CERT'D

Saudi Electricity Company ‫الشركة السعودية للكھرباء‬


A.F

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPR'D

A.F
CHK'D

M.S
ISSUED FOR SEC-WOA APPROVAL

MID SPAN CLEARANCE CALCULATIONS


DESCRIPTION

CONSTRUCTION OF 380kV D/C OHTL FROM


RBG IPP2 TO GANTRY-1 CLOSE TO ADL BSP
DAR
BY

03-2014
DATE
NO.

REVISIONS
DRAWN

BY:- M.S

DATE:- 03-2014

CHECKED

BY:- A.F

DATE:- 03-2014

OPRG. DEPT

BY

DATE:-

ENG'G. DEPT.

BY:-

DATE:-

CERTIFIED.

BY:-

DATE:- AS BUILT BY DATE


THIS DRAWING IS NOT DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TO BE USED FOR
CONSTRUCTION OF
MID SPAN CLEARANCE CALCULATIONS
FOR ORDERING
MATERIALS UNTIL
A RB307 WE-273879 01 of 01 01
CERTIFIED AND
380kV OHTL RBG IPP2 TO GANTRY-1 CLOSE TO ADL BSP
DATED
RABIGH/JEDDAH SAUDI ARABIA CONTRACT NO. 4400002515 DWG. CONT. SHT. WE-273877
SEC-ERB CAD-E (2002/03)
MIDSPAN CLEARANCE CALCULATION AT 30 DEG. C, FINAL SAG FOR TOWER TYPE S1N (REV.01)
Conductor Data OPGW Data Tw. Outline Drawing No.
Type: AAAC ‐ 500mm2 Codename: OPGW‐62L86z (8965) WT‐910336
Outside Dia: 29.1 mm Outside Dia: 17.1 mm (Prvided By SEC with PTS)
V‐Suspension String
Ultimate Tensile Strength: 139.6 KN Ultimate Tensile Strength: 120.5 KN
Drawing No.
Bare Weight: 1.379 kg/m Bare Weight: 0.856 kg/m 75.380.115K
OPGW Suspension Set 
Drawing No.
Later
RULING SPAN 250.00 M

MID SPAN CLEARANCE BETWEEN TOP PHASE CONDUCTOR AND OPGW

As per SEC Standard TES‐P‐122.09 Table 9‐13
Midspan clearance required for  244 m Span 7.30 m
Midspan clearance required for 305 m Span 9.70 m

By linear interpolation
Midspan clearance required at  250.00 m Ruling Span: ( 250 ‐ 244 ) / ( 305 ‐ 244 ) x ( 9.70 ‐ 7.30 )+ 7.30
(AF) = 7.54 m

Final Sag of AAAC Conductor at every day temperature 30 ºC, No wind  & 
250.00 m Ruling Span: 6200 mm (Sag without Conductor Lights)
Final Condition (AB)

Final Sag of OPGW at every day temperature 30ºC, No wind  & Final 
250.00 m Ruling Span: 4170 mm (Sag without Warning Spheres)
Condition (HF)

Length of V‐suspension string for top phase top conductor: (tower cleat+4720‐646.29)‐conductor radius: 
4209.16 mm
(150+4720‐646.29)‐(29.1/2) (BC)

Vertical length of OPGW suspension assembly: 129+(16.2/2)+tower cleat(65) ‐ (DH) 202.10 mm

Horizontal distance from center of tower to top right conductor (top cross arm): (2085/2)+(12232/2) 6958.5 mm

Horizontal distance from center of tower to OPGW attachment point: (1900/2)+5200 6150 mm

Horizontal distance between OPGW attachment point and conductor attachment 
(6958.5 ‐ 6150) 808.5 mm
point: (GF)

Midspan Clearance: √(AG²+ GF²)
(AF)

