SITE INSTRUCTIONS
URGENT
SUBJECT : Three week schedule
GENTLEMEN,
It has been observed that as per agreed in weekly meeting to submit the three week schedule by contractor
on Saturday but still not yet submitted. It is directed to submit the same as early as possible to not delay
the project activities.
REGARDS
SEC/SATECH
Contractor: AL-GIHAZ CO.
Prepared By: Issued By:
Name: Mohammed Hassan Bidri Mohd Akhtar
Job title: CIVIL ENGINEER SITE CIVIL ENGINEER
Signature:
SITE INSTRUCTION NO. C-002 DATE : 28/10/2009 G
SITE INSTRUCTIONS
URGENT
SUBJECT : Shortage of Manpower at site
GENTLEMEN,
It has been observed that the sub-contractor is decrees the manpower at site today. When question to him
he replied the problem of invoice is pending with Al-gihaz so we don’t have the labor payment that is the
reason. Shuttering & rebar for ground floor slab & foundation of transformers is in progress the work is
delay at site due to the decrees of manpower.
It is directed to arrange the manpower immediately and solve the problem to expedite the work on site.
SEC/SATECH
Contractor: AL-GIHAZ CO.
Prepared By: Issued By:
Name: GEORGE MARANO Bidri Mohd Akhtar
Job title: CIVIL ENGINEER SITE CIVIL ENGINEER
Signature:
SITE INSTRUCTION NO. C-001 DATE : 19/06/2011 G
SITE INSTRUCTIONS
URGENT
GENTLEMEN,
It has been observed that the site mobilization still not completed. Still there is no any facility for telephone,
fax and internet on site it not accepted. There are no approved drawings available on site and ABB staff is
not as per organization chart on site. It is directed to submit the revised baseline schedule and three week
time schedule at site and approved Mix design for concrete to expedite the work at site without any delay
to the project.
REGARDS,
SEC/SATECH
Contractor: ABB CO.
Prepared By: Issued By:
Name: EDGAR RIVERA Bidri Mohammed Akhtar
Job title: CIVIL ENGINEER CIVIL ENGINEER
Signature:
SITE INSTRUCTION NO. C-002 DATE : 23/06/2011 G
SITE INSTRUCTIONS
URGENT
GENTLEMEN,
It has been observed that the level for ear thing mesh below the raft foundation is not clear mention in the
overall substation grounding layout so please rectify the same as early as possible and without any delay of
excavation on site.
REGARDS,
SEC/SATECH
Contractor: ABB CO.
Prepared By: Issued By:
Name: EDGAR RIVERA Bidri Mohammed Akhtar
Job title: CIVIL ENGINEER CIVIL ENGINEER
Signature:
SITE INSTRUCTION NO. C-003 DATE : 27/06/2011 G
SITE INSTRUCTIONS
GENTLEMEN,
It has been observed that the trail mix done by ABB without information to a consultant on site it will not
accepted. Any activity regarding the project should be inform earlier to concerned project consultant by RFI
with supporting drawing or document in future then only the activity will accepted.
REGARDS,
SEC/SATECH
Contractor: ABB CO.
Prepared By: Issued By:
Name: EDGAR RIVERA Bidri Mohammed Akhtar
Job title: CIVIL ENGINEER CIVIL ENGINEER
Signature:
SITE INSTRUCTION NO. C-004 DATE : 03/07/2011 G
SITE INSTRUCTIONS
URGENT
GENTLEMEN,
It has been observed that the site mobilization still not completed. Still there is no any facility for telephone,
fax and internet on site. There are no approved drawings available on site and ABB staff is not as per
organization chart on site and also there are no Saudi security guards at site for security. It is directed to
submit the revised baseline schedule and three week time schedule at site and approved Mix design for
concrete to expedite the work at site without any delay to the project.
REGARDS,
SEC/SATECH
Contractor: ABB CO.
Prepared By: Issued By:
Name: EDGAR RIVERA Bidri Mohammed Akhtar
Job title: CIVIL ENGINEER CIVIL ENGINEER
Signature:
SITE INSTRUCTION NO. C-005 DATE : 06/07/2011 G
SITE INSTRUCTIONS
URGENT
GENTLEMEN,
It has been observed that the site mobilization still not completed. Still there is no any facility for telephone,
fax and internet on site. So arrange alternate by internet USB, Mobile and scanner for the site co-ordination
with SEC and complete the balance mobilization immediately. There are no Saudi security guards at site for
security. It is directed to submit the revised baseline schedule and three week time schedule at site and
approved Drawings and Mix design for concrete to expedite the work at site without any delay to the
project.
REGARD,
SEC/SATECH
Contractor: ABB CO.
Prepared By: Issued By:
Name: EDGAR RIVERA Bidri Mohd Akhtar
Job title: CIVIL ENGINEER SITE CIVIL ENGINEER
Signature:
SITE INSTRUCTION NO. C-006 DATE : 09/07/2011 G
SITE INSTRUCTIONS
URGENT
GENTLEMEN,
It has been observed that the sub contractor site civil Engineer is start excavation for earthing without
approved drawing, level of raft etc and without permission of ABB civil Engineer and the site civil consultant
Engineer also it is not accepted and SEC giving first warning if any one violating the instruction then he will
send out from site.
REGARD,
SEC/SATECH
Contractor: ABB CO.
Prepared By: Issued By:
Name: EDGAR RIVERA Bidri Mohd Akhtar
Job title: CIVIL ENGINEER SITE CIVIL ENGINEER
Signature:
SITE INSTRUCTION NO. C-007 DATE : 09/07/2011 G
SITE INSTRUCTIONS
URGENT
GENTLEMEN,
It has been observed that the civil Engineer and safety officer are not approved from Sec so leave the site
and please bring the approval of SEC then only you can enter the site. These are the following names of ABB
non approved staff.
1.Edgar rivera (site civil engineer)
2.Syed masroor ali (safety officer)
REGARD,
SEC/SATECH
Contractor: ABB CO.
Prepared By: Issued By:
Name: EDGAR RIVERA Bidri Mohd Akhtar
Job title: CIVIL ENGINEER SITE CIVIL ENGINEER
Signature: