Project No. 19 Project Name Project detail/ Location
Check list for Back filling
Location : Drawing Ref : Sheet No .
S. No. Points to be verified Yes No N/A Remarks
1 Are the agreed type of compacting machines available at site 2 Is the plan of backfilling with interval of test required agreed upon with the client/consultant 3 Is the approved backfilling material available at site 4 Is the backfilling material free of vegetable matter, roots, organic matter or gypsum etc. 5 Is the moisture content of the backfilling material 6 uniform Is proper protection been provided to footings/plinth beams/sleeves/ducts prior to backfilling 7 Is sufficient water available 8 Are the sizes of stones/boulders as per specification 9 Is moisture protection carried out to the sides of concrete and blockwork as per specification 10 Is the thickness of layer as per the plan Other special requirements/Remarks: