14. What is bar bending schedule (BBS) & how to prepare it?
21. What are the weights of 16mm, 12mm, 20mm, 25mm, 8mm Dia. Bars.
22. What is the minimum Propping Period of Beams and Slabs of various Spans?
39. How many types of slabs are there & how to design it?
44. Difference between one way slab & two way slab?
50. What is the ratio of Grades M5, M7.5, M10, M15, M20, M25, M30, M35, M40?
52. The concrete slump recommended for beams and slabs; is-
56. Define slenderness ratio. What is its effect on the design of compression member?
57. Shear force and BM diagrams for different types of loadings on beams.
1. Grade Of Concrete:
M5 – 1 : 4 : 8
M10 – 1 : 3 : 6
M15 – 1 : 2 : 4
M20 – 1 : 1.5 : 3
M25 – 1 : 1 : 2
Beam : 25 mm
Strap Beam : 50 mm
Column :40 mm
Slab : 15 mm
flat Slab : 20 mm
Staircase : 15 mm
Retaining Wall : 20 – 25 mm
Maximum dia of main bars and distributors in the slab – 1/8 of slab thickness.
All reinforcement should be free from mill scales, loose rust, and coats of paints, oil or any other
substances.
3. Setting Time:
Initial setting time should not be less than 30 minutes.
6. Cube Samples:
1 – 5 m3 : 1 No.
6 – 15 m3 : 2 No..
16 – 30 m3 :3 No.
31 -50 m3 : 4 No.
Concrete Test: Slump test, compression test, split tensile test, soundness etc.
Soil Test: Core cutter test, compaction test,sand replacement test, triaxial test, consolidation test
etc.
Bitumen Test: Ductility test, softening point test, gravity test, penetration test etc.
2. Investigation Of soil:
Various soil tests are conducted to determine the settlement and stability of soils before starting a
construction. So as a civil engineer, you should have enough knowledge of these tests which are
performed at the site.
8. Quality Control:
Quality control ensures the profit of a project by reducing the extra costs. So you must have a
basic knowledge of quality control.
9. On Field Management:
Knowledge of form-work, concreting, safety measures etc is also a key aspect.
B means – Bedroom,
K means – Kitchen.
1 BHK:
Full form – 1 Bedroom, 1 Hall & 1 Kitchen
Explanation:
Plan:
2 BHK:
Full form – 2 Bedrooms, 1 Hall & 1 Kitchen
Explanation:
2 Bedrooms with 1 Hall & 1 Kitchen. Sometimes it is also defined as 1 Master Bedroom (larger
than standard size) & 1 Small Bedroom, 1 Hall & 1 kitchen
Plan:
3 BHK:
Full form – 3 Bedrooms, 1 Hall & 1 Kitchen
Plan:
4 BHK:
Full form – 4 Bedroom, 1 Hall & 1 Kitchen
Plan:
0.5 BHK:
Explanation – Bedroom smaller than the standard size. Normally they are recommended as
library or study room. But it can be used as bedroom.
Plan: Same as 1BHK just bedroom size is smaller than standard size.
1.5 BHK:
Full form – 1.5 Bedroom, 1 Hall & 1 Kitchen
Plan:
2.5 BHK:
Full form – 2.5 Bedroom, 1 Hall & 1 Kitchen.
Plan: Same as 1.5 BHK layout but have one more bedroom.
1 RK:
Full form: 1 Room & 1 Kitchen
Explanation: Studio Apartments have this types of layouts. It has 1 room which is used as living
room & 1 kitchen.
Plan:
2 BHK 2T:
Full form: 2 Bedroom, 1 Hall, 1 Kitchen & 2 Toilets.
Explanation: 2 Bedrooms, 1 Hall, 1 kitchen & 2 Toilets ( 1 common & 1 attached with master
bedroom)
Plan:
3 BHK 2T:
Full form: 3 Bedroom, 1 Hall, 1 Kitchen & 2 Toilets.
Explanation: 3 Bedrooms, 1 Hall, 1 kitchen & 2 Toilets ( 1 common & 1 attached with master
bedroom)
3 BHK 3T:
Full form: 3 Bedroom, 1 Hall, 1 Kitchen & 3 Toilets.
Explanation: 3 Bedrooms, 1 Hall, 1 kitchen & 3 Toilets ( 1 common & 1 attached with master
bedroom).
Scaffolding:
Scaffolding is a temporary framework having platforms at different level of a structure which
enables the masons/labor for working at the height. They are usually used for activities such as
plastering, painting, brickwork at heights etc. There are various types of scaffolding:
3. Steel Scaffolding.
5. Gantries.
6. Bamboo/Wooden Scaffold
3. Suspended Scaffolding.
Shuttering/Formwork:
Formwork is a temporary structure used as a mold in which fresh concrete are poured to cast the
members of the structure at the site. It is also known as falsework or shuttering. In the context of
concrete construction, the falsework supports the shuttering molds for example column sides,
beam sides, slab side, wall side etc.
So, By their definitions, scaffolds are for supporting labor and materials and act as working
platforms. Formwork (Shuttering) acts as molds for pouring concrete.
Centering:
Part of the formwork which supports the horizontal surface is called centering for example slab
bottom, beam bottom etc.
Staging:
That portion which supports centering & shuttering is called Staging. This can be:
1. Wooden Ballies
2. Pipes/Props/Jacks
3. H frames
4. Space frames using Coupler / Cup-Lock system