THIRD ANNUAL ADMINISTRATION REPORT OF HPSEB LTD.
2012-13
INDEX
1 Highlights
3 Development Schemes
5 Rural Electrification
7 Material Management
10 Tariff
11 Tables
CHAPTER-1
C
HIGHLIGHTS:
Achievements Ending
S.No. Item Unit
31.3.2012 31.3.2013
1 INSTALLED CAPACITY
a) Hydro MW 475.95 477.450
2 RURAL ELECTRIFICATION
6 Energy Sold
Completed on 23.1.14
ORGANIZATION CHART OF HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD
CHAIRMAN
MANAGING DIRECTOR
DIRECTOR CIVIL) DIRECTOR (TECH) DIRECTOR (OP) DIRECTOR (F&A) CHIEF ENGINEER DIRECTOR
(P&M) (PERSONNEL)
CHIEF ENGINEER CHIEF ENGINEER CHIEF ENGINEER CHIEF ENGINEER CHIEF ENGINEER
(PROJECT-cum-ARB), (I&P) S/NAGAR (SO&P), SHIMLA (GEN), S/NAGAR (ES), HAMIRPUR CHIEF ENGINEER CHIEF ENGINEER CHIEF CHIEF SE (P&M) SE EXECUTIVE DIRECTOR
SHIMLA (MM), SHIMLA (OP) NORTH, ACCOUNT AUDITOR ELECT. (P&M) (PERSONNEL)
DHARAMSHALA S OFFICER CIVIL
(1.4.2012 TO 31.3.2013)
The Finance and Accounts Wing is headed by the Chief Accounts Officer. This
wing has been assigned the function of maintaining accounts of the HPSEBL (Board),
preparation of final/annual accounts and annual budget of the HPSEBL (Board),
exercise internal checks over the accounts maintained in the various field offices,
exercise financial control, financial planning, financial forecast, funds management,
receipt and disbursement etc. The organizational set up of this wing as on 31.3.2013,
is given in the Organization Chart. Further details are given in Chapter-VII, captioned
"Finance, Accounts and Audit".
Besides the Chief Engineer (MM), three Design Units i.e. Superintending
Engineer, Design (ES), Superintending Engineer Design, Power Houses (Electrical) &
Superintending Engineer, Design (Electrical) Uhl Stage-III have also been entrusted
with the procurement / purchase of classified equipments, for transmission lines &
substations of 33 KV & higher voltages and also electro-mechanical equipments for
different power houses in addition to other duties of Planning and Designs, the details
of which have been given in para 6.6-A, 6.7-A & 6.7-B of Chapter-6, captioned
'Planning and Design'.
In addition to above, field officers of various levels also have powers to purchase
miscellaneous items for day to day working requirements as per the Delegation of
Financial Powers of HPSEBL.
Class Total
I 1091
II 638
III 15658
IV 7521
Total:- 24908
Personal Posts:
a) Regular/Work-charge 1655
b) D/Wages/Part-Time 722
POSTS CREATED/ABOLISHED:-
1) 100 Posts of Computer Operator have been created in various unit of HPSEB
Ltd. vide officer order No. 27 dated 22.06.2012.
2) One Post of Chief Engineer has been abolished vide office order No.4 dated
30.03.2013.
A. GAZETTED STAFF:
1. Final seniority list of CE (E) as it stood on 01.09.2012 circulated vide letter No.
HPSEBL (SECTT.)/101-19/2012-80644-69 dated 01.12.2012.
2. Final seniority list of CE (C/M) as it stood on 01.09.2012, circulated vide letter No.
HPSEBL (SECTT.)/102-68/2012-81396-416 dated 05.12.2012.
3. Provisional Seniority List of SE (E) as it stood on 01.10.2012 circulated vide letter
No. HPSEBL (SECTT.)/101-20/2012-93758-77 dated 31.01.2013.
4. Final Seniority list of SE(C/M) as it stood on 01.09.2012 circulated vide letter No.
HPSEBL (SECTT.)/102-69/2011-81078-107 dated 03.12.2012.
5. Final Seniority list of Sr. Executive Engineer (C/M) as it stood on 01.12.2012
circulated vide letter No. HPSEBL (SECTT.)/102-70/2013-91716-30 dated
17.01.2013.
6. Provisional Seniority list of AEE/AE (C/M) as it stood on 01.04.2012 circulated vide
letter No. HPSEBL (SECTT.)/102-72/2012-13196-260 dated 09.05.2012.
7. Provisional Seniority list of AEE/AE (E) as it stood on 01.06.2012 circulated vide
letter No.HPSEBL(SECTT.)/102-23/2012-33651-771dated 29.06.2012.
8. Final Seniority list of Architect as it stood on 01.01.2012 circulated vide letter No.
HPSEBL (SECTT.)/102-43/2012-374-85 dated 02.04.2012.
9. Final Seniority list of Asstt. Architect as it stood on 01.01.2013 circulated vide
letter No. HPSEBL (SECTT.)/102-42/2012-1161-72 dated 03.04.2012.
10. Final Seniority list of Section Officers as it stood on 10.07.2012 circulated vide
letter No.HPSEBL(SECTT.)/102-77/2012-79248-308dated 26.11.2012.
11. Final Seniority list of Sr. Accounts Officer as it stood on 01.01.2013 circulated vide
letter No. HPSEBL (SECTT.)/102-75/2013-98440-43 dated 19.02.2013.
12. Final Seniority list of Accounts Officer as it stood on 01.02.2013 circulated vide
letter No. HPSEBL (SECTT.)/102-75/2013-103078-81 dated 11.03.2013.
B. NON GAZETTED STAFF
1. Final Seniority list of A.P.S. as it stood on 01.04.2011.
2. Final Seniority list of Personnel Assistant as it stood on 01.04.2011.
3. Final Seniority list of Jr./Sr. Scale Stenographer as it stood on 01.04.2011.
4. Final Seniority list of Assistant Store Keeper as it stood on 1.1.2011.
5. Final Seniority list of Supdt. G-II as it stood on 01.04.2012.
6. Final Seniority list of Divisional Accountant as it stood on 01.09.2012.
7. Final Seniority list of Stock Verifier as it stood on 01.09.2012.
8. Final Seniority list of Store Helper as it stood on 01.09.2012.
PROMOTIONS/ CONFIRMATIONS/ APPOINTMENTS/ WORK CHARGED
CADRE/ REGULARISATION OF ADHOC SERVICES/ EMPLOYEES, SENT
ON DEPUTATION:-
A. GAZETTED ESTABLISHMENT
During the year 2012-13, 40 No. (Class-I&II) D.P.Cs meetings were convened,
the detail of which is as under:-
(i) Electrical Engineers:
1) Chief Engineer 7 Nos.
2) Superintending Engineer 8 Nos.
3) Sr. Executive Engineer 34 Nos.
4) A.E.E/ A.E 72 Nos.
ii) CONFIRMATION
20 Junior Engineers, 20 Helpers (Auto) & 5 Conductors confirmed.
iii) APPOINTMENTS:
Class - III 44 Posts of Line Man filled up on contract basis.
Class – IV 33 Posts of T/Mats (Disabled) filled up on contract basis
against 3% PWD quota.
Following employment on contract basis against 3% reserved quota for
disabled given during the year 2012-13.
1. Peon = 2 No.
2. Clerk = 10 No.
3. Steno Typist = 1 No.
4. Sweeper = 1 No.
Following employment through H.P.SSB Hamirpur on regular/ contract
basis given during the year 2012-13.
1. Superintendent (D/A) = 5 No.(Regular)
2. Clerks = 17 No.(Contract basis)
Class-III =10 Nos. [3 No. J.E (C/M), 2 No. CHDM, 1No. HDM,3 No.D/Man
& 1 No. Driver]
2.16 GENERAL ACTIVITIES:
The General Activities of the HPSEBL during the year 2012-13 are given
in the following paragraphs.
Himachal Pradesh has huge Hydel Potential in its five river basins. This hydel
potential of the State can play a major role in the power development programme of the
Northern region & provide an economic base for the speedy development of Himachal
Pradesh. Out of this potential, 477.45 MW installed capacity is under the control of
HPSEBL as on 31st March, 2013, the detail of which has been given in Table-14 of
Chapter-11, Captioned “Tables”.
The following Power Projects were under progress during the year 2012-13: -
3.2 UHL STAGE–III HYDRO ELECTRIC PROJECT (100MW):
Transmission Works:
132 kV Double Circuit transmission line from Uhl-III to Hamirpur and 132 kV
Single Circuit transmission line on Double Circuit Tower from Uhl to Bassi is being
carried out by Chief Engineer (ES.) HPSEBL, Hamirpur and about 90% work has so far
been completed.
Project is likely to be commissioned during March, 2014.
