COMPANY NAME

Project Quality Plan (PQP)

Project No. 19 Project Name Project detail/ Location

Check list for Back filling


Location : Drawing Ref : Sheet No .

S. No. Points to be verified Yes No N/A Remarks


1 Are the agreed type of compacting machines available
at site
2 Is the plan of backfilling with interval of test required
agreed upon with the client/consultant
3 Is the approved backfilling material available at site
4 Is the backfilling material free of vegetable matter,
roots, organic matter or gypsum etc.
5 Is the moisture content of the backfilling material
6 uniform
Is proper protection been provided to footings/plinth
beams/sleeves/ducts prior to backfilling
7 Is sufficient water available
8 Are the sizes of stones/boulders as per specification
9 Is moisture protection carried out to the sides of
concrete and blockwork as per specification
10 Is the thickness of layer as per the plan
Other special requirements/Remarks:

NAME SIGNATURE DATE


Site Engineer
MEP Engineer
Project Engineer
Project Manager
HSEQ
QA/QC Incharge

Building: