"PILEGRP" --- PILE GROUP ANALYSIS PROGRAM

Program Description:

"PILEGRP" is a spreadsheet program written in MS-Excel for the purpose of analysis of pile groups with rigid
caps using the "elastic method". Specifically, the properties of the pile group are calculated, and then based
upon the applied vertical and horizontal loadings, the vertical and horizontal pile reactions are calculated.
There is also a worksheet to check beam and punching shear in the pile cap for a single corner pile, for the
purpose of estimating the required pile cap thickness and subsequent pile cap weight.

This program is a workbook consisting of six (6) worksheets, described as follows:

Worksheet Name Description


Doc This documentation sheet
Piles (<=25) Pile group analysis for up to 25 total piles and 4 piers/loadings (metric)
Piles (<=75) Pile group analysis for up to 75 total piles and 8 piers/loadings (metric)
Piles (<=300) Pile group analysis for up to 300 total piles and 17 piers/loadings (metric)
Piles (<=400) Pile group analysis for up to 400 total piles and 23 piers/loadings (metric)
Corner Pile Shear Beam and punching shear checks for pile cap for single corner pile

Program Assumptions and Limitations:

1. The Pile Group worksheets assume a minimum of 2 piles and a maximum of either 25, 75, 300, or 400 piles
for a pile group.
2. This program uses the "elastic method" of analysis, assuming that the pile cap is in fact "rigid", so that the
applied loads are linearly distributed among the piles. A common "rule-of-thumb" is to assume a pile cap
thickness equal to least 1/10 of the longest dimension (length or width) of the pile cap. All piles are assumed
to be vertical, and of equal size and length (stiffness). Battered piles are NOT permitted. The tops of all piles
are assumed at the same level.
3. This program assumes an orthogonal X-Y-Z coordinate system. All piles and piers MUST BE located in the
"positive" (1st) quadrant. "Negative" pile or pier/loading location coordinates are NOT permitted.
"Right-Hand-Rule" sign convention is used for all applied forces and moments at pier locations.
4. The piles and piers/loadings can be numbered in any desired order. However, the user should make
sure to either clear the contents of all spreadsheet cells that are not used for input or those cell values should
be input = 0. All piles and piers/loadings MUST BE input in proper numerical sequence with no "breaks" in
the numerical order of input data.
5. This program does NOT include the weight of the pile cap or piers in the calculation of the vertical pile reactions.
However, the total weight of the pile cap and piers may be included by assuming an additional "ficticious" pier
located at the centroid of the pile cap plan area, and applying the total weight at that "pier" location.
6. This program does NOT check the actual calculated pile reactions (vertical and horizontal) against known
or given allowable pile reactions for downward, uplift, or lateral cases. This is done so that the extent of any
acceptable overstress is left up to the judgement of the user. However, in all cases this must be checked by
the user.
7. This program does NOT check the shear (beam-type or punching) nor the flexural requirements of the pile cap.
This must be done independently by the user.
8. This program contains numerous “comment boxes” which contain a wide variety of information including
explanations of input or output items, equations used, data tables, etc. (Note: presence of a “comment box”
is denoted by a “red triangle” in the upper right-hand corner of a cell. Merely move the mouse pointer to the
desired cell to view the contents of that particular "comment box".)
"PILEGRP.xls" Program
Version 3.4

PILE GROUP ANALYSIS FOR RIGID PILE CAP


Using the Elastic Method for up to 25 Total Piles
(For Metric Units)
Job Name: Subject: Pile No.:
Job Number: Originator: Checker: ###
###
Input Data: ###
Results: ###
Number of Piles, Np = 6
Pile Coordinates: Pile Reactions (tf) 8 PILE GROUP PLAN ###
Xo (m) Yo (m) Vert. Rz Horiz. Rh ###
#1: 0.000 0.000 #1: 537.49 26.73 7 ###
#2: 1.829 0.000 #2: 491.16 26.73 ###
#3: 3.658 0.000 #3: 444.82 26.73 6 ###
#4: 0.000 2.438 #4: 444.82 26.73 ###
#5: 1.829 2.438 #5: 398.49 26.73 5 ###
#6: 3.658 2.438 #6: 352.15 26.73 ###

