TURNAROUND-
Job Type Client: HADEED Area: RMLMP-BARMILL-1
MAINTENANCE
Estimated
PO #
4300081163 Duration: 15 DAYS
Scope of RLMP-BARMILL-TURNAROUND
Document Works DURING FEB -2017
Date
Prepared Mahammad Haneef Feb 23/2017
Prepared:
By:
Height Fork Lift
Manual Electrical/I Confined Hazardous Mechanical Lay down
Work/ Truck/ Cranes
Job Handling nstrument Space Substances Work Area
Scaffold Mobile Plant
Elements:
Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No
Various risks due 1. All persons to be site inducted and approved ICMS Safety Officer
2. Site Arrival to unfamiliarity 2. Site visits and pre-meetings with the client and Coordinator
with the site 3. ICMS to report to the client representative upon arrival at the site for instruction Designated/CLIENT
International Construction And Manufacturing Services – JSA/HIP Template Page 1 of 7 Issue 1:0
JOB SAFETY ANALYSIS (JSA) AND HAZARD IDENTIFICATION PLAN (HIP)
1. Only approved and authorized vehicles to be used.
2. All vehicles to be authorized by the client & relevant approvals obtained
3. All vehicles maintained to legal and ICMS standards
General
4. Daily maintenance checks to be undertaken prior to use. ICMS defect ICMS Safety Officer
Activities – Various
3. management system to be used for any safety critical defects and Coordinator
Vehicle & workplace
5. All vehicles will obey the client’s traffic management system at all times i.e. in Designated/CLIENT
Plant transport risks
relation to speed limits, one way systems, overtaking and reversing etc.
Movements
6. Reversing alarms are fitted to all vehicles and banksmen will be used for
complex movements and reversing.
1. ICMS will request that the client removes as much process materials from the
systems being worked as possible
2. Plant to be de-energized and isolated/blinded prior to starting any work
3. Relevant permits i.e. general, confined space & hot work to be raised by the
ICMS Safety Officer
Site Setup & Process/ client as necessary before any work on the plant commences
and Coordinator
4. General energized plant & 4. All identified controls in the Permits are to be checked for completion/adequacy
Designated/CLIENT
Operations machinery by the ICMS Permit Receiver before permits are accepted.
5. All ICMS/sub-contractor personnel to be briefed on identified controls and
requirements via a pre-meeting/toolbox talk before starting work/stages of work
on the plant
1. Manual handling risk is to be eliminated and weights reduced so far as is
reasonably practicable.
2. Where manual lifting is necessary in excess of 25Kg or less if loads/operations
ICMS Safety Officer
Manual Sprains, strains, are awkward and risks are significant all operations are to be assessed and risks
5. and Coordinator
Material cuts & related reduced by manual handling aids or team lifting.
Designated/CLIENT
Handling industries 3. FLT/crane provided for heavier lifting
4. Minimum PPE provided includes safety gloves, safety footwear, hard hats, eye
protection fire retardant overalls
1. All relevant controls in the section on general vehicle controls
Falling objects, 2. The crane will only be operated by competent and certified 3rdparty drivers, in
failure of lifting conjunction with qualified Riggers
Crane equipment, 3. Only 3rdparty certified lifting equipment and lifting accessories will be used. ICMS Safety
6 operations crane turnover ICMS will check all certification and inspect all lifting equipment prior to delivery to Officer and
& striking Site. Client will be invited to inspect equipment and paperwork Coordinator
persons/equip 4. Lifting plan to be determined for all lifts, this will include safe working loads, lifting Designated/C
ment with route, swing radius, safe operating wind speeds, safe rigging requirements, LIENT
loads Adequate means of communication between chief Rigger and crane operator.
International Construction And Manufacturing Services – JSA/HIP Template Page 2 of 7 Issue 1:0
JOB SAFETY ANALYSIS (JSA) AND HAZARD IDENTIFICATION PLAN (HIP)
Any hand signals/terminology is to be agreed in advance.
5. Loads will be lifted the minimum required height to perform operations. Loads will
6. never be lifted over any persons or high risk equipment
7. Lifting area will be demarcated and persons not involved in the lifting operations
Will be kept clear of the working area. Lifting operations will cease if unauthorized
Persons encroach on the working area.
8. Loads will be stabilized before hoisting, lines will be used if required.
All relevant controls in workplace transport & crane operation sections above
Only approved and qualified operators will operate FLTs.
FLT will have valid 3rd.party lifting equipment inspection. All lifting equipment will be
inspected prior to use.
Loads/lifting routes should be planned in conjunction with supervisor prior operations.
SWL & other critical parameters of FLT will never be exceeded.
Falling objects, Operatortoensureloadsaresafeandsecurebeforetransportation.Loadstobelifted the
7 Forklift truck failure of lifting minimum height necessary. ICMS Safety Officer
operations equipment,FLT Only approved lifting attachments are to be used and Coordinator
turn over & Banks man to be used for complex lifts or where there is a possibility of restricted Designated/CLIENT
workplace visibility
transport risks Lifting will only occur in approved working areas lifted the minimum height necessary.
Only approved lifting attachments are to be used
Banks man to be used for complex lifts or where there is a possibility of restricted
visibility
Lifting will only occur in approved working areas.
International Construction And Manufacturing Services – JSA/HIP Template Page 3 of 7 Issue 1:0
JOB SAFETY ANALYSIS (JSA) AND HAZARD IDENTIFICATION PLAN (HIP)
ICMS Supervisors/Safety Officers will inspect scaffolding/access equipment at the start
of every shift.
Any work not from fixed gantries/approved scaffold/ scaffold with a yellow tag or
equivalent, will require the use of safety harnesses. Harnesses will incorporate double
lanyards, where access/egress/movement at height poses significant risk. Lanyards are
to be secured to approve anchor points only.
Ladders are to be used for access and egress only, unless their use is specifically risk
assessed & approved by the client. All ladders are to be tied/footed as required and
protrude 1.1M above any landing.
Where necessary ICMS will haul plant/equipment to positions & use suitable bags/tools.
Loose equipment will not be carried on any ladders.
Client to advise with reference to any potentially weak or corroded surfaces
Surfaces to be inspected prior to starting work
Where necessary temporary access equipment and/or fall arrest equipment will be used.
Operatives to be advised to remain vigilant & stop work where necessary reporting any
concerns.
All relevant controls in the working at height sections above
Excessive amounts of equipment and materials will not be stored at height
All hoses and heavy equipment will be tied at height to prevent them falling. I ICMS Safety
Working at Falling Objects Good housekeeping will be maintained Officer and
9 Height Areas where height working is being undertaken will have barriers and warning signs. Coordinator
There will be no “bombing” of equipment and materials from height Designated/CLIENT
Standby men will be utilized to keep persons away from high risk areas when required
All personnel will wear hardhats
International Construction And Manufacturing Services – JSA/HIP Template Page 4 of 7 Issue 1:0
JOB SAFETY ANALYSIS (JSA) AND HAZARD IDENTIFICATION PLAN (HIP)
1. All ICMS equipment conforms to relevant national and international standards
2. All equipment has adequate guards and protection devices as necessary
3. All equipment is only used by authorized and competent persons
Risks from ICMS Safety Officer
Using 4. All equipment is serviced in line with relevant ICMS servicing schedules
11 moving and Coordinator
machinery 5. All equipment is inspected at the start of every shift.
machinery Designated/CLIENT
6. Where necessary the ICMS defect management system will be used to control
defects that may occur when the equipment is in use
International Construction And Manufacturing Services – JSA/HIP Template Page 5 of 7 Issue 1:0
JOB SAFETY ANALYSIS (JSA) AND HAZARD IDENTIFICATION PLAN (HIP)
International Construction And Manufacturing Services – JSA/HIP Template Page 6 of 7 Issue 1:0
JOB SAFETY ANALYSIS (JSA) AND HAZARD IDENTIFICATION PLAN (HIP)
1. All relevant controls in confined space working sections.
2. Operational noise levels will be reduced so far as is reasonably practicable
3. Where noise levels are likely to exceed 90dBA (Lep, d) or 140dBA peak (ICMS
Standards), i.e. during HPWJ or heavy mechanical works, hearing protection will ICMS Safety Officer
General - Acute & chronic
17 be worn. These levels may be reduced if client requirements dictate due to their and Coordinator
Noise hearing loss
own site policy. Designated/CLIENT
4. Where noise levels with hearing protection are likely to breech these levels (i.e.
taking into account the reduction factor of protectors required). Double hearing
protection will be specified and will be a combination of plugs and muffs.
All relevant controls above including sections on confined space working.
Vessel specific emergency procedures are to be established & agreed with the client
In the event of an emergency forming part of ICMSs operations, all plant/machinery is to
General – Various risks due be shut down and employees are to report to the ICMS supervisor. ICMS supervisor will
18 Fires and to fires, take necessary action and inform the client. ICMS Safety Officer
Emergencies explosions & In the event of wider site emergencies ICMS personnel are to follow the client’s and Coordinator
chemicals emergency arrangements. Designated/CLIENT
All ICMS personnel are to be instructed on the emergency arrangements
International Construction And Manufacturing Services – JSA/HIP Template Page 7 of 7 Issue 1:0