L&T-STEC JV MUMBAI

Mumbai Metro Line 3


Package No: UGC 01

SCG – Strut Forces Summary


L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

1. STRUT FORCES FOR SECANT PILE TYPE-PG01


1.1 Normal Case
Run ID. CG_Secant_piles_PG01_R1 | Sheet No.
Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Strut forces at each stage (horizontal components)

Stage --- Strut no. 1 --- --- Strut no. 2 --- --- Strut no. 3 ---
no. at elev. 2.80 at elev.-2.25 at elev.-5.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
7 3.08 27.69 --- --- --- ---
8 172.47 1552.21 --- --- --- ---
10 169.44 1524.93 21.98 197.83 --- ---
11 142.67 1284.06 346.31 3116.78 --- ---
12 154.46 1390.13 470.46 4234.12 --- ---
13 184.80 1663.19 186.56 1679.07 650.56 845.72
14 184.23 1658.06 189.93 1709.38 658.03 855.44
15 172.63 1553.65 252.25 2270.26 758.64 986.24
16 187.87 1690.81 184.04 1656.34 630.70 819.91
17 187.89 1691.04 184.94 1664.50 632.31 822.01
18 186.36 1677.25 191.56 1724.03 654.17 850.42
19 188.50 1696.53 185.59 1670.27 625.51 813.16
20 188.55 1696.95 186.23 1676.08 626.10 813.93
21 189.25 1703.27 190.58 1715.25 634.53 824.89
22 188.98 1700.82 189.30 1703.67 632.33 822.03
23 189.00 1700.96 189.74 1707.67 632.75 822.57
24 190.68 1716.15 202.06 1818.51 644.06 837.28
25 190.47 1714.25 200.38 1803.40 642.64 835.43
26 190.47 1714.26 200.59 1805.30 642.85 835.70
27 191.19 1720.67 208.09 1872.85 649.41 844.23
30 191.24 1721.13 208.37 1875.31 649.65 844.54
32 191.61 1724.48 209.61 1886.50 652.84 848.69
34 188.69 1698.20 218.07 1962.59 697.13 906.26
36 177.58 1598.18 275.88 2482.95 782.90 1017.77
38 163.71 1473.37 430.36 3873.25 --- ---
40 164.60 1481.43 416.47 3748.25 --- ---
41 201.67 1815.02 --- --- --- ---
42 184.43 1659.84 --- --- --- ---

Run ID. CG_Secant_piles_PG01_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no. 4 --- --- Strut no. 5 --- --- Strut no. 6 ---
no. at elev.-8.50 at elev.-11.50 at elev.-14.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
16 650.56 845.72 --- --- --- ---
17 656.63 853.62 --- --- --- ---
18 736.28 957.16 --- --- --- ---
19 621.07 807.39 650.56 845.72 --- ---
20 622.62 809.40 655.19 851.75 --- ---
21 662.53 861.28 797.51 1036.76 --- ---
22 651.65 847.14 754.96 981.44 325.28 845.72
23 652.64 848.43 757.33 984.53 328.47 854.01
24 688.25 894.73 891.81 1159.35 541.34 1407.47
25 684.38 889.69 877.99 1141.39 517.29 1344.97
26 684.88 890.34 879.15 1142.90 518.68 1348.58

Page 2/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

27 700.59 910.77 922.76 1199.59 586.00 1523.60


30 701.48 911.93 926.90 1204.97 593.30 1542.58
32 719.62 935.50 999.03 1298.74 --- ---
34 903.52 1174.57 --- --- --- ---

Run ID. CG_Secant_piles_PG01_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no. 7 --- --- Strut no. 8 --- --- Strut no. 9 ---
no. at elev.-17.50 at elev.-19.64 at elev.-10.06
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
25 325.28 845.72 --- --- --- ---
26 328.87 855.07 --- --- --- ---
27 556.76 1447.58 --- --- --- ---
30 --- --- slack slack --- ---
32 --- --- slack slack --- ---
34 --- --- slack slack --- ---
36 --- --- slack slack 799.17 799.17
38 --- --- slack slack 935.17 935.17
40 --- --- slack slack 590.05 590.05
41 --- --- slack slack 574.18 574.18
42 --- --- slack slack 334.88 334.88
43 --- --- slack slack 314.97 314.97

Run ID. CG_Secant_piles_PG01_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no.10 --- --- Strut no.11 --- --- Strut no.12 ---
no. at elev.-3.51 at elev.-17.80 at elev.-14.80
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
30 --- --- 557.71 557.71 --- ---
32 --- --- 870.15 870.15 268.27 268.27
34 --- --- 1068.55 1068.55 576.48 576.48
36 --- --- 1060.04 1060.04 541.81 541.81
38 --- --- 1062.28 1062.28 532.13 532.13
40 slack slack 230.32 230.32 419.64 419.64
41 430.98 430.98 230.35 230.35 420.36 420.36
42 210.31 210.31 slack slack 366.22 366.22
43 331.30 331.30 slack slack 361.56 361.56