Where: AG= AB+BC+5000 ‐ (DH+HF) = 11037.06 mm


Therefore:
Midspan Clearance b/w Conductor and OPGW at 30 Deg. C, Final Sag  at 250.00 m Ruling Span= 11066.63 mm
(AF) 11.07 m
Calculated Clearance         > Required Clearance
MIDSPAN CLEARANCE CALCULATION AT 30 DEG. C, FINAL SAG FOR TOWER TYPE S1N (REV.01)
Conductor Data OPGW Data Tw. Outline Drawing No.
Type: AAAC ‐ 500mm2 Codename: OPGW‐62L86z (8965) WT‐910336
Outside Dia: 29.1 mm Outside Dia: 17.1 mm (Prvided By SEC with PTS)
V‐Suspension String
Ultimate Tensile Strength: 139.6 KN Ultimate Tensile Strength: 120.5 KN
Drawing No.
Bare Weight: 1.379 kg/m Bare Weight: 0.856 kg/m 75.380.115K
OPGW Suspension Set 
Drawing No.
Later
RULING SPAN 275.00 M

MID SPAN CLEARANCE BETWEEN TOP PHASE CONDUCTOR AND OPGW

As per SEC Standard TES‐P‐122.09 Table 9‐13
Midspan clearance required for  244 m Span 7.30 m
Midspan clearance required for 305 m Span 9.70 m

By linear interpolation
Midspan clearance required at  275.00 m Ruling Span: ( 275 ‐ 244 ) / ( 305 ‐ 244 ) x ( 9.70 ‐ 7.30 )+ 7.30
(AF) = 8.52 m

Final Sag of AAAC Conductor at every day temperature 30 ºC, No wind  & 
275.00 m Ruling Span: 7200 mm (Sag without Conductor Lights)
Final Condition (AB)

Final Sag of OPGW at every day temperature 30ºC, No wind  & Final 
275.00 m Ruling Span: 5050 mm (Sag without Warning Spheres)
Condition (HF)

Length of V‐suspension string for top phase top conductor: (tower cleat+4720‐646.29)‐conductor radius: 
4209.16 mm
(150+4720‐646.29)‐(29.1/2) (BC)

Vertical length of OPGW suspension assembly: 129+(16.2/2)+tower cleat(65) ‐ (DH) 202.85 mm

Horizontal distance from center of tower to top right conductor (top cross arm): (2085/2)+(12232/2) 6958.5 mm

Horizontal distance from center of tower to OPGW attachment point: (1900/2)+5200 6150 mm

Horizontal distance between OPGW attachment point and conductor attachment 
(6958.5 ‐ 6150) 808.5 mm
point: (GF)

Midspan Clearance: √(AG²+ GF²)
(AF)

Where: AG= AB+BC+5000 ‐ (DH+HF) = 11156.31 mm


Therefore:
Midspan Clearance b/w Conductor and OPGW at 30 Deg. C, Final Sag  at 275.00 m Ruling Span= 11185.57 mm
(AF) 11.19 m
Calculated Clearance         > Required Clearance
MIDSPAN CLEARANCE CALCULATION AT 30 DEG. C, FINAL SAG FOR TOWER TYPE S1N (REV.01)
Conductor Data OPGW Data Tw. Outline Drawing No.
Type: AAAC ‐ 500mm2 Codename: OPGW‐62L86z (8965) WT‐910336
Outside Dia: 29.1 mm Outside Dia: 17.1 mm (Prvided By SEC with PTS)
V‐Suspension String
Ultimate Tensile Strength: 139.6 KN Ultimate Tensile Strength: 120.5 KN
Drawing No.
Bare Weight: 1.379 kg/m Bare Weight: 0.856 kg/m 75.380.115K
OPGW Suspension Set 
Drawing No.
Later
RULING SPAN 300.00 M

MID SPAN CLEARANCE BETWEEN TOP PHASE CONDUCTOR AND OPGW

As per SEC Standard TES‐P‐122.09 Table 9‐13
Midspan clearance required for  244 m Span 7.30 m
Midspan clearance required for 305 m Span 9.70 m

By linear interpolation
Midspan clearance required at  300.00 m Ruling Span: ( 300 ‐ 244 ) / ( 305 ‐ 244 ) x ( 9.70 ‐ 7.30 )+ 7.30
(AF) = 9.50 m

