Академический Документы
Профессиональный Документы
Культура Документы
DATE: NEW
/
CONSTRUCTION WORK 1/2013
28TH August 2013 REVISED
JOB SAFETY ANALYSIS TITLE OF PERSON WHO DOES PROJECT/ SENIOR ANALYSIS PERFOMED BY:
JOB: MANAGER: M. IZAHAR B. BAHARI
CONSTRUCTION WORKER (OSH SUPERVISOR)
MR. KELLY LEE
ORGANIZATION LOCATION: SUPERVISOR: REVIEWED BY:
BEE KONG CONSTRUCTION
SDN BHD SENAI AIRPORT,JOHOR MR. QUEK MR. KELLY LEE
BAHRU,JOHOR
SEQUENCE OF BASIC JOB POTENTIAL HAZARDS RECOMMENDED ACTION OR PROCEDURE
STEPS
1.Falling from height 1. Wear safety belts at edges and building corners.
Preparing formwork
2.Falling Objects 2. To provide life lines at locations that have no areas to attach safety
3. Trip & fall belts.
3. Falling points such as corners and edges of building to be securely
barricaded.
4. Supervisor to monitor on all jobs working at height.
5. Management & safety committee members to take disciplinary
actions against employees that do not wear safety belts while
working at height.
6. Proper surface should be placed on formwork to be used as
walkways and prevent trip & fall.
7. All loose woods / materials / tools must not be kept at edges of
building where there is a risk of falling.
8. All openings or holes must be securely covered to prevent workers
from falling in.
JOB TITLE: JSA No. DATE: NEW
/
CONSTRUCTION WORK 1/2013
28TH August 2013 REVISED
1.Falling from height 1. Wear safety belts at edges and building corners.
Removing formwork
2.Falling Objects 2. To provide life lines at locations that have no areas to attach safety
belts.
3. Falling points such as corners and edges of building to be securely
barricaded.
4. Supervisor to monitor on all jobs related to working at height.
5. Management & safety committee members to take disciplinary
actions against employees that do not wear safety belts while
working at height.
6. All loose woods / materials / tools must not be kept at edges of
building where there is a risk of falling.
7. Supervisor must monitor and barricade are below while removing
formwork at the top to prevent any other person from being hit by
falling woods / objects.
8. All openings or holes must be securely covered to prevent workers
from falling in.
Mobile Crane Operations 1. Loads / falling on workers or public 1. To conduct a daily check on hoist ropes for better assurance.
people and equipments. 2. Weekly inspection is recommended to be done by a competent
2. Hoist rope snap and load falls technician.
3. 1 signal man must be appointed to supervise on the crane
movements.
4. To ensure bricks are securely fasted before lifting.
5. Cement opening must be ensured closed while lifting.
Cement / Bricks work 1. Cement dust can cause respiratory 1. To be provided with dust masks.
problem such as
pneumonoconiosis (lung scarring).