Академический Документы
Профессиональный Документы
Культура Документы
Version :A
The following signature indicates that the commissioning test protocol has been released for execution.
Prepared by
Reviewed by
Approved by
Page 2 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
The following signature indicates that the commissioning test protocol has been executed and reported.
Checked by
Approved by
Page 3 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Contents
1 Reference Documents 6
1.1 Verification with as built P&ID 6
2 Version History 6
4 Purpose 7
5 System Description 7
6 System Boundaries 8
7 Testing Rationale 8
9 Deviation List 8
11 Test Sheets 11
Documentation – Pre-Requisite Documentation Review 12
Installation Verification – Hot Water Generation Skid 14
Documentation - Calibration Verification Record (General) 23
Installation Verification (System) - Utilities 25
Safety- Zero Access Machinery Guarding & Lock-Out/Tag-Out (LOTO)
Testing & Verification Requirements 26
Control Verification – HMI Functionality (General/Commissioning) 30
Control Verification - Password Access (General) 34
Alarm and Interlock Verification - General 36
COMMISSIONING REPORT 39
Performance Verification – Flow, Pressure & Temperature Verification Test 44
Control Verification – Control Inputs and Output Record (Functional) 48
Page 4 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
12 List of Attachments 59
13 Exclusion 59
Page 5 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
1 Reference Documents
2 Version History
Page 6 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
4 Purpose
The purpose of this document is to provide documented evidence that the components of the hot
water generation for HVAC are installed correctly and in accordance with the requirements of
design documentation, that supporting documentation is in place and to provide evidence of the
systems proper operation.
5 System Description
Hot Water Generation – HVAC (18.5 m3/hr)
Make: Armstrong
Model: D85180
Capacity:100 L
Hot Water Expansion Tank with Pressurizing
1 No
pumps Design Temperature: 120⁰C
Design Pressure: 5 barg / Full
Vacuum
MOC: SS316L
Make: Grundfos
Model: CR15-04 A-F-A-E-HQQE
Rated Speed: 2917 RPM
Rated flow: 17m3/h
Hot Water Hot Water Centrifugal pumps VFD based 4 Nos
Generation Rated head: 44.8m
@ 50⁰C Rated power: 4 kW
Mains frequency: 50 Hz
Quantity: 4
Make: Alfa Laval
Model: M6 MFM
Plate Heat Exchanger 1 No
Design Pressure:
Design Temperature:
Make: Armstrong
Air separator 1 No Model: Air Sep 2-1/2 NPT Vortex
MOC: Cast Iron
Make: Armstrong
Double Duty Pump Trap 1 No
Model: DD6 1-1/2’’ X 1’’ 150RF
Page 7 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
6 System Boundaries
As per system boundary as per mark up on P&ID drawing no PID-00-0-MLGHW-HVAC-Model.
7 Testing Rationale
Testing described within this report/protocol is based upon the Commissioning Plan. All
acceptance criteria will be verified for indirect systems.
10
11
12
13
14
15
9 Deviation List
Record each of the deviations raised during the completion of the protocol and the date that the
deviation was resolved.
Page 8 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
10.2 Documentation
10.3 Installation
A/C. Acceptance Criteria A/C Met? Test Sheet Reference Initial and
Ref. Yes/No (If any) Date
Page 9 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
A/C. Acceptance Criteria A/C Met? Test Sheet Reference Initial and
Ref. Yes/No (If any) Date
10.4 Operational
A/C. Acceptance Criteria A/C Met? Test Sheet Reference Initial and
Ref. Yes/No (If any) Date
10.5 Additional
A/C. Acceptance Criteria A/C Met? Test Sheet Reference Initial and
Ref. Yes/No (If any) Date
Page 10 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
11 Test Sheets
This section details the checks to be carried out in support of the system specific acceptance
criteria contained within Section 11.
Page 11 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 12 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Overall Test Outcome (PASS/FAIL) Tested By (Signature): Verified By (Signature): Date (dd/mm/yyyy):
Page 13 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Make: Armstrong
Model: D85180
Hot Water Expansion
Capacity:100 L
EV/035/001 Tank with Pressurizing
Pumps Design Temperature: 120⁰C
Design Pressure: 5 barg / Full Vacuum
MOC: SS316L
Page 14 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 15 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 16 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 17 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 18 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Make: Sant
VNR/035/006 Forged Steel Horizontal
VNR/035/007 Check Valve (40NB) MOC: ASTM A351
Quantity: 2
VNR/035/001 Make: Weir BDK Valve
VNR/035/002
Swing Check Valve MOC: ASTM A351
VNR/035/003
(65NB) Quantity: 5
VNR/035/004
VNR/035/005
Make: Armstrong
Model: ASTM PSTN 1-1/2’’ SW
VP/035/001 Piston Valve (40NB)
MOC: ASTM A105
Quantity: 1
Make: Armstrong
Model: Valve PSTN 1
VP/035/002 Piston Valve (25NB)
MOC: ASTM A105
Quantity: 1
VP/035/003 Make: Armstrong
VP/035/004 Model: Valve ASTM PSTN ½’’ SW
VP/035/005 Piston Valve (15NB) MOC: ASTM A105
VP/035/006 Quantity: 5
VP/035/007
Page 19 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 20 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 21 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 22 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 23 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Overall Test Outcome (PASS/FAIL) Tested By (Signature): Verified By (Signature): Date (dd/mm/yyyy):
Page 24 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 25 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Title: Safety- Zero Access Machinery Guarding & Lock-Out/Tag-Out (LOTO) Testing & Verification Reference: 0044
Requirements
Objective:
1. To provide documented evidence that the machinery physical guarding and lock-out/tag-out (LOTO) requirements have been designed,
installed and tested safely, to prevent contact with dangerous parts and prevent injury during normal operation or during an intervention, as
defined in Global Engineering Standard - Machinery Safety - GES 110.
Note:
1) Zero Access is a standard of machine guarding where it is physically impossible for anyone to gain access to any dangerous parts of a
machine or equipment without using a tool to remove or disable a safeguard.
2) Lock-out/tag-out (LOTO) is the required standard within GES 110 to ensure that machinery remains isolated from all sources of energy during
an intervention to protect those involved from being injured either by energy sources or unexpected operation of equipment.
Pre-requisites: Global EHS Standard 604 – Use of Work Equipment Assessment completed.
Method:
1. Complete the required checks to assess the equipment against the defined criteria detailed within the results section. Where applicable
checks should be completed with the equipment in normal run mode. If criteria are not met ensure details are recorded.
Note: All tests are to be completed safely and in compliance with site operating & safety procedures.
Acceptance Criteria:
1. Machinery physical guarding and lock-out/tag-out (LOTO) requirements have been designed, installed and tested safely, to prevent
contact with dangerous parts and prevent injury during normal operation or during an intervention, as defined in Global Engineering Standard -
Machinery Safety - GES 110.
Results:
Page 26 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Title: Safety- Zero Access Machinery Guarding & Lock-Out/Tag-Out (LOTO) Testing & Verification Reference: 0044
Requirements
Page 27 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Title: Safety- Zero Access Machinery Guarding & Lock-Out/Tag-Out (LOTO) Testing & Verification Reference: 0044
Requirements
Page 28 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Title: Safety- Zero Access Machinery Guarding & Lock-Out/Tag-Out (LOTO) Testing & Verification Reference: 0044
Requirements
Comments/Deviations/Supporting Documentation:
Overall Test Outcome (PASS/FAIL): Tested By (Signature): Verified By (Signature): Date (dd/mm/yyyy):
Page 29 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 30 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Comments/Deviations/Supporting Documentation:
Page 31 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 32 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Overall Test Outcome (PASS/FAIL): Tested By (Signature) Verified By (Signature): Date (dd/mm/yyyy):
Page 33 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Objective/Purpose:
1 To provide documented evidence that the correct levels of password protection are installed, thus preventing unauthorised software
changes to be made.
Pre-requisites:
1 System control software version is current and controlled in accordance with GSK procedures and policies.
Method:
1 The system access will be challenged to ensure that operators and technicians only have access to those areas of the program which
have been agreed as required for the furtherance of their individual duties.