Final Sag of AAAC Conductor at every day temperature 30 ºC, No wind  & 
300.00 m Ruling Span: 8220 mm (Sag without Conductor Lights)
Final Condition (AB)

Final Sag of OPGW at every day temperature 30ºC, No wind  & Final 
300.00 m Ruling Span: 6010 mm (Sag without Warning Spheres)
Condition (HF)

Length of V‐suspension string for top phase top conductor: (tower cleat+4720‐646.29)‐conductor radius: 
4209.16 mm
(150+4720‐646.29)‐(29.1/2) (BC)

Vertical length of OPGW suspension assembly: 129+(16.2/2)+tower cleat(65) ‐ (DH) 202.85 mm

Horizontal distance from center of tower to top right conductor (top cross arm): (2085/2)+(12232/2) 7158.5 mm

Horizontal distance from center of tower to OPGW attachment point: (1900/2)+5200 6150 mm

Horizontal distance between OPGW attachment point and conductor attachment 
(6958.5 ‐ 6150) 1008.5 mm
point: (GF)

Midspan Clearance: √(AG²+ GF²)
(AF)

Where: AG= AB+BC+5000 ‐ (DH+HF) = 11216.31 mm


Therefore:
Midspan Clearance b/w Conductor and OPGW at 30 Deg. C, Final Sag  at 300.00 m Ruling Span= 11261.56 mm
(AF) 11.26 m
Calculated Clearance         > Required Clearance
MIDSPAN CLEARANCE CALCULATION AT 30 DEG. C, FINAL SAG FOR TOWER TYPE S1N (REV.01)
Conductor Data OPGW Data Tw. Outline Drawing No.
Type: AAAC ‐ 500mm2 Codename: OPGW‐62L86z (8965) WT‐910336
Outside Dia: 29.1 mm Outside Dia: 17.1 mm (Prvided By SEC with PTS)
V‐Suspension String
Ultimate Tensile Strength: 139.6 KN Ultimate Tensile Strength: 120.5 KN
Drawing No.
Bare Weight: 1.379 kg/m Bare Weight: 0.856 kg/m 75.380.115K
OPGW Suspension Set 
Drawing No.
Later
RULING SPAN 320.00 M

MID SPAN CLEARANCE BETWEEN TOP PHASE CONDUCTOR AND OPGW

As per SEC Standard TES‐P‐122.09 Table 9‐13
Midspan clearance required for  305 m Span 9.70 m
Midspan clearance required for 350 m Span 11.30 m

By linear interpolation
Midspan clearance required at  320.00 m Ruling Span: ( 320 ‐ 305 ) / ( 350 ‐ 305 ) x ( 11.30 ‐ 9.70 )+ 9.70
(AF) = 10.23 m

Final Sag of AAAC Conductor at every day temperature 30 ºC, No wind  & 
320.00 m Ruling Span: 9340 mm (Sag without Conductor Lights)
Final Condition (AB)

Final Sag of OPGW at every day temperature 30ºC, No wind  & Final 
320.00 m Ruling Span: 6840 mm (Sag without Warning Spheres)
Condition (HF)

Length of V‐suspension string for top phase top conductor: (tower cleat+4720‐646.29)‐conductor radius: 
4209.16 mm
(150+4720‐646.29)‐(29.1/2) (BC)

Vertical length of OPGW suspension assembly: 129+(16.2/2)+tower cleat(65) ‐ (DH) 202.85 mm

Horizontal distance from center of tower to top right conductor (top cross arm): (2085/2)+(12232/2) 7158.5 mm

Horizontal distance from center of tower to OPGW attachment point: (1900/2)+5200 6150 mm

Horizontal distance between OPGW attachment point and conductor attachment 
(6958.5 ‐ 6150) 1008.5 mm
point: (GF)

Midspan Clearance: √(AG²+ GF²)
(AF)