Run ID. CG_Secant_piles_PG01_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no.13 --- --- Strut no.15 ---


no. at elev.-11.80 at elev.-5.80
kN/m run kN/strut kN/m run kN/strut
34 186.39 186.39 --- ---
36 168.36 168.36 --- ---
38 161.95 161.95 477.37 477.37
40 143.36 143.36 426.15 426.15
41 143.86 143.86 386.46 386.46
42 135.28 135.28 338.00 338.00
43 134.91 134.91 302.74 302.74

Page 3/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

1.2 1st Level OSF


Run ID. CG_Secant_piles_PG01_OSF-1_R1 | Sheet No.
Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Strut forces at each stage (horizontal components)

Stage --- Strut no. 1 --- --- Strut no. 2 --- --- Strut no. 3 ---
no. at elev. 2.80 at elev.-2.25 at elev.-5.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
7 3.14 28.29 --- --- --- ---
8 171.52 1543.65 --- --- --- ---
10 168.55 1516.92 21.94 197.43 --- ---
11 142.09 1278.83 348.42 3135.81 --- ---
12 153.91 1385.23 470.63 4235.63 --- ---
13 184.40 1659.57 186.73 1680.59 650.56 845.72
14 183.83 1654.44 190.10 1710.88 658.03 855.44
15 172.30 1550.67 252.04 2268.39 758.14 985.58
16 187.52 1687.66 184.04 1656.34 630.28 819.36
17 187.54 1687.90 184.94 1664.49 631.89 821.45
18 186.00 1674.03 191.61 1724.45 653.75 849.87
19 188.13 1693.16 185.72 1671.45 625.15 812.70
20 188.18 1693.58 186.36 1677.26 625.74 813.47
21 188.89 1700.00 190.69 1716.21 634.13 824.37
22 188.61 1697.50 189.41 1704.65 631.95 821.53
23 188.63 1697.64 189.85 1708.66 632.37 822.08
24 190.30 1712.74 201.98 1817.83 643.49 836.53
25 190.09 1710.83 200.30 1802.69 642.06 834.68
26 190.09 1710.84 200.51 1804.59 642.27 834.95
27 190.81 1717.29 208.03 1872.25 648.84 843.49
29 --- --- 361.16 3250.46 630.12 819.16

Run ID. CG_Secant_piles_PG01_OSF-1_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no. 4 --- --- Strut no. 5 --- --- Strut no. 6 ---
no. at elev.-8.50 at elev.-11.50 at elev.-14.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
16 650.56 845.72 --- --- --- ---
17 656.64 853.63 --- --- --- ---
18 735.88 956.64 --- --- --- ---
19 620.60 806.78 650.56 845.72 --- ---
20 622.14 808.79 655.19 851.74 --- ---
21 662.02 860.63 797.50 1036.75 --- ---
22 651.19 846.55 754.99 981.48 325.28 845.72
23 652.18 847.84 757.36 984.57 328.46 854.01
24 687.26 893.44 890.15 1157.19 538.94 1401.24
25 683.40 888.41 876.38 1139.30 514.91 1338.76
26 683.90 889.07 877.54 1140.80 516.30 1342.37
27 699.62 909.51 921.09 1197.41 583.52 1517.16
29 687.85 894.21 919.38 1195.19 584.23 1519.00

Page 4/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

Run ID. CG_Secant_piles_PG01_OSF-1_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no. 7 --- --- Strut no. 8 ---


no. at elev.-17.50 at elev. 2.82
kN/m run kN/strut kN/m run kN/strut
25 325.28 845.72 --- ---
26 328.87 855.06 --- ---
27 556.91 1447.97 --- ---
29 557.63 1449.83 99.24 893.16

Page 5/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

1.3 2nd Level OSF


Run ID. CG_Secant_piles_PG01_OSF-2_R1 | Sheet No.
Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Strut forces at each stage (horizontal components)

Stage --- Strut no. 1 --- --- Strut no. 2 --- --- Strut no. 3 ---
no. at elev. 2.80 at elev.-2.25 at elev.-5.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
7 3.14 28.25 --- --- --- ---
8 171.41 1542.69 --- --- --- ---
10 168.44 1515.95 21.94 197.43 --- ---
11 141.97 1277.70 348.32 3134.88 --- ---
12 153.80 1384.21 470.71 4236.38 --- ---
13 184.28 1658.54 186.81 1681.28 650.56 845.72
14 183.71 1653.42 190.18 1711.58 658.03 855.44
15 172.18 1549.62 252.13 2269.19 758.15 985.59
16 187.40 1686.62 184.12 1657.10 630.29 819.38
17 187.43 1686.86 185.03 1665.25 631.90 821.47
18 185.89 1672.99 191.69 1725.22 653.76 849.89
19 188.01 1692.12 185.80 1672.21 625.16 812.71
20 188.06 1692.54 186.45 1678.01 625.76 813.48
21 188.77 1698.95 190.77 1716.97 634.14 824.39
22 188.50 1696.46 189.49 1705.41 631.96 821.55
23 188.51 1696.60 189.94 1709.42 632.38 822.10
24 190.19 1711.69 202.07 1818.60 643.50 836.55
25 189.98 1709.78 200.38 1803.45 642.08 834.70
26 189.98 1709.79 200.59 1805.35 642.29 834.97
27 190.69 1716.24 208.11 1873.03 648.85 843.51
29 228.12 2053.04 --- --- 704.04 915.25

Run ID. CG_Secant_piles_PG01_OSF-2_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no. 4 --- --- Strut no. 5 --- --- Strut no. 6 ---
no. at elev.-8.50 at elev.-11.50 at elev.-14.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
16 650.56 845.72 --- --- --- ---
17 656.64 853.63 --- --- --- ---
18 735.88 956.65 --- --- --- ---
19 620.60 806.79 650.56 845.72 --- ---
20 622.15 808.79 655.19 851.74 --- ---
21 662.03 860.64 797.50 1036.75 --- ---
22 651.19 846.55 754.99 981.49 325.28 845.72
23 652.19 847.84 757.37 984.58 328.46 854.01
24 687.27 893.45 890.15 1157.19 538.94 1401.23
25 683.40 888.42 876.38 1139.30 514.91 1338.76
26 683.91 889.08 877.54 1140.80 516.29 1342.37
27 699.63 909.51 921.09 1197.41 583.52 1517.16
29 714.98 929.47 922.88 1199.74 584.19 1518.90

Run ID. CG_Secant_piles_PG01_OSF-2_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no. 7 --- --- Strut no. 8 ---


no. at elev.-17.50 at elev.-2.27

Page 6/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

kN/m run kN/strut kN/m run kN/strut


25 325.28 845.72 --- ---
26 328.87 855.06 --- ---
27 556.91 1447.96 --- ---
29 558.09 1451.04 44.91 404.16

Page 7/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

1.4 3rd Level OSF


Run ID. CG_Secant_piles_PG01_OAF-3_R1 | Sheet No.
Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Strut forces at each stage (horizontal components)

Stage --- Strut no. 1 --- --- Strut no. 2 --- --- Strut no. 3 ---
no. at elev. 2.80 at elev.-2.25 at elev.-5.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
7 3.14 28.28 --- --- --- ---
8 173.92 1565.31 --- --- --- ---
10 170.95 1538.57 21.95 197.54 --- ---
11 144.40 1299.57 349.97 3149.70 --- ---
12 155.17 1396.50 469.34 4224.05 --- ---
13 185.55 1669.93 185.39 1668.47 650.56 845.72
14 184.98 1664.81 188.75 1698.76 658.03 855.44
15 173.42 1560.76 250.87 2257.85 758.40 985.92
16 188.63 1697.68 182.86 1645.77 630.55 819.71
17 188.66 1697.92 183.77 1653.91 632.16 821.80
18 187.11 1684.03 190.44 1713.95 654.05 850.26
19 189.24 1703.15 184.55 1660.95 625.45 813.09
20 189.29 1703.57 185.20 1666.76 626.04 813.86
21 190.00 1709.98 189.52 1705.70 634.44 824.77
22 189.72 1707.49 188.24 1694.15 632.25 821.93
23 189.74 1707.63 188.68 1698.15 632.67 822.48
24 191.41 1722.72 200.81 1807.28 643.79 836.93
25 191.20 1720.81 199.13 1792.14 642.37 835.08
26 191.20 1720.82 199.34 1794.04 642.58 835.35
27 191.92 1727.27 206.85 1861.69 649.15 843.89
29 166.80 1501.16 451.79 4066.15 --- ---

