Академический Документы
Профессиональный Документы
Культура Документы
: CBLT-TPI-00F-186-12623 AJN :
Client: COBALT INTERNATIONAL ENERGY / TOTAL P O: N/A
Location: ANGOLA LOGISTICS BASE Date / Period
Manufacturer/s: SCHLUMBERGER/HALLIBURTON
Item Inspected
Sl. No. Item Identification No. Description Qty (Unit)
Document verification has been carried out prior to starting the job, this includes the following:
A suction pipe string was assembled using 3” pipe, connected to the pump inlet using a 3” weco union.
The pipe was then connected to a pre-filled surge tank with volume indicator showing levels, the flow
Is controlled by a 3”, 300# ball valve.
A discharge pipe string was assembled using 3” pipe, connected to the discharge line using a 3” weco
Union. The flow is controlled by a 3”, 3 way ball valve fitted to the unit diverting to the PSV. Back
pressure is controlled by a 3” ball valve located on the discharge surge tank.
In order to function test the pump at maximum working pressure a back pressure was established by
Closing the inlet valve on the discharge surge tank. This is to test the PSV.
Working pressure is to be monitored using the calibrated Bourdon pressure gauge, this gauge is a
permanent fitting.
The following topics are covered in the procedure as per attached checklist:
The unit was operated at ZERO pressure for 3 minutes, and again at 20 bar for 3 minutes. Back pressure to be
Simulated in order to activate and test PSV.
RESULT
All aspects of the attached procedure have been strictly followed, and the unit is of good working order. The serial number
of the bourdon pressure gauge was not visible/marked. Schlumberger was advised that this would need to be replaced
with a calibrated unit to conform with Cobalt requirements. The gauge was changed out and tested at min/max working
pressure.
Bourdon Gauge
04 QA File / attached herein (See Correction note 1) YES
Calibration
Pressure Equipment
12 QA File / Attached herein YES
Directive - DOC
Safety of Machinery
13 QA File / Attached herein YES
Directive - DOC
Surface Testing –
16 Surface Testing Maintenance Office YES
Pressure Testing Manual
Pressure Recorder
17 QA File / Attached herein YES
Calibration
NON CONFORMANCE / ACTION REQUESTED DATE REQUESTED / DATE RECTIFIED / CLOSED OUT
Bourdon pressure
gauge – no Replace with a traceable
identification number
1 Calibrated gauge. 22 June 2012 22 June 2012
or calibration
certificate. No auditable Record in the QA file
test/inspection history
Non-Conformance:
1) Skid unit has not proof load test certification and is out of compliance
Recommendation – The skid unit is to be proof load tested by a third party as per BS7072 – offshore Cargo
Carrying Units
2) No NDT reports available, it is required that lifting points on BS7072 units undergo an MPI
examination within a 24 month period.
Recommendation – The lifting points of BS7072 units are to undergo an MPI examination every 12 months by
a third party.
3) SI2307 certification is out of compliance. The skid unit is to be certified every 6 months by a third
party.
4) SI2307 certification is out of compliance. The lifting accessories i.e the lifting set, inclusive of 4 leg
sling and 4 x shackles are to be certified every 6 months by a third party
Recommendation – The lifting accessories inclusive of quad sling and shackles are to undergo a visual
examination as per SI2307:LOLER1998
NOTE - All of the above should be carried out at the same time by a specialist lifting
equipment inspection company