3.3 GHANVI STAGE-II HEP (10 MW):
Ghanvi Stage-II HEP is a run of the river scheme on Ghanvi rivulet, a tributary of
Satluj river. The project is located near Jeori township, about 150 Km from Shimla. The
power house site is near Ghanvi which is about 12 Km from Jeori. This scheme
envisages construction of drop type trench weir to divert the Ghanvi waters. This
diverted water will be conveyed through 1.8m size D-shaped 1440m long tunnel and one
penstock, bifurcating near power house to feed two turbines in an underground power
house to generate 10 MW of power by utilizing a gross head of 165m and designed
discharge of 7 cumecs. The annual energy generation in a 75% dependable year is
expected to be 56.30 MU. The cost of generation at Bus Bar works out to 2.92 per
unit.
The Himachal Pradesh State Electricity Board limited, is executing this Hydro
Electric project. Environment & Forest clearance stand accorded by HPSEB & PCB,
Shimla and by MOEF, Govt. of India respectively.
Estimated cost of the project is 99.80 crore at December, 2009 price level .The
funds have been arranged from M/s Rural Electrification Corporation Ltd., who has
sanctioned a revised loan amounting to 8982.00 lacs on dated 22.07.2010. An
expenditure amounting to 10647 lacs has been incurred upto March, 2013.
Civil and Hydro Mechanical Works:
The civil work of all the main components have been completed up to an extent of
95% up to March,2013.
Electro-Mechanical Works:
The Electro Mechanical packages have been awarded during April, 2008 at
tendered amount of 18.86 crores to M/s VA TECH ESCHER WYSS, FLOVEL LTD.
FARIDABAD. All the Electro-Mechanical Equipments of the project have been reached
at site and 96% erection work has been completed upto March, 2013.
The project is likely to be commissioned during August, 2013.
Thirot HEP (4.50MW) is run off river scheme on Thirot Nallah in Distt. Lahaul &
Spiti (HP) on Chenab Basin. Though the project was commissioned during 1996-97,
but the installed capacity of power could not be achieved due to damages occurred to
power channel & diversion structure on account of land settlement in 1998. For
restoration of 4.50MW generation capacity of power on long term basis, it was
proposed to convert entire water conductor system into tunnel for which an estimate
amounting to 1175.30 lac has been sanctioned during 2006. The loan of 900 lac
has been sanctioned against this work by M/s PFC.
The work for construction of 1338m long Head Race Tunnel and an intermediate
Adit 185m length was taken in hand during April, 2007, which has been completed
during July 2012.
Besides, the work for modification of existing Trench weir has also been awarded
during October, 2010 and 25% of the work has been completed up to March, 2013.
The desired progress could not be achieved due to adverse climatic and site
conditions.
3.6 Khauli-II HEP (6.00MW):
The progress of the various transmission lines & sub-stations during the year
2012-13, is given here under:-
(A) LINES COMPLETED/COMMISSIONED:-
The following transmission line works were completed during the year:-
All the Power Houses except diesel generating station at Keylong, remained
in operation during the year under report.
This power house with two units of 2.25MW each is located at Kafnoo in
Distt. Kinnaur which was commissioned during July, 2011. During the year
under report this Power House generated 10.434MU of energy with a plant load
factor of 26.47% and maximum demand was recorded as 4.76MW.
This Power House is located on Nogli Khad, a tributary of the Satluj river in
Shimla District. During the year under report, this Power House generated 5.873
MU of energy with plant load factor of 26.82% and maximum demand was recorded
as 1220 KW.
xvi) RONGTONG (4x500= 2000 KW):
This Power House is located on Rongtong Nallah, a tributary of the Spiti
river. During the year under report, this Power House generated 1.488 MU of
energy with plant load factor of 8.49% and maximum demand was recorded as
690 KW. The power from this Power House is utilized in Spiti Valley.The main
reason for poor performance was break down of two machines i.e Machine No. I
& III since long and Machine No. II & IV also remained under break-down during
different intervals. An integrated scheme has been sanctioned for strengthening
the infrastructure including renovation & Modernization of Electro-Mechnical
Equipments, which is being financed by 13th Finance Commission. It is expected
that full potential of this power house will be utilized by March, 2014.
The Directorate of P&D (REC) was renamed as Directorate of RGGVY Cell vide
Secretary, HPSEB, Shimla letter No. HPSEB (Sectt)/HRD/2-5/2005-64567-767 dated
5.9.05 and its head-quarter shifted from Dalhousie to Shimla. RGGVY cell is headed
by the Superintending Engineer (RGGVY) under the administrative control of Chief
Engineer (System Operation & Planning). This Cell has two units viz projects
monitoring and system cells. In addition to earlier duties, these units are entrusted
with the preparation of restructured APDRP schemes, RE schemes, GSC schemes,
System Improvement schemes, T&D schemes upto 33 kV, Appraisal, Monitoring of
progress, loan drawl and closing of such schemes.
In addition to above, annual working programme, preparation of STC agenda
and minutes of meeting/SLCC Agenda and minutes of meeting & REC/SI cost data
are also prepared in this office.
5.3 ELECTRIFICATION OF VILLAGES AND HAMLETS:-
Cent Percent Target of village electrification as per the 1981 Census was
achieved in Himachal Pradesh in June, 1988.
As per 2001 census, definition of village electrification has been changed.
As per new definition, “A village would be declared as electrified if:-
For special category states like Himachal Pradesh, GoI Loan for Part-‘B’ shall
be 90% of the total project cost and 10% shall be arranged by the utility through
loan/own funding. The loan under Part-B will be convertible into grant in equal
tranches, every year for 5 years starting one year after the year in which the base-line
data system (Part A) of project area concerned is established and verified by the
independent agency appointed by MoP through the Nodal Agency.
In Himachal Pradesh 14 towns namely Baddi, Bilaspur, Chamba,
Dharamshala, Hamirpur, Kullu, Mandi, Nahan, Paonta Sahib, Solan, Shimla,
Sundernagar, Una and Yol having population more than 10000 are covered under
R-APDRP.
Initially, the R-APDRP (Part-B) schemes amounting to 322.180 Cr. (Loan
amount 289.97 Cr.) were sanctioned by M/s PFC/MoP for all the 14 towns covered
under R-APDRP in Himachal Pradesh. Due to non-availability of land for construction
of 66/11 kV substations and right of way problem for associated 66 kV lines the
schemes for Shimla and Baddi towns have been revised. The revised R-APDRP
(Part-B) DPRs for Shimla & Baddi towns have been approved by M/s PFC on dated
08.02.2012 who has revised the project cost for these towns from 100.25 &
87.40 Cr. to 120.34 & 84.10 Cr. respectively. Accordingly the original sanctions
amounting to 322.18 Cr. (Loan amount 289.97 Cr.) for all the 14 towns have
been revised to 338.97 Cr. (Loan amount 305.07Cr.) with additional terms and
conditions in sanction letters dated 20.08.2010 and 21.12.2010. The MoA have been
signed for enhanced loan amount of 18.07 Cr. on dated 06.08.2012.
The town wise sanction status of the R-APDRP (Part-B) schemes is as
hereunder:
Sr. Name of Loan PFC Own Total Completion
No. Town/ Number Funded Funded Project Date
Project Area ( ( Crore) Cost
Crore) ( Crore)
1 Baddi 4134001 75.69 8.41 84.10 07.12.2015
2 Bilaspur 4134002 1.87 0.21 2.08 07.12.2015
3 Chamba 4134003 2.64 0.29 2.93 07.12.2015
4 Dharamshala 4134004 9.28 1.03 10.31 07.12.2015
5 Hamirpur 4134005 5.81 0.65 6.46 07.12.2015
6 Kullu 4134006 6.66 0.74 7.40 07.12.2015
7 Mandi 4134007 17.32 1.92 19.24 07.12.2015
8 Nahan 4134008 5.46 0.61 6.07 15.08.2015
9 Paonta Sahib 4134009 32.97 3.66 36.63 15.08.2015
10 Shimla 4134010 108.30 12.04 120.34 15.08.2015
11 Solan 4134011 20.32 2.26 22.58 15.08.2015
12 Sundernagar 4134012 5.90 0.65 6.55 07.12.2015
13 Una 4134013 6.58 0.73 7.31 07.12.2015
14 Yol 4134014 6.27 0.70 6.97 07.12.2015
Total 305.07 33.90 338.97
The scheme also envisages the provision of incentive for utility staff in the towns
where ‘Aggregate Technical & Commercial loss’ (AT&C loss) levels are brought below
15%. A maximum amount equivalent to 2% of the grant for Part-B project is allocated
for this purpose.
The M/s PFC has sanctioned 101.684 Crore as upfront money under R-
APDRP (Part-B). The incentive scheme amounting 9.76 Crore for all the 14 towns
has been sanctioned by M/s PFC Ltd. The counterpart funding (10% of the total
project cost) amounting to 33.90 Crore have also been sanctioned by M/s PFC.
