Академический Документы
Профессиональный Документы
Культура Документы
The State Corporations Act, etc —Appointments ................. 970–972 The National Hospital Insurance Fund Act—Change of
Name .......................................................................... 982
The Firearms Act—Appointment ........................................... 972
The Insolvency Act—Members’ Voluntary Liquidation . 982
The Mining Act— Application for a Prospecting Licence 972
The Labour Relations Act—Application for
The National Museums and Heritage Act—Declaration of Registration of a Trade Union ................................... 982
a Monument ....................................................................... 972
The Physical Planning Act—Completion of Physical
The Co-operative Societies Act—Intention to Grant Development Plans ........................................................... 984–985
Exemption from Provisions of the Co-operative
Societies Act, etc ............................................................... 973, 982 The Environmental Management and Co-ordination
(Amendment) Act—Environmental Impact
Taskforce on Legal Sector Reforms ....................................... 973 Assessment Study Reports ............................................... 985–992
The National Crime Research Centre Act—Membership of Disposal of Uncollected Goods .............................................. 992
the Governing Council ...................................................... 973
Loss of Policies ........................................................................ 992–996
County Government Notices................................................... 973, 982–983
Change of Names ............................................................. 997
The Land Registration Act—Issue of Provisional SUPPLEMENT No. 29
Certificates, etc .................................................................. 973–981
Legislative Supplements, 2018
The Land Act—Intention to Acquire .............................. 981
LEGAL NOTICE NO. PAGE
The Independent Electoral and Boundaries Commission
Act—Corrigenda ....................................................... 981–982 29—The National Hospital Insurance Fund Act—
Declaration of Hospitals ............................................ 105
[969
970
217 THE KENYA GAZETTE 6th April, 2018
IN Gazette Notice No. 598 of 2016, Cause No. 118 of 2015, amend IN EXERCISE of the powers conferred by section 5 (1) (a) of the
the deceased’s name printed as “Mary Wambui Muigai” to read Kenya Roads Act, 2007, I, Uhuru Kenyatta, President and
“Mbugua Ngure”. Commander-in-Chief of the Defence Forces of the Republic of Kenya,
appoint—
------------------
ERASTUS MWONGERA (ENG.)
IN Gazette Notice No. 1930 of 2018, Cause No. 36 of 2018, amend
the deceased’s name printed as “Pius Awino Owiti alias Adoyo Owiti” to be the Chairperson of the Kenya National Highways Authority
to read “Pius Adoyo Awiti alias Adoyo Owiti” and the place of death Board, for a period of three (3) years, with effect from the 18th April,
printed as “East Kadianga” to read “Kotieno”. 2018.
Dated the 28th March, 2018.
GAZETTE NOTICE NO. 3132 UHURU KENYATTA,
THE CAPITAL MARKETS ACT President.
(Cap. 485A)
RE-APPOINTMENT GAZETTE NOTICE NO. 3136
IN EXERCISE of the powers conferred by section 5 (3) (a) of the THE STATE CORPORATIONS ACT
Capital Markets Act, I, Uhuru Kenyatta, President and Commander-in-
(Cap. 446)
Chief of the Defence Forces of the Republic of Kenya, re-appoint—
THE KENYATTA NATIONAL HOSPITAL BOARD ORDER, 1987
JAMES NDEGWA
APPOINTMENT
to be the Chairperson of the Board of Capital Markets Authority, for a
IN EXERCISE of the powers conferred by section 7(3) of the State
period of three (3) years with effect from the 18th April, 2018.
Corporations Act, I, Uhuru Kenyatta, President and Commander-in-
Dated the 28th March, 2018. Chief of the Kenya Defence Forces, appoint—
Dated the 28th March, 2018. Dated the 14th March, 2018.
UHURU KENYATTA,
President. JOHN MUNYES,
MR/4183068 Cabinet Secretary for Petroleum and Mining.
Any objection to the grant of the prospecting licence may be made LET ALL parties concerned take notice that an application for a
in writing and addressed to the Cabinet Secretary, Ministry of Mining, grant of exemption has been filed in this office by the above named
P.O. Box 30009–00100, GPO, Nairobi, Kenya to reach him within
co-operative society.
twenty one (21) days from the date of the publication of this notice.
SCHEDULE OF THE PROPOSED APPLICATION BOUNDARIES And further take notice that any objections to the proposed grant
are invited and must be lodged with this office within thirty (30) days
The proposed application’s area is particularly described by the of this notice.
following WGS 84 co-ordinates.
Take notice that if no objections are lodged with me within thirty
Lat. Lat. Lat. N/S Long. Long. Long. (30) days hereof, I will proceed to grant the exemption as I deem fit.
Order Deg. Min. Sec. Deg. Min. Sec. E/W
ADAN MOHAMED,
1 3 20 15 S 39 39 30 E Cabinet Secretary,
2 3 20 15 S 39 40 15 E MR/4183184 Ministry of Industry, Trade and Co-operatives.
6th April, 2018 THE KENYA GAZETTE 973
GAZETTE NOTICE NO. 3151 the County Governments Act, 2012, and upon approval by the County
Assembly of Homa Bay in its sitting held on 1st March, 2018. I,
TASKFORCE ON LEGAL SECTOR REFORMS Cyprian A. Otieno Awiti, the Governor of Homa Bay County
(G.N. No. 8116 of 2016) appoint—
EXTENSION OF TENURE FREDRICK OCHIENG ODERO
IT IS notified for the general information of the public that to be a member of the Homa Bay County Executive Committee
pursuant to paragraph 4 of Gazette Notice No. 8116 of 2016, the responsible for Energy and Mining. The earlier appointment of Mr.
Attorney-General has extended the tenure of the Taskforce on Legal Alphonse Odhiambo Werah vide Kenya Gazette Notice No. 10940
Sector Reforms to the 26th April, 2018, with effect from the 26th dated 8th November, 2017 is revoked.
March, 2018.
Dated the 12th March, 2018.
Dated the 21st March, 2018. CYPRIAN A. OTIENO AWITI,
GITHU MUIGAI, MR/ 4183361 Governor, Homa Bay County.
Attorney-General.
Dated the 6th April, 2018. Dated the 6th April, 2018.
C. M. WACUKA, M. J. BOOR,
MR/4183276 Land Registrar, Garissa District. MR/4183089 Land Registrar, Kakamega District.
6th April, 2018 THE KENYA GAZETTE 975
ISSUE OF A NEW LAND TITLE DEED ISSUE OF A NEW LAND TITLE DEED
WHEREAS Alfred Osore Chisombe, of P.O. Box 65, Malava in WHEREAS Hannah Waithira Gachungah, of P.O. Box 10116–
the Republic of Kenya, is registered as proprietor in absolute 00200, Nairobi in the Republic of Kenya, is registered as proprietor in
absolute ownership interest of all that piece of land containing 0.100
ownership interest of that piece of land containing 6.20 hectares or
hectare or thereabouts, situate in the district of Laikipia, registered
thereabout, situate in the district of Kakamega, registered under title
under title No. Laikipia/Nyahururu/8377, and whereas sufficient
No. S/Kabras/Chesero/1256, and whereas sufficient evidence has been
evidence has been adduced to show that the land title deed issued
adduced to show that the land title deed issued thereof has been lost,
notice is given that after the expiration of sixty (60) days from the date thereof has been lost, notice is given that after the expiration of sixty
hereof, I shall issue a new title deed provided that no objection has (60) days from the date hereof, I shall issue a new title deed provided
that no objection has been received within that period.
been received within that period.
Dated the 6th April, 2018.
Dated the 6th April, 2018.
P. M. NDUNGU,
M. J. BOOR,
MR/4183380 Land Registrar, Laikipia District.
MR/4183040 Land Registrar, Kakamega District.
Dated the 6th April, 2018. Dated the 6th April, 2018.
P. M. NDUNGU, G. M. NJOROGE,
MR/4183238 Land Registrar, Laikipia District. MR/4183151 Land Registrar, Machakos District.
976
217 THE KENYA GAZETTE 6th April, 2018
Dated the 6th April, 2018. Dated the 6th April, 2018.
M. A. OMULLO, G. O. ONGUTU,
MR/4143211 Land Registrar, Kericho District. MR/4143068 Land Registrar, Migori District.
GAZETTE NOTICE NO. 3206 show that the land register (green card) of the said piece of land is
missing, and whereas all efforts made to locate the said land register
THE LAND REGISTRATION ACT (green card) have failed, notice is given that after the expiration of
(No. 3 of 2012) sixty (60) days from the date hereof, provided that no valid objection
has been received within that period, I intend to open another land
OPENING OF A NEW LAND REGISTER register and upon such opening the said missing land register shall be
deemed obsolete and of no effect.
WHEREAS Margaret Nyambura Kibe, of P.O. Box 14043–20100,
Nakuru in the Republic of Kenya, is registered as proprietor in absolute Dated the 6th April, 2018.
ownership interest of that piece of land containing 0.259 hectare or J. K. NJOROGE,
thereabouts, situate in the district of Nyeri, registered under title No. MR/4183011 Land Registrar, Thika District.
Gakawa/Kahurura Block I/Ichuga/334, and whereas sufficient evidence
has been adduced to show that the land register (green card) of the said
piece of land is missing, and whereas all efforts made to locate the said GAZETTE NOTICE NO. 3210
land register (green card) have failed, notice is given that after the
expiration of sixty (30) days from the date hereof, provided that no THE LAND REGISTRATION ACT
valid objection has been received within that period, I intend to open
another land register and upon such opening the said missing land (No. 3 of 2012)
register shall be deemed obsolete and of no effect. LOSS OF LAND REGISTER
Dated the 6th April, 2018. WHEREAS Michael Gitau Ng’ae, of P.O. Box 88005–00100,
J. M. MWAMBIA, Nairobi in the Republic of Kenya, is registered as proprietor in
MR/4143091 Land Registrar, Nyeri District. absolute ownership interest of that piece of land situate in the district
of Mombasa, registered under title No. Mombasa/Block IX/332, and
whereas sufficient evidence has been adduced to show that the land
GAZETTE NOTICE NO. 3207 register (green card) of the said piece of land is missing, and whereas
all efforts made to locate the said land register (green card) have failed,
THE LAND REGISTRATION ACT notice is given that after the expiration of sixty (60) days from the date
(No. 3 of 2012) hereof, provided that no valid objection has been received within that
period, I intend to open another land register and upon such opening
LOSS OF LAND REGISTER the said missing land register shall be deemed obsolete and of no
effect.
WHEREAS Peter Njuguna Kang’ethe (ID/0355166), is registered
as proprietor in absolute ownership interest of that piece of land situate Dated the 6th April, 2018.
in the district of Kiambu, registered under title No. A. N. MURIITHI,
Kiambaa/Thimbigua/2985, and whereas sufficient evidence has been MR/4183069 Land Registrar, Mombasa District.
adduced to show that the land register (green card) of the said piece of
land is missing, and whereas all efforts made to locate the said land
register (green card) have failed, notice is given that after the GAZETTE NOTICE NO. 3211
expiration of sixty (60) days from the date hereof, provided that no
valid objection has been received within that period, I intend to open THE LAND REGISTRATION ACT
another land register and upon such opening the said missing land (No. 3 of 2012)
register shall be deemed obsolete and of no effect.
REGISTRATION OF INSTRUMENT
Dated the 6th April, 2018.
