Вы находитесь на странице: 1из 121

DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

81

81

81
N
00 NOTES

38

39

40
92
81 N

00

00

00
00 1. FOR GENERAL NOTES AND LEGENDS, REFER
91

E
81 TO DRAWING NO. J3518/P/TGP/30/0001 & 0002.

55
0 N
0+

81
OR DE

AS IN N

41
E1
0+500

IG SI

00
PE L

4-
R

E
A
G

B
M.
J.
M.J.
0+550

N
M.J 00
AS
PER
. 90
ORI 81
GIN
AL
DES 0
IGN 0
5
+
0

0+
N

60
00

0
81
92 E14
-A
A

0+4
50
E1
3-

0+
A

65
0

0
5
4
+
0
C

0+
110m

70
- T
UNG

0
CHU
NG N
AVI
GATI
ON
CHA

0+
NNE
L

75
0
40

0
0+
A

0+ C D
40
0

E12-A
B
E1 BR 30/3050
ID
4- GE

0
E8
E12-B

35
C

0+

0+850
M.
J. E1
0
55

3-
0+

0
0+8
81

0+30
D
37

BR

00
ID
00

GE 30/3050 A

E7

0+250
E

0+200
A
OR S
IG PE A

I R C

DE NA
SI L
GN
00

E13-C
0+5

0+900
N
C

E 00
89

0+950
E1 30/3050
81
0+450

4-

0+400

0+350

0+300

0+250

0+200
C
N
00
91
81 BRIDGE E6
C

C
B
A

0+718
C
M.J.

0+700
C

C BRIDGE E5

0+650
0+600
0+550

81
0+500
0+450
0+400

40
00
E
C
E12-C
30/3050

AS PER
ORIGINAL
E12-D

SEE DRG J3518/P/TGP/30/3001


DESIGN
E13-D D

MATCH LINE
FOR CONTINUATION
E14-D
81
37
00

81

81
E

N N
38

39
00 00
00

00
90 89
81 81
E

E
Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
C FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

D ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0900 WKW 25/07/14


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) WKW 30/10/15


SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
LAYOUT PLAN
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

SHEET 1
Scale
Drawing no. Rev.
1:500 @ A1 / 1:1000 @ A3
J3518/P/TGP/30/3000 D
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

81
43
00
81
N

E
00

41
N

81
89 00 NOTES

00
81 88

42
1
N 8

00
1. FOR GENERAL NOTES AND LEGENDS, REFER
TO DRAWING NO. J3518/P/TGP/30/0001 & 0002.

E
E12-A

E12-B E11-A
E10-A
81
40

F
00
E

30/3050

BRIDGE E8 BRIDGE E2-3A

A
C

BRIDGE E
8
C

C B
B

BRIDGE E8 BRIDGE E2-3A


BRIDGE E7
BRIDGE E7
B
MV01
N
BRIDGE E6 0
870
81
BRIDGE E6
B
BRIDGE E5 BRIDGE E2-3B

N
00
89 BRIDGE E5
81

BRIDGE E5 BRIDGE E2-3B

81
43
00
D

E
SEE DRG J3518/P/TGP/30/3000

MATCH LINE
E11-B E10-B
MATCH LINE

FOR CONTINUATION
FOR CONTINUATION

E12-D

SEE BELOW
81
81

81
N N

42
40

41
00 00

00
87
00

00
188 1
8 8

E
E

E
N N
00 00
187 186
8 8

81
81

81

46
44

45

00
00

00

E
E

E
N

E9-A E8-A E7-A E6-A

A
30/3050
BRIDGE E2-3A BRIDGE E2-2A BRIDGE E2-2A BRIDGE E2-1A

BRIDGE E2-3A BRIDGE E2-2A BRIDGE E2-1A

MV01

BRIDGE E2-3B BRIDGE E2-2B BRIDGE E2-1B

N
0
870
81 BRIDGE E2-3B BRIDGE E2-2B BRIDGE E2-2B BRIDGE E2-1B

SEE DRG J3518/P/TGP/30/3002


MATCH LINE

E9-B E8-B E7-B E6-B

MATCH LINE
FOR CONTINUATION

FOR CONTINUATION

81
46
00
SEE ABOVE

E
81

81
81
43

N N

45
44
00

00 00

00
86 85
00

1
81
E

E
E

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
C FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

D ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0900 WKW 25/07/14


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) WKW 30/10/15


SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
LAYOUT PLAN
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

SHEET 2
Scale
Drawing no. Rev.
1:500 @ A1 / 1:1000 @ A3
J3518/P/TGP/30/3001 D
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

81

81

81
N N
00 00 NOTES

48

49

50
86 85
81

00

00

00
81
1. FOR GENERAL NOTES AND LEGENDS, REFER

81

E
TO DRAWING NO. J3518/P/TGP/30/0001 & 0002.

