Академический Документы
Профессиональный Документы
Культура Документы
RESUMEN DE G
HIDROELÉCTRICO
EMPRESAS
(MWh)
PROGRAMADO EJECUTADO
E51 AIPSA
E55 ETEN
E57 SAMAY I
E59 ELSE
TOTAL TOTAL INTEGRANTES COES 99,424.09 98,302.04
N
N
N
N
N
N RESUMEN DE GE
HIDROELÉCTRICO
N (MWh)
EMPRESAS
PROGRAMADO EJECUTADO
N
NC1 SINERSA: C.H. POECHOS1 +C.H. CURUMUY 577.50 577.77
NC2 CEMENTO ANDINO: C.H. CARPAPATA 611.70 602.81
NC3 ELECTRO ORIENTE: CENTRALES ELOR 158.55 350.00
NC4 SDE PIURA
GENERACIÓN
EMPRESAS
KALLPA GENERACION
ENEL PERÚ
ELECTROPERU
HUALLAGA
STATKRAFT
ORAZUL
CELEPSA
ENGIE
EGASA
CHINANGO
EGEMSA
TERMOCHILCA
ORAZUL
CELEPSA
ENGIE
EGASA
CHINANGO
EGEMSA
TERMOCHILCA
SAN GABAN
LDS
ENERGIA EOLICA
TRES HERMANAS
ENEL GREEN POWER PERU S.A
ENEL PIURA
EGEJUNÍN
EGEHUANZA
EGESUR
SDF ENERGIA
MARAÑÓN
HUANCHOR
HUAURA POWER GROUP
AGUA AZUL
HIDROLECTRICA SANTA CRUZ
PARQUE EÓLICO MARCONA
ELÉCTRICA RIO DOBLE
GEPSA
SINERSA
TACNA SOLAR
PANAMERICANA SOLAR
MOQUEGUA FV SOLAR
EGECSAC
PETRAMAS
GTS MAJES
MAJA
HIDROCAÑETE
GTS REPARTICION
ECELIM
ELÉCTRICA YANAPAMPA
ELEC. SANTA ROSA
TERMOSELVA
SHOUGESA
FENIX POWER
AIPSA
AGROAURORA S.A.C.
ETEN
MINERA CERRO VERDE
SAMAY I
INFRAESTRUCTURA Y ENERGÍA DEL PERÚ
ELSE
RESUMEN DE GENERACIÓN DE ENERGÍA ELÉCTRICA POR EMPRESAS INTEGRANTES DE
AS
RACION
EL PERÚ
ROPERU
UALLAGA
ATKRAFT
ORAZUL
CELEPSA
ENGIE
EGASA
NANGO
EGEMSA
OCHILCA
ORAZUL
CELEPSA
ENGIE
EGASA
NANGO
EGEMSA
OCHILCA
GABAN
LDS
EOLICA
MANAS
ERU S.A
L PIURA
GEJUNÍN
HUANZA
EGESUR
NERGIA
RAÑÓN
NCHOR
GROUP
UA AZUL
TA CRUZ
ARCONA
DOBLE
GEPSA
SINERSA
A SOLAR
A SOLAR
V SOLAR
EGECSAC
TRAMAS
S MAJES
MAJA
CAÑETE
RTICION
ECELIM
APAMPA
TA ROSA
MOSELVA
OUGESA
POWER
AIPSA
RA S.A.C.
ETEN
O VERDE
SAMAY I
EL PERÚ
ELSE
TEGRANTES DEL COES
EÓLICO TOTAL
(MWh) (MWh)
4,500
4,300
5,100
4,900
4,700
0.00 648.00 613.13 4,500
34.87
0.00 450.72 468.59 -17.87
4,300
0.00 456.56 458.00 -1.44
0.00 427.44 455.06
4,100
-27.62
0.00 464.64 419.51 3,900
45.13
0.00 800.16 403.46 3,700
396.70
586.16 399.52 186.64 586.16 399.52 3,500
186.64
0.00 443.76 229.98 213.79:30 : 00 :30 :00 :30 :0
0.00 192.00 187.64 00 01 01 02 02 03
4.36
0.00 176.64 181.76 -5.11
0.00 149.18 150.51 -1.33
0.00 149.96 147.09 2.87
0.00 151.74 132.00 19.74
0.00 112.80 113.04 -0.24
0.00 100.80 105.23 -4.43
0.00 90.26 104.84 -14.58
0.00 84.00 88.32 -4.32
0.00 81.60 84.33 -2.73
0.00 67.57 67.99 -0.42
0.00 67.20 65.70 1.50
0.00 72.00 34.78 37.22
0.00 24.00 4.03 19.97
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00
3,737.88 3,203.11 534.77 141,725.00 139,184.07 2,540.93
AS NO INTEGRANTES COES
EÓLICO TOTAL
(MWh) (MWh)
21.3%
14.6%
13.9%
7.2% La máxima demanda del miércoles, 31 de Enero de 2018 ocurrió a l
6.0% El costo marginal promedio fué 0 Nuevos Soles/MWh
5.8% DEMANDA MEDIA HORARIA EJEC
MW
3.7%
6,900 3.5%
3.3%
6,700
3.1%
6,500
2.9%
6,300 2.3%
6,100 2.0%
5,900 1.6%
5,700 1.0%
1.0%
5,500
0.9%
5,300
0.7%
5,100 0.6%
4,900 0.6%
4,700 0.5%
4,500
4,300
5,100
4,900
4,700
4,500 0.4%
0.3%
4,300
0.3%
4,100 0.3%
3,900 0.3%
3,700 0.3%
3,500 0.3%
PARTICIPACION
%
23.5%
24.5%
14.2%
26.8%
10.9%
0.0%
0.0%
0.0%
0.0%
100%
Enero de 2018 ocurrió a las 12:00 horas con un valor de 6427.67446 MW, 103.4 MW menos de lo programado
es/MWh
HORARIA EJECUTADA Y PROGRAMADA DEL SEIN
00 :30 :00 :30 :00 :30 :00 :30 :00 :30 :00 :30 :00 :30 :00 :30 :00 :30 :00 :30 :00 :30 :00 :30 :00
09 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21
PROGRAMADO REPROGRAMADO
W menos de lo programado , (-1.61 %)
N
: 30 :00 :30 :00 :30 :00 :30 :00 :30 :00 :30 :00
8 19 19 20 20 21 21 22 22 23 23 00
Wednesday, January 31, 2018
HN TN SN EN HC TC
RESUMEN DE GE
NORTE CENTRO
HORA
Generación Generación Generación Generación
Generación Generación
Hidroeléctrica Termeléctrica Hidroeléctrica Termeléctrica
Solar Norte Eólico Norte
Norte Norte Centro Centro
H T S E H T
MW
SC EC HS TS SS ES N
S E H T S E TOTAL
MW GENER
7,000
6,000
5,000
4,000
3,000
2,000
MW
GENERACIÓN ELÉCTRICA POR ÁREAS OPERATIVAS DEL SEIN
1,000
0
30 30 30 30 30 30
0: 1: 2: 3: 4: 5:
TÉR
Generación COES Generación COES Generación COES
Sur Centro Norte
0
30 30 30 30 30 30
0: 1: 2: 3: 4: 5:
TÉR
Generación COES Generación COES Generación COES
Sur Centro Norte
C S H T S
H T S
0
30 30 30 30 30 30 30 30 30 30 0 0 0 0 0 0 0 0 0 0 0 0 0
0: 1: 2: 3: 4: 5: 6: 7: 8: 9: :3 :3 :3 :3 :3 :3 :3 :3 :3 :3 :3 :3 :3
10 11 12 13 14 15 16 17 18 19 20 21 22
RH RT RS RE
E TOTAL_R
500
400
300
200
100
0
0 0 0 0 0 0 30 30 30 30 30 30 30 30 30 30 0 0 0
:3 :3 :3 :3 :3 :3 0: 1: 2: 3: 4: 5: 6: 7: 8: 9: :3 :3 :3
18 19 20 21 22 23 10 11 12 1
TOTAL RER
285.92
305.73
279.81
261.96
252.39
243.17
242.91
252.04
241.86
239.89
227.91
235.85
268.02
311.47
310.08
393.46
427.06
421.77
436.56
453.09
490.16
503.55
501.84
492.70
457.11
500.66
544.09
537.76
515.50
521.26
489.44
492.13
453.22
396.88
372.33
327.43
307.96
316.44
323.23
320.08
286.54
312.15
267.42
271.81
271.88
265.76
260.26
266.47
8,578.50
TOTAL RER
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
:3 :3 :3 :3 :3 :3 :3 :3 :3 :3 :3 :3 :3 :3
10 11 12 13 14 15 16 17 18 19 20 21 22 23
GENE
CENTRALES
PQE-EOLICO
CUPISNIQUE
TALARA 280.36
PQE-EOLICO
TRES HERMANAS
PQE-EOLICO
MARCONA 399
INTIPAMPA 0.00
RUBÍ
MOQUEGUA 132.00
PANAMERICANA
SOLAR 147.09
TACNA
SOLAR 150.51
REPARTICION 67.99
MAJES 104.84
YARUCAYA
POTRERO 41
RUNATULLO III
RUNATULLO II 408
CANCHAYLLO 113.04
NIMPERIAL 84.33
RUNATULLO III
RUNATULLO II 408
CANCHAYLLO 113.04
NIMPERIAL 84.33
LA JOYA 187.64
4.03
PURMACANA
RONCADOR 88.32
PIZARRAS 229.98
34.78
YANAPAMPA
POECHOS2 181.76
HUASAHUASI 214.31
STACRUZ_1_2 189.15
41.31
CAÑA BRAVA
CARHUAQUERO4 238.06
PARAMONGA 0.00
65.70
LA GRINGA V
105.23
HUAYCOLORO
0.00
MAPLE
0.00 200.00
213 216 198 201
OLICO
NIQUE 1,122.01
ALARA 280.36
ANAS
OLICO
ONA 399.52
AMPA 0.00
RUBÍ 1,230.71
UEGUA 132.00
CANA
147.09
TACNA
OLAR 150.51
ICION 67.99
MAJES 104.84
UCAYA 455.06
TRERO 419.51
LLO III 481.48
ULLO II 408.59
AYLLO 113.04
ERIAL 84.33
LLO III 481.48
ULLO II 408.59
AYLLO 113.04
ERIAL 84.33
A JOYA 187.64
4.03
CANA
ADOR 88.32
ARRAS 229.98
34.78
AMPA
CHOS2 181.76
HUASI 214.31
Z_1_2 189.15
41.31
BRAVA
UERO4 238.06
ONGA 0.00
65.70
NGA V
05.23
OLORO
0.00
MAPLE
GENE
LES RER (MWh)
1,122.01
1,401.22 EÓLICO
1,230.71
1,000.00 1,200.00 1,400.00 1,600.00
MWh
214 223 211 228
EÓLICO; 37.34%
HÍDRICO; 39
TÉRMICO; 1.99%
SOLAR; 21.37%
260 258 259 2128
GENERACIÓN EN EL SEIN
04 MWh
HÍDRICO; 39.30%
MICO; 1.99%
2135 233 234 235
HUAURA POWER
GTS MAJES GTS REPARTICION TACNA SOLAR
GROUP
TACNA
YARUCAYA MAJES REPARTICION
SOLAR
18.81 0.00 0.00 0.00
18.86 0.00 0.00 0.00
18.91 0.00 0.00 0.00
18.96 0.00 0.00 0.00
19.00 0.00 0.00 0.00
18.93 0.00 0.00 0.00
18.95 0.00 0.00 0.00
19.00 0.00 0.00 0.00
19.01 0.00 0.00 0.00
19.00 0.00 0.00 0.00
19.04 0.00 0.00 0.00
18.86 0.07 0.07 0.27
18.93 0.06 0.07 3.24
18.98 0.28 0.24 9.55
18.95 1.40 1.58 13.12
19.00 3.38 3.35 14.58
18.99 5.98 4.75 16.52
19.02 8.18 6.42 17.16
18.79 9.56 7.82 17.80
18.84 11.82 8.52 17.94
18.98 14.61 9.23 17.82
18.94 16.18 9.48 17.81
18.87 16.91 9.41 17.24
18.97 17.14 10.15 16.80
19.02 17.04 10.44 17.56
18.98 16.35 9.38 16.37
18.96 14.75 7.53 17.53
18.97 13.25 6.67 14.48
19.00 11.72 6.31 14.58
19.00 10.27 5.85 14.92
19.01 8.08 5.61 15.88
18.98 5.20 5.04 3.80
18.95 3.44 4.15 2.36
19.03 2.28 2.55 1.87
18.84 1.31 1.10 1.20
18.92 0.42 0.19 0.61
18.83 0.00 0.07 0.00
19.07 0.00 0.00 0.00
19.00 0.00 0.00 0.00
18.99 0.00 0.00 0.00
19.00 0.00 0.00 0.00
18.98 0.00 0.00 0.00
19.03 0.00 0.00 0.00
19.03 0.00 0.00 0.00
19.04 0.00 0.00 0.00
18.99 0.00 0.00 0.00
18.98 0.00 0.00 0.00
18.96 0.00 0.00 0.00
TOTAL
RER
MW
285.92
305.73
279.81
261.96
252.39
243.17
242.91
252.04
241.86
239.89
227.91
235.85
268.02
311.47
310.08
393.46
427.06
421.77
436.56
453.09
490.16
503.55
501.84
492.70
457.11
500.66
544.09
537.76
515.50
521.26
489.44
492.13
453.22
396.88
372.33
327.43
307.96
316.44
323.23
320.08
286.54
312.15
267.42
271.81
271.88
265.76
260.26
266.47 TÉRMICO SOLAR EÓLICO
GF
202 232 5002 5000
,26.5
,26.0
,25.5
,25.0
,24.5
,24.0
,23.5
,23.0
,22.5
30 30 30 30 30 30 30 30 30 30 :3
0
:3
0
:3
0
:3
0
:3
0
:3
0
:3
0
0: 1: 2: 3: 4: 5: 6: 7: 8: 9: 10 11 12 13 14 15 16
MAPLE OQUENDO TG1
ACIÓN DEL SEIN
0 0 0 0 0 0 0 0 0 0 0 0
:3 :3 :3 :3 :3 :3 :3 :3 :3 :3 :3 :3
12 13 14 15 16 17 18 19 20 21 22 23
OQUENDO TG1
Wednesday, January 31, 2018
REPORTE POTENCIA GENERADA POR TIPO DE RECURSO
HORA H. DE PASADA H.REGULACION GAS NATURAL GAS MALACAS
P R GN GM
MW
7,000.00
6,000.00
MW
7,000.00
6,000.00
5,000.00
4,000.00
3,000.00
2,000.00
1,000.00
0.00
3 0 00 30 0 0 3 0 00 3 0 0 0 30 0 0 30 0 0 30
0 : 1: 1: 2 : 2 : 3: 3 : 4 : 4: 5: 5: 6 : 6:
GA GI C D R500
BIOGAS BAGAZO RESIDUAL R6 RESIDUAL R500 DIESEL CARBÓN GAS LA ISLA GAS AGUAYTIA GAS MALACAS GAS NATURAL H.
