Project ID : IA/12-13/C/060/ST
Contractor: Joannou & Paraskevaides(Overseas) Ltd/ J&P-Avax.S.A,-JV
Consultant: AECOM Middle East
Bill Of Quantities- JUNCTION 17
Old Design New Design
ITEM DESCRIPTION Variance Remarks
AMOUNT AMOUNT
SUMMMARY
Bill no - 01 - EARTHWORKS
Bill no - 01 Additions
Bill no - 01 Omissions
Bill no - 02 Additions
Bill no - 02 Omissions
Bill no - 03 Additions
Bill no - 03 Omissions
Bill no - 04 - FORMWORKS
Bill no - 04 Additions
Bill no - 04 Omissions
Bill no - 05 Additions
Bill no - 05 Omissions
Bill no - 06 Additions
Bill no - 06 Omissions
Total to Collection QAR.
AMOUNT
Err:509
(1,283,710)
Err:509
(6,814,196)
Err:509
(11,997,968)
Err:509
(1,370,196)
Err:509
(858,758)
Err:509
(354,663)
Err:509
BILL OF QUANTITY FOR MATERAL OF 11 KV SWITCHGEAR RING MAIN UNIT (RMU)
Schedule
ITEM DESCRIPTION UNIT RATE QTY.
Ref.
Bill no - 01
Excavation ancillaries
Preparation of excavated surface
F Material other than topsoil. Rock or artificial hard E 522 m2 4,495.19 1.89
material
Fillina to Structures
G Selected excavated material other than topsoil or E614 m3 4,878.65 65.71
rock
Filling ancillaries
Preparation of filled surfaces
H E722 m2 3,968.26 1.89
With material other than topsoil, rock or artificial
hard mat.
I Material other than topsoil. Rock or artificial hard E 532 m3 8,216.95 9.95
material
Total to Collection QAR.
Design & Construct New Orbital Highway and Truck Route (P023)Contract 1 : New Doha Port to Orbital Highway
Project ID : IA/12-13/C/060/ST
Contractor : Joannou & Paraskevaides (Overseas) Ltd / J&P - Avax S.A - JV
Consultant : AECOM Middle East Ltd.
Bill of Quantities of Junction-17
CESMM3
ITEM DESCRIPTION UNIT QTY. RATE
Ref
Bill no - 02
CONCRETE WORKS
Blinding concrete
A Grade; C30;Cement to BS 12 or BS 146; 20mm F 263 m3 475.34 502.14
Concrete For Foundations/Walls/Columns
F Reinforced concrete for columns and piers cross F655 m3 1,960.76 69.66
sectional area exceeding 1 m2
Total to Collection QAR.
Design & Construct New Orbital Highway and Truck Route (P023)Contract 1 : New Doha Port to Orbital Highway
Project ID : IA/12-13/C/060/ST
Contractor : Joannou & Paraskevaides (Overseas) Ltd / J&P - Avax S.A - JV
Consultant : AECOM Middle East Ltd.
Bill of Quantities of Junction-17
CESMM3
ITEM DESCRIPTION UNIT QTY. RATE
Ref
Bill no - 03
REINFORCEMENT
G 525 - G
A Various diameter: (10mm & above) t 2,700.75 4,442.46
527
Total to Collection QAR.
Design & Construct New Orbital Highway and Truck Route (P023)Contract 1 : New Doha Port to Orbital Highway
Project ID : IA/12-13/C/060/ST
Contractor : Joannou & Paraskevaides (Overseas) Ltd / J&P - Avax S.A - JV
Consultant : AECOM Middle East Ltd.
Bill of Quantities of Junction-17
CESMM3
ITEM DESCRIPTION UNIT QTY. RATE
Ref
Bill no - 04
FORMWORKS
Bill no - 05
WATERPROOFING SYSTEM
Bill no - 06
AMOUNT
(1,258.65)
(23,363.75)
(38,939.58)
(77,879.17)
(280,409.95)
(443,528.08)
(8,495.91)
(320,575.99)
(7,500.01)
(81,758.68)
(1,283,709.77)
uck Route (P023)Contract 1 : New Doha Port to Orbital Highway
AMOUNT
(238,684.72)
(5,907,489.22)
(21,527.92)
(389,032.04)
(120,875.64)
(136,586.27)
(6,814,195.81)
uck Route (P023)Contract 1 : New Doha Port to Orbital Highway
AMOUNT
(11,997,968.03)
(11,997,968.03)
uck Route (P023)Contract 1 : New Doha Port to Orbital Highway
AMOUNT
(813,025.78)
(557,170.17)
(1,370,195.95)
uck Route (P023)Contract 1 : New Doha Port to Orbital Highway
AMOUNT
(490,267.88)
(36,185.71)
(332,304.27)
(858,757.86)
uck Route (P023)Contract 1 : New Doha Port to Orbital Highway
AMOUNT
(354,663.28)
(354,663.28)
Design & Construct New Orbital Highway and Truck Route (P023)Contract 1 : New Doha Port to Orbital Highway
Project ID : IA/12-13/C/060/ST
Contractor : Joannou & Paraskevaides (Overseas) Ltd / J&P - Avax S.A - JV
Consultant : AECOM Middle East Ltd.
Seismic Design Junction-17
Junction 17 Measurements Summary
OLD DESIGN NEW DESIGN
S.No Description Unit Defference
QTY QTY
A Earth works
1 Excavation for foundation
Top Soil upto 0.10 m 449.52 533.62 84.10
Depth: n.e. 0.25 m m3 674.28 800.43 126.15
Depth 0.25 m to 0.50 m m3 1,123.80 1,334.04 210.25
Depth 0.50 m to 1.00 m m3 2,247.60 2,668.09 420.49
Depth 1.00 m to 2.00 m m3 4,495.19 5,336.17 840.98
Depth 2m to 5m 4,105.22 5,916.61 1,811.39
B Concrete
E WaterProofing
System type for abutment
Below ground
1 Foundation m2 5,814.66 14,511.79 8,697.13
2 Walls m2 427.60 805.52 377.92
Above ground
3 Spray type for abutment Wall m2 3,960.06 4,684.62 724.56
Remarks