The tenders for all the 14 towns have been floated during April / May, 2011 and the
technical bids opened during August/September, 2011. The price bids for these have
been opened on 22nd to 25th, November, 2011.
The awards have been placed for all the works under Part-B of R-APDRP schemes of
9 No. of towns namely, Nahan, Solan, Hamirpur, Kullu, Sundernagar, Bilaspur,
Dharamshala, Una and Yol during April/May, 2012. For 3 towns namely Mandi,
Chamba and Paonta Sahib all the works have been awarded during July, 2012 and
March, 2013. The works for R-APDRP (Part-B) are in progress and expenditure to the
tune of . 4.19 Crore has been incurred up to 31.3.2013 against these scheme.
Benefits of the Scheme:-
S.I. Schemes.
1 SI Scheme at Prini 060317 20-04-1998 Closed vide letter No. 1292-
(Manali) 96 dated 15-06-2012.
2 SI Scheme at Jari. 060339 7-04-1999 Closed vide letter No. 768-72
dated 05-05-2012.
3 SI Scheme at Chawari. 060362 17-04-2000 Closed vide letter No. 6288-
93 dated 01-10-2012.
Sr. Name of Scheme No. of Revised Grant Loan Total Exp. i/c
No. Scheme Code left out Sanctioned Amount Amount Amount liabilities
RHH Amount ( in ( in Released ending
(BPL) ( in lacs) lacs) lacs) ( in 31/3/13
covered lacs) ( in
for lacs)
electrific
-ation
1 RGGVY
Distt. HP- 2531
6633.54 5368.81 597.02 5965.83 4851.41
Chamba 300001 (647)
2 RGGVY
Distt. HP- 3877
4618.79 3482.56 388.71 3871.27 4118.79
Solan 300002 (1599)
3 RGGVY
Distt. HP- 3837
2302.81 1734.66 193.8 1928.46 1689.20
Una 300003 (964)
4 RGGVY
Distt. HP- 3805
4969.72 3740.75 418.24 4158.99 4354.60
Sirmour 300004 (1024)
5 RGGVY
Distt. HP-
701 (42) 435.31 347.49 38.79 386.28 418.55
Bilaspur 300005
6 RGGVY
Distt. HP- 1047
596.85 448.62 50.23 498.85 612.59
Hamirpur 300006 (187)
7 RGGVY
HP- 10055
Distt. 2655.13 1958.97 222.15 2181.12 2737.45
300007 (3055)
Kangra
8 RGGVY
Distt. HP- 6301
3366.35 2525.52 283.3 2808.82 2884.47
Mandi 300008 (1537)
9 RGGVY
Distt. HP- 7686
5134.63 3862.36 432.12 4294.48 4676.12
Shimla 300009 (2676)
10 RGGVY
Distt. HP- 2492
777.11 592.52 66.47 658.99 887.04
Kullu 300010 (520)
11 RGGVY
Distt. HP-
999(194) 1324.2 1038.72 115.45 1154.17 1153.39
Lahaul- 100670
Spiti
12 RGGVY HP- 1113 (38) 1371.89 1017.27 113.27 1130.54 1416.81
44496
TOTAL: 34,186.33 26118.26 2919.57 29037.83 29800.42
(12483)
CHAPTER-6
PLANING AND DESIGN
6.1. GENERAL:
In order to tap the vast Hydel Potential of the State, advance action is necessary
for planning and design of Hydel Projects to facilitate proper selection of projects, on
the basis of technical and economical consideration so that these could be executed
speedily. Similarly, advance planning and designs of an adequate transmission and
distribution network is necessary in order to evacuate power from these projects and
its distribution for power utilization within/ outside the State. For achieving these
objectives, various planning and design units have been functioning in the Board.
6.2 PLANNING UNIT AT BOARD’S SECRETARIAT:
At Board’s level, this unit is headed by Chief Engineer (P&M) who is supported
by Superintending Engineer (P&M) Electrical and Superintending Engineer (P&M)
Civil. Superintending Engineer (P&M) Electrical is entrusted with the work of
formulation of Five Year Plans, Tribal Sub-Plans and Special Component Plans and is
also dealing with all other technical matters of electrical nature, which require the
appraisal at Board/Govt. level. Superintending Engineer (P&M) Civil looks after the
monitoring of various on-going Projects and is also entrusted with the scrutiny of
technical matters of civil nature, requiring appraisal at the Board/ Govt. level.
6.3 CHIEF ENGINEER (I&P), HPSEBL, SUNDERNAGAR:
This Wing of HPSEBL has been assigned the S&I of Hydro Electric Schemes in
Beas, Ravi & Chenab basins, formulation of IRs/ PFRs and DPR’s and obtaining
Techno-economic and MoEF clearance from Govt. of India.
Following two units are working under this Wing:-
i. Superintending Engineer Planning Circle-1, HPSEBL, Sundernagar.
ii. Superintending Engineer Planning Circle(Civil), HPSEBL, Mandi.
The detail of Reports prepared / works carried out by these units during the
year 2012-13 (1.4.12 to 31.3.13) are as under:-
A. Superintending Engineer Planning Circle-1, HPSEBL, Sundernagar.
(a) PFRs Prepared / Submitted:
• Bara Bhangal HEP-Stage-I (32MW)
• Bara Bhangal HEP-Stage-II (42MW)
• New Nogli HEP (10MW)
(b) Projects identified under optimization studies (based on studies from SOI
Topo sheets:
• Bara Bhangal HEP-Stage-I (32MW)
• Bara Bhangal HEP-Stage-II (42MW)
• New Nogli HEP (10MW)
(c) DPRs Prepared / Submitted:
• Khauli HEP Stage-II (6.00 MW)
(d) DPRs in progress:
• Dundah HEP (18MW)
• Hail HEP (14MW)
• Chobia-Stage-I HEP (15MW)
(e) Power Potential Optimization:
• Studies to find out the left out power potential in Ravi, Beas and Chenab
basins taken up.
(f) Himurja Schemes:
• Inspection of various Himurja/IPP schemes has been conducted and
certificate regarding interference/overlapping with HPSEBL Schemes issued
accordingly as per the requirement of Himurja from time to time.
(g). Other Miscellaneous works:-
Construction drawing of weir of Thirot HEP prepared and issued to the
concerned field unit.
• Design of substation building and Idgah (Shimla) prepared and submitted to
the concerned unit.
B. Superintending Engineer Planning Circle (Civil), HPSEBL, Mandi.
(a) Preparation of DPRs of Hydro Electric Projects:-
(I) Hail HEP( 14 MW):-
This hydel scheme is a run of the river scheme proposed to constructed on
Channi Nallah a tributary of river Ravi in Tehsil Churah, District Chamba. The
diversion site has been proposed to be constructed at EK: 2320 Mtrs just
downstream of confluence of Kanjtu nallah, with EL: 1880 Mtrs. on the left bank
of Channi nallah. The following investigation works of this project had been
carried during the year 2012-13.
i) The process for observation of daily gauge and discharge data of Channi
Nallah near village Tapa had been kept continued.
ii) The topographical survey covering all the components of the project in a
scale of 1:5000 with 5 Mtrs. contour intervals as per the requirement of
design unit had been got carried out.
iii) The field data as per the requirement of design unit had also been
supplied.’
iv) The work for construction of 1.50 mtrs wide inspection path from village
Hail to proposed weir site had also been carried out.
v) Additional survey of all components of the project has been done as per
requirement.
(II) Tundah HEP(18 MW):-
This hydel scheme is a run of the river scheme proposed to be constructed on
Tundah Nallah a tributary of river Ravi in Tehsil Bharmour, District Chamba.
The diversion site has been proposed to be constructed at EL:1625 Mtrs. The
power House siter has been proposed to be construct at EL:1470 Mtrs. on the
right bank of Budhil Ballah. The following investigation works of this project
had been carried during the year 2012-13.
i) The process for observation of daily gauge and discharge data of Tundah
Nallah near village Reta had been kept continued during the year 2012-
13.
ii) The topographical survey covering all the components of the project in a
scale of 1:5000 with 5 Mtrs. contour intervals had been got carried out.
iii) The field data as per the requirement of design unit had also been
supplied.
iv) The work for construction of 1.20 mtrs wide inspection path from village
Kandailu to discharge site had also been carried out.
v) Additional topographical survey of proposed alternate Barrage & Power
House site in scale of 1.500 with contour intervals 5 mtrs. has been got
done.
(III) Chobia HEP(15MW):-
This hydel scheme is a run of the river scheme proposed to be constructed on
Chobia Nallah a tributary of river Ravi in Tehsil Bharmour, District Chamba.