G. R. GICHUKI, WHEREAS Silas Kamau Kiganya, of Nairobi in the Republic of
MR/4143077 Land Registrar, Kiambu District. Kenya, is registered as proprietor of that piece of containing 1.01
hectares or thereabout, known as Kijabe/Kijabe Block 1/3696, situate
in the district of Nakuru, and whereas the land registrar has established
GAZETTE NOTICE NO. 3208 that the land title deed was acquired fraudulently, and whereas all
efforts to made to recover the land title deed issued in respect of the
THE LAND REGISTRATION ACT said piece of land by the land registrar have failed, notice is given that
after the expiration of thirty (30) days from the date hereof, provided
(No. 3 of 2012) no valid objection has been received within that period, I intend to
LOSS OF LAND REGISTER dispense with the production of the said land title deed and revert it to
Esrom Ngugi Miringu, and upon such registration the land title deed
WHEREAS Isabella Nyambura Wakahu (ID/4442272/67) of P.O. issued to the said Silas Kamau Kiganya shall be deemed to be
Box 827–00232, Ruiru in Kenya, is registered as proprietor in absolute cancelled and of no effect.
ownership interest of that piece of land situate in the district of Thika,
registered under title No. Ruiru/Ruiru East Block 2/4931, and whereas Dated the 6th April, 2018.
sufficient evidence has been adduced to show that the land register S. MWAURA,
(green card) of the said piece of land is missing, and whereas all efforts MR/3574382 Land Registrar, Naivasha District.
made to locate the said land register (green card) have failed, notice is *Gazette Notice No. 12495 of 2017 is revoked.
given that after the expiration of sixty (60) days from the date hereof,
provided that no valid objection has been received within that period, I
intend to open another land register and upon such opening the said
missing land register shall be deemed obsolete and of no effect. GAZETTE NOTICE NO. 3212
registration the land title deed issued earlier to the said Paul Gitahi GAZETTE NOTICE NO. 3214
Mwaura, shall be deemed to be cancelled and of no effect.
THE LAND REGISTRATION ACT
Dated the 6th April, 2018.
S. W. MUCHEMI, (No. 3 of 2012)
Plans of the affected land may be inspected during office hours at the office of the National Land Commission, Ardhi House, 3rd Floor, Room No.
305, 1st Ngong Road, Nairobi.
Notice of inquiry will be published in the Kenya Gazette as per section 112 (1) of the Land Act.
Dated the 29th March, 2018.
MUHAMMAD A. SWAZURI,
MR/4183382 Chairman, National Land Commission.
KISII COUNTY—45
GENDER TOP-UP LIST
Page 5006, Second Column, Row 13
The deleted nominee stands disqualified as the County Assembly representative of the respective County Assembly.
Dated the 3rd April, 2018.
W. W. CHEBUKATI,
Chairperson,
Independent Electoral and Boundaries Commission.
GAZETTE NOTICE NO. 3217 for Co-operative Development was published in the Kenya Gazette
notice No. 2683 dated 23rd March, 2018; the said cancellation of
THE NATIONAL HOSPITAL INSURANCE FUND ACT Registration Order is revoked and substituted by a subsequent
(No. 9 of 1998) cancellation of Registration Order dated 26th March, 2018.
REVOCATION OF CANCELLATION OF REGISTRATION ORDER FOR THE KISUMU COUNTY ASSEMBLY STANDING ORDERS
EKEZA SACCO SOCIETY LIMITED CS 17112 SPECIAL SITTING OF THE ASSEMBLY
WHEREAS, an Order for cancellation of Registration of Ekeza PURSUANT to Standing Order No. 27 (1) of the Kisumu County
Sacco Society Limited dated 5th March, 2018 by the Commissioner Assembly Standing Orders, a notice is given to the Members of
6th April, 2018 THE KENYA GAZETTE 983
Kisumu County Assembly and the general public that there will be a Second Session, Friday, 10th August, 2018 to Monday, 27th
special sitting of the Assembly on Thursday, 5th April, 2018 at the Second Part August, 2018
Assembly Plenary Chambers at 2.30 p.m. to deliberate and approve the
Kisumu County Supplementary Appropriations Bill, 2018. Friday, 19th October, 2018 to Monday,
28th October, 2018
Dated the 3rd April, 2018.
G. O. OLOO, Second Session, Third Friday, 7th December, 2018 to Monday,
MR/4183281 Speaker, County Assembly of Kisumu. Part 11th February, 2019
A. H. SUROW,
GAZETTE NOTICE NO. 3223 MR/4143222 Clerk, County Assembly of Marsabit.
G. Sitting Days (21 Sitting Days)Tuesday (afternoon), Wednesday Any interested person who wishes to make any representation in
(morning and afternoon) and connection with or objection to the above named part development
Tuesday, 11th September, 2018 to plan may send such representations or objections in writing to be
Thursday (afternoon)
Thursday, 25th October, 2018 received by the County Director Urban and Regional Planning Office,
P.O Box 708–10200, Murang’a, within sixty (60) days from the date
H. Short Recess Period (11 Days) Short Recess Period of publication of this notice and such representation or objection shall
Friday, 26th October, 2018 to state the grounds on which it is made.
Monday, 5th November, 2018 Dated the 18th January, 2018.
THIRD PART GEORGE N. NDUNG’U,
MR/4183172 Chief Officer, Lands and Physical Planning.
I. Sitting Days (15 Sitting Days) Tuesday (afternoon), Wednesday
(morning and afternoon) and
Tuesday, 6th November, 2018 to
Thursday (afternoon) GAZETTE NOTICE NO. 3229
Thursday, 6th December, 2018
J. Long Recess Period (67 Days) Long Recess Period THE PHYSICAL PLANNING ACT
(Cap. 286)
Friday, 7th December, 2018 to
Monday, 11th February, 2019 COMPLETION OF PART DEVELOPMENT PLAN
End of the Second Session of the Second Assembly 12th February, PDP No. KBU/40/2018/01–for Proposed Teachers Service
2019 at midnight Commission Offices, Kiambu
NOTICE is given that the above-mentioned part development plan
Dated the 23rd March, 2018. was on 29th March, 2018, completed.
DANIEL ORINA, The part development plan relates to land situated within Kiambu
MR/4183264 Clerk, County Assembly of Nyamira. Sub-county.
