Project: G+ 2 Arbor School Building @ Plot No AFSC-02 At Jabel Ali Project Code: 100068

Material Submittal Ref. No. ( CRC ) MS/100068/Mep/02/Rev 0

Sample Tag Material Submittal Ref. No. ( ARJ ) MS/100068/Mep/02/Rev 0

Specifications Ref. No. Section 20 06 00 Page 3/4/5/6/7/8

Item Description Split Clamp (Water Supply, Drainage, Copper Pipes)


Area of Usage ALL

Main Contractor Statement: We certify that the material


submitted herewith is a specimen of the material which to be used in the areas described above, and in compliance with the contract drawings and specification
except as otherwise stated on the related Material Submittal From.

Issued by: MEP Contractor Received by : Main Received by Consultants

ARJ ENGINEERING LLC CRC Engineering Construction National Engineering


Name Name Name
Mohammed Farooq Mohammed Abdel Wahab Mansour Najjar
Project Manager Signature
Project Manager Signature Project Manager Signature

NEB Engineer's Comments:


□ APP - Approved
□ AAN - Approved As Noted
□ NA - Not Approved, Resubmit
NEB Engineer's Signature Date :

Client's Representative's Comments:

□ APP - Approved
□ AAN - Approved As Noted
□ NA - Not Approved, Resubmit
Client's Representative's Signature: Date :

NEB-SF62 Rev.01
September 2012