Y - AXIS (m)
4 ###
###
3
###
###
2
###
###
###
1
###
###
0
###
0 0.5 1 X -1.5AXIS2 (m)
2.5 3 3.5 4
###
Pile Group Properties:
Xc = 1.829 m
Yc = 1.219 m
Ix = 8.92 m^4
Iy = 13.38 m^4
J = 22.30 m^4
Ixy = 0.00 m^4
q = 0.000 graus
Iy =
Number of Piers, N = 1 S Pier Loads @ C.G. of Group:
S Pz = -2668.93 tf
Pier/Loading Data: Pier #1 S Hx = -88.96 tf
X-Coordinate (m) = 1.829 S Hy = -133.45 tf
Y-Coordinate (m) = 1.219 S Mx = 338.95 tf.m
Dist. to T/Piles, h (m) = 1.524 S My = -338.95 tf.m
Vertical Load, Pz (tf) = -2668.93 S Mz = 0.00 tf.m
Horiz. Load, Hx (tf) = -88.96 S Hy =
Horiz. Load, Hy (tf) = -133.45 Pile Reaction Summary:
Moment, Mx (tf.m) = 135.58 Rz(max) = 537.49 tf
Moment, My (tf.m) = -203.37 Rz(min) = 352.15 tf
Moment, Mz (tf.m) = 0.00 Rh(max) = 26.73 tf

2 of 13 03/31/2018 23:59:53
"PILEGRP.xls" Program
Version 3.4

PILE GROUP ANALYSIS FOR RIGID PILE CAP


Using the Elastic Method for up to 75 Total Piles
(For Metric Units)
Job Name: Subject: Pile No.:
Job Number: Originator: Checker: ###
###
Input Data: ###
###
Number of Piles, Np = 40
Pile Coordinates: Pile Coordinates: Pile Coodinates:
Xo (m) Yo (m) Xo (m) Yo (m) Xo (m) Yo (m)
#1: 0.000 0.000 #26: 1.829 4.572 ###
#2: 0.000 0.914 #27: 1.829 5.486 ###
#3: 0.000 1.829 #28: 1.829 6.401 ###
#4: 0.000 2.743 #29: 1.829 7.315 ###
#5: 0.000 3.658 #30: 1.829 8.230 ###
#6: 0.000 4.572 #31: 2.743 0.000 ###
#7: 0.000 5.486 #32: 2.743 0.914 ###
#8: 0.000 6.401 #33: 2.743 1.829 ###
#9: 0.000 7.315 #34: 2.743 2.743 ###
#10: 0.000 8.230 #35: 2.743 3.658 ###
#11: 0.914 0.000 #36: 2.743 4.572 ###
#12: 0.914 0.914 #37: 2.743 5.486 ###
#13: 0.914 1.829 #38: 2.743 6.401 ###
#14: 0.914 2.743 #39: 2.743 7.315 ###
#15: 0.914 3.658 #40: 2.743 8.230 ###
#16: 0.914 4.572 ###
#17: 0.914 5.486 ###
#18: 0.914 6.401 ###
#19: 0.914 7.315 ###
#20: 0.914 8.230 ###
#21: 1.829 0.000 ###
#22: 1.829 0.914 ###
#23: 1.829 1.829 ###
#24: 1.829 2.743 ###
#25: 1.829 3.658 ###
###
No. Piers = 2 ###
Pier/Loading Data:
Pier #1 Pier #2
X (m) = 1.372 1.372 ###
Y (m) = 2.743 5.486 ###
h (m) = 1.524 1.524 ###
Pz (tf) = -6672.33 -6672.33 ###
Hx (tf) = -88.96 -88.96 ###
Hy (tf) = -133.45 -133.45 ###
Mx (tf.m) = 135.58 135.58 ###
My (tf.m) = -203.37 -203.37 ###
Mz (tf.m) = 0.00 0.00 ###
###
###

3 of 13 03/31/2018 23:59:53
"PILEGRP.xls" Program
Version 3.4

(continued)

4 of 13 03/31/2018 23:59:53
"PILEGRP.xls" Program
Version 3.4

###
Results: 12 PILE GROUP PLAN ###
Pile Group Properties: ###
Xc = 1.372 m ###

Y - AXIS (m)
10
Yc = 4.115 m ###
Ix = 275.92 m^4 ###
Iy = 41.81 m^4 8 ###
J= 317.73 m^4 ###
Ixy = 0.00 m^4 ###
q= 0.000 graus
6
###
###
S Loads @ C.G. of Pile Group: 4 ###
S Pz = -13344.67 tf ###
S Hx = -177.93 tf ###
S Hy = -266.89 tf 2 ###
S Mx = 677.91 tf.m ###
S My = -677.91 tf.m 0
###
S Mz = 0.00 tf.m 0 1 2 X - AXIS3 (m) 4 5 ###
6
###
Pile Reactions (tf) Pile Reactions (tf) Pile Reactions (tf)
Vert. Rz Horiz. Rh Vert. Rz Horiz. Rh Vert. Rz Horiz. Rh
#1: 365.97 8.02 #26: 325.08 8.02
#2: 363.72 8.02 #27: 322.83 8.02
#3: 361.47 8.02 #28: 320.59 8.02
#4: 359.23 8.02 #29: 318.34 8.02
#5: 356.98 8.02 #30: 316.09 8.02
#6: 354.73 8.02 #31: 321.49 8.02
#7: 352.49 8.02 #32: 319.24 8.02
#8: 350.24 8.02 #33: 316.99 8.02
#9: 347.99 8.02 #34: 314.75 8.02
#10: 345.75 8.02 #35: 312.50 8.02
#11: 351.14 8.02 #36: 310.25 8.02
#12: 348.89 8.02 #37: 308.01 8.02
#13: 346.65 8.02 #38: 305.76 8.02
#14: 344.40 8.02 #39: 303.51 8.02
#15: 342.15 8.02 #40: 301.27 8.02
#16: 339.91 8.02
#17: 337.66 8.02
#18: 335.41 8.02
#19: 333.17 8.02
#20: 330.92 8.02
#21: 336.31 8.02
#22: 334.07 8.02
#23: 331.82 8.02
#24: 329.57 8.02
#25: 327.33 8.02

Pile Reaction Summary:


Rz(max) = 365.97 tf
Rz(min) = 301.27 tf
Rh(max) = 8.02 tf

5 of 13 03/31/2018 23:59:53
"PILEGRP.xls" Program
Version 3.4

6 of 13 03/31/2018 23:59:53
"PILEGRP.xls" Program
Version 3.4

PILE GROUP ANALYSIS FOR RIGID PILE CAP CALCULATIONS:


Using the Elastic Method for up to 300 Total Piles
(For Metric Units) Pile Dist. to X,Y axis:
Job Name: Subject: Pile No.:
Job Number: Originator: Checker: ###
###
Input Data: ###
###
Number of Piles, Np = 40 ###
###
Pile Coordinates: Pile Coordinates: Pile Coodinates: Pile Coodinates: Pile Coodinates: Pile Coodinates: ###
Xo (m) Yo (m) Xo (m) Yo (m) Xo (m) Yo (m) Xo (m) Yo (m) Xo (m) Yo (m) Xo (m) Yo (m) ###
#1: 0.000 0.000 ###
#2: 0.000 0.914 ###
#3: 0.000 1.829 ###
#4: 0.000 2.743 ###
#5: 0.000 3.658 ###
#6: 0.000 4.572 ###
#7: 0.000 5.486 ###
#8: 0.000 6.401 ###
#9: 0.000 7.315 ###
#10: 0.000 8.230 ###
#11: 0.914 0.000 ###
#12: 0.914 0.914 ###
#13: 0.914 1.829 ###
#14: 0.914 2.743 ###
#15: 0.914 3.658 ###
#16: 0.914 4.572 ###
#17: 0.914 5.486 ###
#18: 0.914 6.401 ###
#19: 0.914 7.315 ###
#20: 0.914 8.230 ###
#21: 1.829 0.000 ###
#22: 1.829 0.914 ###
#23: 1.829 1.829 ###
#24: 1.829 2.743 ###
#25: 1.829 3.658 ###
#26: 1.829 4.572 ###
#27: 1.829 5.486 ###
#28: 1.829 6.401 ###
#29: 1.829 7.315 ###
#30: 1.829 8.230 ###
#31: 2.743 0.000 ###
#32: 2.743 0.914 ###
#33: 2.743 1.829 ###
#34: 2.743 2.743 ###
#35: 2.743 3.658 ###
#36: 2.743 4.572 ###
#37: 2.743 5.486 ###
#38: 2.743 6.401 ###
#39: 2.743 7.315 ###
#40: 2.743 8.230 ###
###
###
###
###
###
###
###
###
###
###
###
No. Piers = 2 ###
Pier/Loading Data: ###
Pier #1 Pier #2 ###
X (m) = 1.372 1.372 ###
Y (m) = 2.743 5.486 ###
h (m) = 1.524 1.524 ###
Pz (tf) = -6672.33 -6672.33 ###
Hx (tf) = -88.96 -88.96 ###
Hy (tf) = -133.45 -133.45 ###
Mx (tf.m) = 135.58 135.58 ###
My (tf.m) = -203.37 -203.37 ###
Mz (tf.m) = 0.00 0.00 ###
###
###
###
Results: ###
###
Pile Group Properties: S Loads @ C.G. of Pile Group: ###
Xc = 1.372 m S Pz = -13344.67 tf ###
Yc = 4.115 m S Hx = -177.93 tf ###
Ix = 275.92 m^4 S Hy = -266.89 tf ###
Iy = 41.81 m^4 S Mx = 677.91 tf.m ###
J= 317.73 m^4 S My = -677.91 tf.m ###
Ixy = 0.00 m^4 S Mz = 0.00 tf.m ###
q= 0.000 graus ###
###
Pile Reaction Summary: ###
Rz(max) = 365.97 tf ###
Rz(min) = 301.27 tf ###
Rh(max) = 8.02 tf ###
###
###
###
###
###
###
(continued)