6th April, 2018 THE KENYA GAZETTE 985
Copies of the part development plan have been deposited for The copies so deposited are available for inspection free of charge
public inspection at the offices of the County Director of Planning, by all persons interested at the County Physical Planning Office,
Sub-county Administrator, Kiambu Sub-county and the office of the Wundanyi and Office of the Sub-county Administrator, Wundanyi,
Chief Officer and County Executive Committee Member, Land, between the hours of 8.00 a.m. to 4.30 p.m., Monday to Friday.
Housing, Physical Planning and Urban Development, Kiambu County.
Any interested person who wishes to make any representation in
The copies so deposited are available for inspection free of charge connection with or objection to the above-named development plan
by all persons interested at the offices of the County Director of may send such representations or objections in writing to be received
Planning, Sub-county Administrator, Kiambu Sub-county and the
by the County Physical Planning Office, P.O. Box 1264, Wundanyi,
office of the Chief Officer and County Executive Committee Member,
within sixty (60) days from the date of publication of this notice and
Land, Housing, Physical Planning and Urban Development, Kiambu
County, between the hours of 8.00 a.m. to 5.00 p.m., Monday to such representation or objection shall state the grounds on which it is
Friday. made.
Any interested person who wishes to make any representation in Dated the 3rd April, 2018.
connection with or objection to the above-named part development DANIEL GITHIRA,
plan may send such representations or objections in writing to be MR/4183260 for Director of Physical Planning.
received by the Director of Physical Planning, P.O. Box 2344–00900,
or the National Director of Physical Planning, P.O. Box 45025, within
sixty (60) days from the date of publication of this notice and such GAZETTE NOTICE NO. 3232
representation or objection shall state the grounds on which it is made.
THE ENVIRONMENTAL MANAGEMENT AND
Dated the 29th March, 2018. CO-ORDINATION ACT
JANE WANJIKU,
MR/4183272 for County Director of Physical Planning. (No. 8 of 1999)
THE NATIONAL ENVIRONMENT MANAGEMENT
AUTHORITY
GAZETTE NOTICE NO. 3230 ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT
FOR THE PROPOSED GODOWN REFURBISHMENT AND
THE PHYSICAL PLANNING ACT
SETTING UP A FDG PRODUCTION FACILITY USING
(Cap. 286) CYCLOTRON FOR CANCER MEDICAL IMAGING ON PLOT L.R.
NO. 9042/130 AT EMIRATES BUSINESS PARK OFF AIRPORT
COMPLETION OF DEVELOPMENT PLAN
NORTH ROAD IN EMBAKASI, NAIROBI CITY COUNTY
PDP No. MKS/56/2018/01–for Existing Site for Machakos County INVITATION OF PUBLIC COMMENTS
Assembly Pursuant to regulation 21 of the Environmental Management and
NOTICE is given that the above-mentioned development plan was Co-ordination (Impact Assessment and Audit) Regulations, 2003, the
on 20th March, 2018, completed. National Environment Management Authority (NEMA) has received
an Environmental Impact Assessment Study Report for the above
The development plan relates to land situated within Machakos proposed project.
Sub-county.
The proponent, Advanced Molecular Imaging Limited, is
Copies of the development plan have been deposited for public proposing to refurbish a godown and establish a medical Cyclotron at
inspection at the offices of the Machakos Sub-county Administrator, Emirates Business Park off Airport North Road in Embakasi, Nairobi
Machakos and the County Physical Planning Office, Machakos. City County. The project entails setting up of cancer related
The copies so deposited are available for inspection free of charge pharmaceutical production unit, installing the relevant machinery and
by all persons interested at the offices of the Machakos Sub-county equipment for the proposed FDG production facility, production of
Administrator, Machakos and the County Physical Planning Office, positron-emitting isotopes suitable for molecular imaging in the
Machakos between the hours of 8.00 a.m. to 5.00 p.m., Monday to refurbished godown, production of ancillary molecules, which will
Friday. include setting up equipment that would be required for production,
testing, quality control, distribution, storage, warehousing and any
Any interested person who wishes to make any representation in other related activities. The main partitioning and rooms will be as
connection with or objection to the above-named development plan follows: Manager and technicians rooms/offices, quarantine and
may send such representations or objections in writing to be received storage room, incoming material zone, packaging and labelling area,
by the Director of Physical Planning, P.O. Box 333, Machakos not dispatch area, deconcentrating room, waste storage room, cyclotron
later than sixty (60) days from the date of publication of this notice room and production and synthesis room.
and such representation or objection shall state the grounds on which it
is made. The following are the anticipated impacts and proposed mitigation
measures:
Dated the 21st March, 2018.
KARURU CHEGE, Impacts Proposed Mitigation Measures
MR/4183261 for Director of Physical Planning.
Air pollution • Maintenance of plant and equipment and
sensitize workforce.
National Environment Management Authority (NEMA) has received Impacts Proposed Mitigation Measures
an Environmental Impact Assessment Study Report for the above
proposed project. • Reduce gaseous emissions by selection of
appropriate machinery and regular servicing
The proponent, Kenya Railways, is proposing to construct a of vehicles.
4.153km access road linking the Nairobi inland container depot to the
Southern Bypass Road along the inner boundary of the Nairobi • Provide workers with appropriate protective
National Park (NNP). Its starting point will connect the west entrance gear including masks to cut down on gaseous
of the ICD running through the inner boundary of the NNP and the end emissions inhaled. All workers involved in
forming a partial “pear-shaped” interchange with the Southern Bypass construction activities to wear face masks.
Road.
• Strict adherence to Air Quality Regulations,
The following are the anticipated impacts and proposed mitigation 2014.
measures:
Invasive species • Screen the construction equipment to avoid
Impacts Proposed Mitigation Measures the spread of invasive species such as seeds
To reduce, control • Commissioning of a RAP study for the attached to road construction machinery
and avoid land proposed project. Spillages of • All hazardous chemicals including
related conflicts hazardous hydrocarbons such as fuel, oils and greases
• Undertake the RAP (where applicable) in
accordance with the legal framework of the chemical will be contained in bunded areas with
Government of Kenya. sufficient capacity to contain the quantity
stored in the bunded area.
