNA SEA B.V Doc. No. : CO-13-100-100-00-PR-L-003
REQUISITION Revision :A
FOR
SP ITEM Page : 9 of 18
APPENDIX 1
QA PROGRAM STANDARD AND INSPECTION REQUIREMENTS FOR VENDORS / REQUISITION N°
SELLERS CO-07-138-100-00-PR-L-113
REQUISITION Revision :A
FOR
SP ITEM Page : 10 of 18
APPENDIX - 1
INSPECTION LEVEL REQUIREMENTS TO BE AS PER SP-Q-007 and AA-Q-003 Clause 9.4 for definition of
Inspection levels.
REQUISITION Revision :A
FOR
SP ITEM Page : 11 of 18
APPENDIX : 2
REQUISITION Revision :A
FOR
SP ITEM Page : 12 of 18
ELECTRONIC
ELECTRONIC
ELECTRONIC
IN MANUAL
IN MANUAL
IN MANUAL
REQUIRED
REQUIRED
REQUIRED
REMARKS
REMARKS
REMARKS
WITH BID
WITH BID
WITH BID
REVIEW
REVIEW
REVIEW
B - DESIGN INFORMATION D - RECORDS, REPORTS AND CERTIFICATES
A01 VENDOR DATA MASTER LIST (VDML) I A D 8 (2) WAFO B19 LOOP DIAGRAMS D19 LIFTING EQUIPMENT TEST CERTIFICATES
A02 GENERAL ARRANGEMENT DRAWINGS I A D 8 (4) WAFO B20 RECOMMENDED SPARE PARTS - R M 8 (4) WAFO D20 DIMENSIONAL REPORT
A03 FOUNDATION LOADING DIAGRAMS & SUPPORT DETAILS B21 SPARE PARTS INTERCHANGEABILITY LIST (SPIL) D22 INSTRUMENT TEST / CALIBRATION CERTIFICATE
A04 PFD'S, UFD'S, HEAT & MASS BALANCE B25 QUALITY MANUAL - R D 8 (2) WAFO D23 INSTRUMENT SYSTEM SOFTWARE LICENSES
A05 PIPING & INSTRUMENT DIAGRAMS (P&IDs) B26 QUALITY PLAN - R D 8 (2) WAFO D24 INSTRUMENT SYSTEM SOFTWARE CODING/LISTING
A06 OPERATION/ TECHNICAL DESCRIPTION I A D 8 (4) WAFO Included in E05 B27 INSPECTION AND TEST PLAN I A D 8 (2) WAFO D25 ELECTRICAL MACHINERY TYPE TESTS
A07 INTERFACE & CONNECTION SCHEDULE B30 HEALTH AND SAFETY ENVIRONMENTAL MANAGEMENT SYSTEM D26 ELECTRICAL EQUIPMENT HEAT RUN TEST RECORDS
A08 SINGLE LINE ELECTRICAL DIAGRAMS B31 HEALTH AND SAFETY ENVIRONMENTAL PLAN D27 ROUTINE ELECTRICAL EQUIPMENT TEST CERTIFICATES
A09 SCHEMATIC DIAGRAMS B35 VENDORS CATALOGUES I I D 8 (2) WAFO D30 PAINTING / INSULATION INSPECTION REPORT - R C 8 (4) WAT
A10 ELECTRICAL CONNECTION DIAGRAMS B40 SIZING CALCULATIONS D34 INGRESS PROTECTION CERTIFICATES
A11 INSTRUMENT / ELECTRICAL LOGIC DIAGRAM B41 RELIABILITY AND AVAILABILITY DATA D35 FIRE TEST REPORTS / CERTIFICATES - I C 8 (4) WAFO
A12 CABLE SCHEDULE B42 PERFORMANCE CURVES D36 EQUIPMENT HAZARDOUS AREA CERTIFICATES
A13 CAUSE & EFFECT MATRICES B43 LATERAL & TORSIONAL CRITICAL ANALYSIS REPORTS D37 PERFORMANCE TEST REPORT/RESULTS - I C 8 (4) WAFO
A14 INSTRUMENTATION BLOCK DIAGRAMS B44 MISCELLANEOUS DESIGN CALCULATIONS D38 FACTORY ACCEPTANCE TEST REPORT - S C 8 (2) WAT
A20 EQUIPMENT AND BILL OF MATERIALS B45 LIST OF PROPOSED SUB-VENDORS AND SERVICE AGREEMENTS D40 HAZARDOUS MATERIAL SAFETY DATA SHEETS
A21 EQUIPMENT DATA SHEETS I A D 8 (4) WAFO D41 HAZARDOUS MATERIAL SHIPPING CERTIFICATES
A22 UTILITIES SCHEDULE C - MANUFACTURING AND TESTING PROCEDURES D42 SHIPPING & PACKING DOCUMENTS - R C 8 (2) WPTD
A23 WEIGHT DATA SHEET Included in A02 C01 WPS AND WPQ RECORDS - I C 8 (4) WPTP If Applicable D50 INSPECTION RELEASE CERTIFICATE (IRC) - R C 8 (2) WPTD
A24 ACCEPTABLE NOZZLE LOADS C02 NON DESTRUCTIVE EXAMINATION PROCEDUREs (NDE) - R C 8 (4) WPTP If Applicable D51 NON CONFORMANCE REPORTS (NCR) - R C 8 (2) WPTD If Applicable
A25 NOISE LEVEL DATA SHEETS C03 MANUFACTURING PROCEDURES INCLUDING HEAT TREATMENT - I C 8 (4) WPTP If Applicable D55 TABLE OF CONTENTS FOR MANUALS - A C 8 (2) WAFO
A26 ENCLOSURE VENTILATION REQUIREMENTS C04 PRESSURE TEST PROCEDURES - A C 8 (4) WPTP D56 DESIGN BOOK - A C 8 (2) WAD
A30 COMMUNICATION INTERFACE DETAILS C05 SURFACE PREP. & PAINTING SPECIFICATION - A C 8 (6) WPTP D59 AS BUILT DOCUMENTS - A C 8 (4) WAD
A31 CONTROL SYSTEM I/O LIST C06 PERFORMANCE & ACCEPTANCE TEST PROCEDURES D60 FABRICATION/PRODUCTION SCHEDULE - R C 8 (2) WAFO
C08 PACKING PROCEDURE - I C 8 (8) WPTP D65 ELECTRICAL EQUIPMENT INSULATION RESISTANCE
C09 DIMENSIONAL CONTROL PROCEDURE D66 INST. & ELEC. CABLE INSULATION RESISTANCE AND CONTINUITY
B - DESIGN INFORMATION C10 SOFTWARE QEALITY SYSTEM D67 LOOP TEST AND INSTU. IMPULSE LINE PRESSURE TEST
B01 DETAILED FABRICATION DRAWINGS C14 IMPLEMENTATION SPECIFICATION D68 INSTRUMENT TUBING LEAK CHECK REPORT
B02 CROSS SECTIONAL / EXPLODED VIEW DIAGRAM WITH PARTS LIST - A D 8 (4) WAFO C15 MATERIALS TESTING PROCEDURES - I C 8 (6) WPTP
B03 SUB ASSEMBLY DRAWINGS E - INSTRUCTIONS FOR INSTALLATION, OPERATION AND MAINTENANCE
B04 PIPING ISOMETRICS D - RECORDS, REPORTS AND CERTIFICATES E01 UNPACKING & PRESERVATION PROCEDURE
B05 PRESSURE VESSEL / TANK MECHANICAL CALCULATIONS D01 MATERIAL TEST CERTIFICATES - R C 8 (2) WAT E02 ERECTION & INSTALLATION PROCEDURES
B06 NAME PLATE FORMAT DRAWINGS - D 8 (6) WAFO D02 WELDER PERFORMANCE QUALIFICATION CERTIFICATES - I C 8 (4) WPTP If Applicable E03 ERECTION FASTENER SUMMARY LIST
B07 MECHANICAL SEAL/BEARING DRAWINGS D03 WELDABILITY DATA E04 PRE-COMMISSIONING / COMMISSIONING PROCEDURES
B08 SHAFT ALIGNMENT DRAWINGS D04 NDE OPERATOR QUALIFICATION CERTIFICATES E05 OPERATING & MAINTENANCE MANUAL - I M 8 (4) WAD
B10 SCHEDULE OF ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS D05 PRODUCTION TEST RESULTS (INCLUDING WELDING) E06 LUBE OIL AND OPERATING FLUIDS SCHEDULE
B11 TERMINAL BLOCK DIAGRAMS D06 NDE RECORDS - I C 8 (2) WAT If Applicable E10 CERTIFICATE AND MANUFACTURING DATA BOOKS - I C 8 (4) WAD
B12 WIRING DIAGRAMS D07 HEAT TREATMENT RECORDS - I C 8 (2) WAT If Applicable E14 LIST OF SPECIAL TOOLS FOR INSTALLATION AND MAINTENANCE
B13 FUNCTIONAL/TECHNICAL DESCRIPTION OF SUBSYSTEMS D08 MATERIAL TRACEABILITY RECORDS AND LOCATION PLANS - I C 8 (6) WAFO If Applicable E 15 PROGRAMMER'S REFERENCE MANUAL
B14 INSTRUMENT / ELECTRICAL DESIGN DETAILS D09 PRESSURE TEST CERTIFICATES - R C 8 (2) WAT If Applicable
B17 INSTRUMENT DATA SHEETS D16 VIBRATION REPORT REV Date DESCRIPTION Prepared Checked Proj, App Client App
I ISSUED FOR INFORMATION ONLY TO EPCI ENGINEERING OFFICE Copies Required: WPTP - Weeks Prior To Production
Vendor Data Requirements List (VDRL)
B COMBINATION OF S AND I With Bid : 6 WPTT - Weeks Prior To Test MANUAL VALVES Requisition No. :
(X) A NUMBER INDICATES NUMBER OF WEEKS For Review: 7 WAT - Weeks After Test CO-13-100-100-00-PE-B-006
Manuals (Asbuilt status) : 8 WPTD - Weeks Prior To Delivery
Electronic WAD - Weeks After Delivery
Certified Final Version of Document Required WAOA - Weeks After Offshore Acceptance
in CD ROM in 3 copies
PREMIER OIL NATUNA SEA B.V Doc. No. : CO-13-100-100-00-PR-L-003
REQUISITION Revision :A
FOR
SP ITEM Page : 13 of 18
APPENDIX : 3
SP ITEM LIST
REQUISITION Revision :A
FOR
SP ITEM Page : 14 of 18
APPENDIX : 4
SP ITEM DATASHET
REQUISITION Revision :A
FOR
SP ITEM Page : 15 of 18
APPENDIX : 4
to be filled by Supplier
EQUIPMENT REG.
SPIL NUMBER : 32
QUANTITY TO BE ORDERED
PREMIER OIL NATUNA SEA BV VENDOR NO. CO-13-100-100-00-PR-L-003 CURRENCY UNIT BY MANUFACTURER
UNIT OF MEASURE
NORMAL (2 YEARS)
NORMAL (2 YEARS)
PHYSICAL STOCK
NAME OF THE SUPPLIER PART NUMBER VALIDITY DATE
COMMISSIONING
COMMISSIONING
MANUFACTURER'S
ITEM NUMBER
3 DESCRIPTION OF PARTS MATERIAL INCLUDING BRAND NAME EQUIPMENT SUPPLIER OF PONSL STOCK
CRITICAL
CRITICAL
SPECIFICATION POSITION OR OF BOUGHT OUT ITEMS MANUFACTURER BOUGHT OUT CODE NUMBER
ITEM NUMBER OR ITEMS
REMARKS
NO. OF
UNITS
4 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 36 37 38 39 40 41
4
NO. OF PARTS PER UNIT
5 6
10
11
12
TOTAL VALUE
27 CUMULATIVE 24 43
ORDER REF. NO.
REVISION UP TO THIS
6 SHEET
BROUGHT IN 25 44
DATE FROM LAST
SHEET
NAME : 30 IN LOCAL 45
FOCAL POINT OF MANUFACTURER/SUPPLIER SIGNATURE CURRENCY
DESIGNATION : (1Rp = )
ALL DRAWINGS AND PARTS LISTS 28
31 CLASSIFICATION OF EQUIPMENT PHONE NUMBER : ATTACHED YES PAGE NO. 16 OF 18
EQUIPMENT REG.