7 of 13 03/31/2018 23:59:53
"PILEGRP.xls" Program
Version 3.4

###
PILE GROUP PLOT ###
9
###
###
###
8 ###
###
###
###
7 ###
###
###
###
6
###
###
###
5 ###
###

Y-AXIS (m)
###
###
4 ###
###
###
###
3 ###
###
###
2 ###
###
###
###
1 ###
###
###
###
0 ###
0 0.5 1 1.5 2 2.5 3 3.5 ###
X-AXIS (m)
###
###
###
Pile Reactions(tf) Pile Reactions(tf) Pile Reactions(tf) Pile Reactions(tf) Pile Reactions(tf) Pile Reactions(tf) ###
Vert. Rz Horiz. Rh Vert. Rz Horiz. Rh Vert. Rz Horiz. Rh Vert. Rz Horiz. Rh Vert. Rz Horiz. Rh Vert. Rz Horiz. Rh ###
#1: 365.97 8.02 ###
#2: 363.72 8.02 ###
#3: 361.47 8.02 ###
#4: 359.23 8.02 ###
#5: 356.98 8.02 ###
#6: 354.73 8.02 ###
#7: 352.49 8.02 ###
#8: 350.24 8.02 ###
#9: 347.99 8.02 ###
#10: 345.75 8.02 ###
#11: 351.14 8.02 ###
#12: 348.89 8.02 ###
#13: 346.65 8.02 ###
#14: 344.40 8.02 ###
#15: 342.15 8.02 ###
#16: 339.91 8.02 ###
#17: 337.66 8.02 ###
#18: 335.41 8.02 ###
#19: 333.17 8.02 ###
#20: 330.92 8.02 ###
#21: 336.31 8.02 ###
#22: 334.07 8.02 ###
#23: 331.82 8.02 ###
#24: 329.57 8.02 ###
#25: 327.33 8.02 ###
#26: 325.08 8.02 ###
#27: 322.83 8.02 ###
#28: 320.59 8.02 ###
#29: 318.34 8.02 ###
#30: 316.09 8.02 ###
#31: 321.49 8.02 ###
#32: 319.24 8.02 ###
#33: 316.99 8.02 ###
#34: 314.75 8.02 ###
#35: 312.50 8.02 ###
#36: 310.25 8.02 ###
#37: 308.01 8.02 ###
#38: 305.76 8.02 ###
#39: 303.51 8.02 ###
#40: 301.27 8.02 ###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