Habitat loss and • Compensation of land ceded for the project
reduced including that affected by disturbance • Hazardous chemicals including
ecosystem impacts such as noise and air pollution. Such hydrocarbons are to be handled over
land should be purchased on the southern impervious surfaces.
side of the NNP (i.e. Kapiti plains) pursuant • Proper storage of liquids on site, e.g. oil,
to the objectives of Kenya’s Vision 2030 diesel and solvents must be ensured as well
regarding environmental conservation as containment of accidental oil spill.
(Government of Kenya, 2006).
• Undertake regular and repair of construction
Conflicts related to • Equitable provision of employment machinery and vehicles.
hiring of workers opportunities with regards to gender, skills,
indigenous people and disability. To manage sewage • Portable chemical toilets to be provided at
and effluent site offices; portable toilets are to be cleaned
Traffic flow and • No overloading of trucks and. good driving on a regular basis.
safety practices to be practiced. Suitable
junction/access point to be provided. • Strict adherence to Water Quality
Regulations, 2006.
• Use of appropriate and legible signage.
Employment of formal flagmen/women in Proliferation of • Under no circumstances should construction
order to ensure the public safety. plastics workers and management bring, or use
banned plastic bags at the construction site.
• Erect road signage informing other road
users of the nearby construction works. Loss of vegetation • Retention of vegetation where possible and
replanting of grass and shrubs in other
• Ensure that truck drivers are educated on undisturbed areas should be applied.
road safety.
• Minimize the destruction or damage of
Soil erosion • Grained materials (sand, marl, etc.) will be vegetation cover by clearing construction
stockpiled away from drainage channels and designated areas only.
low berms will be placed around the piles
which themselves will be covered with Construction waste • The management of construction solid waste
tarpaulin to prevent them from being eroded management shall adopt the integrated solid waste
and washed away. management system through a hierarchy of
options: Source reduction, recycling
• Loose soils to be used to fill back composting and reuse, combustion and
excavated/disturbed areas. Loose soils to be sanitary land filling.
compacted with a mechanical roller so as to
avoid erosion by wind or water. • The proponent and contractor will liaise with
the county government and designate a
• Planting of grass on the slopes of the proper site for disposing excavated soils in
subgrade to slow runoff. strict adherence to Waste Management
Noise and excessive • Provision of mufflers on exhausts and Regulations, 2006.
vibrations standard restrictions to hours of site works. Visual impact • Adoption of alternatives to the alignment and
Water spraying on dusty sites during strong their associated above-ground structures; and
wind. refinements to the basic engineering and
• Utility of machinery with high noise e.g. pile architectural design including layout, built
drivers should be conducted at day time; structures etc. to avoid and/or minimize
Night operations (if necessary) should only potential adverse impacts.
include machinery with low noise emissions. • Care will be taken to avoid having open
Use of ear muffs by construction workers. trenches in an area for a long period of time.
• Adherence to Noise and Excessive Vibration Public health • Continuation of awareness (through
Pollution (Control) Regulations, 2009. distribution of flyers, condoms and holding
Air quality • Covering wetting of materials and wastes, related sensitization classes) program on
management during transportation. risks associated with STIs and HIV/AIDS
will be undertaken.
• Regular surface wetting on roads under
construction and cleared areas to minimize • Adherence to provisions of Public Health,
entrainment of dust. Cap. 242.
988
217 THE KENYA GAZETTE 6th April, 2018
The full report of the proposed project is available for inspection • Stabilize the soils in order to reduce potential
during working hours at: erosion after project construction phase is
over.
(a) Director-General, NEMA, Popo Road, off Mombasa Road,
P.O. Box 67839–00200, Nairobi. • Restore all the sites that were damaged during
construction.
(b) Principal Secretary, Ministry of Environment and Mineral
Resources, NHIF Building, Community, P.O. Box 30126– • At the end of construction works, level off the
00100, Nairobi. soils and facilitate vegetation regeneration.
(c) County Director of Environment, Nairobi City County. Terrestrial (flora • Educate contractors on the importance of flora
and fauna) and fauna in the area, including the
The National Environment Management Authority invites appropriate regulatory requirements to
members of the public to submit oral or written comments within preserve fauna and flora.
thirty (30) days from the date of publication of this notice to the
Director-General, NEMA, to assist the Authority in the decision • Minimize vegetation clearance and demarcate
making process of the plan. areas of construction.
GEOFFREY WAHUNGU, • Restrict foreign material export to and from
Director-General, the site to curtail spread of invasive species.
MR/4183147 National Environment Management Authority.
Water quality • Earthworks shall be halted when rain
conditions are such that excessive erosion and
GAZETTE NOTICE NO. 3234 silt loaded run-off can be expected.
Noise and vibration • Construction workers should be provided • Design the office infrastructure to maximise
with appropriate ear protection. the use of natural light.
• Install metering system for monitoring.
• Use of vibratory hand operated equipment
should be minimized. Road traffic • Deliveries will be made to site outside of the
periods of high congestion on the public road
• Noisy operations should be restricted to
system (i.e. early morning, late afternoon).
daytime operation.
• Materials haulage companies to use
• Power generator and other equipment should competent drivers and ensure that shift
be state of the art and equipped with patterns do not result in excessive working
silencers/mufflers where necessary. hours resulting in compromised road safety.
• Construction plant should be maintained in • All haulage vehicles shall be maintained in
good running order; all vehicles should good running order and should comply with
comply with the requirements of Road the requirements of Road Traffic Act.
Traffic Act.
• Where feasible, and to limit the number of
• Adherence to Noise and Excessive Vibration movements of haulage vehicles to and from
Pollution (Control) Regulations, 2009. the Port area, it is anticipated that bulk
materials will be shipped to Port and moved
Air quality • For potentially dusty earth works operations, directly to site (i.e. steel reinforcement,
construction workers to be enclosed within
geogrid, etc. subject to appropriate port
ventilated cabs or provided with facemasks clearance).
for potentially dusty earth works operations.
Security and public • Proponent should liaise with Mombasa
• Where appropriate water damping to be used safety County government and County
to control dust. Particular attention to be Administrations during the mobilization
paid when the wind is from the south or phase.
west.
• Ensure that all workers can be identified by
• Limit traffic speed and restrict movement of staff uniform and badges at the site.
vehicles as to minimize dust generation.
• Adequate security measures should be
• Construction plant will be maintained in provided, e.g. perimeter fencing and security
good running order; all vehicles should manning at the site.
comply with the requirements of road.
• Journey management policy and monitoring
• Traffic Act and its subsequent regulations to be enforced.
for emission control.
• Smoking will only be permitted in designated
• Strict adherence to Air quality Regulations, areas; no litter will be left along the
2014. construction sites; there will be no collecting
of vegetation or firewood.
Marine traffic • Kenya Ports Authority to control and
regulate shipping movements within the port • Barriers and guards should be installed as
area. necessary to protect employees and visitors
from physical hazards and criminal activity.
• Kenya Ports Authority to have adequate
controls enforced to ensure the safety of ship Socio-economic • The contractor should promote dialogue with
movements and berthing operations, and that welfare the local community, especially community
this includes the avoidance and mitigation of involvement in the project activities through
potential negative environmental impacts. employment.
• Put in place good marine traffic plan. • Effectively plan for their transport of gas
without interfering with the areas traffic.
• Work in collaboration with Kenya Ports
Authority to ensure the safety of ship • Inform the local community on the project
movement and berthing operations. activities through their local leaders.
Fire and safety • In the event of fire, fire management plan • Resolve conflicts mutually and immediately
should be implemented. they occur.
• Install automatic shut off and gas leakage Occupational health • Construction workers safety should be in
detectors. and safety accordance with clients‘ prepared site
specific health and safety plan that identifies
• The entire plant should be networked with
site specific risks, safety equipment,
pressurised fire hydrants lines which should
decontamination procedures, action plans,
have fire hydrant, long range monitors and
and emergency response plans.
deluge valve at strategic locations.
990
217 THE KENYA GAZETTE 6th April, 2018
GAZETTE NOTICE NO. 3235 Liquid waste • Construct suitable and adequate wastewater
management treatment system.
THE ENVIRONMENTAL MANAGEMENT AND
• Regular monitoring of the treatment system.
CO-ORDINATION ACT • Installation of sanitary systems that use less
(No. 8 of 1999) water.
Pursuant to regulation 21 of the Environmental Management and High demand for • Switch off electrical appliances and lights
Co-ordination (Impact Assessment and Audit) Regulations, 2003, the electricity when not in use.
National Environment Management Authority (NEMA) has received • Install occupational sensing lights at various
an Environmental Impact Assessment Study Report for the above locations such as storage areas which are not
proposed project. in use all the time.
The proponent, Excellent Logistics Limited, is proposing to • Install energy saving fluorescent tubes.
develop an LPG cylinder production line and liquefied petroleum gas
(LPG) Plant in Makuyu, on Plot No. Makuyu/Mariaini/Block III/460, • Monitor energy use during the operation of
Murang’a County. The proposed project involves the installation of an the project and set targets for efficient use.
offloading point for LPG road tankers, a manual cylinder filling plant,
LPG cylinders loading and offloading area, cylinders storage space, • Sensitize workers to use energy efficiently.
loading gantry, firefighting system and related offices. In addition, an Dust disturbance • Avoid excavation works in extremely dry
LPG cylinder production line will be built. weather.
The following are the anticipated impacts and proposed mitigation • Regular sprinkling of water to be done on
measures: open surface and dusty grounds during dry
season until paving is done.
Impacts Proposed Mitigation Measures
Solid waste • Ensure solid generated at the plant are • Ensure strict enforcement of on-site speed
generation regularly disposed of appropriately at limit regulations.
authorized dumping areas. • Covering of all haulage vehicles carrying
• Use of integrated solid waste management of sand, aggregate and cement.
options i.e. source reduction, recycling, • Stockpiles of fine materials (e.g. sand and
composting and re-use, combustion and ballast) should be wetted or covered with
sanitary land filling. tarpaulin during windy conditions.
• Carry out environmental awareness training • Access roads and exposed ground must be
to construction workers and plant employees wetted at a frequency that effectively keeps
during operation. down the dust.
• A private company to be contracted to collect • Workers in dusty areas on the site should be
and dispose solid waste on regular basis. issued with dust masks during dry and windy
• Strict adherence to Waste Management conditions.
Regulations, 2006. • Providing appropriate enclosure for the
Release of sewage • Effluent disposal to be done by use of concrete mixer.
to the conservancy tanks. • Use of dust nets at high levels of the
environment building.
• Apply for the license from NEMA for
effluent disposal. • Strict adherence to Air Quality Regulations,
• Conduct regular inspection for the system to 2014.
ensure it works effectively. Noise disturbance • Sensitize construction drivers to avoid
• Strict adherence to Water Quality running of vehicles engines or hooting
Regulations, 2006. especially when passing through sensitive
areas such as churches, schools or hospitals.
High demand for • Create water conservation awareness.
• Ensure the construction machinery are well
water
• Install a discharge meter at water outlets to kept in good condition.
determine and monitor total water usage.
• Sensitize construction drivers and machinery
• Ensure water taps are not running when not operators to switch off engines when not
in use. being used.
• The management to conserve water e.g. by • Trees to be planted on site to provide some
avoiding unnecessary toilet flushing. buffer against noise propagation.
• Ensure all generators and heavy machines are
• Promptly detect and repair of water pipes
insulated or placed in an enclosure to
and tank leaks.
minimize ambient noise levels.
