GA26 Construction phase plan Legal and management Company name Description of project 41. Project description and programme details including any important dates. 2. Details ofthe project team, including: @) clent ») principal signer (©) designers) ‘) principal contactor ©) contracor(s) 1) other consultants. 3. Extent and location of existing records and plans which are rolevant to health and safety on sie, including information on ‘existing structures when appropriate. ‘Management of the work 4. Managemont structure and responsibilities. 2. Health and safoty goals for the project and arrangomants for ‘monitoring and review of health and safety performance. ‘3. Health and safety arrangements for the construction phas 4 Site rules. 5._Arrangements for ‘8) co-operation between the project team onsite and co-ordination of their work ') consultation with the werkforce (©) the exchange of design information between the cent, designers, Principal designers and contractors onsite «) handling design changes during the project ©) the selection and contrel of contractors 1) the exchange of health and safely information between contractors Version 2 47 Legal and management 48 GA26 Construction phase plan continued Management of the work (continued) Details 9) sito security ‘hy site induction 1) onsite taining 1) weltare facies and frst id the reporting and investigation of accidents and incidents inctding ear misses 1) the production and approval of risk assessments and writtan| systems of work 'm) fire and emergency procedures. Arrangements for controlling significant site risks 4. Safoty risks, including: ) delvery and removal of materia (Including waste) and work ‘equipment taking account of any risks tothe public (for example ‘during access to or egress from the ste) ') dealing with services — water, elacticty and gas, incting ‘overhead powerlines and temperary electrical installations ©) accommedating adjacent land use ‘stably f structures whist carrying out construction work, Including temporary structures and existing unstable structures ©) provanting falls ‘work wih or near ragle materials {Work involving the assembly oF dismantling of heavy prefabricated components hn) work ar high-votage cables 1) work on excavations and work whore there are poor ‘und conelitions 2 work on wells, underground earthworks and tunnels 1) work exposing workers tothe risk of drowning 1) work earned out by divers having a system of ai supply 'm) work in a calsson with @ compressed air ystom 1) work involving explosives ©) tac routes and segregation of vehicles and pedestrians ) Storage of materials (particulary hazardous materials) and ‘work equipment Version 2 GA26 Construction phase plan continued Legal and management (continued) Arrangements for controlling significant site risks Details {) work which puts workers at risk rom chemical and biological substances 1) work with ionising radiation requiring the designation of controlled oF supplied areas. 2. Health risks, Inluding: 4) the removal of asbestos ‘) dealing with contaminated land ‘¢) manual handling «) use of hazardous substances, particularly where there fs a noed Tor health monitoring ©) reducing noise andor vibration 4) exposure to UV radiation (from the sun) {@) any other significant health risks. The health and safety file 4. Layout and format. 2. Arrangements for the collection and gathering of information. 3. Storage of information. Significant design and construction hazards 1. Significant design assumptions and suggested work methods, ‘Sequences or other control measures. 2. Arrangements for co-ordination of ongoing design work and handling design changes. 3. Information on significant risks identified during design. 4 Matorials requir Name Position Signature Version 2 49

Вам также может понравиться