Вы находитесь на странице: 1из 2

QF-DGN-01

TITLE: DOCUMENT/DRAWING APPROVAL/COMMENT TRANSMITAL

PROJECT : DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF 230/132KV AIR


INSULATED SWITCHGEAR (AIS) SUBSTATION AT BARISAL ON TURNKEY BASIS.
CONTRACT NUMBER : PGCB/SS/2011/02, Dated 01.08.2012
DOCUMENT SUBMITTAL REF: LECLDR14/08/14-088; Dated: 14/08/2014.
SUBJECT : APPROVAL OF STRUCTURAL DESIGN & FOUNDATION LOADS (SUPPORT REACTION) OF
SUPPORTER FOR EQUIPMENT FOR BARISAL 230/132KV AIS SUBSTATION

To Copy to,
Project Director
Managing Director, PGCB
Barisal – Bhola Project
Power Grid Company of Bangladesh Limited √ Executive Director (P & D), PGCB
NLDC Complex Aftabnagar South Badda,
Dhaka-1212 √ Chief Engineer (P & D/Project), PGCB
Kind Attn: Mr.
√ Shandong Taikai Power Engineering Co.,Ltd

√ Executive Engr. (Civil Design), PGCB

√ Master File
Dear Sir,
We are pleased to enclose the following documents for the purpose indicated below:

Issued by:
(1)
In case of any modification other than those desired are carried out, the same shall be
highlighted clearly in the Drawing/Document with full justification thereof and resubmitted A.K.M.G.Mohiuddin Ahmed
for approval. Superintending Engr.
(2) (Design & Q/C),
Approval/Comments/Information conveyed herein neither relieves the contractor of his
contractual obligation and his responsibilities for correctness of dimensions, material of PGCB, Dhaka
constructions, weight, quantities, design details, assemble fits, performance particulars Our Ref: 04-PGCB/SE (Design & Q/C)/ 2014/927
and conformity of the supplies with the Statutory Laws of Bangladesh as may be
applicable, nor does it limit the Employer’s right under the contract.” Date: 18/08/2014

Item No Description of Drawing/ Document Drawing Number Revision Status Enclosed


Documents Number

Approved (A) √
Yes √
Approved with
Please refer to Annexure -1 Correction (C)

Request for re-


Submission (RR) No

For information
(FI)

Please acknowledge receipt of documents:


Received by Date

Note:
(1)The above paragraph shall be added if the status of the document is C/RR/FI.
(2)The above paragraph shall be added if the status of the document is A or C.
04-PGCB/SE (Design & Q/C)/ 2014/927 Date: August 18, 2014

Annexure-1

Sl. no Description Drawing / Document no. Comments


01. Basic Design for Supporter of 230KV Capacitor Voltage
Transformer for Barisal 230/132KV AIS Sub-station TKPE-230-B0004-A-C0209-01; Rev. 0, Approved
Sheet 1 of 1
02. Basic Design for Supporter of 230KV Capacitor Voltage
Transformer for Barisal 230/132KV AIS Sub-station TKPE-230-B0004-A-C0209-02; Rev. 0, Approved
Sheet 1 of 1
03. Basic Design for Supporter of 252KV Post Insulator for TKPE-230-B0004-A-C0212-01; Rev. 0, Approved
Barisal 230/132KV AIS Sub-station Sheet 1 of 1
04. Basic Design for Supporter of 252KV Post Insulator for TKPE-230-B0004-A-C0212-02; Rev. 0, Approved
Barisal 230/132KV AIS Sub-station Sheet 1 of 1
Approved
05. Foundation loads (support reaction) for 230KV CVT-1 Structure. CVT-1-FDN-LOADS; Rev. 0
Approved
06. Foundation loads (support reaction) for 230KV CVT-2 Structure. CVT-2-FDN-LOADS; Rev. 0
Approved
07. Foundation loads (support reaction) for 252KV PI Structure. PI-1-FDN-LOADS; Rev. 0
Approved
08. Foundation loads (support reaction) for 252KV PI Structure. PI-2-FDN-LOADS; Rev. 0