Security • Ensure the general safety and security at all • Restrict noisy construction activities to
times by providing day and night security
normal working hours (8 a.m.–5 p.m).
guards and adequate lighting within and
around the premise. • Inform local residents beforehand, via notices
and advisories, of pending noisy periods and
992
217 THE KENYA GAZETTE 6th April, 2018
The full report of the proposed project is available for inspection GAZETTE NOTICE NO. 3240
during working hours at:
LIBERTY LIFE ASSURANCE KENYA LIMITED
(a) Director-General, NEMA, Popo Road, off Mombasa Road,
P.O. Box 67839–00200, Nairobi. Head Office: P.O. Box 30364–00100, Nairobi
(b) Principal Secretary, Ministry of Environment and Mineral LOSS OF POLICY
Resources, NHIF Building, Community, P.O. Box 30126– Policy No. 8178104 in the name and on the life of Derrickson Peter
00100, Nairobi. Amunga.
(c) County Director of Environment, Murang’a County.
APPLICATION having been made to this company on the loss of
The National Environment Management Authority invites the above-numbered policy, notice is given that unless objection is
members of the public to submit oral or written comments within lodged to Liberty Life Assurance Limited within thirty (30) days from
thirty (30) days from the date of publication of this notice to the the date of this notice, a duplicate policy will be issued and shall be
Director-General, NEMA, to assist the Authority in the decision used as the only valid document by the company for all future
making process of the plan. transactions.
GEOFFREY WAHUNGU, Dated the 21st March, 2018.
Director-General, CHARLES THIGA,
MR/4143070 National Environment Management Authority. MR/4183115 Head of Customer Service, Liberty Life.
6th April, 2018 THE KENYA GAZETTE 993
APPLICATION having been made to this company on the loss of APPLICATION having been made to this company on the loss of
the above-numbered policy, notice is given that unless objection is the above-numbered policy, notice is given that unless objection is
lodged to Liberty Life Assurance Limited within thirty (30) days from lodged to Liberty Life Assurance Limited within thirty (30) days from
the date of this notice, a duplicate policy will be issued and shall be the date of this notice, a duplicate policy will be issued and shall be
used as the only valid document by the company for all future used as the only valid document by the company for all future
transactions. transactions.
Dated the 21st March, 2018. Dated the 21st March, 2018.
CHARLES THIGA, CHARLES THIGA,
MR/4183115 Head of Customer Service, Liberty Life. MR/4183115 Head of Customer Service, Liberty Life.
994
217 THE KENYA GAZETTE 6th April, 2018
APPLICATION having been made to this company on the loss of APPLICATION having been made to this company on the loss of
the above-numbered policy, notice is given that unless objection is the above-numbered policy, notice is given that unless objection is
lodged to Liberty Life Assurance Limited within thirty (30) days from lodged to Liberty Life Assurance Limited within thirty (30) days from
the date of this notice, a duplicate policy will be issued and shall be the date of this notice, a duplicate policy will be issued and shall be
used as the only valid document by the company for all future used as the only valid document by the company for all future
transactions. transactions.
Dated the 21st March, 2018. Dated the 21st March, 2018.
CHARLES THIGA, CHARLES THIGA,
MR/4183115 Head of Customer Service, Liberty Life. MR/4183115 Head of Customer Service, Liberty Life.
LIBERTY LIFE ASSURANCE KENYA LIMITED LIBERTY LIFE ASSURANCE KENYA LIMITED
Head Office: P.O. Box 30364–00100, Nairobi Head Office: P.O. Box 30364–00100, Nairobi
LOSS OF POLICY LOSS OF POLICY
Policy No. 6995332 in the name and on the life of Ben Kinuthia. Policy No. 6979416 in the name and on the life of Natalie Nyanchoka
Nyairo.
APPLICATION having been made to this company on the loss of
the above-numbered policy, notice is given that unless objection is APPLICATION having been made to this company on the loss of
lodged to Liberty Life Assurance Limited within thirty (30) days from the above-numbered policy, notice is given that unless objection is
the date of this notice, a duplicate policy will be issued and shall be lodged to Liberty Life Assurance Limited within thirty (30) days from
used as the only valid document by the company for all future the date of this notice, a duplicate policy will be issued and shall be
transactions. used as the only valid document by the company for all future
transactions.
Dated the 21st March, 2018.
CHARLES THIGA, Dated the 21st March, 2018.
MR/4183115 Head of Customer Service, Liberty Life. CHARLES THIGA,
MR/4183115 Head of Customer Service, Liberty Life.
Head Office: P.O. Box 30364–00100, Nairobi THE JUBILEE INSURANCE COMPANY OF KENYA LIMITED
Head Office: P.O. Box 30376–00100, Nairobi
LOSS OF POLICY
LOSS OF POLICY
Policy No. 8165419 in the name and on the life of Florence Tsindoli
Machio. Policy No. 206807 in the name of Daniel Ntawuasa Kutatoi.
APPLICATION having been made to this company on the loss of REQUEST has been made to this company for the issue of
the above-numbered policy, notice is given that unless objection is duplicate of the above-numbered policy, the original having been
lodged to Liberty Life Assurance Limited within thirty (30) days from reported as lost or misplaced. Notice is given that unless objection is
the date of this notice, a duplicate policy will be issued and shall be lodged to the contrary at the office of the company within thirty (30)
used as the only valid document by the company for all future days from the date of this notice, duplicate policy document will be
transactions. issued, which will be the sole evidence of the contract.
Dated the 21st March, 2018. Dated the 19th March, 2018.
CHARLES THIGA, LYNETTE ROP,
MR/4183115 Head of Customer Service, Liberty Life. MR/4143207 Life Department.
6th April, 2018 THE KENYA GAZETTE 995
THE JUBILEE INSURANCE COMPANY OF KENYA LIMITED OLD MUTUAL LIFE ASSURANCE COMPANY LIMITED
(Incorporated in Kenya)
Head Office: P.O. Box 30376–00100, Nairobi
Head Office: P.O. Box 30059–00100, Nairobi
LOSS OF POLICY
LOSS OF POLICY
Policy No. IL201400395884 in the name of Faith Cherono.
Policy No. 6001571 in the name of Mary Angela Wanjiku Mwangi.