RESIDUAL R6 BAGAZO BIOGAS SOLAR EOLICO TOTAL
R6 B BG S E TOTAL
DE RECURSO
GA
30 0 0 3 0 00 30 0 0 30 00 3 0 00 30 00 3 0 00 3 0 0 0 3 0 00 3 0 00
4 : 15 : 15 : 16 : 1 6 : 17 : 1 7 : 1 8 : 18 : 19 : 1 9 : 2 0 : 20 : 21 : 21 : 22 : 22 : 2 3 : 23 : 0 :
212 CELEPSA
150 CHINANGO
149
105
106
107
151 EGASA
152
153
154
260 EGECSAC
251 EGEHUANZA
258 EGEJUNÍN
259
163 EGEMSA
127 EGENOR
126
216
198
170 EGESUR
223 ELEC. SANTA ROSA
247 ELÉCTRICA RIO DOBLE
238 ELÉCTRICA YANAPAMPA
101 ELECTROPERU
102
191 ENERSUR
766
211 GEPSA
228 HIDROCAÑETE
201 HIDROLECTRICA SANTA CRUZ
226
188 HUANCHOR
755 LUZ DEL SUR
214 MAJA
182 SAN GABAN
215 SINERSA (C.H. POECHOS 2)
266 STATKRAFT
117
119
118
120
189
121
122
775 HUALLAGA
777
0 796
KALLPA
0 2146
H.REGULACION; 54.7%
P R
HIDROELECTRICA HIDROELECTRICA
CENTRAL
DE PASADA DE REGULACION
PLATANAL 5,146.7
CHIMAY 3,470.3
YANANGO 882.0
HUINCO 2,673.3
MATUCANA 3,015.3
CALLAHUANCA
MOYOPAMPA 954.1
HUAMPANI 734.1
CHARCANI I,II,III 163.3
CHARCANI IV 363.2
CHARCANI V 3,397.9
CHARCANI VI 209.6
CANCHAYLLO 113.0
HUANZA 821.1
RUNATULLO II 408.6
RUNATULLO III 481.5
MACHUPICCHU 3,983.4
CAÑON DEL PATO 5,735.3
CARHUAQUERO 2,117.5
CARHUAQUERO4 238.1
CANA BRAVA 41.3
ARICOTA 315.6
PURMACANA 4.0
PIZARRAS 230.0
YANAPAMPA 34.8
MANTARO 14,528.7
RESTITUCION 4,840.0
YUNCAN 3,172.9
QUITARACSA 1,512.6
LA JOYA 187.6
NIMPERIAL 84.3
STACRUZ_1_2 189.2
HUASAHUASI 214.3
HUANCHOR 458.0
SANTA TERESA 2,173.0
RONCADOR 88.3
SAN GABAN II 2,728.5
POECHOS2 181.8
CHEVES 3,259.4
YAUPI 2,482.2
MALPASO 595.5
OROYA/PACHACHACA 170.4
CAHUA 1,093.6
ARCATA 111.9
PARIAC 61.1
GALLITO CIEGO 599.5
PCH CHAGLLA 0.0
CHAGLLA 10,032.8
CERRO DEL ÁGUILA 12,416.0
PCH CERRO DEL ÁGUILA 243.5
POTRERO 419.5
MARAÑÓN 468.6
YARUCAYA 455.1
22,190.4 76,111.6
P R
5.9%
101 102 147 103
E1 E1 E1 E2
HORA
HC HC TN HC
H H T H
C C N C
1 1 1 1
1H 1H 1T 1H
R P R6 R
104 106 107 110
E2 E2 E2 E2
STAROSA
MATUCANA MOYOPAMPA HUAMPANI
TG7
HC HC HC TC
H H H T
C C C C
1 1 1 1
1H 1H 1H 1T
R P P GN
208 109 144 113
E2 E2 E2 E2
ENEL PERÚ
STAROSA VENTANILLA
UTI_5 UTI_6
TG8 TG3
136.4 92.5
136.3 92.7
136.8 92.9
137.0 93.1
136.6 93.0
136.6 92.7
137.6 93.0
136.6 92.6
137.7 93.0
138.1 93.4
137.0 92.7
137.7 93.1
136.6 92.0
137.5 93.7
137.5 92.8
137.5 93.3
136.1 135.9
181.0 137.7
173.7 137.6
175.0 137.7
173.6 137.4
173.8 137.7
173.0 137.7
169.9 136.8
170.2 137.6
169.1 137.3
168.8 136.5
168.6 136.0
168.6 135.3
167.3 136.4
168.4 136.0
168.5 134.2
169.8 135.0
170.6 135.7
171.4 135.6
137.3 135.9
137.6 135.7
180.6 135.5
173.3 135.3
173.1 135.8
173.4 135.6
173.4 135.7
152.8 135.8
136.5 135.7
137.6 135.7
137.7 123.2
137.7 92.7
136.5 92.4
3,699.2 0.0 0.0 2,873.0
TC TC TC TC
T T T T
C C C C
1 1 1 1
1T 1T 1T 1T
GN GN GN GN
114 193 150 149
E2 E2 E3 E3
CHINANGO
VENTANILLA VENTANILLA
CHIMAY YANANGO
TG4 TV
TC TC HC HC
T T H H
C C C C
1 1 1 1
1T 1T 1H 1H
GN GN R P
266 117 119 118
STATKRAFT
OROYA
CHEVES YAUPI MALPASO
PACHACHACA
HC HC HC HC
H H H H
C C C C
1 1 1 1
1H 1H 1H 1H
R P R P
120 189 121 122
STATKRAFT
HC HS HN HN
H H H H
C S N N
1 1 1 1
1H 1H 1H 1H
P P P R
142 143 125 187
E9 E9 E9 E9
SHOUGESA
TC TC TC TC
T T T T
C C C C
1 1 1 1
1T 1T 1T 1T
R500 R500 R500 D
288 115 239 127
E5 E5 E5 E4
26.3 240.4
25.3 237.1
25.1 237.6
25.8 239.6
25.0 238.4
26.1 238.5
26.2 239.6
25.1 240.0
25.2 238.7
25.0 241.0
25.2 239.1
26.4 239.5
25.3 237.0
25.6 240.9
25.5 241.6
35.1 239.2
47.8 236.6
46.5 238.2
46.7 235.0
46.9 240.1
46.8 239.7
47.3 240.8
46.8 238.9
47.3 240.0
47.0 241.1
46.6 240.7
46.8 238.3
46.5 239.2
47.2 239.9
47.4 235.5
47.0 239.4
47.5 236.9
47.1 240.5
47.4 239.0
48.0 241.0
49.2 238.9
51.8 239.0
52.2 239.4
51.4 240.1
51.3 237.2
51.7 238.0
51.6 237.4
51.4 237.7
51.1 238.2
52.0 239.3
52.0 239.0
51.9 239.1
25.0 238.7
977.6 0.0 0.0 5,735.3
HN
TN TN TN
T T T H
N N N N
1 1 1 1
1T 1T 1T 1H
GM GM D R
126 216 198 138
E4 E4 E4 E8
ORAZUL TERMOSELVA
AGUAYTIA
CARHUAQUERO CARHUAQUERO4 CANA BRAVA
TG1
1 R R 1
1H RH RH 1T
R P P GA
139 163 170 219
AGUAYTIA
MACHUPICCHU ARICOTA INDEPENDENCIA
TG2
TC HS HS TC
T H H T
C S S C
1 1 1 1
1T 1H 1H 1T
GA P R GN
191 766 174 240
ILO2
YUNCAN QUITARACSA RF ILO2 TG1
TV CARB1
132.1 16.0
131.8 15.6
131.9 15.6
132.1 16.1
132.2 16.4
132.0 15.5
132.2 15.6
131.8 16.4
132.0 15.6
133.0 16.4
132.1 15.9
132.5 16.1
131.4 15.2
132.1 16.5
132.1 16.7
132.0 16.4
131.6 15.3
132.5 16.3
131.3 110.6
132.1 60.0
132.3 60.2
132.6 111.9
131.9 111.6
132.2 112.3
133.0 51.0
132.0 90.1
132.3 39.4
131.9 39.6
132.4 79.9
131.6 110.9
132.1 111.7
130.2 112.2
132.1 112.2
132.3 112.2
133.1 112.1
132.4 79.6
132.5 79.7
132.8 112.0
132.4 112.0
132.3 111.6
132.6 112.0
132.3 112.0
132.6 111.8
132.6 112.0
132.7 81.1
132.8 79.9
132.7 79.9
132.5 16.0
3,172.9 1,512.6 0.0 0.0
HC HN TS TS
H H T T
C N S S
1 1 1 1
1H 1H 1T 1T
R R C D
241 242 995 996
ENGIE
TS TS TS TS
T T T T
S S S S
1 1 1 1
1T 1T 1T 1T
D D D D
997 194 196 207
ENGIE
TS TC TC TC
T T T T
S C C C
1 1 1 1
1T 1T 1T 1T
D GN GN GN
236 795 285 2148 151
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.9
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.7
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
6.8 6.8
69.1 6.8
70.4 6.8
41.3 6.8
38.0 6.8
37.8 6.8
37.5 6.8
38.5 6.8
36.3 6.8
37.4 6.8
36.9 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 6.8
0.0 225.0 0.0 0.0 163.3
TC TC TC SS HS
T T T S H
C C C S S
1 1 1 R 1
1T 1T 1T RS 1H
GN GN GN S P
152 153 154 756
EGASA
HS HS HS TS
H H H T
S S S S
1 1 1 1
1H 1H 1H 1T
R R R D
217 218 156 155
SA
MOLLENDO CHILINA
PISCO TG1 PISCO TG2
1, 2, 3 (SULZ 1,2)
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 25.5
0.0 34.0
0.0 33.8
34.4 33.8
34.4 33.7
34.5 34.2
34.4 34.2
34.4 33.9
34.3 34.0
0.0 33.8
0.0 30.0
0.0 29.4
0.0 30.2
0.0 29.7
0.0 6.4
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 15.0
0.0 34.3
0.0 34.0
0.0 30.5
0.0 30.2
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
103.2 300.3 0.0 0.0
TC TC TS TS
T T T T
C C S S
1 1 1 1
1T 1T 1T 1T
GN GN D R500
182 197 203 204
HS TC TC TC
H T T T
S C C C
1 1 1 1
1H 1T 1T 1T
R GN GN GN
230 209 796 2146
KALLPA
TC TC HC HC
T T H H
C C C C
1 1 1 1
1T 1T 1H 1H
GN GN R P
252 249 250 248
135.5
133.0
135.5
134.6
135.5
135.1
135.6
133.8
135.5
135.8
134.3
135.4
136.0
135.3
134.8
136.0
135.6
135.1
135.6
135.2
135.1
133.8
134.7
135.0
134.0
135.4
134.1
135.5
135.5
135.0
135.0
134.5
135.9
135.8
135.0
135.4
134.6
134.7
134.2
135.0
134.9
134.5
136.3
135.2
135.1
134.2
135.6
134.3
0.0 0.0 0.0 3,240.8
TC TC TC TC
T T T T
C C C C
1 1 1 1
1T 1T 1T 1T
GN GN GN GN
2159 263 265 758
TC TN TN TN
T T T T
C N N N
2 1 1 1
1T 1T 1T 1T
GN D D D
786 787 788 789
SAMAY I
TS TS TS TS
T T T T
S S S S
1 1 1 1
1T 1T 1T 1T
D D D D
212 251 188 755
HC HC HC HS
H H H H
C C C S
1 1 1 1
1H 1H 1H 1H
R R P P
775 777 924 926
459.1
449.7
403.8
355.8
306.0
301.6
283.0
288.4
287.9
295.3
287.8
357.0
285.7
294.4
386.5
456.3
447.9
450.5
450.0
455.1
456.7
459.3
452.4
456.4
464.9
459.4
451.8
448.8
450.9
444.8
454.7
458.6
458.9
462.2
460.8
447.9
455.7
456.5
456.9
453.1
458.7
457.8
457.9
456.5
454.9
455.7
458.0
453.6
0.0 10,032.8 0.0 0.0
HC HC TC TS
H H T T
C C C S
1 1 1 1
1H 1H 1T 1T
P R D D
202 213 232 225
SDF
AIPSA AGROAURORA PETRAMAS
ENERGIA
OQUENDO
PARAMONGA MAPLE HUAYCOLORO
TG1
26.8 4.5
26.6 4.5
26.7 4.5
26.2 4.5
26.3 4.5
25.8 4.5
26.0 4.5
25.7 4.5
25.7 4.5
26.0 4.5
26.0 4.5
25.8 4.5
26.1 4.5
26.3 4.5
26.2 4.5
25.8 4.5
25.9 4.5
26.0 4.4
25.9 4.4
25.8 4.4
25.1 4.3
25.0 4.3
25.1 4.1
24.9 4.1
24.7 4.1
24.6 4.1
24.2 4.1
24.6 4.1
24.7 4.1
25.0 4.1
24.9 4.1
24.5 4.1
24.8 4.1
25.0 4.4
24.9 4.4
24.9 4.4
25.0 4.5
25.4 4.5
25.6 4.5
25.7 4.5
26.1 4.5
25.8 4.5
25.8 4.5
25.9 4.5
25.6 4.5
25.9 4.5
25.6 4.5
25.6 4.5
613.1 0.0 0.0 105.2
TC TC TN TC
T T T T
C C N C
1 R R R
1T RT RT RT
GN B B BG
760 201 226 215
TC HN HC HN
T H H H
C N C N
R R R R
RT RH RH RH
BG P P P
238 247 214 223
HC HN HC HC
H H H H
C N C C
R R R R
RH RH RH RH
P P P P
211 228 260 258
HS HC HC HC
H H H H
S C C C
R R R R
RH RH RH RH
P P P P
259 2128 2131 2135
HC HN HC HC
H H H H
C N C C
R R R R
RH RH RH RH
P P P P
233 234 235 237
TACNA PANAMERICANA
MAJES REPARTICION
SOLAR SOLAR
SS SS SS SS
S S S S
S S S S
R R R R
RS RS RS RS
S S S S
261 2150 253 770
PQE-EOLICO PQE-EOLICO
MOQUEGUA RUBÍ
MARCONA TRES HERMANAS
SS SS EC EC
S S E E
S S C C
R R R R
RS RS RE RE
S S E E
257 256 6000 6001
E39 E39
PQE-EOLICO
TALARA
CUPISNIQUE MW MW
EN EN GF GF
E E GF GF
N N GF GF
R R GF GF
RE RE GF GF
E E GF GF
6002 222 199
NC3 NC1
CENTRALE
GF HC HN
GF H_NC H_NC
GF C N
GF 1 1
GF 1H_NC 1H_NC
GF
200 221 224
AGUA Y
SINERSA ANDINO
E. PERU
HN HN HN
H_NC H_NC H
N C N
1 1 R
1H_NC 1H_NC RH
227 5000
NC4
SDE TOTAL
PIURA NO COES HORA
TABLAZO MW
TN
T_NC
N
1
1T_NC
8000 8001
RESERVA FRÍA
INDISPONIBILIDAD
RESERVA FRÍA
MANTENIMINETO
TERMOELÉCTRICAS
TERMOELÉCTRICAS
(MW)
(MW)
3,760.8 1,276.0
3,760.8 1,276.0
3,760.8 1,276.0
3,760.8 1,276.0
3,760.8 1,276.0
3,760.8 1,276.0
3,760.8 1,276.0
3,760.8 1,276.0
3,760.8 1,276.0
3,760.8 1,276.0
3,760.8 1,276.0
3,957.6 1,276.0
3,957.6 1,276.0
3,957.6 1,276.0
3,957.6 1,276.0
3,957.6 1,276.0
3,957.6 1,276.0
3,957.6 1,276.0
3,847.6 1,276.0
3,847.6 1,276.0
3,847.6 1,276.0
3,637.5 1,276.0
3,637.5 1,276.0
3,637.5 1,276.0
3,637.5 1,276.0
3,637.5 1,276.0
3,637.5 1,276.0
3,637.5 1,276.0
3,637.5 1,276.0
3,637.5 1,276.0
3,637.5 1,276.0
3,637.5 1,276.0
3,637.5 1,276.0
3,637.5 1,276.0
3,637.5 1,276.0
3,672.9 1,276.0
3,672.9 1,276.0
3,672.9 1,276.0
3,672.9 1,276.0
3,672.9 1,276.0
3,672.9 1,276.0
3,672.9 1,276.0
3,847.6 1,276.0
3,847.6 1,276.0
3,847.6 1,276.0
3,847.6 1,276.0
3,847.6 1,276.0
3,847.6 1,276.0
90,167.9 30,624.0
Wednesday, January 31, 2018
ELECTROPERU
6
101 102
HORA
MANTARO RESTITUCION
DÍa
EMPRESA E1 E1
AREAS CN Y S CN CN
RECURSO AREA HC HC
RECURSO H H
AREA C C
RER 1 1
RECURSO RER 1H 1H
RECURSO AREAS CN Y S HCN HCN
PROGRAMACIÓN DIARIA
ERU
145.0 132.8
145.0 132.8
145.0 132.8
145.0 132.8
145.0 132.8
145.0 132.8
145.0 132.8
145.0 132.8
145.0 132.8
145.0 132.8
145.0 132.8
145.0 132.8
145.0 132.8
145.0 132.8
145.0 129.8
145.0 119.4
145.0 132.8
145.0 132.8
155.4 132.8
145.0 132.8
145.0 132.8
151.9 132.8
181.2 132.8
189.9 132.8
175.6 132.8
145.0 132.8
145.0 132.8
151.2 132.8
171.8 132.8
181.7 132.8
178.9 132.8
179.4 132.8
171.8 132.8
174.2 132.8
145.0 132.8
145.0 132.8
145.0 132.8
145.0 132.8
171.6 132.8
181.0 132.8
166.4 132.8
158.4 132.8
145.0 132.8
145.0 132.8
145.0 132.8
145.0 132.8
145.0 132.8
145.0 132.8
0.0 3,690.8 3,178.3
E1 E2 E2
CN CN CN
TN HC HC
T H H
N C C
1 1 1
1T 1H 1H
TCN HCN HCN
ENEL PERÚ
STAROSA
MOYOPAMPA HUAMPANI
TG7
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
54.1 29.9
50.5 29.9
50.5 29.9
52.9 29.9
63.1 29.9
66.1 29.9
61.2 29.9
50.5 29.9
50.5 29.9
52.7 29.9
59.8 29.9
63.3 29.9
62.3 29.9
62.5 29.9
59.8 29.9
60.7 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
59.8 29.9
63.0 29.9
58.0 29.9
55.2 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
50.5 29.9
1,285.5 717.4 0.0
E2 E2 E2
CN CN CN
HC HC TC
H H T
C C C
1 1 1
1H 1H 1T
HCN HCN TCN
ENEL PERÚ
STAROSA
UTI_5 UTI_6
TG8
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
173.6
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
137.4
137.4
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
176.6
0.0
0.0
3,692.9 0.0 0.0
E2 E2 E2
CN CN CN
TC TC TC
T T T
C C C
1 1 1
1T 1T 1T
TCN TCN TCN
113 114 193
E2 E2 E2
CN CN CN
TC TC TC
T T T
C C C
1 1 1
1T 1T 1T
TCN TCN TCN
CHINANGO
E3 E3 E46
CN CN CN
HC HC HC
H H H
C C C
1 1 1
1H 1H 1H
HCN HCN HCN
STATKRAFT
OROYA
YAUPI MALPASO
PACHACHACA
SHOUGESA SHOUGESA
GALLITO CIEGO
TV1 TV2
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
569.8 0.0 0.0
E46 E9 E9
CN CN CN
HN TC TC
H T T
N C C
1 1 1
1H 1T 1T
HCN TCN TCN
SHOUGESA ENEL PIURA
26.4
26.4
26.4
26.4
26.4
26.4
26.4
26.4
26.4
26.4
26.4
26.4
26.4
26.4
26.4
26.4
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
0.0 0.0 1,006.6
E9 E9 E5
CN CN CN
TC TC TN
T T T
C C N
1 1 1
1T 1T 1T
TCN TCN TCN
ENEL PIURA O
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
257.3
0.0 0.0 6,175.8
E5 E5 E4
CN CN CN
TN TN HN
T T H
N N N
1 1 1
1T 1T 1H
TCN TCN HCN
Wednesday 31
ORAZUL
E4 E4 E4
CN CN CN
HN HN HN
H H H
N N N
1 R R
1H RH RH
HCN HCN HCN
Wednesday 31 de January de 2018
TERMOSELVA EGEMSA
AGUAYTIA AGUAYTIA
MACHUPICCHU
TG1 TG2
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
163.6
0.0 0.0 3,926.0
E8 E8 E11
CN CN S
TC TC HS
T T H
C C S
1 1 1
1T 1T 1H
TCN TCN HS
EGESUR
ILO2
QUITARACSA RF ILO2 TG1
TV CARB1
17.8
17.8
17.8
17.8
17.8
17.8
17.8
17.8
17.8
17.8
17.8
17.8
17.8
17.8
17.8
17.8
52.2
108.0
108.0
108.0
108.0
108.0
108.0
108.0
108.0
108.0
108.0
108.0
108.0
108.0
108.0
108.0
108.0
108.0
108.0
42.2
68.9
108.0
108.0
108.0
108.0
108.0
108.0
108.0
108.0
108.0
108.0
40.6
1,756.7 0.0 0.0
CHILCA1
NEPI TG42 NEPI TG43
TG1
0.0 0.0 0.0
CHILCA2 CHILCA2
INTIPAMPA
TG4 TV
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
53.7
74.7
74.7
74.7
73.8
45.1
39.3
39.3
39.3
39.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
276.8 0.0 0.0
CHARCANI
CHARCANI IV CHARCANI V
I,II,III
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 31.0
8.9 34.3
8.9 34.3
8.9 34.3
8.9 34.3
8.9 34.3
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 34.3
8.9 34.3
8.9 34.3
8.9 34.3
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
8.9 0.0
214.6 0.0 169.7
MOLLENDO CHILINA
PISCO TG2
1, 2, 3 (SULZ 1,2)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
31.0
31.0
31.0
33.8
31.0
31.0
33.8
33.8
33.8
33.8
32.1
31.0
33.8
33.8
33.8
33.8
33.8
33.8
33.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
312.0 0.0 0.0
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
12,676.3 237.6 0.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
140.0
0.0 0.0 3,325.0
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
215.5
0.0 0.0 5,173.0
E10 E7 E45
CN CN S
HC HC HS
H H H
C C S
1 1 1
1H 1H 1H
HCN HCN HS
HUALLAGA INFR. Y ENERGÍA DEL PERÚ
243.4
191.0
158.9
144.6
144.6
144.6
144.6
144.6
144.6
144.6
174.4
192.7
206.7
243.4
299.5
425.7
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
455.8
0.0 8,866.3 0.0
OQUENDO
RF PTO MALDONADO PARAMONGA
TG1
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
0.0 648.0 0.0
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
4.2 2.8
0.0 100.8 67.2
TACNA
MAJES REPARTICION
SOLAR
PANAMERICANA
MOQUEGUA RUBÍ
SOLAR
PQE-EOLICO PQE-EOLICO
TALARA
MARCONA TRES HERMANAS
PQE-EOLICO
CENTRALES ELOR CURUMUY
CUPISNIQUE
HN HN HN
H_NC H_NC H_NC
N N N
1 1 1
1H_NC 1H_NC 1H_NC
SDE
PIURA
227 9000 1221 -1
OFERTA
TABLAZO DEMANDA DEFICIT
(SOLO COES)
27.8 5,329.9
27.9 5,192.3
27.9 5,100.7
27.9 5,046.5
27.8 5,014.5
27.8 4,985.6
27.9 4,935.5
27.9 4,941.0
28.0 4,999.7
28.0 5,047.6
28.0 5,124.0
28.0 5,129.2
28.1 5,188.7
28.1 5,261.7
28.1 5,476.1
28.0 5,702.8
28.0 5,923.4
27.9 6,123.6
27.7 6,245.3
27.4 6,346.1
27.0 6,429.0
26.9 6,461.8
26.9 6,519.5
27.1 6,531.1
26.9 6,497.0
26.7 6,443.8
26.8 6,381.5
26.9 6,422.5
26.7 6,512.4
26.5 6,530.5
26.6 6,518.9
26.6 6,501.6
26.7 6,469.8
26.8 6,407.8
26.7 6,309.9
26.8 6,036.4
26.9 6,051.3
27.2 6,288.1
27.5 6,332.2
27.6 6,344.9
27.7 6,316.6
27.7 6,289.9
27.6 6,205.0
27.7 6,204.7
27.6 6,142.7
27.6 5,931.7
27.5 5,712.2
27.6 5,542.9
658.6 141,725.0 0.0 0.0
T_COES
CNC4 T_COES
T_COES
TN T_COES
T_NC T_COES
N T_COES
1 T_COES
1T_NC T_COES
T_COES
T_COES
T_COES
T_COES
T_COES
T_COES
1310 1318 1311
Flujo Pomacocha-San Juan Flujo Trafo Oroya 220/50 Flujo San Juan Santa Rosa
Flujo Trujillo - Guadalupe Cmg SEIN NCP(US$/MWh) Cmg Santa Rosa NCP(US$/MWh)
T_SEIN
T_SEIN
T_SEIN
T_SEIN T H
T_SEIN
T_SEIN
T_SEIN
T_SEIN
PROGRAMACION INTEG
GENERACION GENERACION
GENERACION GENERACION
TERMICA (COES) HIDRAULICA COES
SOLAR EÓLICO
(CENTRO + NORTE) (CENTRO + NORTE)
0.0 140.1 1,272.3 3,367.0
0.0 131.1 1,272.3 3,246.6
0.0 131.1 1,272.3 3,155.1
0.0 133.1 1,272.3 3,098.8
0.0 127.1 1,272.3 3,072.9
0.0 127.1 1,272.3 3,044.0
0.0 127.1 1,272.3 2,993.8
0.0 127.1 1,272.3 2,999.3
0.0 106.6 1,277.0 3,073.9
1.0 106.6 1,277.0 3,120.8
14.1 99.6 1,254.4 3,213.6
35.0 102.6 1,254.4 3,195.0
68.3 96.6 1,277.0 3,204.6
96.0 99.6 1,278.1 3,245.9
116.6 99.6 1,291.8 3,425.9
138.5 106.6 1,313.0 3,602.4
148.9 108.6 1,441.9 3,680.2
164.1 130.1 1,518.8 3,766.9
175.4 130.1 1,579.8 3,813.1
186.0 128.4 1,685.6 3,799.2
193.4 164.1 1,724.5 3,799.2
198.0 175.1 1,732.5 3,808.4
200.2 191.1 1,732.5 3,847.9
200.1 191.1 1,732.5 3,859.6
198.5 188.1 1,732.5 3,830.1
195.2 188.1 1,730.8 3,782.0
187.9 189.1 1,677.6 3,779.1
180.0 189.1 1,698.2 3,807.4
170.8 206.6 1,751.9 3,835.2
155.6 205.6 1,772.9 3,848.6
139.9 207.6 1,772.9 3,844.8
121.8 207.6 1,772.9 3,845.4
95.2 205.6 1,772.1 3,835.2
65.6 198.6 1,743.3 3,838.5
38.4 196.6 1,710.0 3,799.2
9.0 196.6 1,626.4 3,639.2
0.9 196.6 1,622.6 3,665.9
0.0 196.6 1,726.6 3,799.2
0.0 196.6 1,734.9 3,835.0
0.0 196.6 1,734.9 3,847.6
0.0 188.1 1,734.9 3,827.9
0.0 172.1 1,734.9 3,817.2
0.0 172.1 1,670.1 3,799.2
0.0 172.1 1,669.8 3,799.2
0.0 144.1 1,647.7 3,799.2
0.0 138.1 1,490.8 3,751.5
0.0 122.1 1,314.2 3,731.6
0.0 122.1 1,239.5 3,637.6
1,747.2 3,737.9 36,815.8 86,214.9
S E TCN HCN
GRAMACION INTEGRANTES COES
HS SS ES TOTAL_S
FIN
Wednesday, January 31, 2018
MIÉ ELECTROPERU
101 102 147
E1 E1 E1
CN CN CN
HC HC TN
H H T
C C N
1 1 1
1H 1H 1T
HCN HCN TCN
103 104 106 107
E2 E2 E2 E2
CN CN CN CN
HC HC HC HC
H H H H
C C C C
1 1 1 1
1H 1H 1H 1H
HCN HCN HCN HCN
REPROGRAMACIÓN DIARIA
ENEL PERÚ
110 208 109 144
STAROSA STAROSA
UTI_5 UTI_6
TG7 TG8
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
137.4
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
177.0
168.7
168.7
168.7
168.7
168.7
137.8
137.4
137.4
168.7
168.7
168.7
168.7
168.7
168.7
151.0
168.7
168.7
137.4
137.4
0.0 3,765.5 0.0 0.0
E2 E2 E2 E2
CN CN CN CN
TC TC TC TC
T T T T
C C C C
1 1 1 1
1T 1T 1T 1T
TCN TCN TCN TCN
CHINANGO
113 114 193 150
E2 E2 E2 E3
CN CN CN CN
TC TC TC HC
T T T H
C C C C
1 1 1 1
1T 1T 1T 1H
TCN TCN TCN HCN
CHINANGO STATK
149 266 117 119
OROYA
CAHUA ARCATA PARIAC
PACHACHACA
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
23.7
569.8 0.0 0.0 0.0
E46 E9 E9 E9
CN CN CN CN
HN TC TC TC
H T T T
N C C C
1 1 1 1
1H 1T 1T 1T
HCN TCN TCN TCN
ENEL PIURA
187 288 115 239
26.4
26.4
26.4
26.4
26.4
26.4
26.4
26.4
26.4
26.4
26.4
26.4
26.4
26.4
26.4
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
49.7
0.0
0.0 993.4 0.0 0.0
E9 E5 E5 E5
CN CN CN CN
TC TN TN TN
T T T T
C N N N
1 1 1 1
1T 1T 1T 1T
TCN TCN TCN TCN
ORAZUL
127 126 216 198
CAÑON
CARHUAQUERO CARHUAQUERO4 CANA BRAVA
DEL PATO
E4 E4 E4 E4
CN CN CN CN
HN HN HN HN
H H H H
N N N N
1 1 R R
1H 1H RH RH
HCN HCN HCN HCN
TERMOSELVA EGEMSA EGESUR
138 139 163 170
AGUAYTIA AGUAYTIA
MACHUPICCHU ARICOTA
TG1 TG2
163.6 5.0
163.6 5.0
163.6 5.0
163.6 5.0
163.6 5.0
163.6 5.0
163.6 5.0
163.6 5.0
163.6 5.0
163.6 5.0
163.6 5.0
163.6 5.0
163.6 5.0
163.6 5.0
163.6 5.0
163.6 5.0
163.6 6.5
163.6 6.5
163.6 9.0
163.6 9.0
163.6 10.0
163.6 10.0
163.6 10.0
163.6 10.0
163.6 10.0
163.6 10.0
163.6 10.0
163.6 10.0
163.6 10.0
163.6 10.0
163.6 16.0
163.6 16.0
163.6 24.0
163.6 24.0
163.6 27.9
163.6 27.9
163.6 27.9
163.6 27.9
163.6 27.9
163.6 27.9
163.6 27.9
163.6 27.9
163.6 26.0
163.6 26.0
163.6 14.0
163.6 14.0
163.6 6.5
163.6 6.5
0.0 0.0 3,926.0 303.6
E8 E8 E11 E12
CN CN S S
TC TC HS HS
T T H H
C C S S
1 1 1 1
1T 1T 1H 1H
TCN TCN HS HS
EGESUR
219 191 766 174
ILO2
INDEPENDENCIA YUNCAN QUITARACSA
TV CARB1
CHILCA1 CHILCA1
NEPI TG42 NEPI TG43
TG1 TG2
0.0 0.0 0.0 0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
46.7
68.6
74.7
68.9
39.3
39.3
43.7
57.7
39.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0 0.0 239.1 0.0
CHARCANI
INTIPAMPA CHARCANI IV CHARCANI V
I,II,III
MOLLENDO CHILINA
SAN GABAN II KALLPA TG1
1, 2, 3 (SULZ 1,2)
112.1 142.4
112.1 142.4
112.1 142.4
112.1 142.4
112.1 142.4
112.1 142.4
112.1 142.4
112.1 142.4
112.1 142.4
112.1 142.4
112.1 137.4
112.1 137.4
112.1 142.4
112.1 142.4
112.1 142.4
112.1 142.4
112.1 154.6
112.1 154.6
112.1 154.6
112.1 154.6
112.1 149.1
112.1 149.1
112.1 149.1
112.1 149.1
112.1 149.1
112.1 149.1
112.1 149.1
112.1 149.1
112.1 149.1
112.1 142.4
112.1 142.4
112.1 142.4
112.1 142.4
112.1 142.4
112.1 142.4
112.1 142.4
112.1 142.4
112.1 154.6
112.1 154.6
112.1 154.6
112.1 150.6
112.1 154.6
112.1 142.7
112.1 146.5
112.1 143.7
112.1 142.4
112.1 142.4
112.1 142.4
0.0 0.0 2,691.4 3,499.2
CERRO DEL ÁGUILA PCH CERRO DEL ÁGUILA FENIX GT11 FENIX GT12
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 9.9
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
528.2 10.0
12,676.3 239.1 0.0 0.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
135.0
0.0 3,240.0 0.0 0.0
215.5 47.6
215.5 11.4
215.5 0.0
215.5 0.0
215.5 0.0
215.5 0.0
215.5 0.0
215.5 0.0
215.5 0.0
215.5 0.0
215.5 20.6
215.5 4.6
215.5 4.6
215.5 26.5
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
215.5 47.6
0.0 0.0 5,173.0 867.5
OQUENDO
RF PUCALLA RF PTO MALDONADO PARAMONGA
TG1
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
27.0
0.0 0.0 648.0 0.0
TACNA PANAMERICANA
MOQUEGUA RUBÍ
SOLAR SOLAR
SD SD SD SD
AGUA Y SDE
E. PERU PIURA
224 227 1221
11.6 27.8
11.6 27.9
11.6 27.9
11.6 27.9
11.6 27.8
11.6 27.8
11.6 27.9
11.6 27.9
11.6 28.0
11.6 28.0
11.6 28.0
11.6 28.0
11.6 28.1
10.2 28.1
9.7 28.1
9.7 28.0
10.2 28.0
10.7 27.9
11.6 27.7
11.6 27.4
11.6 27.0
11.6 26.9
11.6 26.9
11.6 27.1
11.6 26.9
11.6 26.7
11.6 26.8
11.6 26.9
11.6 26.7
11.6 26.5
11.6 26.6
11.6 26.6
11.6 26.7
11.6 26.8
11.6 26.7
11.6 26.8
10.7 26.9
10.2 27.2
10.2 27.5
10.2 27.6
10.2 27.7
11.6 27.7
11.6 27.6
11.6 27.7
11.6 27.6
11.6 27.6
11.6 27.5
11.6 27.6
271.6 658.6 0.0 0.0
SD SD
1229 9000 9999
"DEMANDA" COES +
Demanda Ecuador GENERACION
( Exportación a ECUADOR) INTERCONEXIÓN PERU DEMANDA SEIN
TERMOELECTRICA
ECUADOR
0.0 5,344.2 5,344.2 1,272.3
0.0 5,207.1 5,207.1 1,272.3
0.0 5,136.9 5,136.9 1,272.3
0.0 5,063.0 5,063.0 1,272.3
0.0 5,030.2 5,030.2 1,272.3
0.0 5,000.2 5,000.2 1,272.3
0.0 4,952.0 4,952.0 1,272.3
0.0 4,956.0 4,956.0 1,272.3
0.0 5,015.1 5,015.1 1,277.0
0.0 5,065.7 5,065.7 1,277.0
0.0 5,137.6 5,137.6 1,254.4
0.0 5,146.1 5,146.1 1,254.4
0.0 5,203.3 5,203.3 1,277.0
0.0 5,273.7 5,273.7 1,278.1
0.0 5,493.3 5,493.3 1,286.8
0.0 5,701.6 5,701.6 1,438.0
0.0 5,921.8 5,921.8 1,574.8
0.0 6,123.1 6,123.1 1,574.8
0.0 6,244.5 6,244.5 1,574.8
0.0 6,347.7 6,347.7 1,763.7
0.0 6,432.7 6,432.7 1,727.5
0.0 6,468.6 6,468.6 1,774.3
0.0 6,492.3 6,492.3 1,796.1
0.0 6,513.4 6,513.4 1,802.2
0.0 6,507.2 6,507.2 1,796.4
0.0 6,454.7 6,454.7 1,766.8
0.0 6,393.6 6,393.6 1,766.8
0.0 6,435.8 6,435.8 1,771.2
0.0 6,525.9 6,525.9 1,785.2
0.0 6,380.6 6,380.6 1,683.7
0.0 6,371.1 6,371.1 1,644.4
0.0 6,356.0 6,356.0 1,613.4
0.0 6,323.0 6,323.0 1,613.4
0.0 6,259.6 6,259.6 1,613.4
0.0 6,161.9 6,161.9 1,582.5
0.0 5,999.8 5,999.8 1,582.1
0.0 6,014.2 6,014.2 1,582.1
0.0 6,300.9 6,300.9 1,687.3
0.0 6,305.7 6,305.7 1,687.3
0.0 6,318.6 6,318.6 1,687.3
0.0 6,289.9 6,289.9 1,700.3
0.0 6,303.9 6,303.9 1,721.1
0.0 6,217.2 6,217.2 1,664.5
0.0 6,216.9 6,216.9 1,664.3
0.0 6,151.0 6,151.0 1,638.3
0.0 5,941.2 5,941.2 1,477.9
0.0 5,728.9 5,728.9 1,366.2
0.0 5,558.9 5,558.9 1,245.9
0.0 141,393.3 141,393.3 36,725.8
T_SEIN
T_SEIN
T_SEIN
T_SEIN T
T_SEIN
T_SEIN
T_SEIN
T_SEIN
REPROGRAMA
5559 5560 5561 5562
GENERACION TERMICA
GENERACION GENERACION GENERACION
(COES)
HIDROELECTRICA SOLAR EÓLICO
(CENTRO + NORTE)
3,931.8 0.0 140.1 1,272.3
3,803.7 0.0 131.1 1,272.3
3,733.5 0.0 131.1 1,272.3
3,657.6 0.0 133.1 1,272.3
3,630.8 0.0 127.1 1,272.3
3,600.7 0.0 127.1 1,272.3
3,552.6 0.0 127.1 1,272.3
3,556.6 0.0 127.1 1,272.3
3,631.6 0.0 106.6 1,277.0
3,681.1 1.0 106.6 1,277.0
3,769.5 14.1 99.6 1,254.4
3,754.1 35.0 102.6 1,254.4
3,761.5 68.3 96.6 1,277.0
3,800.1 96.0 99.6 1,278.1
3,990.4 116.6 99.6 1,286.8
4,018.5 138.5 106.6 1,438.0
4,089.5 148.9 108.6 1,574.8
4,254.2 164.1 130.1 1,574.8
4,364.2 175.4 130.1 1,574.8
4,276.0 216.0 92.0 1,763.7
4,380.7 218.4 106.0 1,727.5
4,363.4 220.0 111.0 1,774.3
4,347.9 220.2 128.0 1,796.1
4,362.1 221.1 128.0 1,802.2
4,363.3 222.5 125.0 1,796.4
4,339.7 223.2 125.0 1,766.8
4,279.0 221.9 126.0 1,766.8
4,319.5 219.0 126.0 1,771.2
4,363.8 213.8 163.0 1,785.2
4,328.3 176.6 192.0 1,683.7
4,361.8 171.9 193.0 1,644.4
4,381.7 167.8 193.0 1,613.4
4,349.5 157.2 203.0 1,613.4
4,308.5 134.6 203.0 1,613.4
4,292.0 86.4 201.0 1,582.5
4,184.7 32.0 201.0 1,582.1
4,230.1 0.9 201.0 1,582.1
4,412.6 0.0 201.0 1,687.3
4,417.4 0.0 201.0 1,687.3
4,430.3 0.0 201.0 1,687.3
4,396.7 0.0 193.0 1,700.3
4,424.8 0.0 158.0 1,721.1
4,394.7 0.0 158.0 1,664.5
4,394.7 0.0 158.0 1,664.3
4,382.7 0.0 130.0 1,638.3
4,339.2 0.0 124.0 1,477.9
4,253.7 0.0 109.0 1,366.2
4,204.0 0.0 109.0 1,245.9
99,232.3 2,040.7 3,394.5 36,725.8
H S E TCN
REPROGRAMACION INTEGRANTES COES
5563 5564 5565 5566
GENERACION GENERACION SOLAR GENERACION EÓLICA
TOTAL SICN
HIDRAULICA COES COES COES
(CENTRO + NORTE)
(CENTRO + NORTE) (CENTRO + NORTE) (CENTRO + NORTE)
3,381.3 140.1 4,793.7
3,253.1 131.1 4,656.5
3,182.9 131.1 4,586.4
3,107.0 133.1 4,512.4
3,080.2 127.1 4,479.6
3,050.2 127.1 4,449.6
3,002.1 127.1 4,401.5
3,006.1 127.1 4,405.5
3,081.0 106.6 4,464.6
3,130.5 106.6 4,514.1
3,219.0 99.6 4,573.0
3,203.6 102.6 4,560.6
3,210.9 96.6 4,584.5
3,249.6 99.6 4,627.2
3,439.8 99.6 4,826.1
3,467.9 106.6 5,012.6
3,537.4 108.6 5,220.8
3,702.1 130.1 5,407.0
3,809.6 130.1 5,514.5
3,722.5 92.0 5,578.2
3,826.3 106.0 5,659.8
3,808.9 111.0 5,694.1
3,793.4 128.0 5,717.5
3,807.6 128.0 5,737.8
3,808.8 125.0 5,730.2
3,785.2 125.0 5,677.0
3,724.5 126.0 5,617.2
3,765.0 126.0 5,662.2
3,809.3 163.0 5,757.6
3,773.8 192.0 5,649.5
3,801.4 193.0 5,638.8
3,821.3 193.0 5,627.7
3,781.0 203.0 5,597.4
3,740.1 203.0 5,556.5
3,719.5 201.0 5,503.1
3,612.3 201.0 5,395.4
3,657.7 201.0 5,440.8
3,840.2 201.0 5,728.5
3,845.0 201.0 5,733.3
3,857.9 201.0 5,746.2
3,824.2 193.0 5,717.5
3,852.3 158.0 5,731.5
3,824.2 158.0 5,646.7
3,824.2 158.0 5,646.5
3,824.2 130.0 5,592.5
3,780.8 124.0 5,382.7
3,702.7 109.0 5,177.9
3,653.0 109.0 5,007.9
85,850.8 0.0 3,394.5 125,971.1
TS HS SS ES
5571
TOTAL SUR
550.5
550.5
550.5
550.5
550.5
550.5
550.5
550.5
550.5
551.5
564.6
585.5
618.8
646.5
667.2
689.1
701.0
716.1
730.0
769.6
772.9
774.5
774.7
775.6
777.0
777.7
776.4
773.5
768.3
731.1
732.3
728.3
725.6
703.1
658.8
604.4
573.4
572.4
572.4
572.4
572.4
572.4
570.4
570.4
558.5
558.5
551.0
551.0
15,422.2 FIN
T_SEIN
T_SEIN
T_SEIN
TOTAL_S T_SEIN T H
T_SEIN
T_SEIN
T_SEIN
T_SEIN
S E TCN HCN SCN ECN TOTAL_CN TS HS SS ES
TOTAL_S
101 101 101 102 102
1 1 1 2 1 1
HORA
MANTARO RESTITUCION
EJE REPROG PROG EJE - PROG EJE REPROG
0:30 608.22 604.66 604.66 3.56 203.14 191.00
1:00 600.88 604.66 569.70 31.18 199.70 191.00
1:30 602.72 604.66 539.17 63.55 200.27 191.00
2:00 604.13 604.66 525.41 78.72 201.52 191.00
2:30 606.05 604.66 520.23 85.82 201.99 191.00
3:00 602.90 604.66 520.49 82.41 201.45 191.00
3:30 606.25 604.66 497.36 108.89 201.73 191.00
4:00 606.94 599.47 604.66 2.28 202.69 189.36
4:30 605.20 604.66 534.80 70.40 202.22 191.00
5:00 611.15 604.66 547.16 63.99 204.43 191.00
5:30 607.87 604.66 569.67 38.20 202.78 191.00
6:00 607.28 604.66 541.66 65.62 202.08 191.00
6:30 603.52 604.66 538.28 65.24 201.44 191.00
7:00 611.10 604.66 541.76 69.34 203.99 191.00
7:30 603.94 604.66 594.95 8.99 201.48 191.00
8:00 605.19 604.66 604.66 0.53 202.07 191.00
8:30 601.76 604.66 604.66 -2.90 199.99 191.00
9:00 603.11 604.66 604.66 -1.55 200.05 191.00
9:30 602.84 604.66 604.66 -1.82 200.85 191.00
10:00 606.22 604.66 604.66 1.56 202.41 191.00
10:30 604.95 604.66 604.66 0.29 202.08 191.00
11:00 605.77 604.66 604.66 1.11 201.60 191.00
11:30 603.24 604.66 604.66 -1.42 200.81 191.00
12:00 606.26 604.66 604.66 1.60 202.04 191.00
12:30 609.89 604.66 604.66 5.23 203.93 191.00
13:00 605.30 604.66 604.66 0.64 201.92 191.00
13:30 602.87 604.66 604.66 -1.79 200.88 191.00
14:00 602.60 604.66 604.66 -2.06 200.16 191.00
14:30 605.15 604.66 604.66 0.49 200.95 191.00
15:00 596.22 604.66 604.66 -8.44 197.19 191.00
15:30 607.24 604.66 604.66 2.58 201.79 191.00
16:00 605.73 604.66 604.66 1.07 201.67 191.00
16:30 606.49 604.66 604.66 1.83 202.00 191.00
17:00 609.18 604.66 604.66 4.52 202.89 191.00
17:30 608.79 604.66 604.66 4.13 203.47 191.00
18:00 601.43 604.66 604.66 -3.23 199.52 191.00
18:30 605.17 604.66 604.66 0.51 201.46 191.00
19:00 606.09 604.66 604.66 1.43 202.47 191.00
19:30 607.50 604.66 604.66 2.84 202.03 191.00
20:00 604.47 604.66 604.66 -0.19 201.80 191.00
20:30 605.40 604.66 604.66 0.74 201.51 191.00
21:00 606.66 604.66 604.66 2.00 202.11 191.00
21:30 605.88 604.66 604.66 1.22 202.17 191.00
22:00 604.59 604.66 604.66 -0.07 201.17 191.00
22:30 606.23 604.66 604.66 1.57 201.71 191.00
23:00 607.48 604.66 604.66 2.82 202.10 191.00
23:30 605.02 604.66 604.66 0.36 201.24 191.00
0:00 604.51 604.66 604.66 -0.15 200.98 191.00
EJEC (MWh) 14528.69 14509.26 14101.89 4839.97 4583.18
102 147 147 147 103 103
1 2 1 1 1 2 1 1
ENEL PERÚ
CHINANGO
STATKRAFT
SHOUGESA
ENEL PIURA
ENEL PIURA
ORAZUL
TERMOSELVA EGEMSA
EGEMSA EGESUR
QUITARACSA ILO 2
PROG EJE - PROG EJE REPROG PROG EJE - PROG EJE REPROG
17.84 -1.84 0.00
17.84 -2.24 0.00
17.84 -2.28 0.00
17.84 -1.72 0.00
17.84 -1.48 0.00
17.84 -2.36 0.00
17.84 -2.20 0.00
17.84 -1.44 0.00
17.84 -2.20 0.00
17.84 -1.48 0.00
17.84 -1.92 0.00
17.84 -1.72 0.00
17.84 -2.64 0.00
17.84 -1.32 0.00
17.84 -1.12 0.00
17.84 -1.48 0.00
52.18 -36.87 0.00
108.00 -91.73 0.00
108.00 2.56 0.00
108.00 -48.00 0.00
108.00 -47.84 0.00
108.00 3.92 0.00
108.00 3.60 0.00
108.00 4.28 0.00
108.00 -57.04 0.00
108.00 -17.90 0.00
108.00 -68.58 0.00
108.00 -68.38 0.00
108.00 -28.11 0.00
108.00 2.88 0.00
108.00 3.72 0.00
108.00 4.16 0.00
108.00 4.24 0.00
108.00 4.16 0.00
108.00 4.08 0.00
42.24 37.38 0.00
68.91 10.78 0.00
108.00 4.04 0.00
108.00 3.96 0.00
108.00 3.64 0.00
108.00 4.00 0.00
108.00 4.00 0.00
108.00 3.80 0.00
108.00 4.04 0.00
108.00 -26.94 0.00
108.00 -28.07 0.00
108.00 -28.07 0.00
40.60 -24.57 0.00
1756.71 0.00 0.00 0.00 0.00 0.00
240 241 241 241 242 242
1 2 1 1 1 2 1 1
ILO 4
CHILCA TG1
PROG EJE - PROG EJE REPROG PROG EJE - PROG EJE REPROG
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
194 196 196 196 207 207
1 2 1 1 1 2 1 1
ENGIE
EGASA
EGASA
SAN GABAN
KALLPA GENERACIÓN
FENIX POWER
FENIX POWER
TERMOCHILCA PLAN
SAMAY I
CELEPSA EGEHUANZA
PETRAMAS ECELIM
HIDROCAÑETE EGECSAC
L GREEN POWER PERU S.A PARQUE EÓLICO MARCONA PARQUE EÓLICO TRES HERMANAS
C.E. CUPISNIQUE
PROG EJE - PROG
22.00 25.64
22.00 20.71
22.00 9.02
24.00 11.58
18.00 17.95
18.00 14.66
18.00 26.87
18.00 24.06
18.00 14.78
18.00 8.29
11.00 9.08
15.00 19.31
15.00 9.43
18.00 6.03
18.00 -2.77
18.00 -11.88
20.00 -8.30
21.00 -12.68
21.00 -7.21
19.36 7.68
55.00 -3.30
66.00 -7.28
66.00 -2.91
66.00 2.78
66.00 0.04
66.00 5.53
66.00 8.32
66.00 9.68
69.00 5.21
69.00 10.05
70.00 10.70
70.00 10.96
68.00 10.88
61.00 19.93
61.00 19.60
61.00 7.09
61.00 5.06
61.00 -7.68
61.00 -5.51
61.00 -16.14
61.00 -21.27
45.00 6.99
45.00 0.06
45.00 -4.78
25.00 10.78
19.00 17.81
19.00 11.24
19.00 15.57
971.18 FIN
EJECUTADO COES PROGRAMADO COES EJE - PROG
HORA
MW MW MW
EXPORTACIÓN A
GENERACIÓN TOTAL SEIN
ECUADOR
ENERGIA (MWh)
139184.07 139184.07 0.00
6427.67 6531.08
12:00 12:00
MÍNIMA -43.1
MEDIA -169.8
MÁXIMA -91.1
OGRAMADO SIN EXPORTACIÓN
DESVIACIÓN (%)
HORA
DESVIO PROMEDIO SEIN
MEDIA -169.8
MÁXIMA -91.1
101 102 147 103 104 106 107
HORA
CHINANGO STATKRAFT
OROYA
CHIMAY YANANGO CHEVES YAUPI MALPASO CAHUA
PACHACHACA
FT SHOUGESA
E13
AGUAYTIA AGUAYTIA
MACHUPICCHU ARICOTA INDEPENDENCIA YUNCAN
TG1 TG2
ENGIE
ILO2
QUITARACSA RF ILO2 TG1 RF ILO2 TG2 RF ILO2 TG3 NEPI TG41 NEPI TG42
TV CARB1
ENGIE
E13
EGASA
CHARCANI
INTIPAMPA CHARCANI IV CHARCANI V CHARCANI VI CHILINA TG PISCO TG1
I,II,III
MOLLENDO CHILINA
PISCO TG2 SAN GABAN II KALLPA TG1 KALLPA TG2 KALLPA TG3
1, 2, 3 (SULZ 1,2)
E52
SDF
HUALLAGA INFR. Y ENERGÍA DEL PERÚ AIPSA AGROAURORA PETRAMAS
ENERGIA
OQUENDO
CHAGLLA RF PUCALLPA RF PTO MALDONADO PARAMONGA MAPLE HUAYCOLORO
TG1
ELÉCTRICA ELÉCTRICA
ECELIM H. SANTA CRUZ SINERSA MAJA
YANAPAMPA RIO DOBLE
ELECTRICA
GEPSA HIDROCAÑETE EGECSAC EGEJUNÍN
STA ROSA
E59
PQE-EOLICO PQE-EOLICO
TRES HERMANAS
TALARA
CUPISNIQUE
MVAR CURUMUY
SDE
SINERSA ANDINO ELECTRO ORIENTE
PIURA
AGUA Y TOTAL
E. PERU NO COES
PIAS1 MVAR
2.4 18.7
2.5 17.5
2.4 17.6
2.6 19.1
2.4 19.7
2.4 19.9
2.3 19.5
2.3 19.2
2.3 19.7
2.4 19.7
2.4 20.0
2.6 19.4
2.3 19.8
2.2 16.9
1.9 16.4
2.2 17.2
2.4 21.1
2.7 21.7
2.8 21.5
2.9 24.4
3.0 22.9
3.1 22.9
3.0 24.4
3.0 22.9
2.6 22.0
2.6 18.4
2.8 18.2
2.9 19.2
3.2 21.3
3.3 22.7
3.2 22.7
3.2 22.4
2.9 21.0
3.0 18.8
2.9 17.7
2.8 18.5
2.6 19.7
2.8 22.7
2.6 21.5
1.9 20.2
1.7 18.7
1.7 17.4
1.8 16.8
1.7 18.3
2.0 22.9
2.7 19.3
2.5 17.0
2.8 17.1
61.4 478.3
HN
H_NC
N
1
1H_NC
Wednesday, January 31, 2018
POTENCIA DE LOS GRANDES USUARIOS LIBRES (MW)
GRANDES USARIOS LIBRES DEL ÁREA NO
FECHAHORA
BARRICK ALTO CEMENTOS
BARRICK PIERINA GOLD FIELD MARSA
CHICAMA PACASMAYO
Nota:
Información proporcionada por la empresas
DATOS ESTIMADOS
SIN DATOS
,70.0
,60.0
,50.0
,40.0
,30.0
,50.0
,40.0
,30.0
,20.0
,10.0
,0.0
30 30 30 30 30 30 30 30 30 30 :3
0
:3
0
:3
0
:3
0
:3
0
:3
0
:3
0
0: 1: 2: 3: 4: 5: 6: 7: 8: 9: 1 0 1 1 1 2 1 3 1 4 1 5 1 6
ACEROS
MISKIMAYO SIDER PERU TEXTIL PIURA YANACOCHA CHINALCO
AREQUIPA
,200.0
,180.0
,160.0
,140.0
,120.0
,100.0
,80.0
,140.0
,120.0
,100.0
,80.0
,60.0
,40.0
,20.0
,0.0
30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
1 2: 1 3: 1 4: 1 5: 1 6: 1 7: 1 8: 1 9: 2 0: 2 1: 2 2: 2 3: 0: 1: 2: 3: 4: 5: 6: 7:
QUIMPAC QUIMPAC
GLORIA MEPSA MILPO-DESIERTO PANASA
PARAMONGA OQUENDO
BUENAVENTURA
EL BROCAL CASAPALCA LAS BAMBAS ARES-CALLALLI ARES-COTARUSE
(ARES)
DEMANDA AREA
FECHAHORA
IMPORTACIÓN
SEIN NORTE CENTRO
ECUADOR
0:30 0.00 5,343.13 725.60 3,300.86
1:00 0.00 5,148.60 716.82 3,120.78
1:30 0.00 5,106.37 691.53 3,110.68
2:00 0.00 5,041.82 678.71 3,077.88
2:30 0.00 5,031.87 714.72 3,035.52
3:00 0.00 4,954.44 679.05 2,990.83
3:30 0.00 4,932.49 676.36 2,975.50
4:00 0.00 4,986.50 701.47 2,992.03
4:30 0.00 4,980.79 681.90 3,008.17
5:00 0.00 5,049.21 724.59 3,027.43
5:30 0.00 5,119.37 730.46 3,111.25
6:00 0.00 5,146.46 746.05 3,140.44
6:30 0.00 5,099.94 711.08 3,125.44
7:00 0.00 5,230.32 743.77 3,213.55
7:30 0.00 5,369.84 761.13 3,340.08
8:00 0.00 5,551.53 803.25 3,466.91
8:30 0.00 5,736.42 826.56 3,597.16
9:00 0.00 5,923.84 857.34 3,727.34
9:30 0.00 6,165.34 855.16 3,954.46
10:00 0.00 6,259.66 889.54 4,040.92
10:30 0.00 6,200.41 900.26 3,978.24
11:00 0.00 6,372.13 933.99 4,087.42
11:30 0.00 6,399.18 915.41 4,137.21
12:00 0.00 6,427.67 951.89 4,120.19
12:30 0.00 6,329.86 909.87 4,083.62
13:00 0.00 6,253.75 896.48 4,034.65
13:30 0.00 6,148.03 886.18 3,949.46
14:00 0.00 6,099.66 858.72 3,956.02
14:30 0.00 6,305.05 904.42 4,040.28
15:00 0.00 6,263.79 887.69 4,025.35
15:30 0.00 6,369.58 882.16 4,112.22
16:00 0.00 6,357.08 880.00 4,088.10
16:30 0.00 6,303.96 873.13 4,061.31
17:00 0.00 6,255.11 878.55 4,017.76
17:30 0.00 6,160.66 854.44 3,935.98
18:00 0.00 5,926.91 841.30 3,729.85
18:30 0.00 5,890.78 825.02 3,654.34
19:00 0.00 6,232.99 950.32 3,878.60
19:30 0.00 6,287.59 972.57 3,905.98
20:00 0.00 6,284.04 955.90 3,916.50
20:30 0.00 6,262.02 948.62 3,890.89
21:00 0.00 6,232.73 960.99 3,863.54
21:30 0.00 6,153.56 909.47 3,826.69
22:00 0.00 6,106.80 867.63 3,850.01
22:30 0.00 5,923.28 839.02 3,728.10
23:00 0.00 5,709.48 804.14 3,558.78
23:30 0.00 5,537.42 762.18 3,444.95
0:00 0.00 5,396.65 722.28 3,362.87
DATOS ESTIMADOS
SIN DATOS
1,400
1,200
1,000
800
600
400
200
NORTE SUR
0
3 0 00 30 00 30 0 0 3 0 00 3 0 0 0 30 00 30 00 30 0 0 3 0 0 0 3 0 0 0 3 0 0 0 3 0 0 0
0 : 1: 1: 2: 2: 3 : 3 : 4: 4 : 5 : 5: 6: 6: 7: 7: 8 : 8 : 9 : 9 : 10 : 10 : 11 : 11 : 12 : 1 2 :
EAS OPERATIVAS (MW)
3006 3007 3008 3009
EA SUBAREAS
(Valores SCADA)
4,500
4,000
3,500
3,000
2,500
2,000
1,500
1,000
500
ORTE SUR CENTRO
0
0 30 0 0 3 0 00 3 0 0 0 30 0 0 30 00 30 00 30 0 0 30 0 0 3 0 0 0 3 0 0 0 30 00 30 00 30 00 30 0 0 3 0 00
9 : 10 : 10 : 11 : 11 : 12 : 1 2 : 13 : 1 3 : 1 4 : 1 4 : 1 5 : 1 5 : 16 : 16 : 17 : 17 : 18 : 18 : 19 : 1 9 : 2 0 : 2 0 : 2 1 : 2 1 : 22 : 22 : 23 : 23 : 0:
3010 3012 3013 3014 5000
SUBAREAS
MW
ÁREA CENTRO
4,500
4,000
3,500
3,000
2,500
2,000
1,500
1,000
500
0
0 0 0
3 :0 3:3 0:0
2 2
Wednesday, January 31, 2018
9808 9812 9505 9473 4671
POTENCIA ACTIVA LÍNEAS DE TRANSMISIÓN DEL SEIN
SS.EE S.E. ZORRITOS S.E. TALARA S.E. PIURA OES
Nota:
Información proviene de datos instantáneos de potencia cada 30 minutos (Valores SCA
DATOS ESTIMADOS
SIN DATOS
EQUIPOS INTERVIENEN EN DEMANDA POR ÁREAS Y CONGESTIONES
4676 4681 5362 163 362 25198
N N N N N N
N: Norte
minutos (Valores SCADA) C: Centro
S: Sur
GESTIONES
25038 25051 25187 25104 3431 155
N N N N N N
S.E. CAJAMARCA
S.E. GUADALUPE S.E. CEMENTOS PACASMAYO
NORTE
N N N N N N
N N N N N N
N N N N N N
N N N N N N
S.E. CHIMBOTE 1
N N N N N N
S.E. CHIMBOTE
S.E. CHIMBOTE1 S.E. PARAMONGA EXISTENTE S.E. PARAMONGA
NUEVA
N N N N N N
N N N N N N
N N N N N N
AT73-523 AT74-523
TRA1 L-6554 L-652 TRA1
220kV 220kV
15.9 15.8 52.9 -20.2 57.6
