North-West Power Generation Company Limited

Sirajganj 225 MW Combined Cycle Power Plant (Unit-1)


Soydabad, Sirajganj
Field Inspection Sheet- ST Site

Date: Night Shift Morning Shift Evening Shift


Unit
Time of inspection: 22:30 hrs 03:00 hrs 07:30 hrs 11:30 hrs 14:30 hrs 18:30 hrs
HRSG
Seal Air Fan Status R/S 1- 2- 1- 2- 1- 2- 1- 2- 1- 2- 1- 2-
Main Pump Status R/S 1- 2- 1- 2- 1- 2- 1- 2- 1- 2- 1- 2-
Bypass Stack Damper

Charging Pump Status R/S


Oil Cooler Fan Status R/S 1- 2- 1- 2- 1- 2- 1- 2- 1- 2- 1- 2-
Electronic Enclosure Air Con. R/S
Damper Opening %
Hydraulic Oil Tank Level %
Hydraulic Oil Tank Temperature °C I I I I I I
Hydraulic Oil Pressure psi
Running Feed Water Pumps - R- R- R- R- R- R- R- R- R- R- R- R-
Bearing Cooling Water Cir. -
Bearing Sealing Water Cir. -
Motor Cooling Water Cir. -
Feed Water Pump

Suction Pressure Mpa


Delivery pressure Mpa
Bearing Temperture- DE °C
Bearing Temperture- NDE °C
Bearing X direction Vib. of DE µm
Bearing Y direction Vib. of DE µm
Bearing X dir. Vib. of NDE µm
Bearing Y dir. Vib. of NDE µm
Running Pump - R- R- R- R- R- R- R- R- R- R- R- R-
Recir. Pump
Blowdown System Condensate

Bearing Cooling Water Cir. -


Inlet Pressure Mpa
Outlet Pressure Mpa
Blowdown Tank Pressure Mpa
Blowdown Water Pond Level %
& HRSG top

Flash Tank Pressure Mpa


Flash Tank Level cm
HP Drum Level (once in a shift) mm I I I
LP Drum Level (once in a shift) mm I I I
Steam Turbine
Running Pump - R- R- R- R- R- R- R- R- R- R- R- R-
CW Pump & Hydraulic Oil System for CW

Bearing Cooling Water Cir. -


Bearing Lube oil Level -
Pump Outlet Valve Actuating

Inlet Valve Position %


Outlet Pressure Mpa
Outlet Valve Position °
Bearing X direction Vib. of DE mm/s
Bearing Y direction Vib. of DE mm/s
Bearing X direction Vib. of NDE mm/s
Bearing Y direction Vib. of NDE mm/s
Hydraulic Oil Temperature °C
Hydraulic Oil Pressure Mpa
Hyraulic Oil Pump Status R/S
Water Level in Pond m
System
OCCW

Stand by Cooling Tower Fan - S/B- S/B- S/B- S/B- S/B- S/B-
Lube Oil Level in gear box of fan cm I I I I I I I I I I I I I I I
Running Cooler - R- R- R- R- R- R-
Lube Oil Cooler

Oil Inlet Temperature °C I I I I I I


Oil Inlet Pressure Mpa
Oil Outlet Temperature °C
Oil Outlet Pressure Mpa I I I I I I

F20(S/OPN-P-01) Page 1 of 3
North-West Power Generation Company Limited
Sirajganj 225 MW Combined Cycle Power Plant (Unit-1)
Soydabad, Sirajganj
Field Inspection Sheet- ST Site

Date: Night Shift Morning Shift Evening Shift


Unit
Time of inspection: 22:30 hrs 03:00 hrs 07:30 hrs 11:30 hrs 14:30 hrs 18:30 hrs
Running Pump - R- HRSG
R- R- R- R- R-
Inlet Pressure Before Strainer Mpa
Inlet Pressure After Strainer Mpa
Outlet preesure Mpa
CCCW Cooler Inlet Temperature °C
CCCW System

CCCW Cooler Inlet Pressure Mpa


CCCW Cooler Outlet Temp. °C
CCCW Cooler Outlet Pressure Mpa
OCCW Cooler Inlet Temperature °C
OCCW Cooler Inlet Pressure Mpa
OCCW Cooler Outlet Temp. °C
OCCW Cooler Outlet Pressure Mpa
OCCW Electric Filter I/L Pres. Mpa
OCCW Electric Filter O/L Pres. Mpa
Running Vacuum Pump - R- R- R- R- R- R-
Vacuum System

Pump Inlet Pressure Mpa


Seal Water Temp.- Inlet/Outlet °C I I I I I I
Seal Water Pressure Mpa
Cooling Water I/L pres in Cooler Mpa
Water Level in Separator Tank mm
De-iron Filter Inlet/Outlet Pres. Mpa I I I I I I
R- R- R- R- R- R- R- R- R- R- R- R-
Condensate System

