MONTH
Item Description Period 1 2 3 4 5 6 7 8 9 10 11
Start Finish 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
1 PRELIMINARY
2 MOBILISATION 14 days
3 PILING WORKS 60 days
BUILDING WORKS
4 SUBSTRUCTURE 60 days
RC RAME 270 days
UPPER FLOOR & SUSPENDED SLAB 290 days
STAIRCASE STRUCTURE 150 days
ROOF 30 days
EXTERNAL & INTERNAL WALL 230 days
DOORS 120 days
WINDOWS 240 days
FLOOR FINISHES 150 days
WALL FINISHES 200 days
CEILING FINISHES 180 days
HANDRAILING 150 days
SANITARY AND WARES 45 days
EXTERNAL WORKS
ROAD & CARPARK 30 days
SURFACE WATER DRAINAGE 45 days
SOIL DRAINAGE 80 days
WATER RETICULATION SYSTEM 60 days
PRIME COST & PROVISIONAL SUMS
ELECTRICAL INSTALLATION 400 days
EXTRA LOW VOLTAGE 400 days
COLD WATER & SANITARY SERVICES 400 days
FIRE PROTECTION SERVICES 400 days
LIFT INSTALLATION 150days
AIRCOND SYSTEM 210 days
SWIMMING POOL SYSTEM 120 days
LANDSCAPING 60 days
GYM EQUIPMENT 60 days
DEMOBILISATION 14 days
TH
11 12 13 14 15 16 17 18 19
3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
PROJECT: PROPOSED MAIN BUILDING WORKS FOR MIXED DEVELOPMENT OF RESIDENTIAL (APARTMENT) & COMMERCIAL ON 0150, PL. 103, 0151 & 015 AT JALAN BUKIT PADANG, KOTA KINABALU, SABAH.
WORK PROGRAMME IN 30 MONTHS
MONTH
Item Description Schedule 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Start Finish
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
MOBILISATION 30 Days
BUILDING WORKS
MACHANICAL WORK
DEMOBILISATION 75 Days