0 оценок0% нашли этот документ полезным (0 голосов)
41 просмотров1 страница
The document is about construction reference drawings for Cuffe Parade station on Line 3 of the Mumbai Metro Rail project from Colaba to Bandra to Seepz. It discusses ground movement due to excavation, instrumentation and monitoring, and building risk assessment and is from L&T-STEC JV Mumbai dated January 12, 2018.
The document is about construction reference drawings for Cuffe Parade station on Line 3 of the Mumbai Metro Rail project from Colaba to Bandra to Seepz. It discusses ground movement due to excavation, instrumentation and monitoring, and building risk assessment and is from L&T-STEC JV Mumbai dated January 12, 2018.
The document is about construction reference drawings for Cuffe Parade station on Line 3 of the Mumbai Metro Rail project from Colaba to Bandra to Seepz. It discusses ground movement due to excavation, instrumentation and monitoring, and building risk assessment and is from L&T-STEC JV Mumbai dated January 12, 2018.