CLOSED Operation
Sideways Clearance
End
30-40mph (0.5m)
50-70mph (1.2m)
15 30 60 100
30 or less 40 50 60 70
>> CHEVRON>>
Working
Vehicle
Working
1/2
Vehicle
3.7m maximum
Minimum Longways
Clearance (Metres)
ROAD
CLOSED
No
Through
Route
ROAD
AHEAD
CLOSED 200 yds
Diversion
ROAD INITIAL ISSUE J.CAIRNS 22/02/18
AHEAD Revision Details By Date Suffix
CLOSED Chk
Drawing Number Revision
CTM-JC-A508-03
End
KIERWSP
A508-M1 TO
OLD STRATFORD
RD CLOSURE
POINT DETAILS
Scale at A1
NTS
Drawn & Checked
Design Process SF42A & SF42B X
J.CAIRNS / D.HICKS
Date
9-MARCH-2018