Вы находитесь на странице: 1из 54

A B C D E F G

Founders Square
1 1

2101 L Street, NW Suite 200


F E D C B A A B C D E F

Washington, DC 20037
RTKL Associates Inc.
Design Architect
PENTHOUSE ROOF PENTHOUSE ROOF PENTHOUSE ROOF PENTHOUSE ROOF
519.00 519.00

MTL PANEL MECH

Arlington, VIRGINIA
PENTHOUSE ENCL MTL PANEL MECH
(BEYOND) PENTHOUSE
ENCLS (BEYOND)
MAIN ROOF MAIN ROOF MAIN ROOF MAIN ROOF
499.00 499.00
2 2
VISION GLASS (TYP)

18TH FLOOR METAL PANEL (TYP) 18TH FLOOR


SPANDREL GLASS (TYP) 483.00 483.00

ENTER PROJECT ADDRESS


The Shooshan Compay
17TH FLOOR 17TH FLOOR
471.00 471.00

Owner / Developer
16TH FLOOR PRECAST CONC 16TH FLOOR
459.00 PIERS & SPANDREL 459.00

Address
(TYP)

15TH FLOOR 15TH FLOOR


447.00 447.00

3 3
14TH FLOOR 14TH FLOOR
435.00 435.00

VISION GLASS (TYP) PROJECTED BAY BEYOND


VISION GLASS
13TH FLOOR 13TH FLOOR
423.00 423.00

12TH FLOOR 12TH FLOOR


SPANDREL GLASS (TYP) 411.00 SPANDREL GLASS 411.00

VISION GLASS (TYP)


244' - 11"

244' - 11"
11TH FLOOR 11TH FLOOR
399.00 399.00 No. Date Item

Issued Drawing Log


224' - 11"

224' - 11"
10TH FLOOR 10TH FLOOR
387.00 387.00
4 4
6 6

KEY PLAN
9TH FLOOR 9TH FLOOR
375.00 375.00

NORTHWEST
8TH FLOOR 8TH FLOOR OFFICE RESID
363.00 363.00 NORTH

7TH FLOOR 7TH FLOOR SOUTH


351.00 351.00 OFFICE HOTEL

6TH FLOOR 6TH FLOOR


339.00 339.00
RETAIL
6

5 5TH FLOOR 5TH FLOOR


5
327.00 327.00

6
4TH FLOOR 4TH FLOOR
315.00 315.00
N
3RD FLOOR 3RD FLOOR
303.00 303.00

METAL PANEL
2ND FLOOR 2ND FLOOR
291.00 PRECAST CONC 291.00
PIERS / SPANDREL

VISION GLASS (TYP) VISION GLASS


6 ASE ASE ASE ASE 6
274.06 274.06 274.06 274.06
(AVE SITE ELEV)
GROUND FLOOR
(AVE SITE ELEV)
GROUND FLOOR
RTKL Associates Inc.
271.50
VARIES (SEE PLAN) 271.50
VARIES (SEE PLAN) 2101 L St., NW Suite 200
7 Washington, DC 20037
202.833.4400
202.912.8100
RETAIL DOOR OFFICE LOBBY www.rtkl.com
LOCATIONS 8 ENTRY METAL GRILL FOR
GENERATOR EXHAUST c RTKL Associates Inc.

NORTH WEST
1 NORTH ELEVATION 2 SOUTH ELEVATION OFFICE NORTH &
1/16" = 1'-0" 1/16" = 1'-0"
SOUTH ELEVATIONS
0 8' 16' 32' 0 8' 16' 32'
RTKL Contract No. 20-08081.12
GRAPHIC SCALE GRAPHIC SCALE Issue Date 06/04/10
Scale 1/16" = 1'-0"

A.2-10
A B C D E F G 4.1 SITE PLAN - AMENDMENT
A B C D E F G

7 6 5 4 3 2 1

Founders Square
1 1

2101 L Street, NW Suite 200


MTL PANEL MECH

Washington, DC 20037
PENTHOUSE

RTKL Associates Inc.


ENCLS (BEYOND)
PENTHOUSE ROOF MTL PANEL BROW

Design Architect
PENTHOUSE ROOF
519.00

PRECAST CONCRETE PEIRS


& SPANDRELS (TYP)

Arlington, VIRGINIA
MAIN ROOF MAIN ROOF
499.00

2 2

18TH FLOOR
483.00

ENTER PROJECT ADDRESS


17TH FLOOR
471.00

The Shooshan Compay


Owner / Developer
16TH FLOOR
459.00

Address
15TH FLOOR
447.00

3 14TH FLOOR 3
435.00

VISION GLASS
(TYP.) PRECAST
CONC PIER 13TH FLOOR
423.00

12TH FLOOR
411.00

METAL PANEL
244' - 11"

11TH FLOOR
(TYP.) SPANDREL 399.00
GLASS (TYP) No. Date Item
224' - 11"

10TH FLOOR Issued Drawing Log


6 387.00

4 VISION 4
GLASS (TYP)
9TH FLOOR
375.00

KEY PLAN
8TH FLOOR
363.00 NORTHWEST
OFFICE RESID
NORTH
PROJECTED
7TH FLOOR
GLASS BAY 351.00
BEYOND SOUTH
OFFICE HOTEL

6TH FLOOR
339.00 6

RETAIL
5TH FLOOR
5 327.00 5

4TH FLOOR
315.00

N
3RD FLOOR
303.00

PRECAST
CONCRETE 2ND FLOOR
291.00
METAL PANEL

ASE ASE
274.06 274.06
6 (AVE SITE ELEV) 6
GROUND FLOOR
VARIES (SEE271.50
PLAN) RTKL Associates Inc.
2101 L St., NW Suite 200
Washington, DC 20037
202.833.4400
POTENTIAL 202.912.8100
RETAIL DOOR www.rtkl.com
LOCATIONS c RTKL Associates Inc.

NORTH WEST
1 EAST ELEVATION OFFICE EAST
1/16" = 1'-0"
ELEVATION
0 8' 16' 32'
RTKL Contract No. 20-08081.12
GRAPHIC SCALE Issue Date 06/04/10
Scale 1/16" = 1'-0"

A.2-11
A B C D E F G 4.1 SITE PLAN - AMENDMENT
A B C D E F G

1 2 3 4 5 6 7

Founders Square
1 1

2101 L Street, NW Suite 200


MTL PANEL MECH
PENTHOUSE ENCLS

Washington, DC 20037
RTKL Associates Inc.
PENTHOUSE ROOF PENTHOUSE ROOF

Design Architect
519.00

Arlington, VIRGINIA
MAIN ROOF MAIN ROOF
499.00

2 VISION GLASS (TYP.) 2


18TH FLOOR
483.00

ENTER PROJECT ADDRESS


17TH FLOOR
471.00

The Shooshan Compay


VISION GLASS

Owner / Developer
16TH FLOOR
459.00

Address
METAL PANEL (TYP.) 15TH FLOOR
447.00

SPANDREL GLASS (TYP.)


14TH FLOOR
3 435.00 3

13TH FLOOR
SPANDREL GLASS 423.00

VISION GLASS (TYP.)


12TH FLOOR
411.00
244' - 11"

11TH FLOOR
399.00

No. Date Item


224' - 11"

10TH FLOOR
6 387.00 Issued Drawing Log

4 4
9TH FLOOR
375.00

KEY PLAN
8TH FLOOR
363.00 NORTHWEST
OFFICE RESID
NORTH
7TH FLOOR
351.00
SOUTH
OFFICE HOTEL

6TH FLOOR
339.00
6

RETAIL
5TH FLOOR
327.00
5 5

4TH FLOOR
315.00

PRECAST CONC (TYP.)


N
3RD FLOOR
303.00

2ND FLOOR
291.00
METAL PANEL
ENTRY CANOPY

ASE ASE
274.06 274.06
(AVE SITE ELEV)
6 GROUND FLOOR 6
VARIES (SEE 271.50
PLAN)
8 RTKL Associates Inc.
2101 L St., NW Suite 200
Washington, DC 20037
RETAIL DOOR ALUMINUM/GLASS ALUMINUM/GLASS 202.833.4400
LOCATION DOCK DOOR LOADING ENTRY PARKING ENTRY PARKING ENTRY DOOR 202.912.8100
www.rtkl.com
c RTKL Associates Inc.

NORTH WEST
1 WEST ELEVATION OFFICE WEST
1/16" = 1'-0"
ELEVATION
0 8' 16' 32'
RTKL Contract No. 20-08081.12
NOTE:
GRAPHIC SCALE Issue Date 06/04/10
RETAIL CLG. HEIGHTS SHALL BE 16'-0" Scale 1/16" = 1'-0"

A.2-12
A B C D E F G 4.1 SITE PLAN - AMENDMENT
A B C D E F G

G H

Founders Square
1 1
A B C D E F

2101 L Street, NW Suite 200


Washington, DC 20037
RTKL Associates Inc.
DOMESTIC
WATER
PROPERTY LINE

Design Architect
230 SF

FIRE
1

Arlington, VIRGINIA
PUMP HC HC S S S S S S S S S S S S S S
10' - 0"

230 SF

2
13' - 0" RAMP DN @ 5.5%

MIN TYP
16' - 0"
.

2 MIN TYP
2
OFFICE BUILDING

MIN TYP
23' - 0"
HCV ABOVE (DASHED)
30' - 0"

258.00' 259.50' RESID NORTH


BIKES GARAGE
370 SF
GARAGE

ENTER PROJECT ADDRESS


INTAKE
130 SF

The Shooshan Compay


3 C
C C C
S

MIN TYP
S UP 18' - 0"

8' - 6"

Owner / Developer
23' - 0" 23' - 0" S S
MIN TYP C
ELEVATOR PIT ABOVE
30' - 0"

MIN (TYP) TYP (MIN.)

MIN TYP
ELEVATOR 15' - 0"

8' - 0"
VESTIBULE S S C

Address
MIN TYP
D. MARC S S S
258.00' C C
130 SF S S C

4
.

3 ELEVATOR PIT ABOVE 3


OPEN TO S S S
2

MIN (TYP.)
STORM

23' - 0"
A.2-14 TANK
30' - 0"

BELOW S S S S
S

S RAMP DN @ 5.5% S S S S 259.50'

212' - 10"
5
23' - 0" C C C
S C
S S S S MIN (TYP.)
30' - 0"

OPEN TO DN C No. Date Item


S S S S
TRANSFORMER
VAULT BELOW Issued Drawing Log
C
S S S S S OPEN TO
4 BELOW 4
6 C
PARKING ATTENDANT

RAMP FROM P1
BOOTH & ISLAND S S
C KEY PLAN
30' - 0"

259.50'
.

TO GRADE S S NORTHWEST
C RESID
OFFICE
NORTH
S S S S
S S C

7 SOUTH
OFFICE HOTEL
GARAGE
S EXHAUST

MIN (TYP.)
23' - 0"
OPEN TO 100 SF
30' - 0"

MAIN RETAIL
S
ELECTRIC
ROOM
5 BELOW 5

8
S S S S S S S S S S S S S S S S S S S S

4 N

1 SECURE OFFICE 3
GARAGE
A.2-13

243' - 9"

6
1 P1 LEVEL PLAN 6
1/16" = 1'-0"
RTKL Associates Inc.
2101 L St., NW Suite 200
0 8' 16' 32'
Washington, DC 20037
202.833.4400
202.912.8100
GRAPHIC SCALE www.rtkl.com
c RTKL Associates Inc.
NOTES :

1. UNLESS OTHERWISE NOTED PARKING SPACE SIZES ARE AS FOLLOWS: NORTH WEST
PARKING SPACES LEVEL P1 BICYCLE P1 -STANDARD (FULL SIZE) PARKIG (S) SPACES: 8.5' by 18' AT 90 DEGREES; 8' by 22' at PARALLEL LOCATIONS.
3
-COMPACT PARKING (C) SPACES: 8' by 15' at 90 DEGREE LOCATIONS; 8' by 20' at PARALLEL LOCATIONS.
OFFICE P1 LEVEL
COMP. 19 RES./EMP. 18
HC 2 PLAN
2. UNLESS OTHERWISE NOTED ALL VEHUCULAR DRIVE AISLES WITHIN PARKING GARAGES ARE 23' WIDE.
HC VAN 1
STD. 84 3. SEE SHEET A.2-0B FOR ADDITIONAL NOTES & TABULATIONS. RTKL Contract No. 20-08081.12
Grand total 106 Issue Date 06/04/10
Scale 1/16" = 1'-0"
% COMP = 17.9%

A.2-5
A B C D E F G 4.1 SITE PLAN - AMENDMENT
A B C D E F G

A B C D E F

Founders Square
1 1

18' - 8" 30' - 0" 30' - 0" 30' - 0" 18' - 8"

2101 L Street, NW Suite 200


WILSON BOULEVARD

Washington, DC 20037
20 BICYCLE

RTKL Associates Inc.


PROPERTY SPACES @GRADE
LINE FOR VISITORS

Design Architect
PROPERTY LINE

PROPERTY
LOCATION OF

Arlington, VIRGINIA
LINE
GARAGE BELOW
A.2-10

2 2
1

10' - 0"
LOCATION OF POTENTAIL
BLDG ABOVE RETAIL ENTRY
FCR
2

ENTER PROJECT ADDRESS


130 SF
POTENTAIL
MAIN BUILDING RETAIL

The Shooshan Compay


RETAIL
ENTRY ENTRY

30' - 0"
6330 SF

Owner / Developer
MAIN 272.25

STREET
GARAGE LOBBY
INTAKE 2490 SF

Address
3 DN

NDOLPH
271.15 UP

3 3
30' - 0"

POTENTAIL
A.2-12 1 RETAIL
ENTRY
NORTH RA

163' - 8"
2
A.2-14
30' - 0"

RETAIL POTENTAIL
RETAIL
1240 SF
BLDG ENTRY
1 A.2-11
272.00 MGR No. Date Item
180 SF
5 Issued Drawing Log
272.25
PROPERTY 35' - 0" DN
4 LINE 2' - 0" 4
LOADING
30' - 0"

UP
O.H. DOOR 1120 SF
FITNESS KEY PLAN
2520 SF
272.25 NORTHWEST
LIFT J ELEC OFFICE RESID
6 NORTH
190 SF

PARKING SOUTH
ENTRANCE O.H. DOOR HOTEL
OFFICE
30' - 0"

RAMP DOWN
273.00' TO P1 GEN
560 SF

RETAIL
STOR
7
5 5
STOR
GARAGE
EXHAUST
LOCATION OF 90 SF 2
BLDG ABOVE
A.2-10 1
A.2-13
N
130' - 8"

6 6
RTKL Associates Inc.
1 GROUND FLOOR PLAN 2101 L St., NW Suite 200
1/16" = 1'-0" NOTE: Washington, DC 20037
202.833.4400
0 8' 16' 32' SEE SHEET A.2-0B FOR ADDITIONAL NOTES & TABULATIONS 202.912.8100
www.rtkl.com
c RTKL Associates Inc.
5 GRAPHIC SCALE

FLOOR FIN. FLR. ELEV OFFICE RETAIL SERVICE/UTILITY PARKING TOTAL GFA
NORTH WEST
GROUND FLOOR VARIES (SEE PLAN) 8,560 7,670 0 0 16,230 OFFICE GROUND
FLOOR PLAN
RTKL Contract No. 20-08081.12
Issue Date 06/04/10
Scale 1/16" = 1'-0"

A.2-6
A B C D E F G 4.1 SITE PLAN - AMENDMENT
A B C D E F G

Founders Square
1 1

2101 L Street, NW Suite 200


Washington, DC 20037
RTKL Associates Inc.
Design Architect
Arlington, VIRGINIA
2 A.2-10 2
1

ENTER PROJECT ADDRESS


ROOF ABOVE
PROJECTED BAY

The Shooshan Compay


Owner / Developer
Address
ROOF TERRACE
499.00

3 MECH 3
ROOM
STAIR 1 DN
370 SF

VESTIBULE ELEV
340 SF MACHINE
499.00 ROOM
310 SF

169' - 2"
2

100' - 4"
A.2-14 PENTHOUSE No. Date Item
A.2-12 1 MECH 499.00
EQUIP 1 A.2-11 Issued Drawing Log
2560 SF
4 STAIR 2 4

DN

KEY PLAN
NORTHWEST
CT WELL RESID
OFFICE
1000 SF NORTH
(OPEN TO SKY)

SOUTH
OFFICE HOTEL

61' - 6"
RETAIL

5 5

2
N
ROOF BELOW A.2-10
1 5
A.2-13

130' - 8"

6 6
RTKL Associates Inc.
1 MAIN ROOF 2101 L St., NW Suite 200
1/16" = 1'-0" Washington, DC 20037
202.833.4400
0 8' 16' 32' 202.912.8100
NOTE: www.rtkl.com
c RTKL Associates Inc.
GRAPHIC SCALE
SEE SHEET A.2-0B FOR ADDITIONAL NOTES & TABULATIONS
NORTH WEST
OFFICE ROOF &
FLOOR FIN. FLR. ELEV OFFICE RETAIL SERVICE/UTILITY PARKING TOTAL GFA
PENTHOUSE FLOOR
MAIN ROOF 499.00 0 0 4,350 0 0 PLAN
RTKL Contract No. 20-08081.12
Issue Date 06/04/10
Scale 1/16" = 1'-0"

A.2-9
A B C D E F G 4.1 SITE PLAN - AMENDMENT
A B C D E F G

Donohoe Development Company


Founders Square
1 1

2010 Wisconsin Ave, NW


Washington, DC 20007
Hotel Developer

202.333.0880
2 2

The Shooshan Company


4075 Wilson Blvd, Suite 440
Arlington, VIRGINIA

Arlington, VA 22203
Master Developer

703.527.8600
3 3

No. Date Item


Issued Drawing Log

4 4

KEY PLAN

RESID
NORTH NORTH
OFFICE

HOTEL
SECURE
OFFICE

RETAIL OUT-
PARCEL
5

6 6

BBGM Architects &


Interiors Inc.
1825 K Street, NW Washington DC 20006
(202) 452-1644

HOTEL
ILLUSTRATIVE
IMAGES
VIEW LOOKING NORTH WEST Contract No.
Issue Date 06/04/10
Scale

A.6-0A
4.1 SITE PLAN - AMENDMENT
A B C D E F G
A B C D E F G

Donohoe Development Company


Founders Square
1 1

2010 Wisconsin Ave, NW


Washington, DC 20007
Hotel Developer

202.333.0880
2 2

The Shooshan Company


4075 Wilson Blvd, Suite 440
Arlington, VIRGINIA

Arlington, VA 22203
Master Developer

703.527.8600
3 3

No. Date Item


Issued Drawing Log

4 4

KEY PLAN
RESID
NORTH NORTH
OFFICE

HOTEL
SECURE
OFFICE

RETAIL OUT-
PARCEL

6 6

BBGM Architects &


Interiors Inc.
1825 K Street, NW Washington DC 20006
(202) 452-1644

HOTEL
ILLUSTRATIVE
IMAGES
VIEW LOOKING SOUTH WEST Contract No.
Issue Date 06/04/10
Scale

A.6-0A1
4.1 SITE PLAN - AMENDMENT
A B C D E F G
A B C D E F G

HOTEL - SOUTH BUILDING - NOTES AND TABULATIONS

Donohoe Development Company


Founders Square
1 1

HOTEL - SOUTH BUILDING - GUEST ROOM MATRIX


HOTEL - SOUTH BUILDING - PARKING TABULATIONS

2010 Wisconsin Ave, NW


AUTOMOBILE PARKING SPACES BICYCLE RACKS

Washington, DC 20007
STD. COMP. HC HC VAN TOTAL EMPL. VISIT.

Hotel Developer

202.333.0880
GRADE 0 0 0 0 0 4 4

LEVEL P1 37 7 4 1 52 0 6

2 LEVEL P2 42 8 0 0 54 0 0 2

The Shooshan Company


TOTALS: 84 15 4 1 106 14

4075 Wilson Blvd, Suite 440


Arlington, VIRGINIA
PARKING NOTES: GUESTROOM RATIOS: 34% STUDIOS

Arlington, VA 22203
Master Developer
57% 1-BEDROOMS
1. AUTOMOBILE PARKING SPACES
9% 2-BEDROOMS

703.527.8600
REQUIRED:
HOTEL USE: 1/ GUESTROOM X 180 GUESTROOMS = 180 HOTEL GUEST SPACES
RETAIL USE: 1/580 GSF X 1840 GSF = 4 RETAIL PARKING SPACES
TOTAL REQUIRED PARKING SPACES: 184 GENERAL NOTES:
PROVIED:
HOTEL USE: 102 (WAIVER REQUESTED TO REDUCE REQUIRED RATIO TO 0.5/GUESTROOM) 1. RETAIL CEILING HEIGHTS ARE ANTICIPATED TO BE 14'-0" A.F.F.
RETAIL USE: 4 2. LOADING DOCK HEIGHT IS 4 FEET HIGH.
3 TOTAL PROVIDED PARKING SPACES: 106 3
3. A TOTAL OF 8 ACCESSIBLE GUESTROOMS WITH HEARING IMPAIRED
2. UNLESS OTHERWISE NOTED, PARKING SPACE SIZES ARE AS FOLLOWS: ACCOMMODATIONS ARE TO BE PROVIDED PER CODE. 2 OF THESE SHALL HAVE
STANDARD (FULL SIZE) PARKING SPACES: ROLL-IN SHOWERS
8.5' X 18' AT 90 DEGREES. 4. 6 STANDARD GUESTROOMS SHALL HAVE HEARING IMPAIRED ACCOMMODATIONS.
8' X 22' AT PARALLEL LOCATIONS.
8' X 19' AT 60 DEGREES.
COMPACT PARKING SPACES:
8' X 15' AT 90 DEGREES;
8' X 20' AT PARALLEL LOCATIONS.
3. TRAFFIC AISLE DIMENSIONS ARE:
2 WAY TRAFFIC: 23' WIDE
2 WAY OR 1 WAY TRAFFIC W/ 90 DEGREE PARKING: 23' WIDE
1 WAY TRAFFIC W/ NO PARKING: 12' WIDE
No. Date Item
1 WAY TRAFFIC W/ 60 DEGREE PARKING: 16' WIDE
4. BICYCLE RACK CALCULATIONS PER LEED. Issued Drawing Log
EMPLOYEES: 40 HOTEL + 3 RETAIL = 43 HOTEL - SOUTH BUILDING - AREA AND USE TABULATIONS
GUESTS/TRANSIENTS: 2/ STUDIO, 2/ 1-BEDROOM, 3/ 2-BEDROOM = 285 HOTEL + 12 RETAIL = 297
43 FTE EMPLOYEES (FULL TIME EQUIVALENT) X 5% = 3 BIKE RACKS
4 4
285 TRANSIENT HOTEL OCCUPANTS X 60% OCCUPANCY + 12 TRANSIENT RETAIL ( X 5%) = 10
13 BIKE RACKS REQUIRED PER LEED REQUIREMENTS. ALL BIKE RACKS CAN BE AT EXTERIOR.
1 SHOWER FOR EMPLOYEES REQUIRED. KEY PLAN
(PER SITE PLAN CONDITIONS FOR RETAIL SPACE - 2 BICYCLE RACKS PER 10,000 GSF.)
5. ACCESSIBLE PARKING SPACES PER CODE:
BETWEEN 101 AND 150 SPACE REQUIRE 5 ACCESSIBLE PARKING SPACES.
RESID
1 ACCESSIBLE PARKING SPACE SHALL BE FOR ACCESSIBLE VAN. NORTH NORTH
OFFICE

HOTEL
SECURE
OFFICE

RETAIL OUT-
PARCEL
5

N
AREA TABULATION NOTES:

1. LOADING AREA IS EXCLUDED FROM F.A.R. (FLOOR AREA RATIO) AREA CACLULATIONS ABOVE.
2. ALL BELOW GRADE AREAS, INCLUDING BELOW-GRADE PARKING GARAGE, ARE EXCLUDED FROM
F.A.R. AREA CALCULATIONS ABOVE. ENCLOSED RAMP AREAS FROM GRADE TO P1 LEVEL ARE
EXCLUDED FROM F.A.R. AREA CALCULATIONS ABOVE.
3. MECHANICAL SHAFTS ARE EXCLUDED FROM F.A.R. AREA CALCULATIONS ABOVE.
4. MECHANICAL PENTHOUSE AREAS ARE NOT INCLUDED IN TOTAL F.A.R. AREA CALCULATIONS ABOVE.
5. HOTEL BACK OF HOUSE AND STORAGE AREAS BELOW GRADE ARE INCLUDED IN PARKING AREA
TOTALS.
6 6

BBGM Architects &


Interiors Inc.
1825 K Street, NW Washington DC 20006
(202) 452-1644

HOTEL
PROGRAM/
ROOM MATRIX
Contract No.
Issue Date 06/04/10
Scale

A.6-0B
4.1 SITE PLAN - AMENDMENT
A B C D E F G
A B C D E F G

Donohoe Development Company


A.1 A B C D A.1 A B C D

Founders Square
1 27' - 0" 7' - 10" 22' - 10" 31' - 5" 27' - 0" 7' - 10" 22' - 10" 31' - 5" 1
123' - 5"
123' - 5"

OUTLINE OF
BUILDING ABOVE

MECH.

2010 Wisconsin Ave, NW


STORAGE

Washington, DC 20007
1 1
1.1 1.1

Hotel Developer
VENT. PARKING SPACES LEVEL P1 BICYCLES - P1
FAN

202.333.0880
EL. 252.03 EL. 252.33 EL. 261.16 EL. 261.46
STD. COMP. HC HC VAN TOTAL EMPL. VISIT.
2 2
BOTTOM OF
S S
TRANSFORMER BIKE
VAULT 40 7 4 1 52 0 6 RACKS ELEC. VAULT
UP STAIR 1 STAIR 1
S EL. 257.0' S UP DN
2 2
3 3
55' - 0"

55' - 0"

The Shooshan Company


S S PARKING SPACES LEVEL P2 BICYCLES - P2 S S
S S
STD. COMP. HC HC VAN TOTAL EMPL. VISIT. EL.257.00

S S S S
S S

4075 Wilson Blvd, Suite 440


46 8 0 0 54 0 0
4 4

Arlington, VIRGINIA
S S

Arlington, VA 22203
S S

Master Developer
S S S
4.4 4.4

703.527.8600
PARKING SUMMARY TOTAL S S
ELEC. ROOM
S S S S S
% COMPACT
STD. COMP. HC HC VAN TOTAL
5 SPACES 5
27' - 6"

27' - 6"
S S
150' - 0"

S S S
86 15 4 1 106 15% S S
1
S S
A.6-10
3 OUTLINE OF 3
S
5.7 S S 5.7 S S BUILDING ABOVE

S 6 S 6
NOTE:
S S S
27' - 6"

27' - 6"
C
S S
1. UNLESS OTHERWISE NOTED, PARKING SPACE SIZES ARE EL. 261.16 EL. 261.46

S AS FOLLOWS: STANDARD (FULL SIZE) PARKING SPACES:


S S C
S
8.5' X 18' AT 90 DEGREES; 8.5' x 19' AT 60 DEGREES; 8' X 22' S
AT PARALLEL LOCATIONS. COMPACT PARKING SPACES: 8' X
7 7
7.1 15' AT 90 DEGREE LOCATIONS; 8' X 20' AT PARALLEL 7.1

8' - 0"
EL. 252.03 EL. 252.33 S LOCATIONS. HC HC
S S C

5' - 0"
2. UNLESS OTHERISE NOTED, ALL VEHICULAR DRIVE No. Date Item
S
27' - 6"

27' - 6"
AISLES FOLLOW ZONING REQUIREMENTS: Issued Drawing Log

8' - 0"
S S C
TWO WAY TRAFFIC DRIVE AISLE = 23' HC 3' - 0"

259' - 11"
HC
ONE WAY AND TWO WAY TRAFFIC DRIVE AISLES W/ 90
289' - 4"

289' - 4"
8 DEGREE PARKING = 23'
8
S

8' - 0"
4 S
ONE WAY TRAFFIC DRIVE AISLE WITHOUT PARKING = 12 ' S VAN 4
S S C
8.4 S S S ONE WAY TRAFFIC DRIVE AISLE WITH 8.5' X 19' SPACE AT 60 8.4
DEGREES = 16'
KEY PLAN

8' - 0"
S S S
C
3. SEE SHEET A.6-0B FOR OTHER NOTES & TABULATIONS
EL. 261.16
27' - 6"

27' - 6"
9 9

5%
DN
S EL.261.80 RESID
NORTH NORTH
ELEC RM. ELEV LOBBY OFFICE
ELEV LOBBY C
STORAGE S EL.261.46
EL. 252.63 S
GAS
9.7 S 9.7 OFFICE
EL.261.80

6%
DN
EL.262.06 HOTEL
SECURE
S OFFICE
10 10
EL. 252.63
27' - 6"

27' - 6"
EL. 252.33 C
S
TELECOM
LAUNDRY EL.262.08 RETAIL OUT-
PARCEL
C S
5 GEN STORAGE
11.2 11 11.2 11
C
S BOOSTER
109' - 11"

PUMP ROOM
RAMP DOWN TO PARKING 5%

EL.265.58
27' - 6"

27' - 6"
OFFICE C S
EL.261.80
N
UP
12 UP
12
S FIRE PUMP
DN
ROOM
C

ENGINEER'S TOILET
EMPLOYEE
EL.265.58
12.6 SHOP
12.6 BREAK ROOM

14% RAMP DOWN TO P1


STAIR 2 TOILET
S
STAIR 2
C

13 13
27' - 6"

27' - 6"
S

EL. 255.01
EL. 257.06
C

RAMP DOWN TO
PARKING 5%
OPEN TO
S BELOW
6 EL. 255.01 6
14.2 14 14.2 14
C

BBGM Architects &


Interiors Inc.
27' - 6"

27' - 6"

15 15 1825 K Street, NW Washington DC 20006


STORM WATER VAULT
OPEN TO STORM
17' - 2"

17' - 2"

(202) 452-1644
EL. 255.01 WATER VAULT
BELOW
HOTEL
16 16
GARAGE FLOOR
42' - 7" 34' - 6" 46' - 4" PLANS
1
A.6-9 Contract No.
2 PLAN- P-2 1 PLAN- P-1 Issue Date 06/04/10
A.6-1 1/16" = 1'-0" A.6-1 1/16" = 1'-0"
Scale
NOTE:
0' 8' 16' 32' 64' 1. SEE SHEET A.6-0B FOR ADDITIONAL NOTES & TABULATIONS
A.6-1
4.1 SITE PLAN - AMENDMENT
A B C D E F G
A B C D E F G

A.6-6
A B C D
7' - 10" 22' - 10" 1
2 31' - 5"

Donohoe Development Company


Founders Square
8' - 1" 57' - 4" EDGE OF PARKING
1 GARAGE BELOW 1

GARAGE
AIR INTAKE
1

13' - 6"

2010 Wisconsin Ave, NW


Washington, DC 20007
2

Hotel Developer
RETAIL

15' - 11"
1840 GSF

202.333.0880
STAIR 1 DN EL. 276.80
UP
3

19' - 6"
2 BOARD ROOM 2
WOMEN'S

91' - 1"

The Shooshan Company


4

4075 Wilson Blvd, Suite 440


21' - 6"
MEN'S

Arlington, VIRGINIA

Arlington, VA 22203
Master Developer
MEETING STUDY
5 SPACE

703.527.8600
21' - 6"
3
6 3
HEARTH
ROOM

19' - 6"
DINING TERRACE
EL. 275.98
DINING
7
EL. 276.00

21' - 6"
1 A.6-7
LOBBY

Adjacent Office Building


A.6-8 1
4

267' - 0"
262' - 5"
8 No. Date Item

NORTH QUINCY STREET


Issued Drawing Log
FRONT DESK

21' - 6"
SERVING
PROPERTY LINE
C D LUGGAGE

4 FCR 4
9 KEY PLAN
EDGE OF PARKING ELEV LOBBY

142' - 7"
MARKET
GARAGE BELOW WORK AREA

21' - 6"
RESID
NORTH NORTH
OFFICE OFFICE

11
EDGE OF PARKING
10 GARAGE BELOW
MECH ROOM SERVICE
OFFICE
CORR.
EL. 281.20 FOOD PREP HOTEL

19' - 6"
SECURE
OFFICE

DN
12 OFFICE STOR. OFFICE

11 SERVER RM.
RETAIL OUT-
DN FOOD STOR. PARCEL
EMPLOYEE FOOD STOR.
19' - 6"

5 ENTRANCE UP MECH. RM.


ACCESS
TEL. LINE OF MECHANICAL
13 ROOM ABOVE

12 DN UP OFFICEOFFICE
LINE OF
BUILDING ABOVE N
19' - 6"

1 LOADING DN

8' - 0"
LINE OF SETBACK FROM SECURE OFFICE BUILDING

14% RAMP DOWN


A.6-9 EL. 276.00
GENERATOR

OUTLINE OF PARKING BELOW


STAIR 2 EL. 272.20
TRASH
13 12' x 25'
LOADING RECYC
3' - 0"
16' - 3"

SPACE

23' - 4" 3' - 6" 10' - 0" 10' - 0"

33' - 0"
GARAGE
EXHAUST 1' - 10"
2 PLAN- MECH. ROOM 14 EL. 273.10

12' - 0"
A.6-2 1/16" = 1'-0"
13' - 2"

6%
DN
1' - 0"
6 6
15 EL. 273.30 EL. 273.75

12' - 0"
23' - 0" 23' - 0" BBGM Architects &
Interiors Inc.
EL. 272.90 EL. 273.35 1825 K Street, NW Washington DC 20006
(202) 452-1644
EDGE OF PARKING
GARAGE BELOW 2
3 HOTEL
A.6-6 GROUND FLOOR
PLAN
Contract No.
Issue Date 06/04/10
Scale
1 LEVEL 1 NOTE:
0' 8' 16' 32' 64'
A.6-2 1/16" = 1'-0" 1. SEE SHEET A.6-0B FOR ADDITIONAL NOTES & TABULATIONS A.6-2
4.1 SITE PLAN - AMENDMENT
A B C D E F G
A B C D E F G

A.6-6
A3-1
A B C D A B C D

Donohoe Development Company


7' - 10" 22' - 10" 31' - 5" 7' - 10" 22' - 10" 1
2 31' - 5"

Founders Square
1 1
58' - 9"
26' - 11" 31' - 10"
4' - 11" 26' - 11" 31' - 10" 1' - 6"

1 1

2010 Wisconsin Ave, NW


Washington, DC 20007
GREEN
13' - 6"

13' - 6"
1 BR ROOF

Hotel Developer
1 BR
2 2

202.333.0880
40' - 6"
15' - 11"

15' - 11"
UP UP
STAIR 1 STAIR 1
DN DN

34' - 8"

34' - 8"
3 2 BR 3 2 BR
2 2
19' - 6"

19' - 6"

The Shooshan Company


STUDIO STUDIO

4 4

4075 Wilson Blvd, Suite 440


113' - 0"
1 BR 1 BR 1 BR 1 BR

Arlington, VIRGINIA
23' - 0"

23' - 0"
21' - 6"

21' - 6"

Arlington, VA 22203
Master Developer

703.527.8600
5 5 33' - 0"
72' - 6"
21' - 6"

21' - 6"
1 1
A.6-10 A.6-10
1 BR 1 BR 1 BR
3 3
6 6
STUDIO STUDIO

59' - 2"

59' - 2"
STUDIO
19' - 6"

19' - 6"

52' - 0"
ROOF OPEN TO BELOW

7 7
21' - 6"

21' - 6"
1 BR 1 BR
1 BR
No. Date Item
270' - 1"

270' - 2"
45' - 0"

45' - 0"
8 8 Issued Drawing Log
CORR. CORR.
250' - 6"

250' - 9"
1 BR 1 BR
1 BR 1 BR
21' - 6"

21' - 6"
4 4

KEY PLAN
9 9
62' - 5"

ELEV LOBBY ELEV LOBBY RESID


NORTH NORTH
21' - 6"

21' - 6"
OFFICE

ADA STUDIO

82' - 3"
ADA STUDIO

10 10 SECURE
HOTEL
OFFICE
HOUSEKEEPING HOUSEKEEPING STUDIO

57' - 4"
STUDIO
19' - 6"

19' - 6"
ROOF
ELEC/COMM ELEC/COMM
78' - 8"

RETAIL OUT-

11 11 PARCEL

5
19' - 10"

STUDIO WEIGHT
19' - 6"

19' - 6"
CARDIO
ROOM
STUDIO

12 12 N
GUEST

21' - 6"
LAUNDRY
19' - 6"

19' - 6"

ROOF
STUDIO DN

13 13
51' - 5"

51' - 8"
DN OPEN TO BELOW STAIR 2
STAIR 2 VEST.
16' - 3"

16' - 3"

UP UP

TOILET POOL/SPA
33' - 6"

33' - 4"

14 14 TOILET
6 1 BR 6
13' - 2"

13' - 2"

POOL EQUIP

15 15 BBGM Architects &


3' - 8"

Interiors Inc.
26' - 11" 35' - 0" 26' - 11" 35' - 7" 1825 K Street, NW Washington DC 20006
(202) 452-1644
1 1
A.6-9 A.6-9 HOTEL
FLOOR PLANS
2ND & 3RD
Contract No.
Issue Date 06/04/10
2 PLAN- 3RD FLOOR 1 PLAN- SECOND FLOOR Scale
A.6-3 1/16" = 1'-0" A.6-3 1/16" = 1'-0" NOTE:
0' 8' 16' 32' 64' 1. SEE SHEET A.6-0B FOR ADDITIONAL NOTES & TABULATIONS
A.6-3
4.1 SITE PLAN - AMENDMENT
A B C D E F G
A B C D E F G

A B C D A B C D
22' - 10" 31' - 5" 7' - 10" 22' - 10" 31' - 5"

Donohoe Development Company


58' - 9" 58' - 9"

Founders Square
1 1
26' - 11" 31' - 10" 26' - 11" 31' - 10"

1 1

13' - 6"

13' - 6"

2010 Wisconsin Ave, NW


Washington, DC 20007
1 BR 1 BR

2 2

Hotel Developer
40' - 6"

40' - 6"
15' - 11"

15' - 11"

202.333.0880
UPSTAIR 1 UP
STAIR 1
DN DN

34' - 8"

34' - 8"
3 2 BR 3 2 BR
19' - 6"

19' - 6"
2 2
STUDIO STUDIO

The Shooshan Company


4 4
1 BR ADA 1 BR 1BR 1BR

4075 Wilson Blvd, Suite 440


23' - 0"

23' - 0"
21' - 6"

21' - 6"

Arlington, VIRGINIA

Arlington, VA 22203
Master Developer
5 5

703.527.8600
72' - 6"

72' - 6"
21' - 6"

21' - 6"
1 1
A.6-10 A.6-10
1 BR 1 BR 1BR 1BR

3 6 6 3
STUDIO STUDIO STUDIO STUDIO

59' - 2"

59' - 2"
19' - 6"

19' - 6"
7 7

202' - 2"
246' - 3"
21' - 6"

21' - 6"
1 BR 1 BR 1BR 1BR

270' - 2"
45' - 0"

45' - 0"
8 8 1BR CORR.
No. Date Item
CORR.

250' - 9"
(ADA 4TH-5TH Issued Drawing Log
1 BR 1 BR 1BR
FLOORS)
21' - 6"

21' - 6"
4 4

9 9 KEY PLAN

62' - 5"
ELEV LOBBY ELEV LOBBY
21' - 6"

21' - 6"
RESID
NORTH NORTH
1 BR 1BR OFFICE
85' - 4"

10 10
HOUSEKEEPING HOUSEKEEPING HOTEL
STUDIO SECURE
19' - 6"

19' - 6"
OFFICE

ELEC/COMM ELEC/COMM
78' - 8"

78' - 8"
11 11 RETAIL OUT-
PARCEL
STUDIO JR SUITE
19' - 6"

19' - 6"
5 (2 BR @ 10TH FL) STUDIO
STUDIO

12 12
N

58' - 8"
19' - 6"

19' - 6"
STUDIO
STUDIO
28' - 0"

ROOF TERRACE 2 BR
(ADA @ 4TH
13 DN
13 DN
FLOOR ONLY)
9' - 7"

STAIR 2
UPSTAIR 2
16' - 3"

16' - 3"
UP

33' - 6"
14 14
1BR
13' - 2"

13' - 2"

ROOF

16' - 3"
6 ROOF 6
15 15
BBGM Architects &
26' - 11" 33' - 4" Interiors Inc.
1825 K Street, NW Washington DC 20006
1 1 (202) 452-1644
A.6-9 A.6-9
HOTEL
FLOOR PLANS
4TH TO 10TH
1 PLAN- 9TH-10TH FLOORS 2 PLAN- 4TH-8TH FLOORS Contract No.
A.6-4 1/16" = 1'-0" A.6-4 1/16" = 1'-0" 06/04/10
Issue Date
Scale
NOTE:
0' 8' 16' 32' 64' 1. SEE SHEET A.6-0B FOR ADDITIONAL NOTES & TABULATIONS
A.6-4
4.1 SITE PLAN - AMENDMENT
A B C D E F G
A B C D E F G

A.6-6
A3-1
A.1 A B C D A B C D
22' - 10" 1
2 31' - 5"

Donohoe Development Company


26' - 11" 26' - 11" 31' - 10"

Founders Square
1 1

1 1

13' - 6"
ROOF AHU
1 BR

32' - 6"

2010 Wisconsin Ave, NW


2 2

Washington, DC 20007
40' - 6"
SP

15' - 11"

Hotel Developer
UP
STAIR 1

202.333.0880
DN DN

34' - 8"
3 3 2 BR

19' - 6"
CT STUDIO
2 2
4 4

The Shooshan Company


52' - 1"
ROOF 1 BR 1 BR

45' - 7"
ROOF

23' - 0"
21' - 6"

4075 Wilson Blvd, Suite 440


Arlington, VIRGINIA
CT

Arlington, VA 22203
5 5

Master Developer
72' - 6"

703.527.8600
21' - 6"
1 1
A.6-10 A.6-10
1 BR 1 BR

6 6
STUDIO STUDIO

59' - 2"
3 3

19' - 6"
ROOF

7 7

202' - 2"
MECH ROOM

246' - 3"
21' - 6"
A.6-8
A3-1 1
4 1 BR 1 BR
95' - 1"
93' - 11"

CORR.