Run ID. CG_Secant_piles_PG01_OAF-3_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no. 4 --- --- Strut no. 5 --- --- Strut no. 6 ---
no. at elev.-8.50 at elev.-11.50 at elev.-14.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
16 650.56 845.72 --- --- --- ---
17 656.64 853.63 --- --- --- ---
18 735.98 956.78 --- --- --- ---
19 620.71 806.92 650.56 845.72 --- ---
20 622.25 808.93 655.19 851.74 --- ---
21 662.15 860.79 797.55 1036.82 --- ---
22 651.31 846.70 755.04 981.55 325.28 845.72
23 652.30 847.99 757.41 984.64 328.46 854.01
24 687.38 893.59 890.17 1157.22 538.90 1401.13
25 683.51 888.56 876.41 1139.33 514.87 1338.66
26 684.02 889.22 877.56 1140.83 516.26 1342.27
27 699.73 909.65 921.10 1197.43 583.47 1517.03
29 827.97 1076.36 958.95 1246.64 588.08 1529.01

Run ID. CG_Secant_piles_PG01_OAF-3_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no. 7 --- --- Strut no. 8 ---


no. at elev.-17.50 at elev.-5.52

Page 8/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

kN/m run kN/strut kN/m run kN/strut


25 325.28 845.72 --- ---
26 328.87 855.06 --- ---
27 556.88 1447.88 --- ---
29 561.34 1459.49 111.13 144.46

Page 9/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

1.5 4th Level OSF


Run ID. CG_Secant_piles_PG01_OAF-4_R1 | Sheet No.
Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Strut forces at each stage (horizontal components)

Stage --- Strut no. 1 --- --- Strut no. 2 --- --- Strut no. 3 ---
no. at elev. 2.80 at elev.-2.25 at elev.-5.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
7 3.14 28.29 --- --- --- ---
8 171.52 1543.70 --- --- --- ---
10 168.55 1516.98 21.94 197.42 --- ---
11 142.10 1278.88 348.43 3135.89 --- ---
12 153.92 1385.28 470.64 4235.72 --- ---
13 184.40 1659.63 186.74 1680.63 650.56 845.72
14 183.83 1654.51 190.10 1710.92 658.03 855.44
15 172.30 1550.71 252.06 2268.55 758.16 985.61
16 187.52 1687.68 184.05 1656.45 630.31 819.40
17 187.55 1687.92 184.96 1664.60 631.92 821.49
18 186.01 1674.05 191.62 1724.57 653.78 849.91
19 188.13 1693.18 185.73 1671.56 625.18 812.74
20 188.18 1693.60 186.37 1677.37 625.78 813.51
21 188.89 1700.01 190.70 1716.30 634.16 824.41
22 188.61 1697.52 189.42 1704.75 631.98 821.57
23 188.63 1697.66 189.86 1708.75 632.40 822.12
24 190.31 1712.76 201.99 1817.90 643.52 836.57
25 190.09 1710.85 200.31 1802.76 642.09 834.72
26 190.10 1710.86 200.52 1804.66 642.30 834.99
27 190.81 1717.31 208.04 1872.32 648.87 843.53
29 177.38 1596.41 269.67 2427.00 764.60 993.98

Run ID. CG_Secant_piles_PG01_OAF-4_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no. 4 --- --- Strut no. 5 --- --- Strut no. 6 ---
no. at elev.-8.50 at elev.-11.50 at elev.-14.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
16 650.56 845.72 --- --- --- ---
17 656.64 853.63 --- --- --- ---
18 735.88 956.64 --- --- --- ---
19 620.61 806.79 650.56 845.72 --- ---
20 622.15 808.80 655.19 851.74 --- ---
21 662.03 860.64 797.49 1036.74 --- ---
22 651.19 846.55 754.98 981.47 325.28 845.72
23 652.19 847.84 757.35 984.56 328.46 854.01
24 687.27 893.45 890.13 1157.17 538.92 1401.20
25 683.40 888.42 876.36 1139.27 514.90 1338.73
26 683.91 889.08 877.52 1140.78 516.28 1342.34
27 699.63 909.52 921.07 1197.39 583.51 1517.12
29 --- --- 1061.15 1379.50 603.35 1568.71

Page
10/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

1.6 5th Level OSF


Run ID. CG_Secant_piles_PG01_OAF-5_R1 | Sheet No.
Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Strut forces at each stage (horizontal components)

Stage --- Strut no. 1 --- --- Strut no. 2 --- --- Strut no. 3 ---
no. at elev. 2.80 at elev.-2.25 at elev.-5.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
7 3.14 28.29 --- --- --- ---
8 171.52 1543.70 --- --- --- ---
10 168.55 1516.98 21.94 197.43 --- ---
11 142.10 1278.88 348.42 3135.82 --- ---
12 153.92 1385.28 470.63 4235.65 --- ---
13 184.40 1659.63 186.73 1680.60 650.56 845.72
14 183.83 1654.51 190.10 1710.89 658.03 855.44
15 172.30 1550.74 252.04 2268.39 758.14 985.58
16 187.53 1687.73 184.04 1656.34 630.27 819.35
17 187.55 1687.97 184.94 1664.49 631.88 821.45
18 186.01 1674.11 191.60 1724.42 653.74 849.86
19 188.14 1693.24 185.71 1671.40 625.14 812.68
20 188.18 1693.66 186.36 1677.21 625.73 813.45
21 188.90 1700.07 190.68 1716.16 634.12 824.36
22 188.62 1697.58 189.40 1704.60 631.94 821.52
23 188.64 1697.72 189.85 1708.61 632.36 822.07
24 190.31 1712.82 201.97 1817.76 643.47 836.52
25 190.10 1710.91 200.29 1802.63 642.05 834.67
26 190.10 1710.92 200.50 1804.52 642.26 834.94
27 190.82 1717.37 208.02 1872.19 648.83 843.48
29 188.59 1697.27 216.64 1949.76 687.99 894.38

Run ID. CG_Secant_piles_PG01_OAF-5_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no. 4 --- --- Strut no. 5 --- --- Strut no. 6 ---
no. at elev.-8.50 at elev.-11.50 at elev.-14.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
16 650.56 845.72 --- --- --- ---
17 656.64 853.63 --- --- --- ---
18 735.87 956.63 --- --- --- ---
19 620.59 806.77 650.56 845.72 --- ---
20 622.14 808.78 655.19 851.74 --- ---
21 662.02 860.63 797.51 1036.76 --- ---
22 651.18 846.54 755.00 981.49 325.28 845.72
23 652.18 847.83 757.37 984.58 328.46 854.01
24 687.26 893.43 890.15 1157.20 538.92 1401.20
25 683.39 888.41 876.39 1139.30 514.90 1338.73
26 683.89 889.06 877.54 1140.81 516.28 1342.34
27 699.61 909.50 921.09 1197.42 583.51 1517.12
29 861.64 1120.14 --- --- 689.88 1793.69

Run ID. CG_Secant_piles_PG01_OAF-5_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no. 7 --- --- Strut no. 8 ---

Page
11/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

no. at elev.-17.50 at elev.-11.52


kN/m run kN/strut kN/m run kN/strut
25 325.28 845.72 --- ---
26 328.87 855.06 --- ---
27 556.90 1447.94 --- ---
29 610.52 1587.36 196.45 255.38

Page
12/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

1.7 6th Level OSF


Run ID. CG_Secant_piles_PG01_OAF-6_R1 | Sheet No.
Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Strut forces at each stage (horizontal components)

Stage --- Strut no. 1 --- --- Strut no. 2 --- --- Strut no. 3 ---
no. at elev. 2.80 at elev.-2.25 at elev.-5.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
7 3.14 28.29 --- --- --- ---
8 171.52 1543.70 --- --- --- ---
10 168.55 1516.98 21.94 197.43 --- ---
11 142.10 1278.88 348.43 3135.84 --- ---
12 153.92 1385.28 470.63 4235.66 --- ---
13 184.40 1659.62 186.74 1680.62 650.56 845.72
14 183.83 1654.50 190.10 1710.91 658.03 855.45
15 172.30 1550.73 252.05 2268.42 758.14 985.58
16 187.52 1687.72 184.04 1656.38 630.28 819.36
17 187.55 1687.96 184.95 1664.53 631.89 821.45
18 186.01 1674.12 191.65 1724.87 653.85 850.01
19 188.13 1693.19 185.76 1671.83 625.26 812.83
20 188.18 1693.61 186.40 1677.64 625.85 813.61
21 188.89 1699.98 190.71 1716.41 634.21 824.48
22 188.61 1697.49 189.43 1704.85 632.03 821.64
23 188.63 1697.63 189.87 1708.85 632.45 822.18
24 190.30 1712.72 202.00 1817.98 643.56 836.63
25 190.09 1710.81 200.32 1802.84 642.14 834.78
26 190.09 1710.82 200.53 1804.74 642.35 835.05
27 190.81 1717.27 208.04 1872.38 648.91 843.59
29 192.10 1728.93 215.13 1936.16 658.67 856.28

Run ID. CG_Secant_piles_PG01_OAF-6_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no. 4 --- --- Strut no. 5 --- --- Strut no. 6 ---
no. at elev.-8.50 at elev.-11.50 at elev.-14.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
16 650.56 845.72 --- --- --- ---
17 656.64 853.63 --- --- --- ---
18 736.36 957.26 --- --- --- ---
19 621.08 807.40 650.56 845.72 --- ---
20 622.62 809.41 655.19 851.74 --- ---
21 662.37 861.09 796.96 1036.05 --- ---
22 651.54 847.00 754.44 980.78 325.28 845.72
23 652.53 848.29 756.82 983.86 328.46 854.01
24 687.60 893.88 889.55 1156.41 538.83 1400.97
25 683.73 888.85 875.78 1138.51 514.81 1338.50
26 684.24 889.51 876.94 1140.02 516.19 1342.11
27 699.95 909.93 920.47 1196.61 583.41 1516.85
29 743.42 966.44 1089.41 1416.23 --- ---

Run ID. CG_Secant_piles_PG01_OAF-6_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no. 7 --- --- Strut no. 8 ---

Page
13/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

no. at elev.-17.50 at elev.-14.52


kN/m run kN/strut kN/m run kN/strut
25 325.28 845.72 --- ---
26 328.87 855.06 --- ---
27 556.84 1447.78 --- ---
29 741.81 1928.70 107.25 278.86

Page
14/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

1.8 7th Level OSF


Run ID. CG_Secant_piles_PG01_OAF-7_R1 | Sheet No.
Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Strut forces at each stage (horizontal components)

Stage --- Strut no. 1 --- --- Strut no. 2 --- --- Strut no. 3 ---
no. at elev. 2.80 at elev.-2.25 at elev.-5.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
7 3.14 28.29 --- --- --- ---
8 171.97 1547.70 --- --- --- ---
10 169.00 1520.98 21.94 197.43 --- ---
11 142.48 1282.36 349.31 3143.77 --- ---
12 154.28 1388.56 470.93 4238.37 --- ---
13 184.76 1662.83 187.03 1683.27 650.56 845.72
14 184.19 1657.71 190.40 1713.56 658.03 855.44
15 172.64 1553.74 252.47 2272.21 758.32 985.82
16 187.85 1690.69 184.46 1660.13 630.46 819.60
17 187.88 1690.93 185.36 1668.28 632.07 821.69
18 186.34 1677.03 192.04 1728.35 653.97 850.16
19 188.46 1696.15 186.15 1675.34 625.37 812.98
20 188.51 1696.57 186.79 1681.15 625.96 813.75
21 189.22 1702.98 191.12 1720.12 634.36 824.67
22 188.94 1700.49 189.84 1708.56 632.18 821.83
23 188.96 1700.63 190.28 1712.56 632.60 822.38
24 190.64 1715.74 202.42 1821.80 643.72 836.84
25 190.43 1713.83 200.74 1806.66 642.30 834.99
26 190.43 1713.84 200.95 1808.56 642.51 835.26
27 191.14 1720.29 208.47 1876.19 649.07 843.80
29 192.70 1734.26 221.55 1993.96 660.51 858.66

Run ID. CG_Secant_piles_PG01_OAF-7_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no. 4 --- --- Strut no. 5 --- --- Strut no. 6 ---
no. at elev.-8.50 at elev.-11.50 at elev.-14.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
16 650.56 845.72 --- --- --- ---
17 656.64 853.63 --- --- --- ---
18 736.02 956.82 --- --- --- ---
19 620.74 806.96 650.56 845.72 --- ---
20 622.28 808.97 655.19 851.74 --- ---
21 662.21 860.87 797.64 1036.93 --- ---
22 651.37 846.78 755.13 981.67 325.28 845.72
23 652.36 848.07 757.50 984.76 328.46 854.01
24 687.47 893.71 890.41 1157.53 539.12 1401.72
25 683.61 888.69 876.64 1139.64 515.09 1339.24
26 684.11 889.34 877.80 1141.14 516.48 1342.85
27 699.82 909.77 921.33 1197.73 583.67 1517.55
29 730.80 950.04 1025.51 1333.16 753.62 1959.40

Run ID. CG_Secant_piles_PG01_OAF-7_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-04 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no. 7 --- --- Strut no. 8 ---

Page
15/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

no. at elev.-17.50 at elev.-17.52


kN/m run kN/strut kN/m run kN/strut
25 325.28 845.72 --- ---
26 328.87 855.06 --- ---
27 556.78 1447.64 --- ---
29 --- --- 225.43 586.11

Page
16/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

2. STRUT FORCES FOR SECANT PILE TYPE-PG02


2.1 Normal case
Run ID. CG_Secant_piles_PG02_R1 | Sheet No.
Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-03 | Checked :
-----------------------------------------------------------------------------

Strut forces at each stage (horizontal components)

Stage --- Strut no. 1 --- --- Strut no. 2 --- --- Strut no. 4 ---
no. at elev. 2.80 at elev.-2.25 at elev.-3.51
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
8 3.49 31.37 --- --- --- ---
9 130.04 1170.35 --- --- --- ---
11 130.02 1170.14 1.09 9.84 --- ---
12 133.00 1196.97 149.89 1349.00 --- ---
13 168.03 1512.24 265.17 2386.55 --- ---
16 168.03 1512.24 265.17 2386.55 --- ---
17 168.07 1512.59 264.02 2376.14 --- ---
19 167.98 1511.86 258.46 2326.16 slack slack
20 189.63 1706.65 --- --- 287.38 287.38
21 171.86 1546.76 --- --- 110.66 110.66
22 --- --- --- --- 232.95 232.95
23 --- --- --- --- 144.84 144.84

Run ID. CG_Secant_piles_PG02_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-03 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no. 5 ---


no. at elev.-5.67
kN/m run kN/strut
16 0.00 0.00
17 slack slack
19 slack slack
20 slack slack
21 slack slack
22 slack slack
23 slack slack

Page
17/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

2.2 1st Level OSF


Run ID. CG_Secant_piles_PG02_OSF-1_R1 | Sheet No.
Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-03 | Checked :
-----------------------------------------------------------------------------

Strut forces at each stage (horizontal components)

Stage --- Strut no. 1 --- --- Strut no. 2 --- --- Strut no. 3 ---
no. at elev. 2.80 at elev.-2.25 at elev.-5.27
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
8 1.80 16.24 --- --- --- ---
9 130.14 1171.29 --- --- --- ---
11 130.11 1171.02 1.09 9.80 --- ---
12 133.13 1198.16 149.20 1342.83 --- ---
13 168.18 1513.62 264.50 2380.49 --- ---
16 --- --- 410.94 3698.47 slack slack

Stage --- Strut no. 4 ---


no. at elev. 2.82
kN/m run kN/strut
16 88.53 796.73

Page
18/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

2.3 2nd Level OSF


Run ID. CG_Secant_piles_PG02_OSF-2_R1 | Sheet No.
Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGBH-03 | Checked :
-----------------------------------------------------------------------------

Strut forces at each stage (horizontal components)

Stage --- Strut no. 1 --- --- Strut no. 2 --- --- Strut no. 3 ---
no. at elev. 2.80 at elev.-2.25 at elev.-5.27
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
8 1.80 16.23 --- --- --- ---
9 130.16 1171.42 --- --- --- ---
11 130.13 1171.15 1.09 9.80 --- ---
12 133.14 1198.29 149.21 1342.91 --- ---
13 168.19 1513.73 264.52 2380.68 --- ---
16 228.60 2057.38 --- --- 40.11 104.28

Stage --- Strut no. 4 ---


no. at elev.-2.27
kN/m run kN/strut
16 57.83 520.49

Page
19/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

2.4 Accidental Case


Run ID. CG_Secant_piles_PG03_R1 | Sheet No.
Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGPBH-06 | Checked :
-----------------------------------------------------------------------------

Strut forces at each stage (horizontal components)

Stage --- Strut no. 1 --- --- Strut no. 2 ---


no. at elev. 2.80 at elev.-2.25
kN/m run kN/strut kN/m run kN/strut
8 1.52 13.65 --- ---
9 114.98 1034.86 --- ---
11 115.00 1035.04 1.66 14.97
12 130.59 1175.34 208.76 1878.80
13 165.69 1491.25 307.25 2765.23
14 165.69 1491.25 307.26 2765.38
15 164.55 1480.99 314.53 2830.79

Page
20/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

3. STRUT FORCES FOR SECANT PILE TYPE-PG03


3.1 Normal Case
Run ID. CG_Secant_piles_PG03_R1 | Sheet No.
Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGPBH-06 | Checked :
-----------------------------------------------------------------------------

Strut forces at each stage (horizontal components)

Stage --- Strut no. 1 --- --- Strut no. 2 --- --- Strut no. 3 ---
no. at elev. 2.80 at elev.-2.25 at elev.-5.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
8 3.33 30.00 --- --- --- ---
9 180.77 1626.93 --- --- --- ---
11 180.66 1625.98 1.63 14.70 --- ---
12 176.68 1590.13 152.16 1369.42 --- ---
13 219.56 1976.02 311.49 2803.45 --- ---
14 220.20 1981.82 299.96 2699.64 72.28 187.94
15 220.20 1981.81 299.97 2699.76 72.31 188.01
16 219.87 1978.82 304.49 2740.39 75.17 195.43
18 218.91 1970.20 320.99 2888.92 --- ---
20 219.23 1973.11 308.09 2772.84 --- ---
21 246.43 2217.88 --- --- --- ---
22 228.66 2057.94 --- --- --- ---

Run ID. CG_Secant_piles_PG03_R1 | Sheet No.


Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGPBH-06 | Checked :
-----------------------------------------------------------------------------

Stage --- Strut no. 4 --- --- Strut no. 5 ---


no. at elev.-3.51 at elev.-5.80
kN/m run kN/strut kN/m run kN/strut
18 --- --- 2.74 2.74
20 slack slack 1.30 1.30
21 320.08 320.08 0.17 0.17
22 126.13 126.13 slack slack
23 291.84 291.84 slack slack
24 200.66 200.66 slack slack

Page
21/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

3.2 1st Level OSF


Run ID. CG_Secant_piles_PG03_1st OSF_R1 | Sheet No.
Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGPBH-06 | Checked :
-----------------------------------------------------------------------------

Strut forces at each stage (horizontal components)

Stage --- Strut no. 1 --- --- Strut no. 2 --- --- Strut no. 3 ---
no. at elev. 2.80 at elev.-2.25 at elev.-5.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
8 0.89 7.98 --- --- --- ---
9 180.04 1620.33 --- --- --- ---
11 179.93 1619.35 1.39 12.47 --- ---
12 174.90 1574.12 144.78 1303.00 --- ---
13 230.36 2073.23 408.55 3676.94 --- ---
14 231.02 2079.22 397.02 3573.20 72.28 187.94
15 231.02 2079.21 397.04 3573.36 72.32 188.04
16 230.69 2076.20 401.57 3614.11 75.19 195.48
18 --- --- 599.45 5395.01 68.52 178.16

Stage --- Strut no. 4 ---


no. at elev. 2.82
kN/m run kN/strut
18 119.63 1076.65

Page
22/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

3.3 2nd Level OSF


Run ID. CG_Secant_piles_PG03_2nd OSF_R1 | Sheet No.
Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGPBH-06 | Checked :
-----------------------------------------------------------------------------

Strut forces at each stage (horizontal components)

Stage --- Strut no. 1 --- --- Strut no. 2 --- --- Strut no. 3 ---
no. at elev. 2.80 at elev.-2.25 at elev.-5.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
8 0.89 7.98 --- --- --- ---
9 180.04 1620.36 --- --- --- ---
11 179.93 1619.39 1.38 12.46 --- ---
12 174.90 1574.14 144.80 1303.17 --- ---
13 230.34 2073.02 408.58 3677.21 --- ---
14 231.00 2079.01 397.05 3573.47 72.28 187.94
15 231.00 2079.00 397.07 3573.63 72.32 188.04
16 230.67 2075.99 401.60 3614.38 75.19 195.48
18 309.77 2787.92 --- --- 170.31 442.82

Stage --- Strut no. 4 ---


no. at elev.-2.27
kN/m run kN/strut
18 87.94 791.50

Page
23/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

3.4 3rd Level OSF


Run ID. CG_Secant_piles_PG03_3rd OSF_R1 | Sheet No.
Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGPBH-06 | Checked :
-----------------------------------------------------------------------------

Strut forces at each stage (horizontal components)

Stage --- Strut no. 1 --- --- Strut no. 2 --- --- Strut no. 3 ---
no. at elev. 2.80 at elev.-2.25 at elev.-5.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
8 0.89 7.98 --- --- --- ---
9 180.04 1620.37 --- --- --- ---
11 179.93 1619.39 1.39 12.47 --- ---
12 174.89 1574.04 144.85 1303.64 --- ---
13 230.34 2073.09 408.58 3677.19 --- ---
14 231.01 2079.08 397.05 3573.46 72.28 187.94
15 231.01 2079.07 397.07 3573.62 72.32 188.04
16 230.67 2076.06 401.60 3614.36 75.19 195.48
18 229.75 2067.71 417.54 3757.84 --- ---

Stage --- Strut no. 4 ---


no. at elev.-5.52
kN/m run kN/strut
18 4.47 11.62

Page
24/25
L&T-STEC JV MUMBAI
Mumbai Metro Line 3
Package No : UGC 01

3.5 Accidental Case


Run ID. CG_Secant_piles_PG03_ACC_R1 | Sheet No.
Churchgate | Date:30-05-2017
Design of Secant Pile Wall wrt CGPBH-06 | Checked :
-----------------------------------------------------------------------------

Strut forces at each stage (horizontal components)

Stage --- Strut no. 1 --- --- Strut no. 2 --- --- Strut no. 3 ---
no. at elev. 2.80 at elev.-2.25 at elev.-5.50
kN/m run kN/strut kN/m run kN/strut kN/m run kN/strut
8 0.88 7.88 --- --- --- ---
9 169.14 1522.26 --- --- --- ---
11 168.90 1520.10 2.52 22.64 --- ---
12 158.31 1424.76 202.64 1823.72 --- ---
13 219.11 1972.01 494.30 4448.70 --- ---
14 220.50 1984.47 475.31 4277.75 72.28 187.94
15 220.49 1984.45 475.32 4277.92 72.33 188.05
16 216.58 1949.23 488.39 4395.49 104.19 270.89
17 212.49 1912.38 490.91 4418.17 137.09 356.44

Page
25/25