The diversion site has been proposed to be constructed at EL:2655 Mtrs. The
power House siter has been proposed to be construct at EL:2240 Mtrs. on the
right bank of Budhil Ballah. The following investigation works of this project
had been carried during the year 2012-13.
i) The process for observation of daily gauge and discharge data of Chobia
Nallah near village Seri had been kept continued during the year 2012-13.
ii) The topographical survey covering all the components of the project in a
scale of 1:5000 with 5 Mtrs. contour intervals had been got carried out.
iii) The field data as per the requirement of design unit had also been
supplied.
iv) The work for construction of 1.20 mtrs wide inspection path from HPPWD
road to discharge site had also been carried out.
v) Additional survey as per requirement has been done.
(b) Reimbursement of expenditure incurred by HPSEBL on S&I works:-
The matter for reimbursement of expenditure incurred by the HPSEBL on S&I
works has been taken up with various IPPs/other agencies in respect of the
projects allotted to them.
(c) Other Miscellaneous works:-
i) The work for checking of the installed capacity of the Hydel projects
identified by the IPPs/other agencies itself and their viability etc. had also
been carried during the year 2012-13.
ii) Assessment of damages caused to Baspa HEP due to flood has been got
done from a Private agency engaged by the Board.
This unit has been assigned the planning, design, framing of specifications
and procurement of Electro-mechanical-equipments for new projects i.e. Uhl-Stage-III
(100 MW) and Ghanvi-Stage-II (10MW). Also the design work / preparation of bid
documents and award of 400 KV S/C Transmission line from Nalagarh to Kunihar
alongwith 2x31.5 MVA, 400/220KV Sub-Station Kunihar has also been entrusted to
this unit.
6.6 CHIEF ENGINEER (SYSTEM OPERATION & PLANNING), HPSEBL, SHIMLA:
During the year under report, the following units were functioning under
Chief Engineer (SO&P), each headed by an officer of the rank of Superintending
Engineer (Electrical):
i) Superintending Engineer (Power House and Transmission) Planning,
Shimla-4.
ii) Superintending Engineer, RGGVY Cell, Khalini, Shimla-2.
iii) Superintending Engineer (Inter State),HPSEBL,Totu,Shimla-11.
iv) Superintending Engineer (PR&ALDC), HPSEBL, Totu,Shimla-11.
v) Superintending Engineer (IT), HPSEBL, Shimla-04.
The detailed tasks, entrusted to these units during the year 2012-13, are
detailed below:-
1. Project Report for C/O 220kV D/C line (initially to be charged on 132kV) from tower No.
61 near Jamta of Giri- Solan line to Devani with Single Zebra Conductor and 132kV
S/C line on 132kV D/C Towers from 220/132kV Sub-Station Devani to exist 132/33kV
Sub-Station. Kala Amb for 2242.15 lac submitted to the REC and loan sanctioned by
REC in Dec, 2012.
2. Project Report for Aug. of 220/66kV 1x25/ 31.5MVA transformer to 1x80/100MVA and
Aug. of 66/22kV, 1x6.3MVA X-former to 25/31.5 MVA at 220/66kV Sub-Station Kotla.
amounting to .1367.64 lac submitted to the REC and loan sanctioned by REC in April,
2012.
3. Project Report for addition of 132/33kV, 1x25/31.5MVA, transformer at Kala-Amb
S/Stn amounting to .533.69 lac submitted to the REC and loan sanctioned by REC in
April, 2012.
4. Project Report for C/O 400kV S/C line on D/C tower from Nalagarh to Kunihar a/w
400/220kV, 1x315 MVA S/Stn Kunihar (Est. amount .150.29 Cr submitted to the
REC and loan sanctioned by REC in April, 2012.
5. Project Report for Providing 16 MVA 132/33kV with I No. spare transformer bank for
SOP to LWSS Gaura river to Solan Town. amounting to .541.79 lac submitted to the
REC and loan sanctioned by REC in April, 2012.
6. Project Report for Const. of 66/22kV, S/Stn. between Narkanda and Theog amounting
to .1310.84 lac submitted to the REC and loan sanctioned by REC in June, 2012.
8. Project Report for Aug. of 132/33kV, 1x16MVA to 1x25/31.5 MVA T/F at 132/33kV
S/Stn Malana amounting to . 287.76 lac submitted to the REC and loan sanctioned
by REC in Nov, 2012.
10. Project Report C/O 132/33kV, 2x16MVA Sub-Station at Kanghain (Lambagaon ) along
with 132kV D/C line by LILO of one CKT of Chullah- Hamirpur D/C line amounting to
1457.77 lac submitted to REC and loan sanctioned by REC in Nov, 2012.
(b) 2 Nos. EHV Committee meeting were held i.e. 62nd EHV meeting on 21.07.12, and 63rd
EHV meeting on 04.01.2013.
(c) During the year 2012-13, following loan re-imbursement claims were submitted to M/s
REC Ltd.
(g) Following schemes submitted to Board, M/s REC and M/s PFC w.e.f.
01.04.2012 to 31.03.2013.
Sr. Description Amount Submitted
No. ( . In Lac) to
GENERATION SCHEMES:
1 Providing log Boom at Barrage site of Larji 152.33 PFC
Power House.
2 Providing Critical Tools & Plants, measuring 23.92 PFC
and recording instruments & spare metering
equipments in Khauli HEP.
3 Procurement of 1 No. spare Runner for 3x4 MW 170.68 PFC
Baner HEP.
4 Providing 3 No. digital Programmable Electronic 190.29 PFC
Governors for 3x3.50 MW Gaj HEP.
5 Procurement of 4 No. Spare Field Coil & re- 135.53 PFC
insulation of 2 No. damaged coils for Rotor of
3x40 MW Bhaba HEP.
6. Procurement of 2 No. Spare Runner for 3x4 MW 296.71 PFC
Binwa HEP.
7. Construction of River Training works on the 106.76 PFC
right bank of river Satluj for protection of 11/66
kv switchyard of (2x11.25 MW) Ghanvi Power
House.
8. Scheme for the proposal for re-conditioning of 3 268.83 PFC
No. 11/220kv 50MVA transformers and 1 No.
22/200 kv 10 MVA station transformer of 3x40
MW SVP Bhaba under P/ House Electrical mtc.
Division, HPSEBL Bhabanagar.
9. Scheme for purchase of Three Nos. Pelton 266.07 PFC
Runners for 2x11.25 MW Ghanvi Power House
under Ghanvi Power House Division, HPSEBL
Jeori.
10 Purchase of 2 Nos Pelton Runners for 3x3.50 109.18 PFC
(MW) Gaj Power House under Gaj Power Houser
Division, HPSEBL Garoh.
11. Scheme for purchase of 2 No. 40 MW Runners 974.02 PFC
for (3x40 MW) HEP under P/House Electrical
mtc. Division, HPSEBL Bhabanagar.
12. Scheme for repair & Renovation of Mulsifire 54.18 PFC
system for the protection of Unit/Station
transformer and sprinkler system for the
protection of 200kv oil filled cables installed in
Bhaba (3x40 MW).
13. Scheme for renovation, Modernization and life 3479.80 PFC
Extension works of 2x30MW Giri Power House
under Giri Power House Division, HPSEBL,
Girinagar.
ANDHRA-NOGLI-ZONE:
1 Estimate for providing interconnection facility to 2219.00 REC
various IPPs of Andhra - Nogli Zone for
Evacuation of Power through 66/22 kV Sub-
Station Andhra and 22 kV Sub-Station Gumma
under Andhra Power House Division, HPSEBL,
Chirgaon.
2 Providing additional of 20 MVA 66/22 kV Power 479.56 REC
Transformer a/w spare bay at 10 MVA 66/22 kV
Nogli for evacuation of power from SHEP's
Andhra- Nogli Zone.
PALAMPUR ZONE:
1 Strengthening / Up-gradation of existing 33 194.55 REC
kV Single Circuit line from Baner Power House
EPI To EP 40 Gopalpur and additional
construction of 33 kV Single Circuit Line from
EP 40 Gopalpur to Darang Via Garh Mata with
ACSR 30/7/2.59 (150mm2) ‘WOLF’ Conductor
under Electrical Division, HPSEBL, Palampur. .
2 Scheme for augmentation of existing line 129.21 REC
conductor from ACSR 6/1/4.72mm (100mm2)
‘DOG’ to ACSR 30/7/2.59mm (150mm2) ‘WOLF’
of 33 kv HT line from Switchyard of Bassi Power
House to 33/11 kV Sub-Station , Baijnath
under Electrical Division, HPSEBL, Baijnath.
3 Scheme for strengthening / up gradation of 275.29 REC
existing Line conductor from ACSR 6/1/4.72
mm (100 mm2) 'DOG' to ACSR 30/7/2.59 mm
(150mm2) 'WOLF' of 33 kV S/C line from
existing 33/11 kV Sub-Station Sidhpur to Baner
Power House switchyard and from 33/11 kV
Sub-Station to 132/33 kV Sub-Station Kangra
under Electrical Division, HPSEBL,
Dharamshala
4 Strengthening / Up-gradation of existing S/C 33 247.00 Board
kV feeder No.II from Baner Power House to
132/33/11 kV Sub-Station Dehan under ESD
No.II Palampur.
5 Strengthening / Up-gradation of existing 33 kV 375.265 Board
Maranda- Nagrota Bagwan- Tanda- Kangra line
from ACSR 6/1/4.72 ( DOG) with ACSR
30/7/2.59 (‘WOLF’) under Electrical Division ,
HPSEBL, Dharamshala.
6 MNES Scheme for Renovation and 1670 REC
Modernization of (2x3 MW) Binwa Power House.
CHAMBA ZONE:
System improvement for transmission & distribution works for evacuation of power
from small HEP (upto 25 MW) Prioritization of works for evacuation of power.
1 Survey design, supply of material requirement 250.667 REC
erection, testing & construction of strengthening
of 33 kV Bus Bar system a/w augmentation of
existing conductor of Bathri- Koti -Chamba line
(1st feeder).
IT Initiatives:
The following main IT initiatives are being undertaken in HPSEBL:
Future Plan:
The project will be rolled out in another 61 Sub Divisions in the next phase,
hardware for which has already been included in the ERP hardware. Supply and
installation of hardware in these subdivisions is in progress. LOA for digitization
of consumer data of these subdivisions has also been accepted by M/s SAR
Technology.
b. GIS/GPS Based Asset Mapping including Consumer Indexing and Valuation
of Assets of HPSEB Ltd, preparation of FARs of HPSEB Ltd called ”GIS
Package”:
• HPSEB Ltd. is carrying out GIS/GPS based asset mapping including consumer
indexing and valuation of assets for whole HPSEB Ltd., which will be used as
the base for computerization of billing, energy accounting, electrical network
management, CRM and Management Information System (MIS) and to create
Fixed Assets Registers with present value for its three wings namely Generation,
Transmission and Distribution after proper reconciliation with latest balance
sheet of the Board.
• GIS/GPS based Asset Mapping including Consumer Indexing and Valuation of
Fixed Assets of HPSEB Ltd within geographical boundaries of Shimla Operation
Circle(Part-1) has been completed. For the remaining 11 Operation Circles,
project related activities are in final stage. The Fixed Asset Registers along with
Valuation are expected to be finalized shortly. The integration of GIS with other
modules as per the requirement of R-APDRP is in progress.
c. Implementation and Integration of an ERP system in HPSEBL.
The award was issued to M/s TCS on dated 21.04.2010, the contract has been
signed on 17.06.2010.
• The “Go Live “ of the pilot in the 1st phase covering Head office and operation
Circle Shimla has been completed during February, 2013.
• The 2nd Phase of the project will cover the other locations of HPSEB Ltd. w.e.f.
August, 2013 onwards.
d. R-APDRP Part-A project under implementation in HPSEB Ltd.
Ministry of Power (MoP) has sanctioned . 96.40 Cr. against DPRs of 14
eligible towns for Himachal during August, 2010. The total project cost for
Part-A under R-APDRP is . 128.46 Cr. The balance is to be met through own
funding. Power Finance Corporation Limited (PFCL) has been designated as
the Nodal Agency for the program by Govt. of India (GoI).
• Under Part- A of Restructured Accelerated Power Development Reform
Program (R-APDRP) in Himachal Pradesh, implementation of following
software applications at Data Center/Disaster Recovery Center level are
covered:-
(i) Meter Data Acquisition System (MDAS)
(ii) Energy Audit (EA)
(iii) Identity & Access Management System (IAMS)
(iv) Management Information System (MIS) containing Dataware Housing (DW)
& Business Intelligence (BI) tools
(v) Enterprise Management System (EMS) & Network Management System
(NMS), which is a part of hardware.
Latest Status:
In all, 17 No. fresh requisitions were received from the field units for the
year 2012-13 for arranging various items of stores. There was one requisition
pending from the last year 2010-11 & 16 No. requisitions were cleared during the
year 2012-13. All out efforts were made to arrange the material so as to maintain
the constant flow of material to all the field units. The position of requisitions and
their disposal is as under:-
Sr. Description Nos.
No.
1. Purchase requisitions pending at the end of 1
the year 2011-12
2. Fresh requisitions received during the year 17
2012-13
3. Requisitions cleared during the year 2012-13 16
4. Requisitions pending at the end of the year 2
2012-13
7.3 PURCHASE ORDERS (EXCLUDING PRINTING AND STATIONERY):
Detail of supply orders placed for various items of stores excluding printing
and Stationery, during the year 2012-13 is as under:-
The Finance & Accounts Wing of HPSEBL has been assigned the
functions of maintaining Accounts of the Board, preparation of final Accounts
and Budget of the Board and exercising an internal check over the Accounts,
being maintained in various offices of the Board. Besides, exercising over all
financial control on the expenses, incurred by the Board, this Wing is responsible
for financial planning & forecasting and funds management as well as reporting
on receipts and disbursement of the Board. The F&A Wing is headed by the Chief
Accounts Officer, who functions under the overall supervision of Director (F&A).
The Comptroller and Auditor General of India through the Accountant General of
Himachal Pradesh, Shimla is the Statutory Auditor of the Board. Besides M/s
Anil Karol & Co. Chartered Accountants, 77, 1st Floor Lower Bazar, Shimla has
been appointed Statutory Auditor of HPSEBL. for the FY 2011-12 and 2012-13 by
the CAG of India under Section 619(2) and Pr. Account General (Audit) HP for
supplementary audit U/S 619 (3) & (4) of the Companies Act 1956.
The Annual Statement of Accounts of the Board for the year, 2012-13
has been prepared on accrual basis based on historical cost convention and in
line with the accounting principles of prudence, consistency and materiality
except otherwise stated. Financial statements are prepared on the basis of
provisions of the Companies Act., 1956 and relevant provision of Electricity Act.,
2003 and other applicable Acts.
8.2 REVENUE RECIEPTS AND REVENUE EXPENDITURE:
The Revenue Receipts and Revenue Expenditure during the financial
year 2011-12 and 2012-13, were as under:-
( in Lacs)
Sr. Revenue Receipts During the 2012-13 based on
No. year 2011-12 Un-audited
Accounts .*
1 From Sale of Electricity 382845.73 421256.45
Revenue Expenditure
1 Power Purchased 265762.21 266600.91
2 Operating Expenses and other 141682.18 146618.34
Expenses (excluding depreciation &
Finance charges) & extra ordinary
items
3 Depreciation 19975.65 20928.78
4 Interest On Loans.
a) R.E.C. Loans 5464.76 8381.04
b) L.I.C. Loans 1598.30 1371.86
c) Market Borrowings 44.48 0.00
d) Other Loans 20721.89 22055.46
e) Government Loans 161.51 154.23
f) Cost of raising finance etc. (i/c 12569.28 14107.93
portion of interest on G.P.Fund)
Total Interest 40560.22 46070.52
LESS:-
5 Interest & Finance Charges 1449.50 7500.00
capitalized
Net Interest 26110.72 38570.52
6 Total Expenses (1to4) 453530.76 472718.55
7 Profit/Loss during the year 51275.59 (Loss) 54190.12 (Loss)*
8 Accumulative profit/loss 139834.82(Loss) 194024.95(Loss)*
9 Rate of Return Achieved. (-)17.42% -16.87%
*figures are provisional.
8.3 CAPITAL EXPENDITURE:
Capital Expenditure to the tune of 49477.65 lacs was incurred
during the year, 2012-13 and the break-up thereof is given as under:-
( in Lacs)
Sr. Fixed Assets Value Additions Assets Value as on
No. progressive at during the transferred 31.3.2013.
the beginning year 2012- during
of the year 13*. 2012-13
2011-12
1 Land and Land 8581.94 447.48 0.00 9029.42
Rights.
2 Buildings. 21387.24 86.63 0.00 21473.87
3 Hydraulic Works. 123100.55 46.63 0.00 123147.18
4 Other Civil 22327.78 2924.61 0.00 25252.39
Works.
5 Plant & 187906.64 32050.25 0.00 219957.89
Machinery.
6 Lines & Cables, 175449.66 40925.73 0.00 216375.39
Net-Works.
7 Vehicles. 1639.75 53.19 0.00 1692.94
8 Furniture and 859.99 116.11 124.27 851.83
Fixtures.
9 Office 3496.73 207.03 0.00 3703.76
Equipments.
10 Assets not 7038.06 0.00 0.00 7038.06
belonging to the
Board.
11 Assets not in use 1038.69 -4.72 0.00 1036.97
12 Intangible Assets 0.00 958.69 0.00 958.69
TOTAL FIXED 552827.03 77811.63 124.27 630514.39
ASSETS
13 Capital Works in 127769.63 (-) 28209.81 0.00 99559.82
Progress i/c IDC.