Where: AG= AB+BC+5000 ‐ (DH+HF) = 11506.31 mm


Therefore:
Midspan Clearance b/w Conductor and OPGW at 30 Deg. C, Final Sag  at 320.00 m Ruling Span= 11550.42 mm
(AF) 11.55 m
Calculated Clearance         > Required Clearance
MIDSPAN CLEARANCE CALCULATION AT 30 DEG. C, FINAL SAG FOR TOWER TYPE S1N (REV.01)
Conductor Data OPGW Data Tw. Outline Drawing No.
Type: AAAC ‐ 500mm2 Codename: OPGW‐62L86z (8965) WT‐910336
Outside Dia: 29.1 mm Outside Dia: 17.1 mm (Prvided By SEC with PTS)
V‐Suspension String
Ultimate Tensile Strength: 139.6 KN Ultimate Tensile Strength: 120.5 KN
Drawing No.
Bare Weight: 1.379 kg/m Bare Weight: 0.856 kg/m 75.380.115K
OPGW Suspension Set 
Drawing No.
Later
RULING SPAN 350.00 M

MID SPAN CLEARANCE BETWEEN TOP PHASE CONDUCTOR AND OPGW

As per SEC Standard TES‐P‐122.09 Table 9‐13
Midspan clearance required for  305 m Span 9.70 m
Midspan clearance required for 350 m Span 11.30 m

By linear interpolation
Midspan clearance required at  350.00 m Ruling Span: ( 350 ‐ 305 ) / ( 350 ‐ 305 ) x ( 11.30 ‐ 9.70 )+ 9.70
(AF) = 11.30 m

Final Sag of AAAC Conductor at every day temperature 30 ºC, No wind  & 
350.00 m Ruling Span: 11170 mm (Sag without Conductor Lights)
Final Condition (AB)

Final Sag of OPGW at every day temperature 30ºC, No wind  & Final 
350.00 m Ruling Span: 8200 mm (Sag without Warning Spheres)
Condition (HF)

Length of V‐suspension string for top phase top conductor: (tower cleat+4720‐646.29)‐conductor radius: 
4209.16 mm
(150+4720‐646.29)‐(29.1/2) (BC)

Vertical length of OPGW suspension assembly: 129+(16.2/2)+tower cleat(65) ‐ (DH) 202.85 mm

Horizontal distance from center of tower to top right conductor (top cross arm): (2085/2)+(12232/2) 7158.5 mm

Horizontal distance from center of tower to OPGW attachment point: (1900/2)+5200 6150 mm

Horizontal distance between OPGW attachment point and conductor attachment 
(6958.5 ‐ 6150) 1008.5 mm
point: (GF)

Midspan Clearance: √(AG²+ GF²)
(AF)

Where: AG= AB+BC+5000 ‐ (DH+HF) = 11976.31 mm


Therefore:
Midspan Clearance b/w Conductor and OPGW at 30 Deg. C, Final Sag  at 350.00 m Ruling Span= 12018.70 mm
(AF) 12.02 m
Calculated Clearance         > Required Clearance
MIDSPAN CLEARANCE CALCULATION AT 30 DEG. C, FINAL SAG FOR TOWER TYPE S1N (REV.01)
Conductor Data OPGW Data Tw. Outline Drawing No.
Type: AAAC ‐ 500mm2 Codename: OPGW‐62L86z (8965) WT‐910336
Outside Dia: 29.1 mm Outside Dia: 17.1 mm (Prvided By SEC with PTS)
V‐Suspension String
Ultimate Tensile Strength: 139.6 KN Ultimate Tensile Strength: 120.5 KN
Drawing No.
Bare Weight: 1.379 kg/m Bare Weight: 0.856 kg/m 75.380.115K
OPGW Suspension Set 
Drawing No.
Later
RULING SPAN 370.00 M

MID SPAN CLEARANCE BETWEEN TOP PHASE CONDUCTOR AND OPGW

As per SEC Standard TES‐P‐122.09 Table 9‐13
Midspan clearance required for  366 m Span 11.90 m
Midspan clearance required for 427 m Span 13.70 m

By linear interpolation
Midspan clearance required at  370.00 m Ruling Span: ( 370 ‐ 366 ) / ( 427 ‐ 366 ) x ( 13.70 ‐ 11.90 )+ 11.90
(AF) = 12.02 m

