DAILY DRILLING REPORT

G.P.C DAILY DRILLING REPORT WELL : HH 83/1D


ATT.
EASTERN DESERT FIELD N AMER RIG HEADING : 206°
REPORT NO. 39 RIG ADMARINE-3 RKB-MSL 36 MT W. DEPTH 23 MT
SPUD IN DATE 22/2/2018 MID NIGHT DEPHT 1960 MT(T.D) PROGRESS MT. MORNING DEPTH 1960 MT.(T.D)
DATE OF REPORT 2/4/2018 DATE OF OPER's 1/4/2018 OPERATION @ 6:00 AM CONT RECORD 2ND RUN " MDT"
NEXT 24 HRs OPERATION FORECAST:- CONT RECORD 2ND RUN " MDT"
CASING DATA 24" C.P THICKNESS 1" @ 115.5 MT & 13-3/8" ( 68# , K-55) @ 775 MT.
BIT DATA MUD DATA ENGINEERS DATA
BIT NO. MUD TYPE : OBM CO. MAN : ENG. MAHMOUD ABDELRAZIK
SIZE MUD WT. (ppg) 9.7 N.CO.MAN : ENG. MAHMOUD BOGHDADY
TYPE VISCOSITY 78 PET. ENG : ENG. MOHAMED ASHRAF
S. / NO. HTHP, ml/30 min. 6 PET. ENG : ENG. MOHAMED AMIN
NOZZLES PV 27
PUMP ( G.P.M ) YP 26
PRESS., PSI LSYP 14 FLUID & BULK DATA
W.O.B ( KLB ) GEL (10 SC / 10 MN ) 17/29 ITEM RCVD USED ON HAND
AVG. ROP ( M/Hr ) ALKALINTY 4 DIESEL, LIT 0 4,770 204,485
R.P.M CORREC. SOLID 19.77 CMT., SK's 0 0 2,440
T.ON BTM HRS EMULSION STABILITY 1,495 BARITE, SK's 0 0 0
DEPTH IN (Mt) EXCESS LIME , PPB 5.18 D. WATER, BBLS 0 19 1231
DEPTH Out (Mt) OIL/WATER RATIO 87/13
DRLD. ( MT ) CHLORIDES MG/L 405559
TORQUE, LB.FT MUD COST DATA
T. BIT REV., K DAILY MUD COST, $ : 0.00
WT BELOW JAR, KLBs : ACC. MUD COST, $ : 177,551.75
BHA LENGTH , MT : JAR S.N CENTRIFUGE PUMP ST.BY
BHA WEIGHT , KLBs : TOTAL JAR HRS

TIME
HRs OPERATIONS
FROM TO

CONT'D RIH W/ SLB FISHING ASSY. ON 5 " D/P , TAGGED T.O.F @ 1527 MT (MAX S.O.W 3 KLB) , POH W/ 5"
0:00 17:00 17:00 D/P'S (OVER PULL MAX 7 KLB) , P/U & M/U 5" D/P STAND & RIH T/ 1554 MT , P/U & M/U SLB CIRC. SUB ,
SHEARED RUPTURE DISK W/1600 PSI , POH W/2 X 5" D/P STANDS .

P/U & M/U W.L SIDE ENTRY SUB W/CABLE CUTTER.


17:00 22:00 5:00 >>CONNECTED TWO ENDS OF E.L W/ TORPEDO (POWER UP : OK)
>> P/U & M/U 10 STD 5'' D/P RACKED BACK SAME ON DERRICK.

22:00 0:00 2:00 CONT'D RIH W/ SLB MDT ASSY. ON 5 " D/P T/ 1648 MT

>> WIND SPEED @ 6:00 AM 44-46 KNTS.( N-NW )


TOTAL HRs. 24:00

TIME
HRs OPERATIONS
FROM TO

0:00 1:00 1:00 CORRELATED DEPTH, TRIED TO TAKE PRESS. POINT @ 1648 MT. "NO SEAL"

1:00 6:00 5:00 CONT'D RIH W/ SLB MDT ASSY.(XLD& E PROBE) ON 5 " D/P T/ 1928 MT.
>>VALID POINT @ 1928.8 MT , PRESSURE : 2354 PSI , MOBILITY : 14 MD/CP & HAD OIL SAMPLE W/BACKUP .

TOTAL HRs. 6:00

MD INC. AZIM. TVD VS NORTH EAST DLS


LAST SURVEY
1960 2.9 294.6 1755.56 726.82 339.33 -642.75 0.72

FORMATION DEPTH ( MD ) DEPTH (TVD) LITHOLOGY


POST ZEIT SURFACE - 376 SURFACE - 375 SAND W/ L.ST, GYPSUM, ANHYDRITE
ZEIT 376 - 664 375 - 641 ANHYDRITE W/ SHALE STKS
S.GHARIB 664 - 943 641 - 862 ANHYDRITE W/ SHALE STKS
BELAYIM 943 - 1175 862 - 1044 SHALE, L.ST & ANHYDRITE
KAREEM 1175 - 1390 1044 - 1218 SHALE & ANHYDRITE W/ S.ST STRKS
RUDIES 1390 - 1646 1218 - 1449.5 SHALE W/ L.ST STRKS
THEBES 1646 - 1668 1449.5 - 1469 CHERTY L.ST
SUDR 1668 - 1730 1469 - 1529 CHALKY L.ST
BROWN L.ST 1730 - 1775 1529 - 1572 L.ST
MATTULA 1775 - 1873 1572 - 1670 SILT ST W/ L. ST, SH AND SAND STRKS
WATA 1873 - 1923 1670 - 1719 L.ST W/ SHALE , SILT & SAND STRKS
NUBIA A 1923 - 1960 1719 - 1755.5 SAND ST AND SILT ST STRKS