15.7 17.2 49.9 -20.6 55.8
11.8 12.2 48.7 -20.6 54.6
12.2 12.2 47.4 -20.2 53.4
1.6 1.3 45.7 -20.2 52.8
4.7 4.6 45.2 -20.2 51.6
4.0 4.1 44.9 -19.9 51.6
0.0 0.2 44.4 -20.2 51.0
0.6 1.1 45.1 -19.9 51.6
-3.8 -3.9 45.3 -19.9 51.6
-5.8 -5.8 46.8 -19.9 52.8
1.8 1.7 48.2 -19.9 54.6
5.8 5.6 46.3 -17.9 52.2
10.7 10.5 46.7 -17.6 51.6
12.9 13.0 49.7 -18.3 54.6
19.2 19.0 53.5 -18.9 57.0
17.0 16.6 57.3 -20.2 61.2
5.8 5.6 57.9 -21.2 64.8
15.2 14.9 60.2 -20.9 66.0
16.8 16.3 61.5 -20.9 67.2
30.4 30.1 65.1 -22.5 69.0
28.4 28.8 64.8 -22.9 69.0
35.8 35.6 67.3 -23.2 70.2
29.4 29.5 64.8 -22.5 70.2
31.0 31.1 64.8 -22.2 69.0
41.4 41.2 64.6 -21.9 69.6
43.6 44.2 64.6 -22.9 70.2
49.6 49.3 65.8 -22.5 70.2
36.2 36.7 67.6 -23.2 70.2
44.0 43.7 67.5 -22.5 69.0
40.5 40.2 67.8 -22.5 70.2
37.7 40.4 67.3 -22.2 69.0
34.3 33.6 66.2 -22.9 70.2
28.0 27.7 63.9 -21.9 67.8
24.2 24.1 62.4 -21.5 66.6
15.3 14.9 59.0 -21.9 65.4
12.2 12.1 55.9 -20.6 58.2
-3.2 -3.3 65.0 -25.1 66.0
-8.7 -8.8 66.4 -26.1 66.6
-5.7 -7.2 67.9 -26.5 66.6
-12.2 -12.5 67.6 -26.5 67.2
-11.8 -11.9 66.8 -26.8 67.8
-11.0 -11.1 67.2 -26.1 66.6
6.6 5.3 68.9 -25.1 71.4
7.8 7.6 65.1 -24.2 67.8
7.2 9.6 60.4 -22.9 64.2
18.5 18.3 58.6 -21.2 60.0
11.8 11.7 54.5 -20.6 57.0
49.6 49.3 68.9 -17.6 0.0 71.4
-12.2 -12.5 44.4 -26.8 0.0 51.0
15.1 15.1 58.4 -21.8 #DIV/0! 62.5
N N C C C C
TRANSMANTARO EDELNOR
1958 330 316 1155 1168 1770
C C C C C C
C C C C C C
C C C C C C
C C C C C C
C.H. MOYOPAMPA S.E. SANTA ROSA NUEVA S.E. SANTA ROSA NUEVA
C C C C C C
C C C C C C
C C C C C C
MEPSA
3216 3220 3223 1903 4078 4070
S.E. BALNEARIOS
T2 T3 T4 T5 L-606 L-663
C C C C C C
C C C C C C
9425 9429 20702 800 795 881
C C C C C C
S.E. CHILCA REP S.E. ASIA S.E. CHILCA CTM (500 Kv)
C C C C C
S.E. INDEPENDENCIA
C C C C C C
S.E. ACEROS
C C C C C
ACEROS AREQUIPA
4866 1747 1744 1753 1764 891
C C C C C C
C C C C C C
C C C C C C
C C C C C C
C C C C C
C C C C C
C C C C C
C C C C C C
C C C C C C
RED DE ENERGIA
MINERA ANTAMINA ISA PERU ISA PERU ETESELVA
DEL PERU
1443 246 229 1439 2177 2179
C C C C C C
C C S S S
KALLPA TRANSMANTARO
2024 2040 21351 21356 5746 5741
S S S S S S
S S S S S S
S.E. SOCABAYA S.E. SOCABAYA S.E. CERRO VERDE S.E. CERRO VERDE
S S S S S S
MINERA CERRO
MINERA CERRO VERDE TESUR REP
VERDE
5671 2648 2647 2154 2172
S S S S S
S S S S S
S
S S S
S S S
S S S S S S
S S S S S S
S S S S S S
S S S S S S
S S S S S S
RED DE ENERGIA
EGEMSA MINERA LAS BAMBAS
DEL PERU
2165 9623 5513 1677 21253
S.E. PUNO S.E. SAN GABÁN S.E. MOQUEGUA S.E. ILO MACHUPICCHU II
S S S S S
AT89-212 AT90-212
L-2050 L-2059 L-2050 L-2060
(220kV) (220kV)
77.5 69.8 -55.3 -76.5 63.1 12.5
76.8 69.8 -56.1 -75.4 63.4 11.7
76.3 69.9 -55.9 -75.7 63.6 11.7
76.8 70.8 -57.1 -75.6 64.8 11.0
77.6 70.6 -58.0 -76.3 65.2 10.8
77.6 70.8 -57.4 -76.5 64.7 11.0
77.7 70.5 -56.9 -76.2 64.1 10.9
77.3 70.7 -57.8 -75.8 64.0 10.9
77.0 70.2 -56.1 -75.9 64.1 11.7
78.0 70.1 -55.7 -77.0 63.1 12.2
77.2 67.8 -55.1 -75.3 62.0 13.6
76.9 69.5 -55.4 -75.8 62.9 12.0
77.0 68.7 -54.0 -75.0 62.0 13.8
76.8 68.2 -52.0 -76.4 59.7 15.0
76.4 66.2 -50.0 -74.8 57.9 16.8
75.9 66.2 -50.8 -74.6 57.9 16.2
75.9 64.6 -48.3 -73.8 56.2 17.4
75.2 63.7 -47.6 -74.0 56.3 17.9
75.2 63.6 -47.0 -73.8 55.4 18.0
75.4 64.0 -47.7 -74.3 55.4 18.3
74.9 63.3 -47.3 -74.1 55.3 18.1
74.6 63.8 -47.9 -73.9 55.0 18.0
74.1 62.4 -46.6 -73.5 53.7 18.6
75.0 63.2 -47.3 -73.4 55.6 18.4
77.2 65.4 -49.2 -76.6 57.2 17.9
75.3 64.8 -49.5 -74.1 56.9 16.8
75.7 65.7 -50.1 -74.6 57.3 16.5
74.9 65.2 -49.2 -74.6 57.1 16.4
75.4 63.2 -46.6 -73.8 54.7 18.1
75.1 62.3 -46.4 -74.2 54.5 18.9
74.7 61.9 -45.4 -74.2 53.6 19.5
74.1 61.3 -43.4 -72.4 53.1 19.5
74.5 61.7 -46.2 -73.2 52.7 20.0
75.1 61.7 -45.2 -73.1 53.9 19.1
74.6 62.1 -45.1 -73.7 53.3 19.9
72.8 59.0 -42.1 -71.0 49.5 21.1
72.8 55.0 -35.7 -71.1 43.9 26.3
73.8 56.8 -39.6 -72.6 46.2 25.6
74.8 56.2 -38.3 -73.1 45.7 27.0
73.2 55.5 -38.8 -72.3 45.4 26.7
73.6 56.7 -39.9 -73.2 46.6 25.9
74.2 59.0 -41.9 -74.1 49.2 24.0
73.9 54.9 -37.0 -71.9 44.6 26.8
74.3 57.8 -40.9 -72.5 47.5 24.5
75.1 61.2 -44.9 -73.2 53.0 20.6
75.9 64.4 -48.3 -74.4 56.0 18.2
76.6 65.6 -50.7 -75.0 57.8 16.1
76.1 66.2 -52.4 -74.3 59.4 14.9
78.0 70.8 -35.7 -71.0 65.2 27.0
72.8 54.9 -58.0 -77.0 43.9 10.8
75.5 64.2 -48.5 -74.3 56.1 17.6
S S S S S S
TRANSMANTARO
Wednesday, January 31, 2018
4264 4268 366
INTERCONEXIÓN
SS.EE CENTRO - NORTE
KIMAN AYLLU KIMAN AYLLU CHIMBOTE1
HORA L-2269 L-2270 L-2215
0:30 36.4 36.4 29.1
1:00 36.4 35.3 25.5
1:30 33.0 33.1 23.2
2:00 28.0 27.9 21.2
2:30 29.3 28.5 27.5
3:00 25.8 25.8 23.4
3:30 22.4 22.4 21.2
4:00 24.6 24.7 23.8
4:30 25.1 25.0 24.4
5:00 29.2 29.2 31.6
5:30 31.5 30.5 31.8
6:00 35.9 35.3 35.4
6:30 31.8 31.8 32.3
7:00 36.0 36.1 36.0
7:30 42.0 42.0 40.2
8:00 44.7 44.7 43.9
8:30 48.5 47.9 44.7
9:00 53.1 53.1 48.6
9:30 30.3 30.3 48.5
10:00 42.8 42.9 50.6
10:30 42.2 42.0 49.0
11:00 31.0 31.5 49.0
11:30 28.4 28.5 45.8
12:00 32.0 32.5 48.9
12:30 44.9 45.2 48.9
13:00 33.4 33.4 46.8
13:30 41.3 41.2 43.3
14:00 38.0 38.6 38.9
14:30 34.2 34.2 43.7
15:00 25.2 25.2 42.1
15:30 23.9 23.6 41.3
16:00 23.4 23.4 44.2
16:30 23.6 23.6 40.7
17:00 24.9 24.8 43.1
17:30 22.8 23.5 41.9
18:00 30.1 30.1 43.1
18:30 29.2 29.0 41.3
19:00 34.5 34.9 53.5
19:30 37.3 37.3 54.1
20:00 35.1 35.1 53.5
20:30 34.4 34.4 53.3
21:00 33.2 33.2 54.1
21:30 28.3 29.5 50.8
22:00 25.4 25.4 45.0
22:30 34.0 34.0 41.9
23:00 30.7 31.3 38.9
23:30 26.3 27.8 35.5
0:00 39.9 39.7 34.6
MINIMO 22.4 22.4 21.2
MÁXIMO 53.1 53.1 54.1
PROMEDIO 32.8 32.8 40.2
MW
MW
CH
L-
1,200.0
1,100.0
1,000.0
900.0
800.0
700.0
600.0
500.0
400.0
300.0
200.0
100.0
0.0
0:30 1:00 1:30 2:00 2:30 3:00 3:30 4:00 4:30 5:00 5:30 6:00
TOTAL_EJECUTADO TOTAL_
(*) LIMITE 6 CENTRO SUR (*) LIM
0.0
0:30 1:00 1:30 2:00 2:30 3:00 3:30 4:00 4:30 5:00 5:30 6:00
TOTAL_EJECUTADO TOTAL_
(*) LIMITE 6 CENTRO SUR (*) LIM
1343 5067 8000 2177
INTERCONEXIÓN ENTRE SISTEMAS OPERATIVOS DEL SEIN
NTRO - NORTE C
CHIMBOTE1 CHIMBOTE NUEVA CAMPO ARMIÑO
TOTAL
L-2216 L-5006 L-2051
29.4 94.1 225.3 164.3
24.0 94.7 215.9 164.6
23.6 96.4 209.2 160.7
21.8 95.3 194.2 159.6
27.9 121.1 234.3 158.4
23.8 102.6 201.5 157.5
22.2 100.2 188.4 157.2
25.7 113.2 212.0 160.2
25.2 102.8 202.5 158.1
32.3 121.7 244.1 158.7
32.9 127.3 254.0 159.6
36.1 113.7 256.4 154.8
33.1 108.4 237.4 147.5
36.4 123.2 267.7 148.0
37.7 136.8 298.7 151.5
43.5 166.1 342.9 144.6
46.1 173.3 360.5 147.0
50.5 195.5 400.8 151.1
48.6 150.4 308.1 149.6
51.8 189.3 377.4 143.8
48.7 178.2 360.2 140.9
48.9 170.7 331.1 144.1
46.2 160.9 309.8 147.3
49.8 172.7 335.9 151.4
51.2 176.7 366.9 147.4
46.8 151.1 311.4 145.6
43.0 168.2 337.0 140.6
39.1 151.5 306.0 140.0
43.9 157.5 313.5 153.0
43.2 133.6 269.3 149.2
42.4 122.8 253.9 157.3
45.0 116.5 252.5 159.4
41.2 111.3 240.4 164.9
42.9 112.7 248.4 168.6
43.3 97.0 228.5 170.5
43.1 114.9 261.3 174.5
41.0 110.8 251.2 181.7
53.6 179.3 355.7 184.3
54.3 188.1 371.1 185.1
53.5 191.7 368.9 184.7
54.5 192.0 368.6 188.5
54.2 195.3 370.0 183.7
50.1 176.9 335.6 184.6
45.2 151.3 292.3 182.4
43.1 135.4 288.4 173.7
40.8 105.1 246.8 172.6
36.7 83.5 209.7 170.0
34.5 102.7 251.4 166.6
21.8 83.5 188.4 140.0
54.5 195.5 400.8 188.5
40.7 138.2 284.7 160.6
CHI MBOTE1 CHI MBOTE1 CHIMBOTE NUEVA KIMAN AYLLU KIMAN AYLLU
L-2216 L-2215 L-5006 L-2270 L-2269
2:00 2:30 3:00 3:30 4:00 4:30 5:00 5:30 6:00 6:30 7:00 7:30 8:00 8:30 9:00 9:30 10:00 10:30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:30 15:00 15:30 16:0
