RENEWABLE ENERGY
DEVELOPMENT IN KAZAKHSTAN
MINISTRY OF ENERGY
OF THE REPUBLIC OF KAZAKHSTAN
О PRIMARY
ъе ENERGYе RESERVES
ч эOFе KAZAKHSTAN
К х

32 Billion
Tons

IN OIL EQUIVALENT
3.6%
OF WORLD PRIMARY
ENERGY RESERVES
О PRIMARY
ъе ENERGYе RESERVES
ч эOFе KAZAKHSTAN
К х

COUNTRIES BY OIL RESERVES


О PRIMARY
ъе ENERGYе RESERVES
ч эOFе KAZAKHSTAN
К х

No. 1
IN URANIUM MINING
40%
OF WORLD URANIUM
IN THE WORLD MINING
KA Z A K H ST A N FOREIGN
N AT U R A L PA RT N E R S
RESOURCES TECHNOLOGIES
Improved positions by criteria

BUSINESS REGISTRATION
GRID CONNECTION

No.
in Doing Business Rating
PROPERTY REGISTRATION
ENFORCEMENT OF CONTRACTS
R E N E WA B L E E N E R G Y I N VE ST M E N T S

920 Billion
kwh/year 62 Billion
kwh/year 3 Thousand
Solar hours/year

WIND ENERGY HYDRO ENERGY SOLAR ENERGY


POTENTIAL POTENTIAL POTENTAIL
2017

WIND
107 MW
HYDRO

50
OPERATING RES
336
TOTAL CAPACITY
mw
171 MW
SOLAR
58 MW
FACILITIES BIO GAS
0.35 МW
Renewables
%
50

RES DEVELOPMENT
INDICATORS 10

3
2020 2030 2050
2020

23 wIND
960 mw

103 2000 mw
OPERATING RES TOTAL CAPACITY
13 HYDRO
290 mw

17 SOLAR
FACILITIES
960 MW
DEFINES:
THE LAW • SCHEME OF PURCHASE AND SALE OF RES
ELECTRIC ENERGY WITH FINANCIAL
‘ON SUPPORT OF THE USE OF SETTLEMENT CENTRE
RENEWABLE ENERGY SOURCES’
• 15-YEAR PPA STANDARD FORM BY AUCTION
PRICE AND IN NATIONAL CURRENCY (KZT)
• STANDARD FORM OF RES FACILITY GRID
CONNECTION AGREEMENT
• TARIFFS ARE SUBJECT TO ANNUAL
INDEXATION CONSIDERING INFLATION AND
EXCHANGE DIFFERENCE BETWEEN KZT AND
USD
• EXEMPTION FROM PAYMENT FOR ENERGY
PREFERENCES FOR TRANSMISSION SERVICES
Res PRODUCERS • INVESTMENT PREFERENCES ON THE BASIS OF
CONTRACT SIGNED BETWEEN THE
GOVERNMENT OF THE REPUBLIC OF
KAZAKHSTAN AND LEGAL ENTITY WHICH
IMPLEMENTS INVESTMENT PROJECT
• PRIORITY DISPATCHING OF ELECTRIC ENERGY
TRANSPARENT AND CLEAR PROCESS OF
PROJECTS AND INVESTORS SELECTION

FROM 2018
SELECTION OF TECHNOLOGIES AND
Auction mechanism of PROJECTS HAVING THE LEAST AFFECT ON
RES projects selection THE TARIFFS OF END CONSUMERS

CLEAR RESPONSIBILITIES OF MARKET


PARTICIPANTS IN GENERATION,
TRANSMISSION AND CONSUMPTION OF
ELECTRIC ENERGY
MINISTRY OF ENERGY
PUBLISHED THE 2018 AUCTION
SCHEDULE
There you can find the information on free
reserved land plots, on possibility of
connecting energy transmission companies to
electric grid with the maximum permissible
capacity for points of connection to electric
grid and the number of possible connections
READINESS OF INFRASTRUCTURE
AND DEMAND IN ENERGY

RES FACILITIES LOCATION PLAN


SELECTION OF RES CONSIDERING TARGET INDICATORS
P R O J E C T S F O R AU C T I O N S I S
B AS E D O N MAXIMUM PERMISSIBLE INSTALLED
CAPACITY BY ZONES OF UNIFIED
POWER SYSTEM

RES POTENTIAL
COMPANY INCLUDED IN THE LIST SIGNS PPA WITH FSC
WINS IN OF ENERGY FOR 15 YEARS
AUCTION PRODUCING
ORGANIZATIONS
INVESTOR MUST PLACE A BID BOND
TO IMPLEMENT RES PROJECT
WE D E VE L O P E D I N T E R N E T P L AT F O R M F O R AU C T I O N S

MOST EFFECTIVE RES PROJECTS WIN


AND SIGN PPA

3-HOUR SESSION
WE WELCOME INTERNATIONAL FINANCIAL
INSTITUTIONS AND PRIVATE INVESTORS FOR
COOPERATION