8 of 13 03/31/2018 23:59:53
"PILEGRP.xls" Program
Version 3.4
PILE GROUP ANALYSIS FOR RIGID PILE CAP CALCULATIONS:
Using the Elastic Method for up to 400 Total Piles
(For Metric Units) Pile Dist. to X,Y axis:
Job Name: Subject: Pile No.:
Job Number: Originator: Checker: ###
###
Input Data: ###
###
Number of Piles, Np = 40 ###
###
Pile Coordinates: Pile Coordinates: Pile Coodinates: Pile Coodinates: Pile Coodinates: Pile Coodinates: Pile Coodinates: Pile Coodinates: ###
Xo (m) Yo (m) Xo (m) Yo (m) Xo (m) Yo (m) Xo (m) Yo (m) Xo (m) Yo (m) Xo (m) Yo (m) Xo (m) Yo (m) Xo (m) Yo (m) ###
#1: 0.000 0.000 ###
#2: 0.000 0.914 ###
#3: 0.000 1.829 ###
#4: 0.000 2.743 ###
#5: 0.000 3.658 ###
#6: 0.000 4.572 ###
#7: 0.000 5.486 ###
#8: 0.000 6.401 ###
#9: 0.000 7.315 ###
#10: 0.000 8.230 ###
#11: 0.914 0.000 ###
#12: 0.914 0.914 ###
#13: 0.914 1.829 ###
#14: 0.914 2.743 ###
#15: 0.914 3.658 ###
#16: 0.914 4.572 ###
#17: 0.914 5.486 ###
#18: 0.914 6.401 ###
#19: 0.914 7.315 ###
#20: 0.914 8.230 ###
#21: 1.829 0.000 ###
#22: 1.829 0.914 ###
#23: 1.829 1.829 ###
#24: 1.829 2.743 ###
#25: 1.829 3.658 ###
#26: 1.829 4.572 ###
#27: 1.829 5.486 ###
#28: 1.829 6.401 ###
#29: 1.829 7.315 ###
#30: 1.829 8.230 ###
#31: 2.743 0.000 ###
#32: 2.743 0.914 ###
#33: 2.743 1.829 ###
#34: 2.743 2.743 ###
#35: 2.743 3.658 ###
#36: 2.743 4.572 ###
#37: 2.743 5.486 ###
#38: 2.743 6.401 ###
#39: 2.743 7.315 ###
#40: 2.743 8.230 ###
###
###
###
###
###
###
###
###
###
###
###
No. Piers = 2 ###
Pier/Loading Data: ###
Pier #1 Pier #2 ###
X (m) = 1.372 1.372 ###
Y (m) = 2.743 5.486 ###
h (m) = 1.524 1.524 ###
Pz (tf) = -6672.33 -6672.33 ###
Hx (tf) = -88.96 -88.96 ###
Hy (tf) = -133.45 -133.45 ###
Mx (tf.m) = 135.58 135.58 ###
My (tf.m) = -203.37 -203.37 ###
Mz (tf.m) = 0.00 0.00 ###
###
(continued)

9 of 13 03/31/2018 23:59:53
"PILEGRP.xls" Program
Version 3.4
###
###

9 PILE GROUP PLOT ###


###
###
###
###
###
###
###
8 ###
###
###
###
###
###
###
###
7 ###
###
###
###
###
###
###
6 ###
###
###
###
###
###
###

5 ###
###
Y-AXIS (m)

###
###
###
###
###
###
4 ###
###
###
###
###
###
###
3 ###
###
###
###
###
###
###
###
2 ###
###
###
###
###
###
###
1 ###
###
###
###
###
###
###

0 ###
###
0 0.5 1 1.5 2 2.5 3 3.5 ###
###
###
X-AXIS (m) ###
###
(continued)

10 of 13 03/31/2018 23:59:53
"PILEGRP.xls" Program
Version 3.4
###
###
Results: ###
###
Pile Group Properties: S Loads @ C.G. of Pile Group: ###
Xc = 1.372 m S Pz = -13344.67 tf ###
Yc = 4.115 m S Hx = -177.93 tf ###
Ix = 275.92 m^4 S Hy = -266.89 tf ###
Iy = 41.81 m^4 S Mx = 677.91 tf.m ###
J= 317.73 m^4 S My = -677.91 tf.m ###
Ixy = 0.00 m^4 S Mz = 0.00 tf.m ###
q= 0.000 graus ###
###
###
Pile Reaction Summary: ###
Rz(max) = 365.97 tf ###
Rz(min) = 301.27 tf ###
Rh(max) = 8.02 tf ###
###
###
###
###
###
Pile Reactions (tf) Pile Reactions(tf) Pile Reactions(tf) Pile Reactions(tf) Pile Reactions(tf) Pile Reactions(tf) Pile Reactions(tf) Pile Reactions(tf) ###
Vert. Rz Horiz. Rh Vert. Rz Horiz. Rh Vert. Rz Horiz. Rh Vert. Rz Horiz. Rh Vert. Rz Horiz. Rh Vert. Rz Horiz. Rh Vert. Rz Horiz. Rh Vert. Rz Horiz. Rh ###
#1: 365.97 8.02 ###
#2: 363.72 8.02 ###
#3: 361.47 8.02 ###
#4: 359.23 8.02 ###
#5: 356.98 8.02 ###
#6: 354.73 8.02 ###
#7: 352.49 8.02 ###
#8: 350.24 8.02 ###
#9: 347.99 8.02 ###
#10: 345.75 8.02 ###
#11: 351.14 8.02 ###
#12: 348.89 8.02 ###
#13: 346.65 8.02 ###
#14: 344.40 8.02 ###
#15: 342.15 8.02 ###
#16: 339.91 8.02 ###
#17: 337.66 8.02 ###
#18: 335.41 8.02 ###
#19: 333.17 8.02 ###
#20: 330.92 8.02 ###
#21: 336.31 8.02 ###
#22: 334.07 8.02 ###
#23: 331.82 8.02 ###
#24: 329.57 8.02 ###
#25: 327.33 8.02 ###
#26: 325.08 8.02 ###
#27: 322.83 8.02 ###
#28: 320.59 8.02 ###
#29: 318.34 8.02 ###
#30: 316.09 8.02 ###
#31: 321.49 8.02 ###
#32: 319.24 8.02 ###
#33: 316.99 8.02 ###
#34: 314.75 8.02 ###
#35: 312.50 8.02 ###
#36: 310.25 8.02 ###
#37: 308.01 8.02 ###
#38: 305.76 8.02 ###
#39: 303.51 8.02 ###
#40: 301.27 8.02 ###
###
###
###
###
###
###
###
###
###
###
###
###