45' - 0"
8 8
1 BR No. Date Item

21' - 6"
Issued Drawing Log

4 9 9 4
ELEV LOBBY
KEY PLAN

66' - 3"
EMR

21' - 6"
AHU

EXECUTIVE RESID
SUITE NORTH NORTH
OFFICE
10 10
25' - 3" HOUSEKEEPING

19' - 6"
HOTEL
SECURE
ELEC/COMM OFFICE

11 11

88' - 3"
STUDIO

19' - 6"

19' - 1"
RETAIL OUT-
PARCEL
ROOF TERRACE
5

12 12

19' - 6"
SP
STUDIO N

13 13 DN
STAIR 2

32' - 11" 24' - 9"


14 14

6 15 15 6

BBGM Architects &


1 1 Interiors Inc.
A.6-9 A.6-9 1825 K Street, NW Washington DC 20006
2
3 (202) 452-1644

A.6-6
A3-1
HOTEL
FLOOR PLANS
2 PLAN- PENTHOUSE 1 PLAN- 11TH FLOOR 11TH & PH
A.6-5 1/16" = 1'-0" A.6-5 1/16" = 1'-0"
Contract No.
Issue Date 06/04/10
Scale
NOTE:
0' 8' 16' 32' 64' 1. SEE SHEET A.6-0B FOR ADDITIONAL NOTES & TABULATIONS
A.6-5
4.1 SITE PLAN - AMENDMENT
A B C D E F G
A B C D E F G

Donohoe Development Company


Founders Square
1 1

2010 Wisconsin Ave, NW


Washington, DC 20007
Hotel Developer

202.333.0880
2 2

The Shooshan Company


4075 Wilson Blvd, Suite 440
Arlington, VIRGINIA

Arlington, VA 22203
Master Developer
METAL PANEL

703.527.8600
PENTHOUSE PENTHOUSE
ROOF ROOF
408' - 0" UPLIT METAL PANEL 408' - 0"
ALUMINUM WINDOW CORNICE
CORRUGATED METAL WALL WITH GLASS &
PANEL PENTHOUSE METAL PANEL INSERTS
ENCLOSURE ILLUMINATED SIGN
3 BEYOND 3
LEVEL PH LEVEL PH
390' - 0" 390' - 0"

ALUMINUM WINDOW
LEVEL 11 LEVEL 11
378' - 0" WALL WITH GLASS & 378' - 0"
METAL PANEL INSERTS

METAL PANEL LEVEL 10 LEVEL 10


368' - 8" 368' - 8"

LEVEL 9 LEVEL 9
359' - 4" 359' - 4"
BRICK BRICK
No. Date Item
LEVEL 8 LEVEL 8
350' - 0" 350' - 0" Issued Drawing Log

133' - 11"

133' - 11"
LEVEL 7 LEVEL 7
340' - 8" 340' - 8"
4 4

115' - 11"

115' - 11"
LEVEL 6 LEVEL 6
331' - 4" 331' - 4" KEY PLAN
METAL PANEL
LEVEL 5 LEVEL 5
322' - 0" 322' - 0" RESID
ILLUMINATED MASONRY NORTH NORTH
OFFICE
WALL. UPLIGHTS MOUNTED
LEVEL 4 LEVEL 4
312' - 8" TO 1ST FLOOR ROOF 312' - 8"
METAL PANEL
LEVEL 3
METAL PANEL LEVEL 3 HOTEL
303' - 4" BUILDING PROJECTION 303' - 4" SECURE
OFFICE
W/ DOWNLIGHTS
LEVEL 2 LEVEL 2
294' - 0" 294' - 0"

RETAIL OUT-
GARAGE ENTRY PARCEL

5 SIGNAGE ILLUMINATED SIGN


LEVEL 1 LEVEL 1
276' - 0" 276' - 0"
ASE ASE
ALUMINUM & GLASS PRECAST CONC. 274' - 1"
274' - 1"
ALUMINUM & GLASS ALUMINUM & GLASS STOREFRONT
LOADING DOCK DOOR GARAGE DOOR N
OVERHANGS W/ PRECAST CONC.
DOWNLIGHT
2 South 1 North
A.6-6 1/16" = 1'-0" A.6-6 1/16" = 1'-0"

6 6

BBGM Architects &


Interiors Inc.
1825 K Street, NW Washington DC 20006
(202) 452-1644

HOTEL
ELEVATIONS

Contract No.
0' 8' 16' 32' 64' Issue Date 06/04/10
Scale

A.6-6
4.1 SITE PLAN - AMENDMENT
A B C D E F G
A B C D E F G

Donohoe Development Company


Founders Square
1 1

2010 Wisconsin Ave, NW


Washington, DC 20007
Hotel Developer

202.333.0880
2 2

The Shooshan Company


4075 Wilson Blvd, Suite 440
Arlington, VIRGINIA

Arlington, VA 22203
Master Developer

703.527.8600
ALUMINUM WINDOW
WALL WITH GLASS & CORRUGATED METAL PANEL UPLIT METAL PANEL
METAL PANEL INSERTS METAL PANEL CORNICE PENTHOUSE
BRICK ROOF
408' - 0"
3 3
METAL WINDOWS WITH
METAL PANEL INSERT

LEVEL PH
390' - 0"

LEVEL 11
378' - 0"
METAL PANEL
LEVEL 10
368' - 8"
No. Date Item
LEVEL 9 Issued Drawing Log
359' - 4"

LEVEL 8
4 350' - 0" 4

133' - 11"
LEVEL 7
340' - 8"
KEY PLAN

115' - 11"
RESID
LEVEL 6 NORTH NORTH
331' - 4" OFFICE

METAL PANEL LEVEL 5


(ILLUMINATED FROM 322' - 0"
GROUND MOUNTED HOTEL
SECURE
FIXTURES) LEVEL 4 OFFICE

312' - 8"

LEVEL 3
303' - 4"
RETAIL OUT-
METAL PANEL BUILDING PARCEL

LEVEL 2
PROJECTION W/
5 294' - 0" DOWNLIGHTS
PRECAST CONC.

LEVEL 1 N
276' - 0"
ASE
ALUMINUM & GLASS BUILDING METAL & GLASS CANOPY W/ 274' - 1"
STOREFRONT ADDRESS SIGN DOWNLIGHTS TO ILLUMINATE SIDEWALK
RETAIL ENTRANCE
ILLUMINATED SIGN MAIN ENTRANCE
ILLUMINATED SIGN

1 East
6 A.6-7 1/16" = 1'-0" 6

BBGM Architects &


Interiors Inc.
1825 K Street, NW Washington DC 20006
(202) 452-1644

HOTEL
ELEVATIONS

Contract No.
Issue Date 06/04/10
0' 8' 16' 32' 64'
Scale

A.6-7
4.1 SITE PLAN - AMENDMENT
A B C D E F G
A B C D E F G

Donohoe Development Company


Founders Square
1 1

2010 Wisconsin Ave, NW


Washington, DC 20007
Hotel Developer

202.333.0880
2 2

The Shooshan Company


4075 Wilson Blvd, Suite 440
Arlington, VIRGINIA

Arlington, VA 22203
Master Developer

703.527.8600
CORRUGATED
METAL PANEL
METAL COPING
PENTHOUSE
ROOF
3 408' - 0" 3
BRICK

METAL WINDOWS WITH


METAL PANEL INSERT

LEVEL PH
390' - 0"

METAL PANEL LEVEL 11


378' - 0"

ALUMINUM WINDOW
WALL WITH GLASS & LEVEL 10
368' - 8"
METAL PANEL INSERTS No. Date Item
Issued Drawing Log
LEVEL 9
359' - 4"

4 ALUMINUM WINDOW LEVEL 8 4


350' - 0"
WALL WITH GLASS &
METAL PANEL INSERTS KEY PLAN

133' - 11"
LEVEL 7
340' - 8"

115' - 11"
RESID
NORTH NORTH
LEVEL 6 OFFICE
331' - 4"
METAL PANEL
LEVEL 5
322' - 0"
HOTEL
SECURE
OFFICE
LEVEL 4
312' - 8"

LEVEL 3
303' - 4" RETAIL OUT-
PARCEL

5 LEVEL 2
294' - 0"

LEVEL 1
N
276' - 0"
ASE
274' - 1"
WALL SCONCE WALL SCONCE PRECAST CONC. WALL SCONCE

1 West
6
A.6-8 1/16" = 1'-0"
6

BBGM Architects &


Interiors Inc.
1825 K Street, NW Washington DC 20006
(202) 452-1644

HOTEL
ELEVATIONS

Contract No.
0' 8' 16' 32' 64' Issue Date 06/04/10
Scale

A.6-8
4.1 SITE PLAN - AMENDMENT
A B C D E F G
A B C D E F G

Donohoe Development Company


Founders Square
1 1

2010 Wisconsin Ave, NW


Washington, DC 20007
Hotel Developer

202.333.0880
2 2

The Shooshan Company


+/- 66' - 6" TO ADJ. RET. BLDG +/- 56' - 8"

4075 Wilson Blvd, Suite 440


Arlington, VIRGINIA

Arlington, VA 22203
Master Developer

703.527.8600
1
A.6-10
PENTHOUSE
3 PENTHOUSE ROOF
ROOF 3
408' - 0"

PENTHOUSE ENCLOSURE

4' - 6"
MAIN ROOF OPENING IN PENTHOUSE ENCLOSURE LEVEL PH
390' - 0"

12' - 0"
GUESTROOMS
LEVEL 11
378' - 0"

9' - 4"
GUESTROOMS
LEVEL 10 No. Date Item
368' - 8"
Issued Drawing Log

9' - 4"
GUESTROOMS
LEVEL 9
359' - 4"

9' - 4"
4 GUESTROOMS 4
LEVEL 8
350' - 0"
KEY PLAN

9' - 4"
GUESTROOMS
133' - 11"

LEVEL 7
340' - 8" RESID

9' - 4"
NORTH NORTH
GUESTROOMS OFFICE
115' - 11"

LEVEL 6
331' - 4"

9' - 4"

141' - 10"
GUESTROOMS
LEVEL 5 SECURE
HOTEL
322' - 0" OFFICE
RETAIL BUILDING

9' - 4"
RESIDENTIAL NORTH
(DASHED) GUESTROOMS (DASHED)
LEVEL 4
312' - 8"

9' - 4"
GUESTROOMS
RETAIL OUT-
PARCEL
LEVEL 3
303' - 4"

9' - 4"
5
LEVEL 2
294' - 0"
POOL

18' - 0"
LOBBY RETAIL 13'-0" CLG.
N
LEVEL 1
273.15 273.55 276' - 0"

14' - 2"
ASE
274' - 1"
PARKING LVL. P1

LEVEL P-1
261' - 10"

9' - 2"
PARKING LVL. P2
LEVEL P-2
252' - 8"

6 6

BBGM Architects &


Interiors Inc.
1825 K Street, NW Washington DC 20006
1 BUILDING SECTION 1 (202) 452-1644
A.6-9 1/16" = 1'-0"
HOTEL
BUILDING
SECTION 1
Contract No.
Issue Date 06/04/10
Scale

0' 8' 16' 32' 64'


A.6-9
4.1 SITE PLAN - AMENDMENT
A B C D E F G
A B C D E F G

Donohoe Development Company


Founders Square
1 1

2010 Wisconsin Ave, NW


Washington, DC 20007
Hotel Developer

202.333.0880
2 2

The Shooshan Company


+/- 93' - 3" TO ADJ. BLDG.
.

4075 Wilson Blvd, Suite 440


Arlington, VIRGINIA

Arlington, VA 22203
Master Developer
1 +/- 90' - 0" TO ADJ. LOT LINE
A.6-9 .