G.TOTAL :- 680596.66 49601.86 124.27 730074.21
The Govt. of H.P. has provided equity capital of 446.53 crore upto
31.03.2013 to the Board, out of which 234 crore is provided by converting 50%
of the Govt. loans of 468.00 crore outstanding as on 31.3.1993 into equity and
212.53 crore provided as equity share for construction of following projects as
on 31st March, 2013.
1.
Khauli Project 15.16 crore.
2.
Beas Valley Power Corporation . 74.26 crore.
3.
Pabbar Valley Power Corporation . 5.58 crore.
4.
Ghanvi Stage-II HEP 15.12 crore.
5.
Larji Hydel Project 48.11 crore.
6.
T&D Scheme . 14.30 crore.
7.
Distribution Schemes . 40.00 crore.
Total . 212.53 crore
8.6 INTERNAL AUDIT:
The Internal Audit on Commercial and Works Accounts is an
instrument of managerial control and this is being done in a regular manner.
Besides, CA firms have been appointed to conduct audit of HPSEBL. under
Company Act, 1956.
8.7 INTERNAL AUDIT GROUP:
The Internal Audit Group of Finance and Accounts Wing is entrusted
with the duties as under:-
i) Carrying out regular audit of consumer accounts in the Electrical
(Operation) Sub- Divisions.
ii) The audit of works Accounts in the Divisional Offices and other units
of the Board.
G IT Schemes
Above 100 KW
Consumer Service Charges (Part -1) 240/month/consumer
Energy Charges (Part - 2) 4.10/KVAh
Demand Charges (Part - 3) 120/KVA/month
10.4 SMALL AND MEDIUM INDUSTRIAL
POWER SUPPLY [Up to 100KW]:
Single Part Tariff (up to 20KW):
Consumer Service Charges (Part-1) 0-20 KW 80/ month/consumer
Energy Charges (Part-2) 4.10/KWh.
Two Part Tariff (above 20 – 100KW):
Consumer Service Charges (Part-1) 150/ month/consumer
Energy Charges (Part-2) 3.70/KVAh.
Demand Charges (Part -3) 70/KVA/month
Peak load exemption Charges (PLEC)
(Above 20KW connected load)
Peak load exemption charges(Energy 6.60/KVAh
charges)
Addl. Demand Charges 60/KVA/month
Peak load violation charges (PLVC)
(Above 20KW connected load)
Peak load violation charges (Energy 9.90/KVAh
Charges)
Addl. Demand Charges 300/KVA/month
10.5 LARGE INDUSTRIAL POWER SUPPLY (LS):
Consumer Service Charges (Part -1)
350/month/consumer
EHT
350/month/consumer
HT
Energy Charges (Part- 2)
EHT
1.Upto 300 KVAh/KVA of the contract 3.35/ KVAh
demand
2.Remaining energy during the month 3.60 /KVAh
HT
1.Upto 300 kVAh/kVA of the contract 3.45/ KVAh
demand
2.Remaining energy during the month 3.70 /KVAh
Demand Charges (Part-3)
EHT 300/KVA/month
HT 300/KVA/month
Peak Load Exemption Charges (PLEC)
Addl. Demand charges on exempted load
EHT 60/KVA/month
HT 60/KVA/month
Energy charges
EHT 5.70/KVAh
HT 6.10/KVAh
12 Charts as on 31.03.2011
Chart - 1 : Installed Capacity, Maximum Demand
2 RURAL ELECTRIFICATION
6 Energy Sold
4 Energy purchased(source-wise)from:-
I BBMB.
a) Old. H.P. 44.00 43.92 43.800
b) New H.P. 125.00 232.45 318.392
c) Dehar. 79.00 81.79 180.902
d) Pong 0.00 0.00 53.518
Total I 248.00 358.16 596.612
II PSEB.
a) Shanan share(45MU) 45.00 45.00 45.000
b) Shanan share1 MW(at gen. Cost). 5.26 5.26 5.256
c) Shanan share 0.5MW(free power). 3.00 2.63 2.628
d) Banking 202.00 312.32 0.000
e) Thein share.(Free Power) 75.59 85.13 62.486
f) Purchase at cost. 0.00 0.06 0.000
g) Pong(Shared generation) 0.00 23.78 0.000
Total-II 330.85 474.18 115.370
III UJVNL(Yamuna Share) 401.00 428.96 438.127
Stage-I,II&III , Kulhal
IV UPJVNL(YamunaShare)Khara. 65.00 74.41 71.902
V NHPC:
a) Bairasuil (12% Free Power). 43.00 34.99 41.105
b) Chamera-I:
12% Free power. 139.00 91.89 114.371
At cost. 70.00 75.56 70.488
c) Chamera-II:
12% Free power. 64.00 71.26 144.549
At cost. 51.00 63.02 64.100
d) Chamera-III
12% Free power. 0.00 0.00 25.078
At cost. 0.00 0.00 24.574
e) Salal-HPS. 32.09 32.02 32.447
f) Uri-HPS. 82.03 72.86 80.288
g) Tanakpur-HPS 14.00 15.35 14.444
h) Dhauli Ganga. 40.00 44.41 46.551
i) Tehri Stage-I Firm power. 87.00 125.46 104.496
j) Tehri-Stage-I Inirm power 0.00 17.67 0.000
k) Dulhasti. 0.00 9.62 15.412
l) Sewa 0.00 3.73 4.974
m) Koteshwar 0.00 0.00 35.728
Total V 622.12 657.84 818.605
VI NTPC:
a) Rihand-I STPS. 238.00 309.66 270.884
b) Rihand –II STPS. 245.00 297.05 315.207
c) Rihand-III STPS 0.00 0 36.929
d) Unchahar- I TPS. 50.00 55.93 56.289
e) Unchahar- II TPS. 86.00 106.20 107.083
f) Unchahar- III TPS. 54.00 72.08 68.275
g) Anta GPP. 74.08 93.00 77.08
h) Auriya GPP. 115.18 114.63 70.195
j) Dadri Gas GPP. 132.67 149.76 111.603
k) Dadri -II TPS. 0.00 0 53.874
l) Singrauli STPS. 0.00 103.90 124.065
m) Kahalgaon 134.02 125.18 134.337
n) Jhajjar/Badri-II 0.00 67.71 32.905
o) NAPP (Naroa-APS) 51.00 65.72 91.491
p) RAPP-5 85.00 145.65 151.469
Total VI 1264.95 1706.47 1701.686
VII Joint Sector:
Nathpa Jhakri.
Against Free Power. 303.20 144.39 386.461
Against Equity. 554.15 350.34 0.000
Against State of the region. 176.00 204.78 192.936
Total VII 1033.35 699.51 579.397
VIII Private Sector:
a. Malana
Free power. 49.43 55.87 49.401
b. Baspa.
Free power. 176.13 166.61 147.184
At cost. 1292.00 1221.83 1079.355
c. Patikari
Free power. 8.00 7.07 8.236
At cost. 61.00 51.83 0.000
d. Sarbari
Free power. 2.00 4.26 0.000
At cost. 15.00 31.27 0.000
e. Toss
Free power. 54.00 7.79 0.000
At cost. 10.00 44.16 0.000
f. ADHPL
Free power. 24.00 16.76 15.922
At cost. 9.00 0.00 0.000
g. Karcham Wangtu 0.00 79.00 77.352
h) Malana-II 0.00 0.00 3.147
i) Budhil 0.00 0.00 1.790
g. Mini Micros. 479.00 731.45 1048.401
Total VIII 2179.56 2417.9 2430.788
IX GO HP Share in HPSEBL Projects:-
Ghanvi. 7.20 8.30 8.4
Baner. 5.00 5.52 5.184
Gaj. 4.27 5.00 4.691
Larji. 79.82 83.46 78.133
Khauli. 4.99 6.02 5.639
Total IX 101.28 108.30 102.047
X Other Purchase:
a) HVPNL/HPGCL/HPPCL Bkg. / 365.00 0.00 0.000
PSEB Bkg.(Seller Bus)
b) BYPL Bkg. (Seller Bus) 0.00 67.94 7.185
c) BYPL Contra Bkg.(Seller Bus) 0.00 134.81 5.445
d) BRPL Bkg.(Seller Bus) 1.52 0.00 19.400
e) BRPL Contra Bkg(Seller Bus) 0.00 0.00 195.659
f) PSEB Contra Bkg.(Seller Bus) 143.70 0.00 0.000
g) HPGCL Contra Bkg (Seller Bus) 0.00 0.00 0.000
h) HPPC-Contra Bkg (Seller Bus) 0.00 224.36 0.000
j) UPPCL - Contra Banking. 160.00 0.00 86.183
k) HPPCL FWD Bkg. 0.00 0.00 240.300
l) HPPCLContra Bkg. 0.00 0.00 123.792
k) PSPCL FWD Bkg. 0.00 0.00 259.543
l) PPCL Contra Bkg. 0.00 0.00 232.950
m) Under UI. 356.00 230.71 211.571
n) Market Purchase 0.00 229.65 61.885
m) Un-allocated 377.00 0.00 0.000
n) 11KV Shanan Bassi line(PSPCL) 0.00 0.00 0.020
Total X 1403.22 887.47 1443.933
Total Purchases 4 7649.33 7813.20 8298.467
b) Losses on Purchase:
External losses @ 3.5 % 268.00 273.46 215.400
c) Net purchase: 7381.330 7539.740 8083.067
A. GENERATING STATIONS:
1 Larji. 138.000
2 Bhaba. 80.000
3 Bassi. 66.000
4 Giri. 60.000
5 Ghanvi. 11.400
6 Andhra. 16.950
7 Baner. 12.000
8 Khauli. 12.700
9 Gaj. 10.500
10 Binwa. 6.000
11 Thirot. 4.300
13 Gumma. 1.500
14 Holi. 3.000
15 Nogli 1.220
16 Rongtong 0.690
17 Sal-II 1.550
18 Chaba 1.500
19 Rukti 1.600
21 Killar 0.160
B. RECEIVING STATIONS/FEEDERS:
1 220 KV,S/Stn. Hamirpur (Matansidh)
i)220/132 KV,2x80/100 MVA 192.81
ii) 33/11KV,2x3.15 MVA 4.80
2 132KV S/Stn.Anu (Hamirpur)
i) 132/33KV,2x25/31.5MVA 58.00
ii) 33/11KV,2x5 MVA 9.70
3 132KV S/Stn.Dehan,
i)132/33KV,2x25/31.5 MVA 48.68
ii)33/11KV, 2x4 MVA 7.77
4 220 KV S/Stn. Jasoore
6 132KV S/Stn.Kandrori,
10 132KV S/Stn.Amb
12 66KV S/Stn.Golthai
i)66/11KV,1x6.3MVA 0.91
15 220/132KV S/Stn.Kangoo
16 132KV S/Stn.Barotiwala,
17 132KV S/Stn.Paonta
19 66KV S/Stn.Nalagarh
20 66KV S/Stn.Parwanoo
21 220KV S/Stn.Baddi
ii)220/33KV,1x25/31.5MVA 19.49
22 220KV S/Stn.Kunihar
23 220KV S/Stn.Kotla
24 132KV S/Stn.Solan
26 66KV S/Stn.Totu
30 66KV S/Stn.Kumarsain
32 132KV S/Stn.Darlaghat
33 66KV S/Stn.Sainj
38 66/11KV S/Stn.Davni
Max. Demand
Sr.No. Month
(in MW)
1 April,2012 1198
3 June,2012 1176
4 July,2012 1152
5 August,2012 1196
6 September,2012 1240
7 October,2012 1298
10 January,2013 1335
11 February,2013 1289
12 March,2013 1295
4 (****) Three Villages of Kinnaur District namely Up Mahal Forche (C. No. 1955400 Pooh), Samodayan (C.
No. 1964300 Pooh), DPF 73(C) C. No. 1993700 Pooh & Rasang (C. No.1987900 Nichar) having no
habitation are not technically justified for electrification.
TABLE-9
SCHEMEWISE STATUS IN RESPECT OF CEN(SI) P:SI CATEGORY SCHEMES ENDING MARCH 2013
( in lacs)
Sanctioned Amount Expenditure, Loan
ending Amount
S.No Name of Scheme Code No: HPSEB March,2013 drawn,
REC Share Total ending
Share
March,2013
1 2 3 4 5 6 7 8
(A) S.I. Schemes identified for closure.
1 SI Scheme in Thakurdawara 60337 150.770 49.937 200.707 201.394 135.693
2 Creation of 33/11 KV, S/Stn at 3200 366.750 40.750 407.500 104.740 280.610
Khaira under Operation Circle
Kangra.
7 Creation of One No 33/11 kV 100879 (old 060459) 322.880 35.660 358.740 248.552 120.947
2x1.6 MVA S/Stn at Thanakalan
under Operation Circle Una
8 Construction of additional 33 kV 3416 389.150 43.240 432.390 306.750 221.198
Line from Una( Rakkar) to
Tahliwala along with
Augmentation of33/11 KV S/Stn
from 2X6.3 MVA to 2x10 MVA
s/stn at Tahliwala under Operation
Circle Una.
9 Augmentation of 33 kV S/Stn at 3201 32.470 3.610 36.080 6.580 0.000
Haroli from 33/11 Kv,2x3.15 to
2x6.3 MVA under Operation Circle
Una .
10 Augmentation of 33/11 kV S/Stn. 3668 128.340 14.260 142.600 85.894 94.294
from 2x3.15 MVA to 2x6.3 MVA at
Bhaira in Una Distt.
11 Pumpsets energisation works in 3907 625.440 69.500 694.940 289.570 224.141
Operation Circle Una.
12 Replacement of old equipments 3911 241.260 26.810 268.070 118.656 71.280
(Switchgear) in 33 kV Substations
at Mehtpur, Bangana and Bhaira
under Operation Circle, Una
22 Scheme for procurement of 100901 (old 060460) 71.480 7.940 79.420 0.000 0.000
ACSR/AAAC conductor for
repalcement of G.I. wire existing in
distribution system (H.T & L.T)
under North Zone
23 Augmentation of 33/11 KV S/Stn 3666 96.710 10.740 107.450 115.000 41.170
from 2x1.6 MVA to 2x3.15 MVA
at Shillai in Sirmour Distt.
24 Pumpsets energisation works in 3440 298.910 33.210 332.120 313.480 284.550
Paonta Sahib block of Sirmour
Distt.
25 Creation of 1 No. 33KV, S/Stn. at 3597 367.600 40.840 408.440 14.060 7.560
Arki in Operation Circle Solan.
26 Creation of 2x3.15 MVA, 33KV 3662 336.220 37.360 373.580 80.610 65.470
S/Stn. (un-manned) at Oachghat in
Solan Distt.
27 Creation of 1x3.15 MVA, 3685 412.610 45.840 458.450 59.830 0.000
33/11kV (un-manned) S/Stn at
Khairi under Electrical Division
Rajgarh in Sirmour Distt.
28 Augmentation of 1x3.15 3688 148.700 16.520 165.220 40.360 0.000
MVA,33/11 KV to 2x3.15 MVA,
33/11 kV Sub-Station at Puruwala,
under Elect. Division, HPSEB,
Paonta-Sahib in Sirmour Distt.
51 Aug of 2x1.6 MVA to 2x3.15 MVA 4566 122.520 13.620 136.140 898.567 18.120
33/11KV Sub-Station at Sarahan in
Sirmour Scheme
52 Augmentation of 33/11 KV S/Stn. 5368 129.280 14.440 144.420 0.000 0.000
at Bhuntar from 2x4 MVA to
2x6.3 MVA in Distt. Kullu of HP
under P:SI (distribution) category.
53 Creation of 13.29 km, 33 KV line 6106 129.630 14.400 144.030 0.000 0.000
between Darkata and Lunj in
Kangra Distt.
54 Aug of 33/11 kV S/Stn BADUKHAR 6175 117.820 13.090 130.910 0.000 0.000
from 2x2.5 MVA to 2x6.3 MVA
capacity in Kangra Distt.
60 Rep. of over head conductor of 6178 89.150 8.910 89.150 0.000 0.000
HT/LT Lines with AB Cable in MC
area of Shri Naina Devi in Bilaspur
Distt.
61 Construction of 33/11 KV 2x1.6 6181 489.110 54.350 543.450 0.000 0.000
MVA S/stn. Karsog in Mandi
District.
Total B 61 Nos. 13807.350 1533.030 15332.270 4724.431 3303.885
(C) Ongoing GSC Schemes.
