Академический Документы
Профессиональный Документы
Культура Документы
F06-04-01-002
Operation Schematic Control Diagram _ 700DX-03CR01
Electric
The Control Chamber of the Inbal Alarm
Automatic Water Control Valve is the To System
annular space between the Valve 7b Fire Alarm
Housing and the Sleeve. The valve is & Releasing
Panel
3
held in a closed position as long as the To
Drain
inlet pressure is maintained in the
Control Chamber. To Water
1
The electric actuation trim consists of a 7a Motor
To Alarm Alarm 34
Solenoid Valve connected to the wet 25 Pressure
Switch
pilot line and is controlled by the 19
9
detection system and the control (Fire
To
Alarm & Releasing) panel. A manual Drain To Drain
emergency electric station and an alarm
bell are incorporated electrically into the 6 30 Water
Fire Alarm & Releasing Panel and Supply
Valve
detector circuits. For "energized to open" 5
Solenoid Valve, the Fire Alarm &
4
Releasing Panel should include a battery 2
To
charging circuit. In the event of power Drain
failure the Fire Alarm & Releasing Panel
automatically switches to battery power. 1 Inbal Automatic 6 Check Valve 19 Restriction Orifice
Water Control Valve 7a Supply Pressure Gauge 25 Solenoid Valve
In the set position, water pressure is 2 Emergency Release Station 7b System Pressure Gauge 30 Alarm Test Valve
applied to the Inbal Valve Control 3 Automatic Drain Valve 9 Pressure Reducing 34 Drain Valve
Chamber and to the Solenoid Valve from 4 Trim Shutoff Valve Pilot Valve
the upstream of the Water Supply Valve. 5 Y-Strainer
The de-energized ("energized to open"
type) or energized ("energized to close"
type) Solenoid Valve is closed. the Inbal Pressure Control Deluge Valve 2.Always flush the pipelines before
Consequently, the Inbal Deluge Valve is reset by the mere retrieval of the installing the Inbal Valve.
stays closed. release device to its set position. 3.Place the Inbal Valve in the piping at
The Inbal Deluge Valve opens when the The Electrically Actuated Inbal Pressure the outlet of the Water Supply Valve.
Solenoid Valve is actuated either by the Control Deluge Valve has several Verify that the arrow on the valve
detectors through the Fire Alarm & optional solenoid valves: Housing matches the actual flow
Releasing Panel or manually (energized Magnetic Latch Type Solenoid Valve: direction. Determine which side the
or de-energized depending on the type of when the Solenoid Valve is actuated it is system will be accessed from and
solenoid valve). The Inbal Valve opens latched and holds the Inbal Deluge locate the Inbal Deluge Valve
also when the Emergency Release Valve Valve in an open position until resetting. accordingly.
opens. Non-Latch Solenoid Valve: Available in 4.Install the Inbal Valve in the pipe
Either one of these operations releases types of "energized to open" and line. Use gaskets, bolts, stud bolts,
water from the Inbal Valve Control "energized to close" the Inbal Deluge bolt sleeves, and nuts as required by
Chamber. The flow through the Pressure Valve. When actuated, the Solenoid the valve ends.
Reducing Pilot Valve responds to Valve allows the Inbal Deluge Valve to 5.Complete the trim assembly by
changes in the downstream pressure open. co nnecting the pr eassembled
while controlling the pressure in the Note: For "energized to open" type Sole- sections or assemble the trim if
Inbal Valve Control Chamber. When the noid Valve - once actuated the Solenoid ordered in loose component form.
delivery pressure decreases, the pilot Valve must remain energized as long as Refer to the applicable Trim Chart
valve and the Inbal Valve open wider to the Inbal Deluge Valve’s open position and Installation Guide.
increase the pressure. When the delivery is required for flowing water to the area. 6.The water pressure supply to the
pressure increases, the pilot valve and control trim must always be sourced
the Inbal Valve close to throttle further from the inlet of the Water Supply
the flow and consequently the delivery Installation Valve through a ½" pipe.
pressure is decreased. Thus, the outlet 7.The Solenoid Valve must be wired in
pressure is maintained within a close Refer to the Trim Chart applicable to the accordance with the requirements of
limit. The operation of the Inbal Deluge specific Inbal Pressure Control Deluge the authorities having jurisdiction
Valve will flow water from any open Valve model . and/or NEC, IEC, or CENELEC
sprinklers and/or spray nozzles on the 1.When the Inbal Deluge Valve is standards and codes. Wiring should
system while activating the system's delivered, carefully unpack and be done by a licensed electrician.
alarm devices. check that there has been no damage 8.Connect the drain tube of the
The valve remains open until the Re- to the operating components, piping, Solenoid Valve and all the other drain
setting procedure is followed. Actually, and fittings. tubes to the drainage system.
F06-04-01-003
Deluge Valve, Pressure Control
Series 700D/DX - 03/13CR01
9.Open the Trim Shutoff Valve and following instructions. It is recommended Verify that water is drained from the
allow the water to fill up the inlet that the Pressure Control Deluge Valve be deluge trim which simulates an open
branch of the control trim. tested, operated, cleaned, and inspected at position of the Inbal Deluge Valve.