Note: The number of access levels are to be configured at the time of commissioning as per GSK requirements.
Acceptance Criteria:
1 Each level of access has its own specific access criteria and operators with differing access authorities cannot enter program areas not
within their remit.
Results:
Step Test Method Acceptance Criteria Initial/ Date
1 Attempt to log onto system and run in normal Machine will not allow normal operation to be
operation using an incorrect password. performed without correct password.
2 Level 0 (Operator Level), login by using operator
View only. No other parameters can be changed.
username and password.
3 All parameters can be modified except configuration
Level 1 (Supervisor Level), login by using supervisor
of controller parameters, adjustment of timer, set
username and password.
parameters, PID settings and test mode activation.
4 Level 2 (Administrator Level), login by using
All parameters can be modified.
administrator username and password.
Page 34 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Comments/Deviations/Supporting Documentation:
Page 35 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 36 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Note:
1. For process liquid consumption, with the availability of
water flow meter, flow rate can be logged.
2. For Steam Consumptions, with the availability of
pressure and temperature transmitter, steam flow rate
can be calculated with the help of water consumption
rate, Delta T, steam pressure and temperature.
Page 37 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 38 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Panel No Incomer Motor Details Output Details Physical Parameter MODBUS Remarks
Voltage (Volts) Wiring Cross COMM Detail
Checked Verification
(YES/NO) Done
(YES/NO)
L1: Power: 4 kW Power: kW Address:
L2:
Voltage: 415 V AC Voltage: V
L3:
Current: 7.9 A Current: A
E-N:
Speed: 2917 RPM Speed: RPM
Frequency: 50 Hz Frequency: Hz
Page 39 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 40 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 41 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 42 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Overall Test Outcome (PASS/FAIL): Tested By (Signature) Verified By (Signature): Date (dd/mm/yyyy):
Page 43 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Title: Performance Verification – Flow, Pressure & Temperature Verification Test Reference: HWG/001_2
Objective:
1 To verify the flow of hot water generation skid is at a consistent pressure.
2 To verify the pressure of the hot water generation skid is as per design specification.
3 To verify the outlet temperature of the hot water generation skid is as per design specification and time taken to achieve the setpoint
temperature.
Pre-requisites:
1 Hot water skid has been pre-commissioned.
Method:
1 Monitor the flow, pressure & temperature of the hot water generation skid for 2 hours with an interval of 30 minutes to ensure no pressure
& temperature drop.
Acceptance Criteria:
1 Flow of hot water generation skid is at a consistent pressure of 18.5 m3/hr.
2 Temperature of the hot water is as per design specification.
Results:
Page 44 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Time (hr)
30 60 90 120
Average
Remarks
flow Rate
Time (hr)
30 60 90 120
Average
Remarks
Pressure
Page 45 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Title: Performance Verification – Flow, Pressure & Temperature Verification Test Reference: HWG/001_2
Time (hr)
30 60 90 120
Average
Remarks
Temperature
Page 46 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Title: Performance Verification – Flow, Pressure & Temperature Verification Test Reference: HWG/001_2
Comments/Deviations/Supporting Documentation:
Overall Test Outcome (PASS/FAIL): Tested By (Signature) Verified By (Signature): Date (dd/mm/yyyy):
Page 47 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Title: Control Verification – Control Inputs and Output Record (Functional) Reference: 0525
Objective:
1 To ensure that the correct field devices are connected to the relevant Input and Output address of the PLC.
Pre-requisites:
1 System control software version is current and controlled in accordance with site and corporate procedures and policies.
Method:
1 To carry out this test refer to the PLC Input/output Schedule listed in IO document reference.
2 For each of the addresses given in the I/O schedule check that the device listed is correct against the module address reference.
Acceptance Criteria:
1 The device connected to an address is as listed in the I/O schedule.
Note: Some addresses will have a function but will not have a physical device connected.
Results:
Mode of
I/O Description Card Model Field Device I/O Type I/O Count Actual Result
Checking
CPU-
Cycle Start N/A Visual DI I0
TM200CE24R
CPU-
Cycle Stop N/A Visual DI I1
TM200CE24R
Circulation
CPU-
Pump Main ON N/A Visual DI I2
TM200CE24R
feed back
Circulation Std.
CPU-
By ON feed N/A Visual DI I3
TM200CE24R
back
Page 48 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Title: Control Verification – Control Inputs and Output Record (Functional) Reference: 0525
Makeup Pump
CPU-
Std. By ON feed N/A Visual DI I4
TM200CE24R
back
Makeup Pump
CPU-
Std, By ON N/A Visual DI I5
TM200CE24R
feedback
Circulation CPU-
Pump Main Trip N/A Visual DI I6
TM200CE24R
Circulation
CPU-
Pump Std. By N/A Visual DI I7
TM200CE24R
Trip
Makeup Pump CPU-
Main Trip N/A Visual DI I8
TM200CE24R
CPU-
Auto Selection N/A Visual DI I10
TM200CE24R
CPU-
Manual N/A Visual DI I11
TM200CE24R
Selection
CPU-
Phase Failure N/A Visual DI I12
TM200CE24R
Makeup Main
CPU-
Pump Auto ON N/A Visual DO Q0
TM200CE24R
Command
Page 49 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Title: Control Verification – Control Inputs and Output Record (Functional) Reference: 0525
Makeup Stdby
CPU-
Pump Auto ON N/A Visual DO Q1
TM200CE24R
Command
Circ. Main Pump
CPU-
Auto ON N/A Visual DO Q2
TM200CE24R
Command
Circ. Standby
CPU-
Pump ON N/A Visual DO Q3
TM200CE24R
Command
Makeup Pump
CPU-
Pressure N/A Visual DO Q4
TM200CE24R
Healthy
Circulation
CPU-
Pump Pressure N/A Visual DO Q5
TM200CE24R
Healthy
Temperature
CPU-
Overshoot N/A Visual DO Q6
TM200CE24R
ON/OFF Valve
Tower Lamp CPU-
Red N/A Visual DO Q7
TM200CE24R
CPU-
Hooter N/A Visual DO Q9
TM200CE24R
Page 50 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Title: Control Verification – Control Inputs and Output Record (Functional) Reference: 0525
Make Up Water
Pressure
Pump Inlet TM3AI8 Visual AI I0+ / I0-
Transmitter
Pressure
Circulation Main
Pressure
Water Pump TM3AI8 Visual AI I1+ / I1-
Transmitter
Outlet Pressure
Make Up Pump Pressure
Outlet Pressure TM3AI8 Visual AI I2+ / I2-
Transmitter
Circulation
Pressure
Standby Pump TM3AI8 Visual AI I5+ / I5-
Transmitter
Outlet Pressure
Hot water PHE Pressure
outlet pressure TM3AI8 Visual AI I6+ / I6-
Transmitter
Hot water
Temperature
Return Line TM3AI8 Visual AI I0+ / I0-
Transmitter
Temperature
Hot Water PHE
Temperature
outlet TM3AI8 Visual AI I1+ / I1-
Transmitter
Temperature
Page 51 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Title: Control Verification – Control Inputs and Output Record (Functional) Reference: 0525
Steam Inlet Temperature
Temperature TM3AI8 Visual AI I2+ / I2-
Transmitter
Make Up Pump
VFD TM3AQ4 N/A Visual AO Q2+ / Q2-
Comments/Deviations/Supporting Documentation:
Page 52 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Name of Trainee Description of Training Provided Date of Training Training Cert Ref
(dd-mmm-yy)
Page 53 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Overall Test Outcome (PASS/FAIL): Tested By (Signature): Verified By (Signature): Date (dd/mm/yyyy):
Page 54 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 55 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Overall Test Outcome (PASS/FAIL): Tested By (Signature): Verified By (Signature): Date (dd/mm/yyyy):
Page 56 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Page 57 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
Overall Test Outcome (PASS/FAIL) Tested By (Signature): Verified By (Signature): Date (dd/mm/yyyy):
Page 58 of 59
Shimizu Corporation India Pvt Ltd
Shimizu Detailed Design
CP-HWG-035-001, Version A
Date – 20/11/2017
12 List of Attachments
13 Exclusion
Page 59 of 59