1 Scheme for release of GSC 5703 3915.100 435.010 4350.110 0.000 613.700
(General Service Connections) in
Kangra Circle of HPSEBL in HP
under P:IE category scheme
2 Scheme for release of GSC 5701 2075.950 230.660 2306.610 0.000 332.660
(General Service Connections) in
Dalhousie Circle of HPSEBL in HP
under P:IE category scheme
3 Scheme for release of GSC 5705 1375.710 152.860 1528.570 0.000 218.060
(General Service Connections) in
Una Circle of HPSEBL in HP under
P:IE category scheme
4 Scheme for release of GSC 5700 1966.750 218.530 2185.280 0.000 467.440
(General Service Connections) in
Shimla Circle of HPSEBL in HP
under P:IE category scheme
5 Scheme for release of GSC 5699 1859.810 206.640 2066.450 0.000 215.260
(General Service Connections) in
Nahan Circle of HPSEBL in HP
under P:IE category scheme
6 Scheme for release of GSC 5695 2711.420 301.270 3012.690 0.000 755.490
(General Service Connections) in
Solan Circle of HPSEBL in HP under
P:IE category scheme
7 Scheme for release of GSC 5704 742.390 82.490 824.880 0.000 300.490
(General Service Connections) in
Mandi Circle of HPSEBL in HP
under P:IE category scheme
8 Scheme for release of GSC 5707 856.620 95.180 951.800 0.000 250.980
(General Service Connections) in
Kullu Circle of HPSEBL in HP under
P:IE category scheme
9 Scheme for release of GSC 5702 671.230 74.590 745.820 0.000 260.360
(General Service Connections) in
Hamirpur Circle of HPSEBL in HP
under P:IE category scheme
10 Scheme for release of GSC 5706 719.120 79.900 799.020 0.000 457.310
(General Service Connections) in
Bilaspur Circle of HPSEBL in HP
under P:IE category scheme
11 Scheme for release of GSC 6524 1607.570 178.620 1786.190 0.000 0.000
(General Service Connections) in
Rampur Circle of HPSEBL in HP
under P:IE category scheme
Scheme for release of GSC 6525 1203.030 133.670 1336.700 0.000 0.000
(General Service Connections) in
Rohru Circle of HPSEBL in HP
12 under P:IE category scheme
12 Nos. 19704.700 2189.420 21894.120 0.000 3871.750
Total C Total A+B+C 81Nos. 34893.280 3896.668 38799.838 6222.172 8358.093
Total schemes closed 35 Nos. 5384.652 2226.396 7611.148 5503.066 3703.554
Grand Total 116 Nos. 40277.932 6123.064 46410.986 11725.238 12061.647
TABLE-10.
CONSUMERS SERVED(NOS).
Sr.No. Category of Total number of consumers %age to Total increase %age increase
Consumers total in number of in number of
As on As on number of consumers consumers
31.03.2012. 31.03.2013. consumers during 2012- during 2012-
as on 13. 13.
31.03.2013.
4 Industrial:
4 Industrial:
4 Industrial:
i)Small & Medium
195.682 2.86 206.168 2.85
Power.
ii) Large Suply. 4100.778 59.93 4170.984 57.74
2 Bilaspur. 51 51 35 0
4 Kinnaur. 71 71 28 0
7 Lahaul-Spiti. 2 2 3 0
10 Kangra. 43 43 34 0
11 Hamirpur. 12 12 12 0
12 Una. 45 45 0 0
Total: 4182 4047 614 135
Table-14.
A SOURCE OF INCOME
Amount
Percentage
( in Lac)
1 Domestic 55,100.71 13.17
B SOURCE OF UTILISATION
29 Parwanoo
66/11 2x20
30 Palampur(Dehan) i)132/33 2x25/31.5
ii)33/11 2x4
31 Rohru(Samoli)
66/22 3x5.33+1x10
32 Sansarpur
66/11 2x10
33 Solan i)132/66 1x25/31.5
ii)132/33 3x16.67
34 Sungra(Nathpa)
66/22 1x10+1x20
35 Sainj
66/11 2x6.3
36 Totu i)66/11 3x6.3
ii)66/15 1x4
37 Una(Rakkar) i)132/33 2x25/31.5
ii)66/33 2x10
iii)66/11 1x6.3
iv)33/11 2x6.3
(. in lacs)
Loan amount drawn Expenditure incurred
Loan amount Upto During Total Upto During IDC
Sr.No. Name of Scheme Code No. Total
sanctioned March 2012-13 March 2012-13
2012 2012
1 2 3 4 5 6 7 8 9 10 11
ON GOING SCHEMES:
A) Chief Engineer (OP) North:
Dalhousie Circle:
1 RE of Tehsil Nurpur,
Indora and Jawali 060403 410.540 345.062 0 345.062 405.910 0 266.920 672.830
Total (A):
1No 410.540 345.062 0.000 345.062 405.910 0.000 266.920 672.830
Total (B): 1 No. 361.260 275.015 0.000 275.015 223.020 0.000 164.165 387.185
C) Chief Engineer (OP) South:
Shimla Circle:
1 RE of Tehsil Theog and
Chopal 060419 166.240 84.519 0 84.519 29.642 77.756 93.600 200.998
1 RE of Tehsil
Rajgarh,Panjotha,
060345 204.402 153.759 0 153.759 133.210 0 44.557 177.767
Nohra and Renuka.
2 RE of Tehsil Paonta
and Kamaru 060374 239.400 115.872 0 115.872 87.913 0 45.018 132.931
3 RE of Tehsil Pachhad
and Kandaghat 060384 64.600 38.951 0 38.951 28.246 0 3.390 31.636
5 RE of Tehsil Shillai
060414 27.350 16.903 0 16.903 22.995 0 10.497 33.492
6 RE of Tehsil Pachhad
& Dadahu 060438 118.340 23.668 0 23.668 6.193 0 16.196 22.389
Total: 7 Nos: 826.564 475.985 0.000 475.985 417.872 0.000 190.526 608.398
Sub Total (C): 9 Nos 1256.104 641.987 0.000 641.987 568.569 0.000 488.928 1057.487
Grand Total A+B+C: 11 Nos. 2027.904 1262.069 0.000 1262.069 1197.493 0.000 920.018 2117.511
TABLE-19.
STATEMENT OF PLAN ALLOCATION FOR THE YEAR 2012-13
( in Lacs)
Sr.No. Name of Scheme Total CE CE (ES) CE(G) CE(OP) CE (OP) CE(OP) CE (SO&P) MD
Allocation CE (PCA) South North C.Zone BVPCL
(I&P)
1 2 3 4 5 6 7 8 9 10 11 12
STATE PLAN
I GENERATION
PROJECTS:UNDER HPSEB
PROJECTS
IA
a Bhaba Aug. P.H. 179.24 89.24 - - 90.00 - - - - -
b Ghanvi Stage-II 2415.00 1834.00 - - 581.00 - - - - -
c Khauli-II 122.50 122.50 - - - - - - - -
Integrated Kashang
a 0 - - - - - - - - -
HEP
b Sainj HEP 0 - - - - - - - - -
c Sawra Kuddu HEP 0 - - - - - - - - -
Shongtong Karcham
d 0 - - - - - - - - -
HEP
Total (IC) 0 0 - - 0 - - - - 0
COMPLETED
II 1291.52 91.52 - - 1200.00 - - - - -
PROJECTS
R&M OF POWER HOUSES
III 410.00 - - - 410.00 - - - - -
MINOR CAPITAL
IV. 550.00 100.00 - - 450.00 - - - - -
WORKS INDIVISIBLE
V BADP 13TH FINANCE
COMMISSION GRANTS 488.10 - - - 488.10 - - - - -
(Gen.)
VI SURVEY &
INVESTIGATION. 961.20 - 961.20 - - - - - - -
VII EHV DISTRIBUTION
SYSTEM 66KV & ABOVE 14839.00 - - 14839.00 - - - - - -
VIII ALDC, SYSTEM
OPERATION,
COMMUNICATION SYSTEM 150.00 - - - - - - - 150.00 -
1 2 3 4 5 6 7 8 9 10 11
STATE PLAN
I GENERATION:
IA HPSEBL Projects
c Khauli-II - - - - - - - - -
b Sainj HEP 0 - - - - - - - -
c Sawra Kuddu HEP 0 - - - - - - - -
d Shongtong Karcham HEP 0 - - - - - - - -
Total (IC) 0 0 0 0 0 0 0 0 0
R&M OF POWER
III HOUSES 369.00 - - - 369.00 - - - -
MINOR CAPITAL
IV. - - - - - - - -
WORKS INDIVISIBLE
V BADP 13TH FINANCE
COMMISSION GRANTS 488.10 - - - 488.10 - - - -
(Gen.)
VI SURVEY &
INVESTIGATION. 0.00 - - - - - - - -
XII CENTRALLY
SPONSORED SCHEMES
5
6801-01-800-02-SOON RGGVY REC Loan (Plan) 0.00 0.00
1
TRANSMISSION LINES
Km
2
ENERGY GENERATED
MU
ENERGY GENERATED
3
SCHEDULE CASTE HOUSES ELECTRIFIED
NUMBER
ELECTRIFIED
4
SALE OF ENERGY
MU
5
PER CAPITA CONSUMPTION
KWh
CONSUMPTION
6
REVENUE INCOME AND EXPENDITURE
` in Crore
7
HAMLETS & PUMPSETS/TUBEWELLS ENERGISED
NUMBER
HAMLETS PUMPSETS
8
CATEGORYWISE EMPLOYMENT (SANCTIONED POST)
NUMBER
9
0.96
0.04 0.01
0.25
0.21
1.65 2.35
0.65 0.36
0.19
1.06 11.15 6.28 22.41
1.48
5.69
84.67 60.59
0.38 -0.30
1.54 0.12
0.20 0.00
0.90 8.16
3.25 13.17 4.43
16.62 5.21
6.66
29.09 56.40
50.62
2.35
1.20