TOTAL_EJECUTADO TOTAL_GPROGRAMADO (*) LIMITE 1 CENTRO SUR (*) LIMITE 2 CENTRO SUR (*) LIMITE 3 C
(*) LIMITE 6 CENTRO SUR (*) LIMITE 7 CENTRO SUR
2:00 2:30 3:00 3:30 4:00 4:30 5:00 5:30 6:00 6:30 7:00 7:30 8:00 8:30 9:00 9:30 10:00 10:30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:30 15:00 15:30 16:0
TOTAL_EJECUTADO TOTAL_GPROGRAMADO (*) LIMITE 1 CENTRO SUR (*) LIMITE 2 CENTRO SUR (*) LIMITE 3 C
(*) LIMITE 6 CENTRO SUR (*) LIMITE 7 CENTRO SUR
2179 24789 5582 5000
OS DEL SEIN
CENTRO - SUR
CAMPO ARMIÑO POROMA POROMA
TOTAL
L-2052 L-5033 L-5034
163.5 155.6 310.5 793.9
163.6 156.0 309.9 794.0
160.3 153.1 303.8 777.9
156.6 143.4 297.0 756.5
156.8 144.3 302.5 762.0
156.0 144.0 304.4 761.9
154.0 145.2 300.5 756.8
158.0 149.7 301.1 769.0
156.9 147.7 305.5 768.3
154.7 144.7 300.6 758.7
157.1 144.2 299.2 760.2
155.4 131.5 286.2 727.9
145.8 117.3 269.1 679.7
144.9 102.2 249.4 644.4
147.5 94.6 252.0 645.5
142.0 70.0 221.4 577.9
143.6 70.5 221.5 582.5
149.0 75.9 218.1 594.1
149.2 73.7 228.5 601.0
143.0 69.7 222.6 579.0
139.1 67.5 219.2 566.7
143.1 72.3 218.0 577.6
145.7 74.1 217.8 584.8
149.2 85.2 229.9 615.6
145.1 83.5 230.4 606.4
143.0 72.8 229.6 591.0
138.8 67.0 207.2 553.6
138.7 76.0 191.4 546.1
150.5 97.7 242.0 643.3
145.7 95.7 236.8 627.4
156.3 117.6 256.1 687.3
158.3 119.7 259.7 697.1
161.8 127.9 275.1 729.8
166.1 145.3 289.6 769.6
168.1 153.9 306.6 799.0
174.5 163.1 314.5 826.6
180.3 181.8 326.1 869.9
182.8 181.7 323.8 872.5
181.2 184.6 327.9 878.9
185.5 187.1 324.6 881.9
186.1 188.7 329.9 893.2
182.5 183.7 323.1 873.0
182.7 181.8 333.2 882.4
181.2 173.2 315.7 852.5
172.2 162.0 310.1 818.0
167.7 153.3 305.2 798.7
168.3 151.1 307.2 796.5
162.1 150.0 309.4 788.1
138.7 67.0 191.4 546.1
186.1 188.7 333.2 893.2
158.6 127.7 276.3 723.3
INTERCONEXIÓN ENTRE SI
MW
CENTRO -
1000.0
900.0
800.0
700.0
600.0
500.0
400.0
300.0
200.0
100.0
400.0
300.0
200.0
100.0
0.0
30 00 3 0 0 0 30 00 30 0 0 3 0 0 0 3 0 0 0 30 00 3 0 0 0 3 0 00 30 0 0 3
0: 1: 1 : 2 : 2: 3: 3: 4 : 4: 5 : 5 : 6 : 6: 7: 7 : 8 : 8 : 9: 9: 1 0 : 10 :
POROMA POROMA
L-5034 L-5033
12:30 13:00 13:30 14:00 14:30 15:00 15:30 16:00 16:30 17:00 17:30 18:00 18:30 19:00 19:30 20:00 20:30 21:00 21:30 22:00 22:30 23:00 23:30 0:00
MITE 2 CENTRO SUR (*) LIMITE 3 CENTRO SUR (*) LIMITE 4 CENTRO SUR (*) LIMITE 5 CENTRO SUR
12:30 13:00 13:30 14:00 14:30 15:00 15:30 16:00 16:30 17:00 17:30 18:00 18:30 19:00 19:30 20:00 20:30 21:00 21:30 22:00 22:30 23:00 23:30 0:00
MITE 2 CENTRO SUR (*) LIMITE 3 CENTRO SUR (*) LIMITE 4 CENTRO SUR (*) LIMITE 5 CENTRO SUR
TOTAL_GPROGRAMA
DO
795.12296
791.63446
778.30166
762.95247
769.72721
777.84096
772.99252
766.53585
775.12961
775.70315
764.56776
727.92972
694.91044
667.88529
650.43207
652.45626
659.11193
652.97951
642.07668
622.87611
619.74794
618.70822
619.47635
618.21382
601.21858
598.80039
615.25005
646.89094
667.36829
688.80433
704.20109
731.76215
758.76397
789.26669
819.61172
860.81202
900.44973
894.33291
897.26151
898.17085
905.39378
894.16257
884.62029
864.24649
848.43912
838.34676
822.6864
622.35355
00 23:30 0:00
UR
00 23:30 0:00
UR
(*) (*) (*) (*) (*) (*) (*)
LIMITE LIMITE LIMITE LIMITE LIMITE LIMITE LIMITE
1 2 3 4 5 6 7
CENTR CENTR CENTR CENTR CENTR CENTR CENTR
1230 O SUR
O SUR 920 O SUR990 O SUR990 O SUR
1230 O SUR
1000 O SUR920
1230 920 990 990 1230 1000 920
1230 920 990 990 1230 1000 920
1230 920 990 990 1230 1000 920
1230 920 990 990 1230 1000 920
1230 920 990 990 1230 1000 920
1230 920 990 990 1230 1000 920
1230 920 990 990 1230 1000 920
1230 920 990 990 1230 1000 920
1230 920 990 990 1230 1000 920
1230 920 990 990 1230 1000 920
1230 920 990 990 1230 1000 920
1230 920 990 990 1230 1000 920
1230 920 990 990 1230 1000 920
1230 920 990 990 1230 1000 920
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 950 970 990 1230 1000 1000
1230 990 1000 1000 1230 1000 990
1230 990 1000 1000 1230 1000 990
1230 990 1000 1000 1230 1000 990
1230 990 1000 1000 1230 1000 990
1230 990 1000 1000 1230 1000 990
1230 990 1000 1000 1230 1000 990
1230 990 1000 1000 1230 1000 990
1230 990 1000 1000 1230 1000 990
1230 990 1000 1000 1230 1000 990
1230 990 1000 1000 1230 1000 990
1230 990 1000 1000 1230 1000 990
1230 920 990 990 1230 1000 920
1230 920 990 990 1230 1000 920
1230 920 990 990 1230 1000 920
0 0 0 0 0 0 0 0 0 0
:3 0:0 0:3 1:0 1:3 2:0 2:3 3:0 3:3 0:0
2 2 2 2 2 2 2 2
RMIÑO
Reporte de Stock de Combustibles
Fecha Inicio: 31/01/2018
Fecha Fin: 31/01/2018
REPORTE DE GPS
GPS S.E. S
Frecuencia mínima
Indicador de Calidad
Hora
Variaciones Sostenidas de Frecuencia 14:15
GPS S.E. SA
Frecuencia mínima
Indicador de Calidad
Hora
Variaciones Sostenidas de Frecuencia
GPS CHI
Frecuencia mínima
Indicador de Calidad
Hora
Variaciones Sostenidas de Frecuencia 14:15
GPS P
Frecuencia mínima
Indicador de Calidad
Hora
Variaciones Sostenidas de Frecuencia 14:15
Variaciones Súbitas de Frecuencia 14:45
GPS S.E. SAN JUAN
ia mínima Frecuencia máxima Transgresiones
Hz Hora Hz Hora Hz
59.983 0:15 60.036
GPS CHICLAYO
ia mínima Frecuencia máxima Transgresiones
Hz Hora Hz Hora Hz
59.983 0:15 60.036
GPS PIURA
ia mínima Frecuencia máxima Transgresiones
Hz Hora Hz Hora Hz
59.983 6:00 60.0259
59.925 7:23 60.0936
nsgresiones
Acumuladas mes
0
nsgresiones
Acumuladas mes
0
nsgresiones
Acumuladas mes
0
nsgresiones
Acumuladas mes
0
0
Wednesday, January 31, 2018
HORA HORA
FECHA EMPRESA UBICACIÓN
INICIO FINAL
R-10MVAr
L-1015
G6
CENTRAL
TG3
TG8
TG4
SVC
CENTRAL
RESERV. SHEQUE
CENTRAL
CENTRAL
CENTRAL
CENTRAL
CENTRAL
BARRA138KV
BC-04
BARRA A 60
T40-13
T41-13
CENTRAL
CENTRAL
TG2
RESTRICCIONES OPERATIVAS
DESCRIPC
interruptor en By-pass.
Limitado a 32
Restricción porMW por problemas en el inyector.
temperatura:
Límite superior: 810 MW
Límite inferior: 517 MW
El agente informó que no puede llegar a su potencia efectiva, establecida en ficha, por causas desconocidas.
Limitado a +5 MVAr hasta +13.5 MVAr debido a las corrientes circulantes que se generan en el SVC TINTAYA.
Presión máxima de gas del sistema de la C.T. Malacas (TGN4, TG5 y TG6) de 280 PSI.
Capacidad mínima del embalse 150 000 m3 por aseguramiento de caudal para SEDAPAL, según lo informado por la empresa EDEGEL.
No puede parar debido a que no cuentan con alimentación para los servicios auxiliares, que era proveniente desde Callahuanca.
La generación mayor a 18 MW, para suministrar de agua a sistema de refrigeración de la C.H. Cañon del Pato.
Capacidad de vertimiento maximo permanente igual a 10 m3/s. Capacidad de vertimiento maximo temporal igual a 16 m3/s.
El CC-EGASA limito la capacidad del transformador 138 kV/33 kV a 50 MVA por deterioro del aislamiento.
Indisponibilidad de la celda del banco de condensadores debido a que continuan deshabilitadas sus protecciones.
Máxima tensión que puede operar es 63 kV debido a alarma en los servicios auxiliares.
Problemas de regulación de TAPS en nivel 3 (se regula a TAP 1 inmediatamente). En nivel 2 si se puede operar normalmente.
Falla en los mandos de la variación de los TAPS (si se realiza la maniobra la posición del TAP se sitúa en el mínimo).
Limitado a una
Generación potencia
mínima mínima
limitada de 19.59 MW,
por problemas porválvulas
en las problemas
de en los sellos
admisión deUnidad
de la las válvulas
TV. eléctricas.
en modo 3x1: 400 MW
en modo 2X1: 450 MW