Ong & Ong Pte Ltd.

SUMMARY OF OVERTIME CLAIM


Site 2 Kung Chong Road
Name Claro Alfredo Jr. A.
Designation Resident Technical Officer
Month/Year FEBRUARY 2018

Day Date from To Hr Description of Work Remarks


3-Feb-18 1:00 PM 7:00 PM 6.0 C
5-Feb-18 6:00 PM 9:30 PM 3.5 Cast Sprinkler Water Tank Wall
13-Feb-18 6:00 PM 9:30 PM 3.5 Cast Sprinkler Wall
19-Feb-18 6:00 PM 9:00 PM 3.0 Casting Basement Slab
24-Feb-18 1:00 PM 4:00 PM 3.0 Precast Installation

Total 19.00
please see attached Overtime Request Form from ZDC

Recorded By: Acknowledged By:

Name/Signature: Claro Alfredo Jr. A. Name/Signature:


Appointment: Resident Technical Officer Appointment: Site Manager
Date prepared:26 MARCH 2018 Date : March 2018
Ong & Ong Pte Ltd Zhengda Corporation Pte Ltd