11 of 13 03/31/2018 23:59:53
"PILEGRP.xls" Program
Version 3.4

BEAM AND PUNCHING SHEAR CHECKS FOR PILE CAP


for Single Corner Pile
Per ACI 318-99 Code
Job Name: Subject: Yes
Job Number: Originator: Checker: No
CS =
Input: b=
d/2 E=45.72cm Vu =
Pile Reaction, Rp = 63.50 tf fVc =
Edge of Pile Cap
Pile Dia., Dp = 30.480 cm For Two
Pile Edge Dist., E = 45.720 cm d=
Pile Spacing, L = 121.920 cm Dp=30.48cm CS =
Pile Embedment, dp = 15.240 cm (L-Dp)/2=45.72cm
Pile
E=45.72cm
Pile Cap Thk, H = 91.440 cm Vu =
Conc. Strength, fck = 211.0 kgf/cm² fVc =
Top Face Reinf.? Yes Dp/2=15.24cm
USD Load Factor, LF = 1.6 Critical Section d/2=35.6cm
for Punching

bo=171.299cm
Note: one-way, beam and two-way, Edge of
punching shear checks for critical Pile Cap
Nomenclature b=251.236cm
sections relative to pier(s) must also
be performed. Checks for one-way
Critical Section
deep beam and two-way deep corbel for Beam Shear
shear should also be considered.

Results:

For One-way, Beam Shear: Critical Section @ min. of d or (L-Dp)/2 from face of pile
Pile Cap Eff. Depth, d = 71.200 cm d = H-dp-5 (Assume 5 cm from top face to centroid of reinf.)
Critical Section, CS = 45.720 cm CS = minimum of: d or (L-Dp)/2
Shear Width, b = 251.236 cm b = 2*(SQRT(2*E^2)+Dp/2+CS)
Ultimate Shear, Vu = 101.60 tf Vu = LF*Rp
Allow. Shear, fVc = 117.05 tf fVc = 0.85*0.53*SQRT(fck)*b*d/1000

Vu <= Allow. Shear, O.K.

For Two-way, Punching Shear: Critical Section @ min. of d/2 or (L-Dp)/2 from face of pile
Pile Cap Eff. Depth, d = 71.200 cm d = H-dp-5 (Assume 5 cm from top face to centroid of reinf.)
Critical Section, CS = 35.600 cm CS = minimum of: d/2 or (L-Dp)/2
Shear Perimeter, bo = 171.299 cm bo = 2*E+(2*p*(Dp/2+CS))/4 <= 2*p*(Dp/2+CS)
Ultimate Shear, Vu = 101.60 tf Vu = LF*Rp
Allow. Shear, fVc = 159.61 tf fVc = 0.85*1.06*SQRT(fck)*bo*d/1000

Vu <= Allow. Shear, O.K.

Comments:

12 of 13 03/31/2018 23:59:54
"PILEGRP.xls" Program
Version 3.4

13 of 13 03/31/2018 23:59:54