Conventional Delayed Coking is a useful and economical refinery Delayed Coking is a process which produces gas, gas oils and
process to convert fractions of crude oils. coke. The furnace provides the heat which starts the vaporisa-
tion and cracking at approximately 485° C (905° F). As the feed
Today due to many improvements in coking and decoking enters the drum at the bottom the cracking and polymerisation
techniques and product demands Delayed Cokers are often built continues until solid coke is formed and the gases go overhead
to make coke. The fresh coker feed is pumped into the to the fractionation tower. When the drum is nearly full the feed
fractionation tower and the conditioned coker feed being
is switched over to the second drum.
pumped out from the bottom to the furnace. Furnace effluent is
feeded into the drum with the overhead vapours returning to
the fractionation tower. The various types of coke produced are fuel coke, sponge coke,
needle coke and shot coke.
RUHRPUMPEN
Hydraulic Decoking System
Control system
• PLC
• Process visualization
• Automatic control
Design Features
System calculated, designed Area Classification Drive Unit Tools
and manufactured for the According to standard of Crosshead, running in 4 Combination Drilling and
demands of the Customer refinery points Cutting Tool
Heavy load wheels, Free Fall
Ambient conditions Hoist Control System
Arrestor for high safety
-45° C (-49° F) to +50° C Hydraulically (preferred), PLC-System for Process
(+122° F) electrically or pneumati- earbox for Heavy Duty
G Data Measurement
cally driven Hydraulic Power Service with grease lubrica- Data Logging and Visuali-
Water
Unit for hoist and Drill Stem ted axial bearing for high sation
normal water, seawater
Drive load Automatic Interlocking
System
2
HYDRAULIC DECOKING SYSTEM
Charge Pump, Pit Pump, Coke-Cutting Pump,
Crosshead, Drill Stem Drive
Ruhrpumpen™ Components
1 H
oist – Hydraulically or 9 OP-Unheading Device
T
electrically driven – Automated Top Unheading
2 HPU – Hydraulic Power Unit (in (optional) Device, electrically or
6
case of hydraulically driven hoists hydraulically driven
and/or Drill 4
10 Feed Entry – (optional) side
Stem Drive and/or Deheading 5 entry connection of feedline,
System (container version) – not separate or connected to cone
3 7
shown 11 Bottom Unheading Device
3 HPW – High Pressure Water line, – (optional) automatic bottom
8
flexible hose or swing pipe unheading system
4 LCP – Local (Operator) Control hydraulically driven, with
9
Panel hanger and installation system
free standing or installed in 12 LCP – Local (Operator) Control
1
operator shelter (optional) one Panel for bottom unheading
panel for one pair of drums. system, installed in an operator
CH + FFA – Crosshead with Free shelter (optional), installed for
Fall Arrestor close and remote operation
5 DSD – Drill Stem Drive, (not shown)
hydraulically or electrically driven
6 PB – Single and double Pulley
Block equipped with instruments
for rope load and tool position
7 Guide Rails – T-type guide rails
with shims, connectors, bolts and 10
nuts with latching mechanism
and proximitor switches 11
8 DS + Tool – Drill Stem (threaded
or welded), Tool (manual switch 12
or autoswitch tool)
2 1 3
4 1 3
3
Cuttingdeck with details
Crosshead with
Drill Stem Drive
Crosshead Design
Standard components of heavy duty industry
–– Guide rails
–– Wheels Pulley Block
–– Free Fall Arrestor
–– Double block
Functional test
–– Simulation of broken rope
Performance
Pull force 45 kN (9,9 lbsf)
4,500 kg (9,912 lbsf)
Compact design
Low noise
Pull speed up to 70 m/min
(Hoist) (230 ft/min)
Combination
Cutting Tool
Basic design
–– Slim tool, diameter 13"
(310 mm)
Pulley Block with Instruments –– Low lift force
–– Low torque
–– Hydrodynamic optimised
channels
Switching device
–– Manual/automatic switch
–– At the top of the tool
Valves
Latching Device –– Ballshape valves
–– No seals
–– Pressure operated
Guide Plate
Basic Design
Guide Plate
• Centering Device
• Safety Latches
Dome
• with Vent / Chimney
Drill Stem Drive, electric
• Drill Stem Guide
Guide Beams
Top Deheading
Automatic
–– Double gate / slide valve (by
others)
–– Electrically (preferred) or
hydraulically driven
–– Adapter to guide plate
–– Operation via Ruhrpumpen
Guide Plate
control system
Hydraulic Power Unit Hoist with Slack Rope Device Tool Hose
5
HYDRAULIC DECOKING SYSTEM
Charge Pump, Pit Pump, Coke-Cutting Pump,
Crosshead, Drill Stem Drive
6
HYDRAULIC DECOKING SYSTEM
Charge Pump, Pit Pump, Coke-Cutting Pump,
Crosshead, Drill Stem Drive
Features
-- Operational testing easily
performed on a routine basis
-- Arrestor cables and cable guides
eliminated
-- Cable grippers are eliminated
-- TÜV (UL/FM equivalent
approved, over 5,000