703.527.8600
PENTHOUSE ROOF
+/- 30' - 0" TO CURB PENTHOUSE
ROOF
408' - 0"
COOLING
TOWER
+/- 15' - 0" TO LOT LINE
3 3

4' - 0"
MAIN ROOF LEVEL PH
390' - 0"

GUESTROOMS

LEVEL 11
378' - 0"
GUESTROOMS

LEVEL 10
368' - 8"
GUESTROOMS

LEVEL 9
359' - 4"
GUESTROOMS
No. Date Item
LEVEL 8
Issued Drawing Log
350' - 0"
GUESTROOMS

133' - 11"
4 LEVEL 7 4
340' - 8"
GUESTROOMS
KEY PLAN

115' - 11"
LEVEL 6
331' - 4"
GUESTROOMS
RESID
LEVEL 5 NORTH NORTH
OFFICE
322' - 0"
GUESTROOMS

LEVEL 4
312' - 8"
GUESTROOMS HOTEL
SECURE
OFFICE
LEVEL 3
303' - 4"
GUESTROOMS

LEVEL 2
294' - 0" RETAIL OUT-
PARCEL

5 MEETING LOBBY
CANOPY
?
ROOM
LANDSCAPED AREA
LEVEL 1
276' - 0"

PARKING LVL. P1
ASE
274' - 1" N
LEVEL P-1
261' - 10"
PARKING LVL. P2
LEVEL P-2
252' - 8"

6 6

BBGM Architects &


1 BUILDING SECTION 2 Interiors Inc.
A.6-10 1/16" = 1'-0" 1825 K Street, NW Washington DC 20006
(202) 452-1644

HOTEL
BUILDING
SECTION 2
Contract No.
Issue Date 06/04/10
Scale

0' 8' 16' 32' 64'


A.6-10
4.1 SITE PLAN - AMENDMENT
A B C D E F G
A B C D E F G

Donohoe Development Company


Founders Square
1 1

UPLIT METAL PANEL CORNICE


METAL PANEL

2010 Wisconsin Ave, NW


Washington, DC 20007
METAL PANEL FASCIA
ILLUMINATED SIGN

Hotel Developer

202.333.0880
UPLIT METAL
PANEL CORNICE
2 ALUMINUM WINDOW 2
WALL W/ GLASS & METAL

The Shooshan Company


PANEL INSERTS ALUMINUM WINDOW WALL W/
METAL PANEL GLASS & METAL PANEL INSERTS

4075 Wilson Blvd, Suite 440


Arlington, VIRGINIA

Arlington, VA 22203
Master Developer

703.527.8600
BRICK

3 3

No. Date Item


Issued Drawing Log

4 EAST FACE NORTH EAST CORNER 4

KEY PLAN
BRICK ALUMINUM WINDOW WALL W/ ILLUMINATED SIGN METAL PANEL
GLASS & METAL PANEL INSERTS

METAL PANEL

METAL & GLASS CANOPY W/


DOWNLIGHTS TO
5 ILLUMINATE SIDEWALK

ALUMINUM & GLASS


STOREFRONT

6 6

PRECAST CONC.
BBGM Architects &
Interiors Inc.
BUILDING SIGN W/ 1825 K Street, NW Washington DC 20006
ILLUMINATION (202) 452-1644

HOTEL
ILLUSTRATIVE
DETAILS
HOTEL ENTRY Contract No.
Issue Date 06/04/10
Scale

A.6-11
4.1 SITE PLAN - AMENDMENT
A B C D E F G
LEED-NC Version 2.2 Registered Project Checklist
Founder Square- Hotel
4.1 Ammendments
Yes ? No
10 1 3 Sustainable Sites 14 Points
Y Prereq 1 Construction Activity Pollution Prevention Required
1 Credit 1 Site Selection 1
1 Credit 2 Development Density & Community Connectivity 1
1 Credit 3 Brownfield Redevelopment 1
1 Credit 4.1 Alternative Transportation, Public Transportation Access 1
1 Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms 1
1 Credit 4.3 Alternative Transportation, Low-Emitting and Fuel-Efficient Vehicles 1
1 Credit 4.4 Alternative Transportation, Parking Capacity 1
1 Credit 5.1 Site Development, Protect of Restore Habitat 1
1 Credit 5.2 Site Development, Maximize Open Space 1
1 Credit 6.1 Stormwater Design, Quantity Control 1
1 Credit 6.2 Stormwater Design, Quality Control 1
1 Credit 7.1 Heat Island Effect, Non-Roof 1
1 Credit 7.2 Heat Island Effect, Roof 1
1 Credit 8 Light Pollution Reduction 1
Yes ? No
2 1 1 Water Efficiency 5 Points
1 Credit 1.1 Water Efficient Landscaping, Reduce by 50% 1
1 Credit 1.2 p g, No Potable Use or No Irrigation
Water Efficient Landscaping, g 1
1 Credit 2 Innovative Wastewater Technologies 1
1 Credit 3.1 Water Use Reduction, 20% Reduction 1
Credit 3.2 Water Use Reduction, 30% Reduction 1
Yes ? No
4 4 3 Energy & Atmosphere 17 Points
Y Prereq 1 Fundamental Commissioning of the Building Energy Systems Required
Y Prereq 2 Minimum Energy Performance Required
Y Prereq 3 Fundamental Refrigerant Management Required
2 2 Credit 1 Optimize Energy Performance 1 to 10
3 Credit 2 On-Site Renewable Energy 1 to 3
1 Credit 3 Enhanced Commissioning 1
1 Credit 4 Enhanced Refrigerant Management 1
1 Credit 5 Measurement & Verification 1
1 Credit 6 Green Power 1
continued…
Yes ? No
3 1 5 Materials & Resources 13 Points
Y Prereq 1 Storage & Collection of Recyclables Required
1 Credit 1.1 Building Reuse, Maintain 75% of Existing Walls, Floors & Roof 1
1 Credit 1.2 Building Reuse, Maintain 100% of Existing Walls, Floors & Roof 1
1 Credit 1.3 Building Reuse, Maintain 50% of Interior Non-Structural Elements 1
1 Credit 2.1 Construction Waste Management, Divert 50% from Disposal 1
1 Credit 2.2 Construction Waste Management, Divert 75% from Disposal 1
1 Credit 3.1 Materials Reuse, 5% 1
1 Credit 3.2 Materials Reuse,10% 1
1 Credit 4.1 Recycled Content, 10% (post-consumer + ½ pre-consumer) 1
Credit 4.2 Recycled Content, 20% (post-consumer + ½ pre-consumer) 1
1 Credit 5.1 Regional Materials, 10% Extracted, Processed & Manufactured Regionally 1
Credit 5.2 Regional Materials, 20% Extracted, Processed & Manufactured Regionally 1
Credit 6 Rapidly Renewable Materials 1
Credit 7 Certified Wood 1
Yes ? No
9 1 2 Indoor Environmental Quality 15 Points
Y Prereq 1 Minimum IAQ Performance Required
Y Prereq 2 Environmental Tobacco Smoke (ETS) Control Required
1 Credit 1 Outdoor Air Delivery Monitoring 1
1 Credit 2 Increased Ventilation 1
1 Credit 3.1 Construction IAQ Management Plan, During Construction 1
Credit 3.2 Construction IAQ Management Plan, Before Occupancy 1
1 Credit 4.1 Low-Emitting Materials, Adhesives & Sealants 1
1 Credit 4.2 Low-Emitting Materials, Paints & Coatings 1
1 Credit 4.3 Low-Emitting Materials, Carpet Systems 1
Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products 1
1 Credit 5 Indoor Chemical & Pollutant Source Control 1
1 Credit 6.1 Controllability of Systems, Lighting 1
1 Credit 6.2 Controllability of Systems, Thermal Comfort 1
1 Credit 7.1 Thermal Comfort, Design 1
Credit 7.2 Thermal Comfort, Verification 1
1 Credit 8.1 Daylight & Views, Daylight 75% of Spaces 1
1 Credit 8.2 Daylight & Views, Views for 90% of Spaces 1
Yes ? No
5 Innovation & Design Process 5 Points
1 Credit 1.1 Innovation in Design: Education Program 1
1 Credit 1.2 Innovation in Design: 100% of parking below grade 1
1 Credit 1.3 Innovation in Design: Energy Star 1
1 Credit 1.4 Innovation in Design: Exemplerary Performance in Transportation 1
1 Credit 2 LEED™ Accredited Professional 1
Yes ? No
33 8 14 Project Totals (pre-certification estimates) 69 Points
Certified 26-32 points Silver 33-38 points Gold 39-51 points Platinum 52-69 points
LEEDFORNEWCONSTRUCTIONV2.2
PROJECT Founder Square- Hotel
STAGE 4.1 Ammendments
27 41 68 LEED NCV2.2 Project Totals
69 33 27 14 12 Certified: 26-32 points Silver: 33-38 points Gold: 39-51 points Platinum: 52-69 points
4.1 COMMITMENT

MODERATE

DIFFICULT
Possible

EASY

Summarized Description of Action Required Status


Sustainable Sites
Incorporate erosion and sedimentation control measures into site
Y Y Prereq 1 Construction Activity Pollution Prevention -
construction.
Do not develop flood prone sites, farmland, wetland, or endangered Founders square site does not fall under any negative site
1 1 1 Credit 1 Site Selection
species refuge. selection criteria according to LEED
Develop on a previously developed with within an area with min
Founders square site is located in the Arlington, VA Ballston
1 1 1 Credit 2 Development Density & Community Connectivity density of 60,000sqft/acre OR develop within 1/2 mile of residential
area which is highly dense development area.
area and within 1/2 mile of 10 community services.
Founders square will do a full remediation of contaminates;
1 1 1 Credit 3 Brownfield Redevelopment Develop EPA or State designated Brownfield site.
Arlington County has identified the site as a Brownfield.
Develop site within 1/4 of two bus lines or within 1/2 mile of rail Founders Square site is within 0.5 mile of Ballston Metro and
1 1 1 Credit 4.1 Alt. Transportation, Public Transportation Access
station. along numerous public bus lines.
For residential projects provide secure covered bike storage for 5%
1 1 Credit 4.2 Alt Transportation, Bicycle Storage & Changing Rooms -
of FTE occupants and showers for 0.5%.
Provide low-emitting/ fuel-efficient vehicles for:
-3% FTE occupants and preferred parking for these vehicles OR
- provide 5% of total parking as preferred parking for fuel efficient
1 1 1 Credit 4.3 Alt Transportation, Low Emitting & Fuel Efficient Vehicles vehicles OR -
- install alternative-fuel refueling stations for 3% of total parking
(Zipcar spaces may be used for credit compliance, 1 zipcar serves 8
FTE).
Do not exceed code/zone allowed minimum parking capacity and
Meeting site plan condition required parking meets and does
1 1 1 Credit 4.4 Alt Transportation, Parking Capacity provide infrastructure and support programs to facilitate shared
not exceed parking requirements.
vehicle usage.
Conserve natural areas by limiting site disturbance to 40' from
1 1 Credit 5.1 Site Development, Protect or Restore Open Space building, 10' beyond walkways, 15' beyond roadways and 25' beyond -
permeable surfaces
Exceed zone open space requirement by 25% or if no open space Planned site provides over 30% vegetated open space on
1 1 1 Credit 5.2 Site Development, Maximize Open Space
requirements exist, provide open space equal to building footprint. grade.
Employ storm retention ponds/tanks OR pervious paving AND/OR
Existing site is almost 100% impervious. Planned site
veg. roof reducing run-off so post development rate and quantity is
1 1 1 Credit 6.1 Stormwater Design, Quantity Control provides over 30% vegetated open space on grade, possible
less than or equal to predevelopment. Feed cooling tower with
green roof and potential for stormwater re-use for irrigation.
captured storm water or use as irrigation water make-up
Employ storm retention ponds/tanks OR pervious paving AND/OR
1 Credit 6.2 Stormwater Design, Quality Control -
veg. roof. & filtration for ALL site runoff
Shade parking OR 50% under cover and utilize high reflective All parking at Founders Square Development will be
1 1 1 Credit 7.1 Heat Island Effect, Non-Roof
materials for hardscape. underground.
Specify high albedo roofing type for 75% of the total roof area OR
1 1 1 Credit 7.2 Heat Island Effect, Roof Green roof under consideration for part of the roof area.
50% of roof as vegetated are or a combination of both.
Design muted exterior lighting (< 1.5 fc) with cut off fixtures and no
1 1 Credit 8 Light Pollution Reduction up lighting. Exterior lighting must not exceed ASHRAE 90.1-2004 -
lpd limits.
Water Efficiency
Specify drip irrigation AND/OR use captured storm water for
1 1 1 Credit 1.1 Water Efficient Landscaping, Reduce by 50% Stormwater re-use for irrigation under consideration.
irrigation.
Install no irrigation OR use captured storm water (tanks or pond) for
1 1 Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation Stormwater re-use for irrigation under consideration.
ALL irrigation.
1 Credit 2 Innovative Wastewater Technologies Re-use stormwater in plumbing fixtures and/or gray water system -
Specify dual flush toilets (1.6/1.1 or less) and low flow lavs (0.5
1 1 1 Credit 3.1 Water Use Reduction, 20% Reduction -
gpm).
Specify dual flush toilets (1.6/1.1 or less), low flow lavs (0.5 gpm)
1 1 Credit 3.2 Water Use Reduction, 30% Reduction -
and low flow showers (1.8 or less).
Energy & Atmosphere
Fundamental Commissioning of the Building Energy
Y Y Prereq 1 Engage a 3rd party commissioning authority. -
Systems
Y Y Prereq 2 Minimum Energy Performance Design envelop, HVAC, and lighting at or below ASHRAE 90.1-2004 -
Y Y Prereq 3 Fundamental Refrigerant Management Specify HCFC or HFC refrigerants in chillers. -
Design envelop, HVAC, and lighting below ASHRAE 90.1-2004 by
10 2 2 2 2 Credit 1 Optimize Energy Performance -
10-45%
Employ renewable energy such as photovoltaic or solar thermal, to
3 Credit 2.1 On-Site Renewable Energy, 2.5%, 7.5%, 12.5% -
offset building energy costs (2.5-12%)
Engage a 3rd party commissioning authority with scope to cover
1 1 1 Credit 3 Enhanced Commissioning -
LEED enhanced commissioning items.
Do not use refrigerants OR use refrigerants with low ozone depleting
1 1 Credit 4 Enhanced Refrigerant Management -
and global warming potential.
Incorporate enhanced BAS energy use monitoring and reporting
1 1 1 Credit 5 Measurement & Verification -
services.
By 35% or building power from grid source green power suppliers or
1 1 Credit 6 Green Power -
through purchasing renewable energy credits.
Founders Hotel - LEED NCv2.2 Tracker - 5-19-10-MG
51 Monroe Street, Suite 402, Rockville, MD 20850 5/19/2010 Ph. 240.403.0953
27 41 68 LEED NCV2.2 Project Totals
69 33 27 14 12 Certified: 26-32 points Silver: 33-38 points Gold: 39-51 points Platinum: 52-69 points
4.1 COMMITMENT

MODERATE

DIFFICULT
Possible

EASY

Summarized Description of Action Required Status


Materials & Resources
Designate specific space to support building recycling efforts on
Y Y Prereq 1 Storage & Collection of Recyclables Recycling collection will be commingled.
floors and loading dock (space must be >500 Sq FT)
Building Reuse, Maintain 75%, 95% of Existing Shell, 50% of
3 Credit 1.1 Reuse existing building structure and shell elements. Building is 100% new construction.
interior
Use waste hauler throughout demolition and construction that will
1 1 1 Credit 2.1 Construction Waste Management, Divert 50% sort on/off site and recycle majority of demolition/ construction waste, -
diverting waste from landfills.
Use waste hauler throughout demolition and construction that will
1 1 Credit 2.1 Construction Waste Management, Divert 75% sort on/off site and recycle majority of demolition/ construction waste, ;-
diverting waste from landfills.
Use salvaged materials (lights, doors, hardware, seating, flooring,
2 Credit 3.1 Materials Reuse, 5%, 10% -
etc)
Specify building materials with high recycled content (concrete,
1 1 1 Credit 4.1 Recycled Content, 10% (post-consumer + 1/2 pre-consumer) -
gypsum board, ceiling, carpet, etc)
Specify building materials with high recycled content (concrete,
1 1 Credit 4.2 Recycled Content, 20% (post-consumer + 1/2 pre-consumer) -
gypsum board, ceiling, carpet, etc)
Specify building materials which are extracted, harvested, and
Local/Regional Materials, 10%
1 1 1 Credit 5.1 manufactured from local sources (within 500 miles of the project -
Extracted/Harvest/Manufactured
site).
Specify building materials which are extracted, harvested, and
Local/Regional Materials, 20%
1 1 Credit 5.1 manufactured from local sources (within 500 miles of the project -
Extracted/Harvest/Manufactured
site).
Specify materials with rapidly renewable content (wheat based
1 1 Credit 6 Rapidly Renewable Materials, 2.5% -
doors/counters/core, bamboo/cork floors/ cotton insulation, etc).
Specify FSC certified wood for the majority (>50% by cost) of the
1 1 Credit 7 Certified Wood -
wood used on the project.
Indoor Environmental Quality
Y Y Prereq 1 Minimum IAQ Performance Design outside air to meet/exceed ASHRAE 62.1-2004 Project will have operable windows.
Adopt no smoking policy and no smoking within 25' of the building.
Y Y Prereq 2 Environmental Tobacco Smoke (ETS) Control If smoking is allowed inside the building all smoking areas must be -
properly sealed, pressurized and exhausted to the outside.
Implement CO2 monitoring and CO2 based ventilation control in all
densly populated speces (lobbies, meeting rooms, resturants, etc.).
1 1 1 Credit 1 Outdoor Air Delivery Method -
Provide air flow monitoring stations on all HVAV units supplying OA
to regularly occupied areas.
Increase ventilation rates to at least 30% above that as required by
1 1 Credit 2 Increased Ventilation Project will have operable windows.
ASHRAE 62.1-2004
Protect HVAC system during construction and properly store
1 1 1 Credit 3.1 Construction IAQ Management Plan, During Construction absorptive materials. Specify and use MERV 8 filters during -
construction.
Flush building w/100% OA for 2 wks OR conduct post construction,
1 1 Credit 3.2 Construction IAQ Management Plan, Before Occupancy -
pre occupancy air testing.
1 1 1 Credit 4.1 Low-Emitting Materials, Adhesives & Sealants Specify low VOC adhesives and sealants in all trades (Arch, MEP) -
1 1 1 Credit 4.2 Low-Emitting Materials, Paints & Coatings Specify low VOC interior paints, stains, varnishes, and coatings. -
Specify only CRI IAQ Green Label Plus certified carpets for ALL
1 1 1 Credit 4.3 Low-Emitting Materials, Carpet Systems -
carpets. Specify low VOC carpet adhesive.
Specify low composite wood and agrifiber products containing no-
1 1 Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products -
urea formaldehyde resins. (Arch, MEP)
Install permanent entryway walk off systems, direct exhaust
1 Credit 5 Indoor Chemical & Pollutant Source Control janitor/copy/fax areas and employ deck to deck partitions. Use -
MERV 13 filtration (or greater) for all areas.
Provide lighting controls for 90% of building occupants and for all
1 1 1 Credit 6.1 Controllability of Systems, Lighting Typical hotel rooms will meet these requirements
shared use spaces.
Provide comfort control for 50% of occupants and for all shared use
1 1 1 Credit 6.2 Controllability of Systems, Thermal Comfort Typical hotel rooms will meet these requirements
spaces.
1 1 1 Credit 7.1 Thermal Comfort, Design Design HVAC system to meet ASHRAE 55-2004. -
Develop thermal comfort survey for building occupants and
1 1 Credit 7.2 Thermal Comfort, Verification -
corrective action procedure.
Design envelop and interior spaces for 2% day lighting in 75% of
1 Credit 8.1 Daylight & Views, Daylight 75% of Spaces -
occupied areas.
Design envelop and interior spaces for views outside for 90% of
1 1 1 Credit 8.2 Daylight & Views, Views for 90% of Spaces Typical hotel rooms will meet these requirements
occupied areas.
Innovation & Design Process
Include signage throughout the building educating occupants on
1 1 1 Credit 1.1 Innovation in Design: Education Program -
aspects of green building.
1 1 1 Credit 1.2 Innovation in Design: 100% of parking below grade Provide 100% underground parking to qualify. -
1 1 1 Credit 1.3 Innovation in Design: Energy Star Specify Energy Star certified appliances and lighting. Energy star appliances and lighting is a 4.1 requirement.
Innovation in Design: Exemplerary Performance in
1 1 1 Credit 1.4 Locate project where numerous transportation options are available. -
Transportation
1 1 1 Credit 2 LEED™ Accredited Professional Have LEED AP on design team OR as consultant. -
69 33 27 14 12 LEED NCV2.2 Project Totals
27 41 53 Certified: 26-32 points Silver: 33-38 points Gold: 39-51 points Platinum: 52-69 points
Founders Hotel - LEED NCv2.2 Tracker - 5-19-10-MG
51 Monroe Street, Suite 402, Rockville, MD 20850 5/19/2010 Ph. 240.403.0953
LEED-CS
LEED-CS Version 2.0 Registered Project Checklist
FOUNDERS SQUARE - NORTHWEST OFFICE - 4040 WILSON BLVD
4.1 AMMENDMENT
Yes ? No
11 1 3 Sustainable Sites 15 Points
Y Prereq 1 Construction Activity Pollution Prevention Required
1 Credit 1 Site Selection 1
1 Credit 2 Development Density & Community Connectivity 1
1 Credit 3 Brownfield Redevelopment 1
1 Credit 4.1 Alternative Transportation, Public Transportation Access 1
1 Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms 1
1 Credit 4.3 Alternative Transportation, Low-Emitting and Fuel-Efficient Vehicles 1
1 Credit 4.4 Alternative Transportation, Parking Capacity 1
1 Credit 5.1 Site Development, Protect of Restore Habitat 1
1 Credit 5.2 Site Development, Maximize Open Space 1
1 Credit 6.1 Stormwater Design, Quantity Control 1
1 Credit 6.2 Stormwater Design, Quality Control 1
1 Credit 7.1 Heat Island Effect, Non-Roof 1
1 Credit 7.2 Heat Island Effect, Roof 1
1 Credit 8 Light Pollution Reduction 1
1 Credit 9 Tenant Design and Construction Guidelines 1
Yes ? No
3 1 1 Water Efficiency 5 Points
1 Credit 1.1 Landscaping Reduce by 50%
Water Efficient Landscaping, 1
1 Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation 1
1 Credit 2 Innovative Wastewater Technologies 1
1 Credit 3.1 Water Use Reduction, 20% Reduction 1
1 Credit 3.2 Water Use Reduction, 30% Reduction 1
Yes ? No
6 3 5 Energy & Atmosphere 14 Points
Y Prereq 1 Fundamental Commissioning of the Building Energy Systems Required
Y Prereq 2 Minimum Energy Performance Required
Y Prereq 3 Fundamental Refrigerant Management Required
2 2 4 Credit 1 Optimize Energy Performance 1 to 8
1 Credit 2 On-Site Renewable Energy 1
1 Credit 3 Enhanced Commissioning 1
1 Credit 4 Enhanced Refrigerant Management 1
1 Credit 5.1 Measurement & Verification- Base Building 1
1 Credit 5.2 Measurement & Verification- Tenant Submetering 1
1 Credit 6 Green Power, 35% 1
continued…
Yes ? No
4 3 4 Materials & Resources 11Points
Y Prereq 1 Storage & Collection of Recyclables Required
1 Credit 1.1 Building Reuse, Maintain 75% of Existing Walls, Floors & Roof 1
1 Credit 1.2 Building Reuse, Maintain 100% of Existing Walls, Floors & Roof 1
FOUNDERS SQUARE - NW Office - 4.1 ammend C2.0-5-26-2010-MG
51 MONROE STREET STE 402, ROCKVILLE, MD 20850 PAGE 1 PH: 240.403.0953
1 Credit 1.3 Building Reuse, Maintain 50% of Interior Non-Structural Elements 1
1 Credit 2.1 Construction Waste Management, Divert 50% from Disposal 1
1 Credit 2.2 Construction Waste Management, Divert 75% from Disposal 1
1 Credit 3 Materials Reuse, 1% 1
1 Credit 4.1 Recycled Content, 10% (post-consumer + ½ pre-consumer) 1
1 Credit 4.2 Recycled Content, 20% (post-consumer + ½ pre-consumer) 1
1 Credit 5.1 Regional Materials, 10% Extracted, Processed & Manufactured Regionally 1
1 Credit 5.2 Regional Materials, 20% Extracted, Processed & Manufactured Regionally 1
1 Credit 6 Certified Wood 1
Yes ? No
6 3 2 Indoor Environmental Quality 11 Points
Y Prereq 1 Minimum IAQ Performance Required
Y Prereq 2 Environmental Tobacco Smoke (ETS) Control Required
1 Credit 1 Outdoor Air Delivery Monitoring 1
1 Credit 2 Increased Ventilation 1
1 Credit 3.1 Construction IAQ Management Plan, During Construction 1
1 Credit 4.1 Low-Emitting Materials, Adhesives & Sealants 1 point for 2
1 Credit 4.2 Low-Emitting Materials, Paints & Coatings 2 points for 3
1 Credit 4.3 Low-Emitting Materials, Carpet Systems 3 points for 4
Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products
1 Credit 5 Indoor Chemical & Pollutant Source Control 1
1 Credit 6 Controllability of Systems, Thermal Comfort 1
1 Credit 7.1 Thermal Comfort, Design 1
1 Credit 8.1 Daylight & Views, Daylight 75% of Spaces 1
1 Credit 8.2 Daylight & Views, Views for 90% of Spaces 1
Yes ? No
4 1 Innovation & Design Process 5 Points
1 Credit 1.1 Innovation in Design: Education Program 1
1 Credit 1.2 Innovation in Design: 100% Parking Below Grade 1
1 Credit 1.3 Innovation in Design: 40% Water Use Reduction 1
1 Credit 1.4 Innovation in Design: Transportation Demand Management Study 1
®
1 Credit 2 LEED Accredited Professional 1
Yes ? No
34 12 15 Project Totals (pre-certification estimates) 61 Points
Certified 23-27 points Silver 28-33 points Gold 34-44 points Platinum 45-61 points
FOUNDERS SQUARE - NW Office - 4.1 ammend C2.0-5-26-2010-MG
51 MONROE STREET STE 402, ROCKVILLE, MD 20850 PAGE 2 PH: 240.403.0953
LEED CSv2.0 Scorecard
Project Name FOUNDERS SQUARE - NORTHWEST OFFICE - 4040 WILSON BLVD
Project Status 4.1 AMMENDMENT
LEED CSv2.0 Project Totals
34 34 41 48 Certified: 23-27 points Silver: 28-33 points Gold: 34-44 points Platinum: 45-61 points
61 34 34 7 5
Design/Construction
4.1 Commitment
Possible Points

MODERATE

DIFFICULT
EASY

Summarized Description of Action Required Status


Sustainable Sites
Incorporate erosion and sedimentation control measures
Y Y Y Y C Prereq 1 Construction Activity Pollution Prevention into site construction that meet local standards or 2003
EPA Construction General Permit, whichever is stricter.
Do not develop flood prone sites, farmland, wetland, or Founders square site does not fall under any negative site
1 1 1 D Credit 1 Site Selection
endangered species refuge. selection criteria according to LEED
Develop on a previously developed with within an area Founders square site is located in the Arlington, VA Ballston
1 1 1 D Credit 2 Development Density & Community Connectivity
with min density of 60,000sqft/acre area which is highly dense development area.
Founders square will do a full remediation of contaminates;
1 1 1 D Credit 3 Brownfield Redevelopment Develop EPA or State designated Brownfield site.
Arlington County has identified the site as a Brownfield.
1 1 1
Alternative Transportation, Public Transportation Develop site within 1/4 of two bus lines or within 1/2 mile Founders Square site is within 0.5 mile of Ballston Metro and
D Credit 4.1
Access of rail station. along numerous public bus lines.
Alternative Transportation, Bicycle Storage & Provide shower facilities for 0.5% or more of the building
1 1 1 D Credit 4.2
Changing Rooms occupants and bike storage for 3%.
Provide low-emitting/ fuel-efficient vehicles for 3% FTE
Alternative Transportation, Low Emitting & Fuel
1 1 1 D Credit 4.3 occupants or provide 5% of total parking as preferred
Efficient Vehicles
parking for fuel efficient vehicles.
Do not exceed code/zone allowed minimum parking
Meeting site plan condition required parking meets and does
1 1 1 D Credit 4.4 Alternative Transportation, Parking Capacity capacity through design or allocation of allowed parking
not exceed parking requirements.
spots to the building.
Restore a minimum of 50% of the predeveloped site with
1 0 C Credit 5.1 Site Development, Protect or Restore Habitat
native and adaptive vegetation.
Exceed zone open space requirement by 25% or if no
open space is required provide open space equal to 20%
Current site is very impervious and site plan options add a lot
1 1 1 D Credit 5.2 Site Development, Maximize Open Space of the project site. Contribution to open space can be
of green space.
from impervious areas, pedestrian oriented hardscape,
and green roofs.
Reduce site stormwater run-off rate and quantity be 25%
from pre=development rates through increase of
Current site is very impervious and site plan options add a lot
1 0 1 D Credit 6.1 Stormwater Design, Quantity Control impervious area or reuse of captured stormwater to feed
of green space.
cooling tower with captured storm water or use as
irrigation water make-up
Design stormwater filtration system to treat 1" of rain from
ALL impervious areas. Strategies from compliance
1 0 D Credit 6.2 Stormwater Design, Quality Control include reduction in impervious areas, re-use of water
within the building, and structural filtration controls such as
sandfilter or stormfilter
Shade parking OR 50% under cover and utilize high All parking at Founders Square Development will be
1 1 1 C Credit 7.1 Heat Island Effect, Non-Roof
reflective materials for hardscape. underground.
Specify high albedo/ white roof for 75% of roofing area
1 1 1 D Credit 7.2 Heat Island Effect, Roof OR use a vegetated roof for 50% of roof area or a
combination thereof.
Minimize light trespass from the building, use minimal
1 0 D Credit 8 Light Pollution Reduction façade and landscape lighting and only utilize full cut-off
fixture for exterior lighting design.
Publish a document that provides a description of
sustainable features in the base building and information
1 1 1 D Credit 9 Tenant Design & Construction Guidelines
that would enable a tenant to align their space with
elements of the core and shell construction.
Water Efficiency
Design landscaping to require minimum irrigation and/or
1 1 1 D Credit 1 .1 Water Efficient Landscaping, Reduce by 50% specify efficient irrigation system such as drip irrigation
AND/OR use captured storm water for irrigation.
Water Efficient Landscaping, No Potable Water Use Install no irrigation OR use captured storm water (tanks or
1 0 1 D Credit 1.2
or No Irrigation pond) for all irrigation.
Reduce generation of wastewater and potable water
1 0 D Credit 2 Innovation Wastewater Technologies demand through use of efficient fixtures, and/ or water
reuse for sewage conveyance.
Specify 1.6 gpf or less water closets, 1.0 or gpf or less
1 1 1 D Credit 3.1 Water Use Reduction, 20% Reduction urinals, 2.0 gpm shower heads, and .5 gpm lavatory
faucet aerators.
Specify 1.6 gpf or less water closets, 0.5 or gpf urinals
1 1 1 D Credit 3.2 Water Use Reduction, 30% Reduction OR waterless , 1.5 gpm shower heads, and .5 gpm
lavatory faucet aerators
Energy & Atmosphere
Fundamental Commissioning of the Building Energy
Y Y C Prereq 1 Engage a 3rd party commissioning authority.
Systems
FOUNDERS SQUARE - NW Office - 4.1 ammend C2.0-5-26-2010-MG
51 MONROE STREET SUITE 402, ROCKVILLE, MD 20850 5/26/2010 Ph. 240.403.0953
61 34 34 7 5
Design/Construction
4.1 Commitment
Possible Points

