PURPOSE
This procedure is aimed to provide a check list for items to be controlled during a safety visit of an
offshore drilling rig.
CONTENTS
1 GENERAL REQUIREMENTS & DOCUMENTATION ................................................................... 2
2 RECORDS AND TRAINING .......................................................................................................... 3
3 PERSONAL PROTECTIVE EQUIPMENT .................................................................................... 4
4 LIVING QUARTERS ...................................................................................................................... 5
5 PIPE RACK AREA ......................................................................................................................... 6
6 RIG FLOOR GENERAL................................................................................................................. 6
7 RIG FLOOR - TONGS & SLIPS .................................................................................................... 8
8 RIG FLOOR - DRAWWORKS & HOISTING GEAR ..................................................................... 9
9 RIG FLOOR - CATHEDS/HOISTS .............................................................................................. 10
10 DERRICK OR MAST ................................................................................................................... 11
11 SUBSTRUCTURE/CELLAR/WELL BAY/TEXAS DECK ............................................................. 12
12 BOP'S/ACCUMULATOR/CHOKE MANIFOLD............................................................................ 13
13 SHALE SHAKER AREA .............................................................................................................. 14
14 MUD TANKS/SOLIDS CONTROL EQUIPMENT ........................................................................ 15
15. SACK STORAGE/BULK TANKS ................................................................................................. 16
16 MUD HOPPER/MIXING BARREL ............................................................................................... 17
17 MUD PUMPS ............................................................................................................................... 17
18 CEMENTING UNIT...................................................................................................................... 18
19 STORAGE AREAS ...................................................................................................................... 18
20 GENERATOR/SCR AREA .......................................................................................................... 19
21 FUEL TANKS/FUEL TRANSFER ................................................................................................ 20
22 WELDING & BURNING ............................................................................................................... 21
23 CRANES ...................................................................................................................................... 22
24 FORKLIFT ................................................................................................................................... 23
25 HELIDECK ................................................................................................................................... 24
26 ANCHOR SYSTEM/JACKING SYSTEM ..................................................................................... 25
27 BALLAST CONTROL SYSTEM .................................................................................................. 25
28 LIFESAVING EQUIPMENT ......................................................................................................... 26
29 H2S REQUIREMENTS................................................................................................................ 27
30 POLLUTION CONTROL EQUIPMENT ....................................................................................... 28
SIGNATURE
Prepared by : Approved by :
JY.NEDELEC JL.JOUSSEAUME
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 2/27
1 GENERAL REQUIREMENTS
Fire pumps tested, local/remote Record pressure and delivery rate. ___________
start functioned. Check power supply mode main
circuit/emergency.
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 3/27
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 4/27
Accident, injury & illness forms Action taken to prevent recur- ___________
filled out ; records ; follow-up on rence.
accidents.
Training for personnel (first aid ; Responsibility for, how controlled. ___________
well control ; H2S ; other) certifi- Review process.
cation on file.
Hard hats & steel-toed boots/ Worn by all personnel on site. ___________
shoes.
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 5/27
4 LIVING QUARTERS
Electrical wiring & outlets in good Supply voltage checked, date of ___________
order. last check.
Station bills posted ; fire/abandon All personnel briefed & know their ___________
alarm station at each exit. stations.
Pipe racks level and in good Pipe stops and stanchions provi- ___________
condition. ded.
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 6/27
Page : 7/27
Tools, hand tools, subs, bits, etc. In good condition & properly stored. ___________
BOP and diverter controls labelled Last function checked : frequency. ___________
& operating properly.
First aid kit, stretcher & eye wash Ready for immediate use. ___________
in doghouse.
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 8/27
Snub lines & jerk lines. In good condition ; properly secu- ___________
red at both ends-3 clamps or
pressed fittings ; clamps on dead
ends.
Tongs : body & jaws. In good condition ; dies sharp & ___________
keepers in position ; handle safety
pin.
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 9/27
Drill line in good condition ; ton- When last visually inspected. ___________
mileage up to date ; slip/cut as
required.
Brakes in good condition ; ad- Last inspection & adjustment re- ___________
justed & working properly. corded.
Travelling block & hook in good When last NDT tested/overhauled. ___________
condition ; regularly maintained.
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 10/27
Overall condition of all rope, wire A systematic check on all lifting ___________
rope, chains, slings & hooks used equipment, slings & shackles.
for lifting.
10 DERRICK OR MAST
Derrick pins & keepers. All in place & in good condition. ___________
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 11/27
All wire rope in good condition. No wire rubbing against structural ___________
members.