REQUEST has been made to this company for the issue of
APPLICATION has been made to this company for the issue of
duplicate of the above-numbered policy, the original having been
duplicate of the above-numbered policy, the original having been
reported as lost or misplaced. Notice is given that unless objection is
reported as lost or misplaced. Notice is given that unless objection is
lodged to the contrary at the office of the company within thirty (30) lodged to the contrary at the office of the company within thirty (30)
days from the date of this notice, duplicate policy document will be days from the date of this notice, duplicate policy will be issued, which
issued, which will be the sole evidence of the contract. will be the sole evidence of the contract.
Dated the 21st February, 2018. Dated the 26th March, 2018.
LYNETTE ROP, JOSEPHINE SANYA,
MR/4143207 Life Department. MR/4183034 Officer, Claims.
THE JUBILEE INSURANCE COMPANY OF KENYA LIMITED OLD MUTUAL LIFE ASSURANCE COMPANY LIMITED
(Incorporated in Kenya)
Head Office: P.O. Box 30376–00100, Nairobi
Head Office: P.O. Box 30059–00100, Nairobi
LOSS OF POLICY
LOSS OF POLICY
Policy No. 191952 in the name of Jonathan Mwilu Ndunda. Policy No. 6004256 in the name of Martin Laban Muiruri Njuguna.
REQUEST has been made to this company for the issue of APPLICATION has been made to this company for the issue of
duplicate of the above-numbered policy, the original having been duplicate of the above-numbered policy, the original having been
reported as lost or misplaced. Notice is given that unless objection is reported as lost or misplaced. Notice is given that unless objection is
lodged to the contrary at the office of the company within thirty (30) lodged to the contrary at the office of the company within thirty (30)
days from the date of this notice, duplicate policy document will be days from the date of this notice, duplicate policy will be issued, which
issued, which will be the sole evidence of the contract. will be the sole evidence of the contract.
Dated the 21st February, 2018. Dated the 26th March, 2018.
LYNETTE ROP, JOSEPHINE SANYA,
MR/4143207 Life Department. MR/4183034 Officer, Claims.
OLD MUTUAL LIFE ASSURANCE COMPANY LIMITED OLD MUTUAL LIFE ASSURANCE COMPANY LIMITED
(Incorporated in Kenya) (Incorporated in Kenya)
Head Office: P.O. Box 30059–00100, Nairobi Head Office: P.O. Box 30059–00100, Nairobi
Policy No. 6006121 in the name of Manaseh Upenji Uzele. Policy No. 37015099 in the name of John Orioro Moset.
APPLICATION has been made to this company for the issue of APPLICATION has been made to this company for the issue of
duplicate of the above-numbered policy, the original having been duplicate of the above-numbered policy, the original having been
reported as lost or misplaced. Notice is given that unless objection is reported as lost or misplaced. Notice is given that unless objection is
lodged to the contrary at the office of the company within thirty (30) lodged to the contrary at the office of the company within thirty (30)
days from the date of this notice, duplicate policy will be issued, which days from the date of this notice, duplicate policy will be issued, which
will be the sole evidence of the contract. will be the sole evidence of the contract.
Dated the 26th March, 2018. Dated the 26th March, 2018.
JOSEPHINE SANYA, JOSEPHINE SANYA,
MR/4183034 Officer, Claims. MR/4183039 Officer, Claims.
Head Office: P.O. Box 30059–00100, Nairobi Head Office: P.O. Box 30059–00100, Nairobi
LOSS OF POLICY LOSS OF POLICY
Policy No. 37015387 in the name of Alhaj Badru Dungu Kateregga Policy No. 6007439 in the name of Francis Mwaura Chege.
(Prof.). APPLICATION has been made to this company for the issue of
APPLICATION has been made to this company for the issue of duplicate of the above-numbered policy, the original having been
duplicate of the above-numbered policy, the original having been reported as lost or misplaced. Notice is given that unless objection is
reported as lost or misplaced. Notice is given that unless objection is lodged to the contrary at the office of the company within thirty (30)
lodged to the contrary at the office of the company within thirty (30) days from the date of this notice, duplicate policy will be issued, which
days from the date of this notice, duplicate policy will be issued, which will be the sole evidence of the contract.
will be the sole evidence of the contract. Dated the 26th March, 2018.
Dated the 26th March, 2018. JOSEPHINE SANYA,
JOSEPHINE SANYA, MR/4183039 Officer, Claims.
MR/4183039 Officer, Claims.
GAZETTE NOTICE NO. 3272
GAZETTE NOTICE NO. 3268 OLD MUTUAL LIFE ASSURANCE COMPANY LIMITED
OLD MUTUAL LIFE ASSURANCE COMPANY LIMITED (Incorporated in Kenya)
(Incorporated in Kenya) Head Office: P.O. Box 30059–00100, Nairobi
Head Office: P.O. Box 30059–00100, Nairobi LOSS OF POLICIES
LOSS OF POLICY Policy Nos. 37015882/37001238 in the name of Stanley Gachomoh
Policy No. 37009616 in the name of Christine Atieno Awando. Kariuki.
APPLICATION has been made to this company for the issue of APPLICATION has been made to this company for the issue of
duplicate of the above-numbered policy, the original having been duplicate of the above-numbered policies, the originals having been
reported as lost or misplaced. Notice is given that unless objection is reported as lost or misplaced. Notice is given that unless objection is
lodged to the contrary at the office of the company within thirty (30) lodged to the contrary at the office of the company within thirty (30)
days from the date of this notice, duplicate policy will be issued, which days from the date of this notice, duplicate policies will be issued,
will be the sole evidence of the contract. which will be the sole evidence of the contract.
Dated the 26th March, 2018. Dated the 26th March, 2018.
JOSEPHINE SANYA, JOSEPHINE SANYA,
MR/4183039 Officer, Claims. MR/4183039 Officer, Claims.
6th April, 2018 THE KENYA GAZETTE 997
317840/41/57/86/87.