Final Sag of AAAC Conductor at every day temperature 30 ºC, No wind  & 
370.00 m Ruling Span: 12490 mm (Sag without Conductor Lights)
Final Condition (AB)

Final Sag of OPGW at every day temperature 30ºC, No wind  & Final 
370.00 m Ruling Span: 9160 mm (Sag without Warning Spheres)
Condition (HF)

Length of V‐suspension string for top phase top conductor: (tower cleat+4720‐646.29)‐conductor radius: 
4209.16 mm
(150+4720‐646.29)‐(29.1/2) (BC)

Vertical length of OPGW suspension assembly: 129+(16.2/2)+tower cleat(65) ‐ (DH) 202.85 mm

Horizontal distance from center of tower to top right conductor (top cross arm): (2085/2)+(12232/2) 7158.5 mm

Horizontal distance from center of tower to OPGW attachment point: (1900/2)+5200 6150 mm

Horizontal distance between OPGW attachment point and conductor attachment 
(6958.5 ‐ 6150) 1008.5 mm
point: (GF)

Midspan Clearance: √(AG²+ GF²)
(AF)

Where: AG= AB+BC+5000 ‐ (DH+HF) = 12336.31 mm


Therefore:
Midspan Clearance b/w Conductor and OPGW at 30 Deg. C, Final Sag  at 370.00 m Ruling Span= 12377.46 mm
(AF) 12.38 m
Calculated Clearance         > Required Clearance
MIDSPAN CLEARANCE CALCULATION AT 30 DEG. C, FINAL SAG FOR TOWER TYPE S1N (REV.01)
Conductor Data OPGW Data Tw. Outline Drawing No.
Type: AAAC ‐ 500mm2 Codename: OPGW‐62L86z (8965) WT‐910336
Outside Dia: 29.1 mm Outside Dia: 17.1 mm (Prvided By SEC with PTS)
V‐Suspension String
Ultimate Tensile Strength: 139.6 KN Ultimate Tensile Strength: 120.5 KN
Drawing No.
Bare Weight: 1.379 kg/m Bare Weight: 0.856 kg/m 75.380.115K
OPGW Suspension Set 
Drawing No.
Later
RULING SPAN 400.00 M

MID SPAN CLEARANCE BETWEEN TOP PHASE CONDUCTOR AND OPGW

As per SEC Standard TES‐P‐122.09 Table 9‐13
Midspan clearance required for  366 m Span 11.90 m
Midspan clearance required for 427 m Span 13.70 m

By linear interpolation
Midspan clearance required at  400.00 m Ruling Span: ( 400 ‐ 366 ) / ( 427 ‐ 366 ) x ( 13.70 ‐ 11.90 )+ 11.90
(AF) = 12.90 m

Final Sag of AAAC Conductor at every day temperature 30 ºC, No wind  
400.00 m Ruling Span: 14600 mm (Sag without Conductor Lights)
& Final Condition (AB)

Final Sag of OPGW at every day temperature 30ºC, No wind  & Final 
400.00 m Ruling Span: 10720 mm (Sag without Warning Spheres)
Condition (HF)

Length of V‐suspension string for top phase top conductor: (tower cleat+4720‐646.29)‐conductor radius: 
4209.16 mm
(150+4720‐646.29)‐(29.1/2) (BC)

Vertical length of OPGW suspension assembly: 129+(16.2/2)+tower cleat(65) ‐ (DH) 200.25 mm

Horizontal distance from center of tower to top right conductor (top cross arm): (2085/2)+(12232/2) 7158.5 mm

Horizontal distance from center of tower to OPGW attachment point: (1900/2)+5200 6150 mm

Horizontal distance between OPGW attachment point and conductor attachment 
(6958.5 ‐ 6150) 1008.5 mm
point: (GF)

Midspan Clearance: √(AG²+ GF²)
(AF)

Where: AG= AB+BC+5000 ‐ (DH+HF) = 12888.91 mm


Therefore:
Midspan Clearance b/w Conductor and OPGW at 30 Deg. C, Final Sag  at 400.00 m Ruling Span= 12928.31 mm
(AF) 12.93 m
Calculated Clearance         > Required Clearance