All sheaves secured with safety To retain both sheave and wire ___________
slings
Gas-burner vent line. Must be routed to a position ___________
commensurate with max. dilution.
Air tank drained daily ; relief valves. Reported/last checked & tested. ___________
Work vests available & used. Safety lines/inertia brakes used/ ___________
use enforced ?
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 12/27
Ring buoys for man overboard. Provided & easily accessible in this ___________
area.
12 BOP'S/ACCUMULATOR/CHOKE MANIFOLD
No missing bolts ; all bolts tight & Bolts checked weekly & reported. ___________
secure.
Metal control lines ; good condi- Lines not in use blanked off. No ___________
tion . leaks
Page : 13/27
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 14/27
14 MUD TANKS
Hand rails on all passageways & In good condition ; secure ; toe ___________
stairs. boards on passage handrails.
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 15/27
This area should contain foam, Fix foam fire fighting equipment. ___________
fire fighting equipment if oil base
mud is used.
Caustic soda & other hazardous Properly labelled, stored & hand- ___________
chemicals. led.
Storage area separated and
closed.
Bulk & cement tanks equipped Pressure gauge on each silo. ___________
with rupture disks and/or pressure Safety valves last function test.
relief devices that function pro-
perly.
Bulk tanks (cement silos must be Equipped with weight indicators. ___________
physically separated from barite Last calibration check.
or bentonite silos).
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 16/27
Emergency eye wash station Primed & ready for use, deluge ___________
nearby. shower required.
Material Safety Data Sheets Readily available, copies with rig ___________
(MSDS). medic & toolpusher.
17 MUD PUMPS
Page : 17/27
Pulsation dampeners :
i. high pressure. Check pre-charge pressure & fluid ___________
used.
18 CEMENTING UNIT
19 STORAGE AREAS
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 18/27
20 GENERATOR/SCR AREA
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 19/27
One special hook & pair of special Available in SCR room. ___________
gloves.
Fuel tanks safely located. Away from heat, oxygen bottles ___________
oxidising agents.
Fuel transfer procedures posted & Date of last procedure checked. ___________
enforced.
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 20/27
Combustibles away from light Kept separate & clearly labelled/ ___________
fixtures. hazard signs.
Hot work permit procedure in Hazardous area limits known, per- ___________
place & enforced. mits used & details included in
work permit.
Welding machines properly groun- Date earthing last tested, welding ___________
ded. machines use earth return to set.
Hoses, fittings, gauges & regu- In good working order ; friction ___________
lators. lighters used ; matches prohibited.
Perforating notices for welding Available on site & used during ___________
machines. "radio silence".
23 CRANES
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 21/27
Limit switches device provided. Regularly tested on hoist & boom. ___________
Crane SWL (Safe Working Load) Clearly indicated on the crane. ___________
at two different radii.
24 FORKLIFT
Engine equipped with emergency Shall cut air and fuel supply. ___________
stop.
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 22/27
25 HELIDECK
Fire fighting equipment. Foam monitor & mains water supply ___________
to hose.
Date last function test.
Deck lights in good working order. In accordance with MODU or other ___________
code.
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 23/27
26 ANCHOR SYSTEM/JACKING
SYSTEM
Access hatches & watertight Well greased, W.T. doors regu- ___________
doors. larly tested.
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 24/27
Control board gauges, lights & Properly labelled and in good ___________
switches. working order.
28 LIFESAVING EQUIPMENT
Work vests provided & used for Including safety lines etc. ___________
work over water.
Ring Life Buoys - proper number, Equipped with light and smoke ___________
properly positioned. signals.
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 25/27
H2S sensors should be installed at the drill floor, cellar deck, shale ___________
shaker, mud pit & mud pump room. H2S monitors installed in the control
room & in the mud logging unit.
Hydrocarbon gas detectors installed in the same places with monitors in ___________
the control room & in the mud logging unit.
29 H2S REQUIREMENTS
Materials & equipment suitable for Determine criteria for equipment ___________
H2S service. selection.
Automatic H2S detection & alarm Alarms set at 10 ppm low level ___________
system. and 20 ppm high level, response
tested. Acoustic and visual signal.
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 26/27
Chalk boards ; bull horns. Fully equipped with pens & erasers. ___________
Safe breathing areas designated. Muster areas identified & known. ___________
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.
TotalFinaElf Date : Nov / 2000
CONTROL OF THE OFFSHORE
TDO/FPL/MTH DRILLING RIG Clt : ?
Page : 27/27
safety inspection offshore rig - 10/11/2015 Ce document est la propriété de TOTAL FINA ELF. Il ne pourra être divulgué ni reproduit sans son autorisation.