SPIL NUMBER :
OR TAG NO.
1
EQUIPMENT :
MANUFACTURER :
MANUFACTURER'S
MODEL OR TYPE
VENDOR :
GAJAH BARU PROJECTBISON, IGUANA AND
2 PROJECT : GAJAH PUTERI (BIGP)
PLANT :
3 NOTES
NO. OF
UNITS
4 REMARKS
SPARE PARTS AND INTERCHANGEABILITY LIST
1 1
2 2
CONTINUATION SHEET
3 3
4 4
NO. OF PARTS PER UNIT
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
STATUS OF SPIL
ORDER REF. NO.
REVISION
6
DATE
SIGNATURE
31 SHEET NO 17 OF 18
SPARE PARTS AND INTERCHANGEABILITY LIST PAGE 18 OF 18
THE COMPLETION OF THE SPIL FORM(S) BY MANUFACTURER(S)/SUPPLIER(S)
Column 16 - UNIT OF MEASURE
The SPIL form consists of a main sheet and continuation sheets, format A3. The completed forms shall be distributed on For example : PC=Piece, ST=Set. The build-up of a set shall be explained in column 9
A3 formats as specified in the Purchase order. The manufacturer/supplier is requested to complete all the columns,
except the bold faced/outlined columns of the form as described below. Column 17 - UNIT PRICE
All information shall be clearly stated in English language. State the ex works price per piece of each part (the currency unit & validity to be entered at the top of the column)
Column 1 - EQUIPMENT REG. or TAG NO. Column 19 - COMMISSIONING SPARE PARTS RECOMMENDED BY MANUFACTURER
Enter the equipment registration - or tag number for each piece of equipment as stated in the requisition - or Commissioning spare parts are parts required to prepare the equipment ready for start up
purchase order.
Column 20 - DELETED
Column 2 - MANUFACTURER'S MODEL or TYPE
State model, type or other positive identification reference of the equipment/instrument ordered. Column 21 - SPARE PARTS FOR NORMAL OPERATION RECOMMENDED BY MANUFACTURER
Spare parts for normal operation should adequately cover the requirements of the day to day maintenance for a period of two
Column 3 - MANUFACTURER'S SERIAL NO. years following the initial operation
State serial number or other unique identification reference of the equipment/instrument ordered.
Column 22 - CRITICAL SPARE PARTS
Column 4 - NO. OF UNITS Based on manufacturer experience
Enter the total number of pieces of identical equipment/instruments as quoted in columns 1, 2, and 3.
Column 23 - TOTAL VALUE
Column 5 - NUMBER OF PARTS PER UNIT to 25 Enter the total value of the spares recommended (current sheet and cumulative up to current sheet and total value of the
For each unit or group of identical units, enter in the appropriate space/number of parts fitted in each unit of SPIL brought in from the last sheet)
equipment/instrument.
Column 26 - STATUS / REVISION OF SPIR LIST
Column 6 - ORDER REF. NO. and 27 F=Final, P=Preliminary. Revision to be marked as O=Original, a, b, c, etc
Filled in by manufacturer
Column 28 - DRAWINGS AND PARTS LISTS
Column 7 - TOTAL NUMBER OF IDENTICAL PARTS INSTALLED Attach all documents and put a check mark in the box
Enter the total number of identical parts covered by the equipment specified in the case of identical units multiply
the quantity of column 5 by the number of units given in column 4. Column 29 - NOTES
Information not covered on other columns to be filled in here
Column 8 - ITEM NUMBER OF PARTS
Column 30 - MANUFACTURER'S FOCAL POINT
Column 9 - DESCRIPTION OF PARTS Name and designation of the person to be filled including telephone number
List all parts which should be carried in stock for initial and normal operation including slow-wearing parts.
If an item is interchangeable between two or more units it should be listed only once (refer to columns 13 & 14). Column 31 - CLASSIFICATION OF EQUIPMENT
V=Vital, E=Essential, A=Auxiliary
Column 10 - MATERIAL SPECIFICATION
Enter material specification in terms of full International Standards and accepted conventions, NDT manufacturer's Column 32 - SPIL NUMBER
or sub-manufacturer's reference, including materials certificates if required. Enter the SPIL list number