Вы находитесь на странице: 1из 1

Sewerage piping installation activity

1. To cut premix 32m


2. Excavation on road inclusive night work
3. Wood shoring for trench
4. To remove excavated area
5. Backfilled with sand
6. 300mm crusher run
7. Temporary premix
8. Supply and lay 300mm VCP along road within site
9. To supply and install precast manhole
10. Heavy duty manhole covers
11. Liaison works with authorities
12. Temporary plug for 300mm VCP

Вам также может понравиться