MODERATE

DIFFICULT
EASY

Summarized Description of Action Required Status


Design envelop, HVAC, and lighting at or below ASHRAE
Y Y D Prereq 2 Minimum Energy Performance
90.1-2004
Y Y D Prereq 3 Fundamental Refrigerant Management Use non CFC-based refrigerants in the base building.
Design envelop, HVAC, and lighting below ASHRAE
90.1-2004 by 10-35%, including but not limited to as close
8 2 2 2 D Credit 1 Optimize Energy Performance to 1:1 wall to window ratio, high performance glazing, wall,
and roof thermal characteristics, and a water cooled,
premium efficiency central chill
Employ renewable energy such as photovoltaic to offset
1 0 D Credit 2 On-site Renewable Energy, 1%
building energy costs.
1 1 1 C Credit 3 Enhanced Commissioning Engage a 3rd party commissioning authority.
1 1 1 D Credit 4 Enhanced Refrigerant Management Specify 123 or 134a refrigerant in central chiller systems.
Include a centrally monitored electronic metering network
in the base building design that is capable of being
1 1 1 D Credit 5.1 Measurement & Verification, Base Building
expanded to accommodate the future tenant sub-
metering.
Provide the necessary equipment within the base building
to facilitate tenant metering. Develop a base building M&V
1 1 1 D Credit 5.2 Measurement & Verification, Tenant Sub-metering
which can be used by tenants to fit-out their areas with
metering.
Provide at least 35% of the core & shells building
1 0 1 C Credit 6 Green Power, 35%
electricity from green power suppliers.
Materials & Resources
Designate specific space to support building recycling
Y Y D Prereq 1 Storage & Collection of Recyclables efforts on floors and loading dock. Space should support
and occupant recycling program and be >500 sq. ft.
Building Reuse, Maintain 25%, 50%, 75% of Existing
3 0 C Credit 1.1 Reuse existing building structure and shell elements.
Walls, Floors & Roof
Use waste hauler that will sort off site and recycle
Construction Waste Management, Divert 50%, 75%
2 2 2 C Credit 2.1 majority of construction waste, diverting waste from
From Disposal
landfills and incinerators.
Use salvaged materials (lights, doors, hardware, seating,
1 0 C Credit 3 Materials Reuse, 1%
flooring, etc)
10% 20% (post-consumer Specify building materials with high recycled content (gyp
Content, Specify 10%,
Recycled Content (gyp,
2 1 1 1 C Credit 4.1
+ 1/2 pre-consumer) ceiling, carpet, etc)
Regional Materials, 10%, 20% Extracted and Specify building materials which are extracted, harvested,
2 1 1 1 C Credit 5.1
Manufactured Regionally and manufactured from local (500miles) sources.
Specify FSC certified wood for the majority of wood used
1 0 1 C Credit 6 Certified Wood on the project including wood formwork, blocking, doors,
casework, lobby finishes, etc.
Indoor Environmental Quality
Y Y D Prereq 1 Minimum IAQ Performance Design outside air to meet/exceed ASHRAE 62.1-2004
Adopt no smoking policy within the building and no
Y Y D Prereq 2 Environ. Tobacco Smoke Control
smoking within 25' of the building.
Install Outdoor Air measurement capable of measuring
1 1 1 D Credit 1 Outdoor Air Delivery Monitoring the outdoor air flow rate +- 15% of design minimum as
described by ASHRAE 62-2004
Increase ventilation rates to at least 30% above that as Designing to ASHRAE 62-1999 (Arlington Co code) will
1 1 1 D Credit 2 Increased Ventilation
required by ASHRAE 62.1-2004 achieve credit.
Protect HVAC system during construction and properly
1 1 1 C Credit 3 Construction IAQ Management, During Construction store absorptive materials. Spec construction filters with
minimum of MERV 8.
Specify low VOC adhesives and sealants in all trades
C Credit 4.1 Low-Emitting Materials, Adhesives & Sealants
(Arch, MEP)
Specify low VOC interior paints, stains, varnishes, and
C Credit 4.2 Low-Emitting Materials, Paints
coatings.
3 2 2 1 Specify only CRI IAQ Green Label Plus certified carpets
C Credit 4.3 Low-Emitting Materials, Carpet for ALL carpets and green label for carpet cushion.
Specify low VOC carpet adhesive (<50g/L)
Low-Emitting Materials, Composite Wood & Agrifiber Specify low composite wood and agrifiber products
C Credit 4.4
Products containing no-urea formaldehyde resins. (Arch, MEP)
Install permanent entryway walk off systems, direct
exhaust janitor/copy/fax areas and employ deck to deck
1 0 1 D Credit 5 Indoor Chemical & Pollutant Source Control
partitions and self closing doors. Spec filters with
efficiency of at least MERV 13.
Provide comfort control for 50% of occupants and for all
1 0 1 D Credit 6 Controllability of Systems, Thermal Comfort
shared use spaces.
Design HVAC system to meet ASHRAE 55-2004. Core
1 1 1 D Credit 7 Thermal Comfort, Design and shell building must have the ability for the tenant build Designing to current codes will achieve this point.
out to meet credit requirements.
Design envelop and interior spaces for 2% day lighting in
1 0 D Credit 8.1 Daylight & Views, Daylight 75%
75% of occupied areas.
Design envelop and interior spaces for views outside for
1 0 D Credit 8.2 Daylight & views, Views for 90% of Spaces
90% of occupied areas.
FOUNDERS SQUARE - NW Office - 4.1 ammend C2.0-5-26-2010-MG
51 MONROE STREET SUITE 402, ROCKVILLE, MD 20850 5/26/2010 Ph. 240.403.0953
61 34 34 7 5
Design/Construction
4.1 Commitment
Possible Points

MODERATE

DIFFICULT
EASY

Summarized Description of Action Required Status


Innovation and Design
Develop and implement an education program for
1 1 1 Credit 1.1 Innovation in Design: Education Program occupant to learn about LEED and building specific green
building measures.
Project would meet requirements for an innovation for
1 1 1 Credit 1.2 Innovation in Design: 100% of parking below grade SSc7.1 reduction in heat islands non roof by placing
100% of parking below grade.
Specify plumbing fixtures to meet >40% water use
1 0 1 Credit 1.3 Innovation in Design: 40% Water Use Reduction
reduction.
The study will identify a set of specific strategies that
Innovation in Design: Transportation Demand
1 1 1 Credit 1.4 influence travel behavior by mode, frequency, time, route,
Management Study
or trip length in order to help achieve a maximally efficient
and sustainable use of transportation facilities. (Ar. Co.)
1 1 1 Credit 2 LEED Accredited Professional
61 34 34 7 5 LEED CSv2.0 Project Totals
34 34 41 46 Certified: 23-27 points Silver: 28-33 points Gold: 34-44 points Platinum: 45-61 points
FOUNDERS SQUARE - NW Office - 4.1 ammend C2.0-5-26-2010-MG
51 MONROE STREET SUITE 402, ROCKVILLE, MD 20850 5/26/2010 Ph. 240.403.0953
LEED-NC Version 2.2 Registered Project Checklist
Founders Square - Residential North
Arlington VA 22203
Yes ? No
9 2 3 Sustainable Sites 14 Points
Y Prereq 1 Construction Activity Pollution Prevention Required
1 Credit 1 Site Selection 1
1 Credit 2 Development Density & Community Connectivity 1
1 Credit 3 Brownfield Redevelopment 1
1 Credit 4.1 Alternative Transportation, Public Transportation Access 1
1 Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms 1
1 Credit 4.3 Alternative Transportation, Low-Emitting and Fuel-Efficient Vehicles 1
1 Credit 4.4 Alternative Transportation, Parking Capacity 1
1 Credit 5.1 Site Development, Protect of Restore Habitat 1
1 Credit 5.2 Site Development, Maximize Open Space 1
1 Credit 6.1 Stormwater Design, Quantity Control 1
1 Credit 6.2 Stormwater Design, Quality Control 1
1 Credit 7.1 Heat Island Effect, Non-Roof 1
1 Credit 7.2 Heat Island Effect, Roof 1
1 Credit 8 Light Pollution Reduction 1
Yes ? No
2 1 2 Water Efficiency 5 Points
1 Credit 1.1 Water Efficient Landscaping, Reduce by 50% 1
1 Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation 1
1 Credit 2 Innovative Wastewater Technologies 1
1 Credit 3.1 Water Use Reduction, 20% Reduction 1
1 Credit 3.2 Water Use Reduction, 30% Reduction 1
Yes ? No
5 3 9 Energy & Atmosphere 17 Points
Y Prereq 1 Fundamental Commissioning of the Building Energy Systems Required
Y Prereq 2 Minimum Energy Performance Required
Y Prereq 3 Fundamental Refrigerant Management Required
2 2 6 Credit 1 Optimize Energy Performance 1 to 10
3 Credit 2 On-Site Renewable Energy 1 to 3
1 Credit 3 Enhanced Commissioning 1
1 Credit 4 Enhanced Refrigerant Management 1
1 Credit 5 Measurement & Verification 1
1 Credit 6 Green Power 1
Yes ? No
4 3 6 Materials & Resources 13 Points
Y Prereq 1 Storage & Collection of Recyclables Required
1 Credit 1.1 Building Reuse, Maintain 75% of Existing Walls, Floors & Roof 1
1 Credit 1.2 Building Reuse, Maintain 100% of Existing Walls, Floors & Roof 1
1 Credit 1.3 Building Reuse, Maintain 50% of Interior Non-Structural Elements 1
1 Credit 2.1 Construction Waste Management, Divert 50% from Disposal 1
1 Credit 2.2 Construction Waste Management, Divert 75% from Disposal 1
1 Credit 3.1 Materials Reuse, 5% 1
1 Credit 3.2 Materials Reuse,10% 1
1 Credit 4.1 Recycled Content, 10% (post-consumer + ½ pre-consumer) 1
1 Credit 4.2 Recycled Content, 20% (post-consumer + ½ pre-consumer) 1
1 Credit 5.1 Regional Materials, 10% Extracted, Processed & Manufactured Regionally 1
1 Credit 5.2 Regional Materials, 20% Extracted, Processed & Manufactured Regionally 1
1 Credit 6 Rapidly Renewable Materials 1
1 Credit 7 Certified Wood 1
Yes ? No
9 6 Indoor Environmental Quality 15 Points
Y Prereq 1 Minimum IAQ Performance Required
Y Prereq 2 Environmental Tobacco Smoke (ETS) Control Required
1 Credit 1 Outdoor Air Delivery Monitoring 1
1 Credit 2 Increased Ventilation 1
1 Credit 3.1 Construction IAQ Management Plan, During Construction 1
1 Credit 3.2 Construction IAQ Management Plan, Before Occupancy 1
1 Credit 4.1 Low-Emitting Materials, Adhesives & Sealants 1
1 Credit 4.2 Low-Emitting Materials, Paints & Coatings 1
1 Credit 4.3 Low-Emitting Materials, Carpet Systems 1
1 Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products 1
1 Credit 5 Indoor Chemical & Pollutant Source Control 1
1 Credit 6.1 Controllability of Systems, Lighting 1
1 Credit 6.2 Controllability of Systems, Thermal Comfort 1
1 Credit 7.1 Thermal Comfort, Design 1
1 Credit 7.2 Thermal Comfort, Verification 1
1 Credit 8.1 Daylight & Views, Daylight 75% of Spaces 1
1 Credit 8.2 Daylight & Views, Views for 90% of Spaces 1
Yes ? No
4 1 Innovation & Design Process 5 Points
1 Credit 1.1 Innovation in Design: Education Program 1
1 Credit 1.2 Innovation in Design: 100% Parking Below Grade 1
1 Credit 1.3 Innovation in Design: Energy Star 1
1 Credit 1.4 Innovation in Design: Transportation Demand Management Study 1
®
1 Credit 2 LEED Accredited Professional 1
Yes ? No
33 10 26 Project Totals (pre-certification estimates) 69 Points
Certified 26-32 points Silver 33-38 points Gold 39-51 points Platinum 52-69 points
SDK
Environmental & Energy Consulting
LEED NC 2.2 Scorecard
Project Name FOUNDERS SQUARE - RESIDENTIAL NORTH
Project Status PLANNING
Difficult but Possible

Design/Construction
4.1 Commitment

Easy to Capture

Moderate
Possible

69 33 27 43 61 Summarized Description of Action Required Status


Sustainable Sites
Incorporate erosion and sedimentation control measures
Y N Y Y C Prereq 1 Construction Activity Pollution Prevention into site construction that meet local standards or 2003
EPA Construction General Permit, whichever is stricter.
Do not develop flood prone sites, farmland, wetland, or Founders square site does not fall under any negative
1 1 1 1 1 D Credit 1 Site Selection
endangered species refuge. site selection criteria according to LEED
Develop on a previously developed with within an area Founders square site is located in the Arlington, VA
1 1 1 1 1 D Credit 2 Development Density & Community Connectivity
with min density of 60,000sqft/acre Ballston area which is highly dense development area.
Founders square will do a full remediation of
contaminates; Arlington County has identified the site as
a Brownfield and in many cases the USGBC will agree
1 0 0 1 1 D Credit 3 Brownfield Redevelopment Develop EPA or State designated Brownfield site.
with this identification as long as documents support
contamination levels prior (Phase II reports) and
remediation efforts during construction.
Develop site within 1/4 of two bus lines or within 1/2 mile Founders Square site is within 0.5 mile of Ballston
1 1 1 1 1 D Credit 4.1 Alt. Transportation, Public Transportation Access
of rail station. Metro and along numerous public bus lines.
Provide covered bike storage for 15% or more of the
1 1 1 1 1 D Credit 4.2 Alt Transportation, Bicycle Storage & Changing Rooms
building occupants.
Provide low-emitting/ fuel-efficient vehicles for 3% FTE
occupants or provide 5% of total parking as preferred
1 0 0 1 1 D Credit 4.3 Alt Transportation, Low Emitting & Fuel Efficient Vehicles parking for fuel efficient vehicles. Path to compliance
can include providing shared use vehicles (zip-cars) for
residents usage.
Do not exceed code/zone allowed minimum parking
Meeting site plan condition required parking meets and
1 1 1 1 1 D Credit 4.4 Alt Transportation, Parking Capacity capacity and provide infrastructure and support
does not exceed parking requirements.
programs to facilitate shared vehicle usage.
Restore a minimum of 50% of the predeveloped site with
1 0 0 0 1 C Credit 5.1 Site Development, Protect or Restore Open Space
native and adaptive vegetation.
Exceed zone open space requirement by 25% or if no
open space is required provide open space equal to 20%
Current site is very impervious and site plan options add
1 1 1 1 1 D Credit 5.2 Site Development, Maximize Open Space of the project site. Contribution to open space can be
a lot of green space.
from impervious areas, pedestrian oriented hardscape,
and green roofs.
Reduce site stormwater run-off rate and quantity be 25%
from pre=development rates through increase of
Current site is very impervious and site plan options add
1 1 1 1 1 D Credit 6.1 Stormwater Design, Quantity Control impervious area or reuse of captured stormwater to
a lot of green space.
feed cooling tower with captured storm water or use as
irrigation water make-up
Design stormwater filtration system to treat 1" of rain
from ALL impervious areas. Strategies from compliance
1 0 0 0 1 D Credit 6.2 Stormwater Design, Quality Control include reduction in impervious areas, re-use of water
within the building, and structural filtration controls such
as sandfilter or stormfilter.
Shade parking OR 50% under cover and utilize high All parking at Founders Square Development will be
1 1 1 1 1 C Credit 7.1 Heat Island Effect, Non-Roof
reflective materials for hardscape. underground.
Specify high albedo/ white roof for 75% of roofing area
1 1 0 1 1 D Credit 7.2 Heat Island Effect, Roof OR use a vegetated roof for 50% of roof area or a
combination thereof.
Minimize light trespass from the building, use minimal
1 0 0 0 1 D Credit 8 Light Pollution Reduction façade and landscape lighting and only utilize full cut-off
fixture for exterior lighting design.
Water Efficiency
Design landscaping to require minimum irrigation and/or
1 1 1 1 1 D Credit 1.1 Water Efficient Landscaping, Reduce by 50% specify efficient irrigation system such as drip irrigation
AND/OR use captured storm water for irrigation.
Install no irrigation OR use captured storm water (tanks
1 0 0 1 1 D Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation
or pond) for all irrigation.
Reduce generation of wastewater and potable water
1 0 0 0 0 D Credit 2 Innovative Wastewater Technologies demand through use of efficient fixtures, and/ or water
reuse for sewage conveyance.
In order to achieve 20% reduction use low-flow or dual-
1 1 0 1 1 D Credit 3.1 Water Use Reduction, 20% Reduction flush water closets, low-flow lavatories (1.0gpm or less),
low flow kitchen sinks (1.8 gpm or less).
Specify very low flow rates for all fixtures and/or reuse no-
potable water within the building fixtures. 30% reduction
1 0 0 0 0 D Credit 3.2 Water Use Reduction, 30% Reduction
in plumbing fixtures in residential buildings is very
difficult to achieve.
FOUNDERS SQUARE - 4.1 Report NC2.2-Residential North 10-17-07-RH.xls
1375 Piccard Drive, Suite 100, Rockville, MD 20850 10/17/2007 Ph. 301.519.9393
Difficult but Possible

Design/Construction
4.1 Commitment

Easy to Capture

Moderate
Possible

69 33 27 43 61 Summarized Description of Action Required Status


Energy & Atmosphere
Y Y Y Y C Prereq 1 Fundamental Commissioning of the Building Energy Systems Engage a 3rd party commissioning authority.
Design envelop, HVAC, and lighting at or below
Y Y Y Y D Prereq 2 Minimum Energy Performance
ASHRAE 90.1-2004
Y Y Y Y D Prereq 3 Fundamental Refrigerant Management Use non CFC-based refrigerants in the base building.
Design envelop, HVAC, and lighting below ASHRAE
90.1-2004 by 10-35%, including but not limited to as
close to 1:1 wall to window ratio, high performance
glazing, wall, and roof thermal characteristics, and a
10 2 2 4 6 D Credit 1 Optimize Energy Performance
water cooled, premium efficiency central chiller plant,
OR a water source heat pump system, low lighting
power density (common areas and garage), and CO
based garage ventilation control.
Employ renewable energy such as photovoltaic or solar
3 0 0 0 0 D Credit 2.1 On-Site Renewable Energy, 2.5%, 7.5%, 12.5%
hot water heaters to offset building energy costs.
1 1 1 1 1 C Credit 3 Enhanced Commissioning Engage a 3rd party commissioning authority.
Specify 123 or 134a refrigerant in central chiller systems,
1 1 0 1 1 D Credit 4 Enhanced Refrigerant Management OR R-400 series in decentralized units. Do not used
distributed air cooled DX systems.
Incorporate enhanced BAS whole building common area
1 1 1 1 1 C Credit 5 Measurement & Verification
energy use monitoring and reporting services.
By 35% or building power from grid source green power
1 0 0 1 1 C Credit 6 Green Power
suppliers or Renewable Energy Credits (RECs)
Materials & Resources
Designate specific space to support building recycling
efforts on floors and loading dock. Space should
Y Y Y Y D Prereq 1 Storage & Collection of Recyclables
support and occupant recycling program and be >500
sq. ft.
3 0 0 0 0 C Credit 1.1 Building Reuse , Maintain 75%, 95% of Existing Shell, 50% of interior Reuse existing building structure and shell elements.
Use waste hauler that will sort off site and recycle
1 1 1 1 2 C Credit 2.1 Construction Waste Management, Divert 50% demolition and construction waste, diverting waste from
landfills and incinerators.
Use waste hauler that will sort off site and recycle
1 0 0 1 2 C Credit 2.2 Construction Waste Management, Divert 75% demolition and construction waste, diverting waste from
landfills and incinerators.
Use salvaged materials (lights, doors, hardware, seating,
1 0 0 0 0 C Credit 3.1 Materials Reuse, 5%
flooring, etc) within the building
Use salvaged materials (lights, doors, hardware, seating,
1 0 0 0 0 C Credit 3.2 Materials Reuse, 10%
flooring, etc) within the building
Specify building materials with high recycled content
1 1 1 1 2 C Credit 4.1 Recycled Content , 10% (post-consumer + 1/2 pre-consumer)
(gyp, ceiling, carpet, etc)
Specify building materials with high recycled content
1 0 0 1 2 C Credit 4.2 Recycled Content , 20% (post-consumer + 1/2 pre-consumer)
(gyp, ceiling, carpet, etc)
Specify building materials which are extracted,
1 1 1 1 2 C Credit 5.1 Local/Regional Materials, 10% Extracted/Harvest/Manufactured harvested, and manufactured from local (500miles)
sources.
Specify building materials which are extracted,
1 0 0 1 2 C Credit 5.2 Local/Regional Materials,20% Extracted/Harvest/Manufactured harvested, and manufactured from local (500miles)
sources.
Specify rapidly renewable product wheat based
1 0 0 0 1 C Credit 6 Rapidly Renewable Materials, 2.5% doors/counters/core, bamboo/cork floors/ cotton
insulation, etc for building materials and interiors
Specify FSC certified wood for the majority of wood used
1 1 0 1 1 C Credit 7 Certified Wood on the project including wood formwork, blocking, doors,
casework, etc.
Indoor Environmental Quality
Y Y Y D Prereq 1 Minimum IAQ Performance Design outside air to meet/exceed ASHRAE 62.1-2004
Adopt no smoking policy and no smoking within 25' of
the building. Where smoking is allowed in the building,
Y N Y Y D Prereq 2 Environmental Tobacco Smoke (ETS) Control isolate smoking areas through deck to deck partitions,
sealed wall penetrations, negative pressure and direct
exhaust.
Implement CO2 monitoring and CO2 based ventilation
1 1 1 1 1 D Credit 1 Outdoor Air Delivery Method control for all regularly occupied spaces within the
building (not including the units).
Increase ventilation rates to at least 30% above that as
1 1 0 1 1 D Credit 2 Increased Ventilation
required by ASHRAE 62.1-2004
Protect HVAC system during construction and properly
1 1 1 1 1 C Credit 3.1 Construction IAQ Management Plan, During Construction store absorptive materials. Specify and use MERV 8 or
greater filtration on HVAC units during construction.
Flush building w/100% OA for 2 wks OR conduct post
1 0 0 0 1 Credit 3.2 Construction IAQ Management Plan, Before Occupancy
C construction, pre occupancy air testing.
Specify low VOC adhesives and sealants in all trades
1 0 0 0 1 C Credit 4.1 Low-Emitting Materials, Adhesives & Sealants
(Arch, MEP)
Specify low VOC interior paints, stains, varnishes, and
1 1 1 1 1 C Credit 4.2 Low-Emitting Materials, Paints & Coatings
coatings.
Specify only CRI IAQ Green label plus certified carpets
1 1 1 1 1 C Credit 4.3 Low-Emitting Materials, Carpet Systems
for ALL carpets. Specify low VOC carpet adhesive.
Specify composite wood and agrifiber products
1 0 0 0 1 C Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products
containing no-urea formaldehyde resins. (Arch, MEP)
FOUNDERS SQUARE - 4.1 Report NC2.2-Residential North 10-17-07-RH.xls
1375 Piccard Drive, Suite 100, Rockville, MD 20850 10/17/2007 Ph. 301.519.9393
Difficult but Possible

Design/Construction
4.1 Commitment

Easy to Capture

Moderate
Possible

69 33 27 43 61 Summarized Description of Action Required Status


Install permanent entryway walk off systems, direct
exhaust janitor/copy/fax areas and employ deck to deck
1 0 0 0 1 D Credit 5 Indoor Chemical & Pollutant Source Control partitions. In residential buildings, credit applicability
may be limited due to small AHU not accommodating
MERV 13 filtration.
Provide lighting controls for 90% of building occupants
1 1 1 1 1 D Credit 6.1 Controllability of Systems, Lighting Typical residential layouts meet these requirements.
and for all shared use spaces.
Provide comfort control for 50% of occupants and for all
1 1 1 1 1 D Credit 6.2 Controllability of Systems, Thermal Comfort Typical residential layouts meet these requirements.
shared use spaces.
1 1 0 1 1 D Credit 7.1 Thermal Comfort, Design Design HVAC system to meet ASHRAE 55-2004.
Develop thermal comfort survey for building occupants
1 0 0 0 1 D Credit 7.2 Thermal Comfort, Verification
and corrective action procedure.
Design envelop and interior spaces for 2% day lighting in
1 0 0 0 1 D Credit 8.1 Daylight & Views, Daylight 75% of Spaces
75% of occupied areas.
Design envelop and interior spaces for views outside for
1 1 1 1 1 D Credit 8.2 Daylight & Views, Views for 90% of Spaces Typical residential layouts meet these requirements.
90% of occupied areas.
Innovation & Design Process
Develop and implement an education program for
1 1 1 1 1 Credit 1.1 Innovation in Design: Education Program occupant to learn about LEED and building specific
green building measures.
Project would meet requirements for an innovation for
1 1 1 1 1 Credit 1.2 Innovation in Design: 100% of parking below grade SSc7.1 reduction in heat islands non roof by placing
100% of parking below grade.
Utilize a majority of appliance which are energy star
1 1 1 1 1 Credit 1.3 Innovation in Design: Energy Star Energy star appliances and lighting is a 4.1 requirement.
compliant.
The study will identify a set of specific strategies that
influence travel behavior by mode, frequency, time,
1 0 0 1 1 Credit 1.4 Innovation in Design: Transportation Demand Management Study route, or trip length in order to help achieve a maximally
efficient and sustainable use of transportation facilities.
(Ar. Co.)
1 1 1 1 1 Credit 2 LEED™ Accredited Professional Have LEED AP on design team OR as consultant.
69 33 27 43 61
26-32 LEED Certified for New Buildings
33-38 LEED Certified Silver for New Buildings
39-51 LEED Certified Gold for New Buildings
52-69 LEED Certified Platinum for New Buildings
FOUNDERS SQUARE - 4.1 Report NC2.2-Residential North 10-17-07-RH.xls
1375 Piccard Drive, Suite 100, Rockville, MD 20850 10/17/2007 Ph. 301.519.9393

Вам также может понравиться