GAS READING:-
DEPTH , MT T.G, PPM C1 , PPM C2 , PPM C3 , PPM I C4 , PPM NC4 , PPM I C5 , PPM N C5 , PPM
986 - 1646 1200 - 3400 50 - 1590 NIL - 20 - - - - -
1646 - 1782 1900 - 4200 452 - 2533 8 - 43 NIL - 3 NIL - 2 NIL - 1 - -
1761 - 1775 1200-1600 300-865 10-25
1775 - 1873 1000-14700 179-11039 11-761 NIL-729 NIL-110 NIL-145 NIL-87 NIL-95
1873-1923 1500-4400 80-2750 NIL-460 NIL-155 NIL-30 NIL-65 NIL-18 NIL-25
1923 - 1960 1500 - 2400 104 - 1050 5-72 NIL - 66 NIL - 14 NIL - 35 NIL - 10 NIL - 14

MAHMOUD ABDELRAZIK

G.P.C REPRESENTATIVE
MAHMOUD ABDELRAZIK
Other Data

SHALE SHAKER SCREEN

SH.SHAKER 1 SH.SHAKER 2

80 NEW 100 NEW


80 NEW 100 NEW
80 OLD 80 OLD
80 OLD 80 OLD

SERVICE ON LOCATION ARRIVAL DATE D

MUD ENGINEER (2) (2) 23-2-2018 + (1) 10-3-2018 + (1) 26-3-2018 (1) 10

(4) 24-2-2018 + (1) 20-3-2018 + (1) 21-3-2018 + (1) (1) 20-3-20


DIRC & MWD (4)
26-3-2018

MUD LOGGER (4) (3) 25-2-2018 + (1) 1-3-2018

(4) 7-3-2018 + (1) 8-3-2018 + (1) 14-3-2018 + (1) 23- (1) 8-3-20
SOLID CONTROL (4)
3-2018 + (1) 30-3-2018 2

LOGGING (7) (6) 30-3-2018 + (1) 31-3-2018

CSG HANDLING (4) (4) 31-3-2018

CENTRIFUGE (1) (1) 3-3-2018 + (1) 13-3-2018 + (1) 23-3-2018 (1) 13

>> MG-15:- >> CAPITANO GEE :


>> >>

MATERIAL RECEIVED
>> MG-15:- >> CAPITANO GEE
>> >>

MATERIAL SENT

LOCATION W/A GHARIB OFF HIRED


>> RECIEVED:- >> SENT
MATERIAL IN JETTY

BOATS
MARINE VESSEL RECEIVED CONSUMPTION REMA

CAPITANO GEE
(DIESEL/WTR) OFF HIRED

MG-15
0 LTR + 0 TON 300 LTR + 3 TON 72700 LTR
(DIESEL/WTR)

RED SEA SEARCHER


0 LTR + 0 TON 2000 LTR + 5 TON 36000 LTR
(DIESEL/WTR)

>> RIG STARTED TO CONSUME WATER FROM GPC STOCK DUE TO WATER M
>> DAILY CONSUMTION : 0 BBL
>> TOTAL CONSUMPTON: 2572 BBL
r Data
DATE April 1, 2018

KER SCREENS

SH.SHAKER 3 SH.SHAKER 4 ( M.C)

80 OLD 170 NEW


80 OLD 170 NEW
80 OLD 170 NEW
80 OLD 170 NEW

DEPARTURE DATE COMPANY

(1) 10-3-2018 + (1) 26-3-2018 EMEC

(1) 20-3-2018 + (1) 21-3-2018 + (1) 26-3-


BAKER
2018

WTF

(1) 8-3-2018 + (1) 14-3-2018 + (1) 23-3-


ES
2018 + (1) 30-3-2018

SLB

IPG

(1) 13-3-2018 + (1) 23-3-2018 HLS

> CAPITANO GEE :- >> RED SEA SEARCHER


> >>
> CAPITANO GEE :- >> RED SEA SEARCHER
> >>

OFF HIRED W/A GHARIB


>> SENT

REMAIN ON BOARD REMARKS

72700 LTR + 59 TON (ST.BY)

36000 LTR + 150 TON (ST.BY)

O WATER MAKER MALFUNCTION ON 13-3-2018.

MAHMOUD ABDELRAZIK
G.P.C REPRESENTATIVE