Running Condensate Pump -


Inlet Filter Upstream Pressure Mpa
Seal Water Pressure Mpa
Pump Inlet/Outlet Pressure Mpa
Bearing X direction Vibration mm/s
Bearing Y direction Vibration mm/s
Storage Tank Level m
A Side CW Inlet/Outlet Pres. Mpa I I I I I I
Condenser

A Side CW Inlet/Outlet Temp. °C I I I I I I


B Side CW Inlet/Outlet Pres. Mpa I I I I I I
B Side CW Inlet/Outlet Temp. °C I I I I I I
Running Fan - R- R- R- R- R- R-
Condenser
Gland Seal

Condensate Level cm
Pressure Mpa
Temperature °C
Cooler Inlet Water header Temp. °C
Generator Cooler

Cooler Inlet Water header Pres. Mpa


Cooler O/L Water Header Temp. °C
Cooler Outlet Water Temp. (1/2) °C I I I I I I
Cooler Outlet Water Temp. (3/4) °C I I I I I I
Gen Cooler I/L Air Temp. (Fr/Re) °C I I I I I I
Gen Cooler O/L Air Temp (Mid.) °C
Lube Oil Filter Status R/W
Lube & EH Oil System

Lube Oil Pump Status R/S A- B- A- B- A- B- A- B- A- B- A- B-


Lube Oil Tank Level m
Running EH Oil Pump R/S A- B- A- B- A- B- A- B- A- B- A- B-
EH Oil Temperature °C
EH Oil Pressure Mpa
EH Oil Tank Level mm
Trip Solenoid Valve Pressure Mpa
Steam Turbine Proper

Tur. Fr. Bearing Box Oil Pres. Mpa


Tur. Front Bearing Sup Oil Pres. Mpa
LP Cylinder Spray Water Pres. Mpa
Back of Cyl.Ex. Steam Temp.(R/L) °C l I I I I I
Gen EE Bearing dis. Oil Temp. °C
Gen TE Bearing dis. Oil Temp. °C

F20(S/OPN-P-01) Page 2 of 3
North-West Power Generation Company Limited
Sirajganj 225 MW Combined Cycle Power Plant (Unit-1)
Soydabad, Sirajganj
Field Inspection Sheet- ST Site

Date: Night Shift Morning Shift Evening Shift


Unit
Time of inspection: 22:30 hrs 03:00 hrs 07:30 hrs 11:30 hrs 14:30 hrs 18:30 hrs
Compressor #1 Running Hour hr HRSG
Compressor #2 Running Hour hr
Temp. & Pres. Before Cooler #1 Mpa/°C
Air Compressor

Temp. & Pres. Before Cooler #2 Mpa/°C


Any Alarm in Local Panel Y/N
Filter Sts for I/A Dryer # 1-1 R/G I I I I I I I I I I I I
Filter Sts for I/A Dryer # 1-2 R/G I I I I I I I I I I I I
Filter Sts for I/A Dryer # 2-1 R/G I I I I I I I I I I I I
Filter Sts for I/A Dryer # 2-2 R/G I I I I I I I I I I I I
I/A Vessel Pressure Mpa
Diesel level (once in a shift) %
EDG

lube Oil Level (once in a shift) %


Auto Mode at Local Panel Y/N
GCB-SF6 Pressure Kpa
GCB & Switch Yard (Once in a shift)

SF6 Pres. Zone-11ADE05GS101 R/G I I I I I I


SF6 Pressure-11ADE05GS101 Mpa I I I I I I
Unit Txr Winding Temp. °C I I I
Unit Txr Oil Temp. °C I I I
Silica Gel condition MT - I I I
Conservator tank oil level %
Unit Aux. Txr Winding Temp °C
Unit Aux. Txr Oil Temp °C I I I
Current NGR A
Silica Gel condition UAT -
Conservator tank oil level %
Auxiliary Boiler House
Power Distri. Room of CWPump House
6.6 KV Switch Gear Room
Ex.TR,PT&CT Cabinet & Excitation Room
Overall Status of

GCB, MPPD, Nutral Point CB Cabinet


Generator Proper & Heater Cabinet
Relay Protection & UPS Equipment Room
Server & Local Control Room
Fire Fighting Equipment Room (HFC & N2)
415 V Switch Gear Room
Battery Room
Water Sampling Room
Chemical Dosing Room

Any Leakage (Steam, Water, Oil, Dosing Chemical


etc) from any System/Room

Any Abnormal Sound from any System/Room

Walk Around View of all the System/Room

Remarks (if any) :

Inspected by Inspected by Inspected by


Signature:
Checked by Checked by Checked by

F20(S/OPN-P-01) Page 3 of 3