Академический Документы
Профессиональный Документы
Культура Документы
Date 15.02.2006
Contracts can be divided in different ways: two ways
are adopted here
• No risk to contractor.
• Useful when technical aspects govern the
project
Disadvantages
Disadvantages
Disadvantages