Академический Документы
Профессиональный Документы
Культура Документы
UNIVERSITY
CHANDKHEDA, AHMEDABAD
AFFILIATED
GOVERNMENT ENGINEERING COLLEGE,
DAHOD
A Report on -
Integrating farming and water supply
GROUP: FARMER
ACADEMIC YEAR
(2016-17)
CERTIFICATE
This is certify that the work in the DESIGN ENGINNERING-
1B(2140002)
:____________________________
ASST.PROF.V.J.PATEL
(HEAD OF DEPARTMENT)
:____________________________
ACKNOWLEDGEMENT
This is to place on record our appreciation and deep
gratitude to the persons without whose support this
project would never been seen the light of the day .We
express my sincere thanks to Prof.V.J PATEL, Head of
the Department, Computer Engineering, GECD for
extending his help .We have immense pleasure in
expressing thanks and deep sense of gratitude to my
guided by VIHARIKA CHAUDHARI and all the Faculty in
Computer Engineering, GECD for his valuable
suggestion and guidance throughout this
project.Finally at the outset we would like to thank all
those who have directly or indirectly helped us
accomplish our project successfully.
INDEX
1.DESCRIPTION
2.INTRODUCTION
village.
village
area
2) INTRODUCTION:
What is design?
situation.
At the beginning ofthe design process only goals are known while
at the end, both the goals andplans are known and that to with
others.
solved. Our main aim of project is to provide clean water with use
1) AEIOU SUMMARY:
ACTIVITIES
Labour digging
Site inspection
Surveying
Construction going
JCB working
Material transportation
ENVIRONMENT:
Water seepage
Water leakage
Garbage
Temple
Trees and Plants
Raw material
INTERACTION:
Group discussion between local people and village head
Group discussions between workers and engineers
Group discussions between worker and contractors.
OBJECTS:
Sand
Cement
pvc pipes
masonry
Hammer
JCB
Tents
Electricity supply
USERS:
Local people
Post man
Government officer
students
Engineer
banker
Local worker
Transporting system
2)EMPATHY:
USERS:
Local people
Post man
Government officer
students
Engineer
banker
Local worker
Transporting system
STACK HOLDERS:
ACTIVITIES:
STORY:
HAPPY STORY
Near our construction site, raw materials were easy available more in
proportion due to which overall cost of transportation was reduce.
During planning of project there was a dispute about place for laying
pipes which was solved by village head by providing land.
SAD STORY
Working was going on and JCB stop working due to some technical
problem which increase cost and time of work.
While working at various place water seepage where seen and that
caused problem to the work.
3) IDEATION:
PEOPLE:
Local people
Post man
Government officer
students
Engineer
banker
Local worker
Transporting system
ACTIVITIES:
Vehicles are parked by contractors and engineers.
Conversations between : Worker to worker
Worker to engineer
Engineer to contractor
Finishing work
JCB digging the land for work
Site inspector inspecting the site
Preparation of mortar
Surveyor is surveying the land
SITUATION/CONTEXT/LOCATION:
Labours where working on site whith the help of masonary tools..
Labors digging land at particular place
Surveyors where surveying using total station.
Trucks where transporting pipes to the site
Engineers where inspecting the place where installation of pumps
could be done to increase speed of water.
PROPS/TOOLS:
P.V.C. pipes
Bricks
Wooden bamboo
JCB machine
Bull dozer
Electrical switches
Safety shoes
Cement
Aggregate
Trucks
Crain
Tractor.
4)PRODUCT DEVELOPMENT:
i. PRODUCT PURPOSE:
To solve water problem of village people.
v. COMPONENTS:
P.V.C pipes
Pumps
Man holes
Raw material
Water purifying plants.
1.1) ACTIVITY FRAMEWORK
2.Pollution : No pollution
LNM MATRIX:
Reference:
1.www.nptel.ac.in
2.googlemaps
3.youtube
4.www.ieeexplore.ieee.org
Conclusion:
Scope of rain water harvestmen
Reuse of water.
Easy to farming using new technology
Prototype:-