10.The downstream pressure adjustment least on a routine basis. The Electric Alarm should operate.
is recommended at a minimum flow 3. Reset the valve by performing the
velocity of 1.5 ft /sec (0.5 m/sec). Inspection instructions in Resetting.
When it is not feasible to flow the A weekly Inspection is recommended: 4. Open the Water Supply Valve.
system, close the system shutoff 1. Verify that the Water Supply Valve is Trip Testing
valve and open the Drain Valve. sealed in a fully open position. An annual Trip Testing is recommended.
11.Operate the system to establish the 2. Verify that the required water pressure By performing the Trip Testing, water
minimum flow. Check the System is being applied to the Inbal Deluge will flow from all open sprinklers and/or
Pressure Gauge reading. If adjust- Valve inlet and trim. nozzles. Prevent damage by taking the
ment is required, turn the pilot valve 3. Verify that the Trim Shutoff Valve, necessary precautions.
adjusting screw clockwise to increase Emergency Release Valve, Pressure 1. Trip the Inbal Valve to open by
or counter-clockwise to decrease the Gauge Valve, Solenoid Valve, actuation of the Solenoid Valve. A
pressure setting. Pressure Reducing Pilot Valve, and flow of water is released from the trim.
12.Open the system shutoff valve and Drain Valve (if in use) are in set The Inbal Valve will open and water
close the Drain Valve. position. will flow to the system.
13.Set the Inbal Pressure Control 4.Check the Supply and System 2. Check the Supply and System Pressure
Deluge Valve by following the Pressure Gauge readings. Gauge readings. Verify that the
Resetting procedure. 5. Visually inspect for disconnected delivery pressure is as predetermined.
14.Test the Inbal Pressure Control wires, broken or missing parts, or 3. Record the actual flow rate and
Deluge Valve and the trim according other evidence of impaired protection. upstream and downstream pressures.
to the Testing procedure. 4. Verify that all the alarms operate
Strainer Cleaning properly.
A quarterly Strainer Cleaning is 5. Reset the system by performing the
Resetting
recommended: instructions in Resetting.
The Inbal Pressure Control Deluge 1. Close the Trim Shutoff Valve. 6. Verify that water supply pressure is
Valve system must be reset and restored 2. Remove the covers of the trim and restored to the normal level as
to service as soon as possible after alarm Y-strainer. Clean if necessary. recorded in (3) above.
automatic, emergency, or manual 3.Open the Trim Shutoff Valve. Removal
actuation. To remove the Inbal Deluge Valve:
1.After automatic or manual electric Alarm Testing 1. Close all the pressure supply valves:
operation - reset the Solenoid Valve. A quarterly Alarm Testing is a) Water Supply Valves.
The Inbal Deluge Valve will close drip recommended: b) Trim Shutoff Valve.
tight. The water flow alarms and 1. Test the Water Motor Alarm or Alarm 2. Disconnect the electric wires from the
Electric Alarm are reset. Pressure Switch by opening the Alarm solenoid valve. The electric work
2.After manual emergency operation - Test Valve. should be done by a licensed
close the Emergency Release Valve. 2. Water Motor Alarm should be audible. electrician.
The Inbal Deluge Valve will close drip Alarm Pressure Switch should 3. Open the Emergency Release Valve to
tight and water flow alarms are reset. activate. release the water pressure from the
In either one of the operations 3. Close the Alarm Test Valve. All local Inbal Valve Control Chamber.
exercised, the piping system should be alarms stop sounding and pressure 4. Open the Drain Valve to allow all the
drained. switch is reset. water to drain.
4. Verify that the supply piping to the 5. Disconnect the union and remove the
alarm drains properly. trim from the valve.
Maintenance, Inspection, & Testing 6. Remove the Inbal Deluge Valve from
Deluge Trim Testing the line for inspection.
It is recommended that periodic inspec- 7. To reinstall, follow the Installation
tions and tests be conducted by qualified A semi-annual Deluge Trim Testing is procedure (use new gaskets for
personnel to ensure that the Inbal Pressure recommended. Testing of the control flanged or wafer valve).
Control Deluge Valve and related trim is conducted with no flow of water
equipment are in good operating condition. to the system.
The inspection and testing activities should 1. Close the Water Supply Valve
Inquiries/Orders
be done according to NFPA Standards, installed in the inlet of the Inbal The Data Sheet For Inquiries/Orders
the guidelines and regulations of the Deluge Valve. (bulletin F01-05-01) should be
authorities having jurisdiction, and the 2. Actuate the Solenoid Valve. submitted.
Mil Ltd. 17 Moshe Beker Street, P.O.Box 15200, Rishon Lezion 75051, Israel. Tel: +972 3 966 4350, Fax: +972 3 966 4320, E-mail:inbalvl@ attglobal.net
March 2000 / F06-04-01