47
N

00
00
84

E
81

N
N
00
186
8

E1-A

E1-
B
E3-A M.J.

E2
-
E5-A E4-A D E3-B B
E2-A
A

G AS PER

LW01
A

ORIGINAL
30/3050
BRIDGE E2-1A DESIGN
M.J.
C

M.J.

A
A

B B A

BRIDGE E2-1A LE02

MV01
N
00
183
8
BRIDGE E1
BRIDGE E2-1B
B
B
LW02
A

N
00 LE01
185 A
81

8 M.J.
46

M.J.
00
E

AS PER
ORIGINAL
BRIDGE E2-1B DESIGN

C M.
J.

C 1-
E5-B E4-B E2-D - E
E3-C
E2
E1-D
E3-D

81
49
00
E
SEE DRG J3518/P/TGP/30/3001

MATCH LINE
FOR CONTINUATION

81

81
81

N N N
47

48
46

00 00 00
00

00
00

184 183 182


8 8 8
E

E
E

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
C FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

D ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0900 WKW 25/07/2014


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) WKW 30/10/15


SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
LAYOUT PLAN
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

SHEET 3
Scale
Drawing no. Rev.
1:500 @ A1 / 1:1000 @ A3
J3518/P/TGP/30/3002 D
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

81
N N

81

81

81
00 N
00 00

81
1+

38
30
92 NOTES

39

41

42
00
0

81 90 89

40
00
91 81 81

00

00

00
0
55
0+
N 81

81
00
1. FOR GENERAL NOTES AND LEGENDS,

43
E1
0+500
REFER TO DRAWING NO.

00
4-
J3518/P/TGP/30/0001 & 0002.

E
00

M.
0+7

J.
M.J.
0+500

0+550
M.J
81

.
37

0
0+45

0
5
+
00

0+
0

60
0
E14
E

-A
A

N
0+4
50 00
65
0
E1 88
0+ 3- 81

0+
A

65
A

0
5
4
+
0
C

N
00
92

0+
81 110m

70
- T
UNG

0
CHU
NG N
AVI
GATI
ON
CHA

0+
NNE
L

75
0

0
0

40
6

0
+
0

0+
A

0+ C

40
0

BR E12-A
ID
E1 GE
4- E8

0
E12-B

35
C E11-A

0+
E10-A

0+850
.

M.
E1
J
.

J.
0
M

3-
55
0+

81
B
BR

0
0+8
ID

0+30

43
GE

00

00
E7
A

0+250

0+200

0+150

1+019

E
A
C

C
0

00
E13-C
+
3

0+5
5

C
0

0+900
C B
B

0+950
E1

0+450
4-

0+400

0+350

0+300

0+250

0+200

0+150

1+000
C

0+100
B

BRIDGE E6
C

C B

1+400.000
B

1+350

1+300

1+250

1+200

1+150

1+100
A

C
A
0+

0+718
C
M.J.
30

0+700
C

POECH
N
C
0

BRIDGE E5 00
C

0+650
87
0+350

81

0+600
0+550
0+500
0+450
0+400

E12-C E11-B E10-B

N
E12-D
00 E13-D
91
81
81
36

E14-D
00
E

PLAN
SCALE 1:1000
81
36
00

81
81

81

81
81

81
N
E

39
38
00

41

42
37

N N

40
N
00 00 88

00
00
00

00

00
00

00
90 89 81 87
81 81 81

E
E

E
E

E
BRIDGE E8
BRIDGE E7
BRIDGE E6
> PIER E14-A > PIER E13-A > PIER E12-A > PIER E11-A > PIER E10-A
BRIDGE E5 BRIDGE E2
PIER E14-B PIER E13-B PIER E12-B PIER E11-B PIER E10-B
PIER E14-C PIER E13-C PIER E12-C
PIER E14-A TO E13-A = 130872 PIER E13-A TO E12-A = 196026 PIER E12-A TO E11-A = 144754
PIER E14-D PIER E13-D PIER E12-D
PIER E14-B TO E13-B = 131125 PIER E13-B TO E12-B = 199147 PIER E12-B TO E11-A = 145189
PIER E14-C TO E13-C = 140051 PIER E13-C TO E12-C = 198150 PIER E12-C TO E11-B = 150228 PIER E11-A TO E10-A = 136213
PIER E14-D TO E13-D = 142913 PIER E13-D TO E12-D = 202109 PIER E12-D TO E11-B = 150181 PIER E11-B TO E10-B = 136213

ELEVATION
SCALE 1:1000

0 10 20 30 40 50

METRES
1 : 1000

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
B FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

WKW 27/08/14
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
PLAN AND ELEVATION
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

BRIDGE E5 TO E8
Scale
Drawing no. Rev.
1:500 @ A1 / 1:1000 @ A3
J3518/P/TGP/30/3015 B
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

81
N N N

81
81

81

81
00 00 00

44
NOTES

47
45

46

48
88 87 86

00
81 81 81

00
00

00

00
81
1. FOR GENERAL NOTES AND LEGENDS,
N

E
E

E
43
REFER TO DRAWING NO.

00
J3518/P/TGP/30/0001 & 0002.

E
N
00
85
81

N
00
89
81
81
42
00
E

E3-A

81
E10-A E9-A E8-A E7-A E6-A E5-A E4-A E3-B

48
00
N
00
88

E
81 M.J.

A
A

B B

BRIDGE E2

BRIDGE E2 B
B
1+250

1+200

1+150

1+100

1+050

1+000

0+950

0+900

0+850

0+800

0+750

0+700

0+650

0+600

0+550

0+500
M.J.

N
00
84
81

E10-B E9-B E8-B E7-B E6-B E5-B E4-B


E3-C

E3-D
81
41
00

PLAN
E

SCALE 1:1000

N
00
83
81

81
47
00
N
81

81

81

81

81
81

E
00
87
42

43

44

45

46
41

N N N N
81 00 00 00 00
00

00

00

00

00
00

86 85 84 83
81 81 81 81
E

E
E

BRIDGE E8
BRIDGE E7
BRIDGE E6
BRIDGE E5 BRIDGE E2
> PIER E10-A > PIER E9-A > PIER E8-A > PIER E7-A > PIER E6-A > PIER E5-A > PIER E4-A > PIER E3-A
PIER E10-B PIER E9-B PIER E8-B PIER E7-B PIER E6-B PIER E5-B PIER E4-B PIER E3-B
PIER E3-C
PIER E4-A TO E3-A = 66207
PIER E4-A TO E3-B = 66006 PIER E3-D

PIER E10-A TO E9-A = 122951 PIER E9-A TO E8-A = 111002 PIER E8-A TO E7-A = 99932 PIER E7-A TO E6-A = 89894 PIER E6-A TO E5-A = 81002 PIER E5-A TO E4-A = 73183 PIER E4-B TO E3-C = 65992
PIER E10-B TO E9-B = 122951 PIER E9-B TO E8-B = 111001 PIER E8-B TO E7-B = 99927 PIER E7-B TO E6-B = 89892 PIER E6-B TO E5-B = 81002 PIER E5-B TO E4-B = 73183 PIER E4-B TO E3-D = 66038

ELEVATION
SCALE 1:1000

0 10 20 30 40 50

METRES
1 : 1000

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

WYLC 27/08/14
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
PLAN AND ELEVATION
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

BRIDGE E2
Scale
Drawing no. Rev.
1:500 @ A1 / 1:1000 @ A3
J3518/P/TGP/30/3016 A
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

> OF PIER E10-A > OF PIER E9-A


BRIDGE E8 BRIDGE E2-3A
BRIDGE E7
M.J. 150 STITCH
200 STITCH 200 STITCH
150 STITCH
200 STITCH
200 STITCH 200 STITCH
150 STITCH 150 STITCH
K8 K7 200 STITCH
K14 K6
K5 K4
K3
K2 K1 M1 M2 N1 N2 N2
N1 K4 K5 K6 K7 K8 K9 K10 K11 K12
M2 M1 K1 K2 K3 K13 K13 K13 K12 K11
K10 K9 K8 K7
K6
K5 K4 M1 M2 N1 N2

J J

NOTE:

1. ALL SEGMENT LENGTHS ARE GIVEN ALONG DECK BOX CENTRELINES.

2. ALL SEGMENT LENGTHS ARE THE ACTUAL DIMENSIONS.

3. REFER TO CONCRETE OUTLINES DRAWING SERIES J3518/P/TGP/30/4000 FOR FURTHER DETAILS.


DIRECTION OF
4. REFER TO CASTING SCHEDULES (J3518/P/TGP/30/8000 SERIES) FOR FINAL REQUIREMENTS PER UPCHAINAGE

SEGMENT.

MATCHLINE A-A
P10R- P10R- P10R- P10R- P10R- P10R- P9R- P9R- P9R-

SEGMENT NAME SU9 SU8 SU7 SU6 SU5 SU4 SU3 SU2 SU1 PD2 PD3 PD4 PD5 PU5 PU4 PU3 PU2 SD1 SD2 SD3 SD4 SD5 SD6 SD7 SD8 SD9 SD10 SD11 SD12 SU12 SU11 SU10 SU9 SU8 SU7 SU6 SU5 SU4 SU3 SU2 SU1 PD2 PD3 PD4 PD5

SEGMENT TYPE K14 K8 K7 K6 K5 K4 K3 K2 K1 M1 M2 N1 N2 N2 N1 M2 M1 K1 K2 K3 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13 K13 K13 K12 K11 K10 K9 K8 K7 K6 K5 K4 M1 M2 N1-1 N2

SEGMENT LENGTH (m) 5.260 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.925 3.925 3.403 3.403 3.403 3.403 3.925 3.925 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.030 3.030 3.031 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.675 3.675 3.253 3.403

UPCHAINAGE RIGHT LENGTH (m) 8.142 8.054 7.966 7.878 7.790 7.701 7.614 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582

UPCHAINAGE LEFT LENGTH (m) 8.067 8.048 8.029 8.011 7.992 7.953 7.953 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952

CANTILEVER TYPE C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2-C3 C3 C2-C3 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

TOP BLISTER TYPE

BOTTOM BLISTER TYPE EPT1 EPT1 IPT1 IPT1 EPT1 IPT1 EPT1 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1 EPT1 IPT1 IPT1 IPT1

DEVIATOR TYPE D1 D1

TOP TEMPORARY BLISTER TTBF3/TTB4S TTB4S TTB4S TTB7 TTB7 TTB7 TTB7 TTB7 TTB7S TTB7 TTB7S TTB7S TTB7 TTB7 TTB7 TTB7 TTB7 TTB4 TTB4 TTB4 TTB4 TTB4 STB1 STB1 TTB1 TTB1 TTB1 TTB1 TTB1 TTB4 TTB4 TTB4 STB4 STB4 STB7 TTB7 TTB7S TTB4

BOTTOM TEMPORARY BLISTER BTB1 BTB1 BTB1 BTB1 BTB1 BTB1S BTB1S BTB2S BTB2S BTB1 BTB1S BTB2S BTB2S BTB1S BTB1S BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB2 BTB2 BTB1

J J

BRIDGE E2-3A BRIDGE E2-2A


> OF PIER E9-A > OF PIER E8-A

J
200 STITCH 150 STITCH 200 STITCH
150 STITCH
200 STITCH 200 STITCH
200 STITCH M.J.
150 STITCH 150 STITCH
150 STITCH 150 STITCH
N2 N1 M2 M1 K4 K5 K6 K7 K8 K9 K15 200 STITCH
K10 K11 K12 K13 K13 K13 K12 K11
K8 K7
K14 K6
K5 K4 N2 N2
M1 M2 N1 N1 M2 M1 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13

MATCHLINE B-B
J
J

DIRECTION OF
UPCHAINAGE
MATCHLINE A-A

J
J
J

P9R- P9R- P8R- P8R- P8R- P8R- P8R- P8R- P8R-

SEGMENT NAME PU5 PU4 PU3 PU2 SD1 SD2 SD3 SD4 SD5 SD6 SD7 SD8 SD9 SD10 SD11 SD12 SU9 SU8 SU7 SU6 SU5 SU4 SU3 SU2 SU1 PD2 PD3 PD4 PD5 PU5 PU4 PU3 PU2 SD1 SD2 SD3 SD4 SD5 SD6 SD7 SD8 SD9 SD10

SEGMENT TYPE N2 N1-1 M2 M1 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13 K13 K13 K12 K11 K15 K14 K8 K7 K6 K5 K4 M1 M2 N1 N2 N2 N1 M2 M1 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13

SEGMENT LENGTH (m) 3.403 3.253 3.675 3.675 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.445 3.445 3.445 3.800 4.000 5.850 5.260 4.000 4.000 4.000 4.000 4.000 3.425 3.425 3.253 3.403 3.403 3.253 3.425 3.425 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 2.581

UPCHAINAGE RIGHT LENGTH (m) 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582

UPCHAINAGE LEFT LENGTH (m) 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.953 7.953

CANTILEVER TYPE C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

TOP BLISTER TYPE

BOTTOM BLISTER TYPE EPT1 IPT1 IPT1 IPT1 EPT1 IPT1 IPT1 EPT1 IPT1 EPT1 IPT1 IPT1

DEVIATOR TYPE D1 D1

TOP TEMPORARY BLISTER TTB4S TTB7S TTB7 STB7 STB4 STB4 TTB4 TTB4 TTB4 TTB1 TTB1 TTB1 TTB1 TTB1 STB1 STB1 TTBF1 TTBF1/TTB4S TTB4 TTB4 TTB7 TTB7 TTB7S TTB4 TTB4S TTB7S TTB7 TTB7 TTB4 TTB4 TTB4 TTB4 TTB4S TTB1S TTB1S TTB1S

BOTTOM TEMPORARY BLISTER BTB1 BTB2 BTB2 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB2 BTB2 BTB1 BTB1 BTB2 BTB2 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
E FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

F ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0900 WKW 25/07/2014


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) DCKC 30/10/15


SUPERSTRUCTURE
$FI

G ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-1126 Checked Approved


Southern Connection Viaduct Section
(GCL REQUEST) DCKC 03/06/16
ELEVATIONS BRIDGE E2-2A, E2-3A
:

H ICE CERTIFICATION BASED ON EMAIL 14/09/2016 DCKC 23/09/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

J ICE CERTIFICATION BASED ON EMAIL 28/02/2017 DCKC 07/03/17 SHEET 1 OF 2


Scale
Drawing no. Rev.
NOT TO SCALE
J3518/P/TGP/30/3100 J
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

BRIDGE E2-2A BRIDGE E2-1A


> OF PIER E7-A
REFER TO DRAWING NO.
> OF PIER E6-A
J3518/P/TGP/30/3112 & 3113

200 STITCH 200 STITCH


200 STITCH J
150 STITCH 150 STITCH 200 STITCH
150 STITCH 150 STITCH
200 STITCH

K13 K12 K11 K10 K9 K8 K7 K6 K5 M1 M2 N1 N2 N2 N1 M2 M1 K5 K6 K7 K8 K9 K10 K11 K12 K13 K13 K12 K11 K15

MATCHLINE B-B
DIRECTION OF
UPCHAINAGE

P7R- P7R- P7R- P7R- P7R- P6R-

SEGMENT NAME SU9 SU8 SU7 SU6 SU5 SU4 SU3 SU2 SU1 PD2 PD3 PD4 PD5 PU5 PU4 PU3 PU2 SD1 SD2 SD3 SD4 SD5 SD6 SD7 SD8 SD9 SU8 SU7 SU6 SU5

SEGMENT TYPE K13 K12 K11 K10 K9 K8 K7 K6 K5 M1 M2 N1 N2 N2 N1 M2 M1 K5 K6 K7 K8 K9 K10 K11 K12 K13 K13 K12 K11 K15

SEGMENT LENGTH (m) 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 2.925 2.925 2.241 2.391 2.3912.241 2.925 2.925 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.509 4.000 4.000 5.850

UPCHAINAGE RIGHT LENGTH (m) 7.582 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.5837.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583

UPCHAINAGE LEFT LENGTH (m) 7.953 7.953 7.953 7.953 7.953 7.953 7.953 7.953 7.954 7.954 7.954 7.954 7.954 7.9547.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954

CANTILEVER TYPE C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

TOP BLISTER TYPE

BOTTOM BLISTER TYPE IPT1 IPT1 IPT1 EPT1 IPT1 IPT1 IPT1 EPT1 IPT1 IPT1

DEVIATOR TYPE D1 D1

TOP TEMPORARY BLISTER TTB1 TTB1 TTB1S TTB4S TTB4S TTB4 TTB4 TTB4 TTB7 TTB7S TTB4 TTB4STTB7S TTB7 TTB4 TTB4 TTB4 TTB4S TTB4S TTB1S TTB1 TTB1 STB1 STB1 STB1 TTBF2

BOTTOM TEMPORARY BLISTER BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB2 BTB2 BTB1 BTB1 BTB2 BTB2 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1

NOTE:

1. ALL SEGMENT LENGTHS ARE GIVEN ALONG DECK BOX CENTRELINES.

2. ALL SEGMENT LENGTHS ARE THE ACTUAL DIMENSIONS.

3. REFER TO CONCRETE OUTLINES DRAWING SERIES J3518/P/TGP/30/4000 FOR FURTHER DETAILS.

4. REFER TO CASTING SCHEDULES (J3518/P/TGP/30/8000 SERIES) FOR FINAL REQUIREMENTS PER

SEGMENT.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
E FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

F ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0900 WKW 25/07/2014


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) DCKC 30/10/15


SUPERSTRUCTURE
$FI

G ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-1126 Checked Approved


Southern Connection Viaduct Section
(GCL REQUEST) DCKC 03/06/16
ELEVATIONS BRIDGE E2-2A, E2-3A
:

H ICE CERTIFICATION BASED ON EMAIL 14/09/2016 DCKC 23/09/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

J ICE CERTIFICATION BASED ON EMAIL 28/02/2017 DCKC 07/03/17 SHEET 2 OF 2


Scale
Drawing no. Rev.
NOT TO SCALE
J3518/P/TGP/30/3101 J
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

> OF PIER E10-B > OF PIER E9-B


BRIDGE E5 BRIDGE E2-3B
134 STITCH K1
BRIDGE E6
M.J. 150 STITCH
133 STITCH 133 STITCH
150 STITCH
200 STITCH 200 STITCH
150 STITCH
K8 K7 200 STITCH 200 STITCH
K14 K6
K5 K4
K3
K2 K1 M1 M2 N1 N2 N2
N1 K4 K5 K6 K7 K8 K9 K10 K11 K12
M2 M1 K1 K2 K3 K13 K13 K13 K12 K11
K10 K9 K8 K7
K6
K5 K4 M1 M2 N1 N2

NOTE:

1. ALL SEGMENT LENGTHS ARE GIVEN ALONG DECK BOX CENTRELINES.

2. ALL SEGMENT LENGTHS ARE THE ACTUAL DIMENSIONS.


DIRECTION OF
3. REFER TO CONCRETE OUTLINES DRAWING SERIES J3518/P/TGP/30/4000 FOR FURTHER DETAILS.
UPCHAINAGE
4. REFER TO CASTING SCHEDULES (J3518/P/TGP/30/8000 SERIES) FOR FINAL REQUIREMENTS PER

SEGMENT.

MATCHLINE A-A
K1

P10L- P10L- P10L- P10L- P10L- P10L- P9L- P9L- P9L-

SEGMENT NAME SU9 SU8 SU7 SU6 SU5 SU4 SU3 SU2 SU1 PD2 PD3 PD4 PD5 PU5 PU4 PU3 PU2 SD1 SD2 SD3 SD4 SD5 SD6 SD7 SD8 SD9 SD10 SD11 SD12 SU12 SU11 SU10 SU9 SU8 SU7 SU6 SU5 SU4 SU3 SU2 SU1 PD2 PD3 PD4 PD5

SEGMENT TYPE K14 K8 K7 K6 K5 K4 K3 K2 K1 M1 M2 N1 N2 N2 N1 M2 M1 K1 K2 K3 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13 K13 K13 K12 K11 K10 K9 K8 K7 K6 K5 K4 M1 M2 N1 N2

SEGMENT LENGTH (m) 5.260 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.925 3.925 3.403 3.403 3.403 3.403 3.925 3.925 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.030 3.030 3.031 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.675 3.675 3.403 3.403

UPCHAINAGE RIGHT LENGTH (m) 8.067 8.048 8.029 8.011 7.992 7.974 7.953 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952

UPCHAINAGE LEFT LENGTH (m) 8.142 8.054 7.966 7.878 7.790 7.702 7.612 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582

CANTILEVER TYPE C2 C2 C2 C3-C2 C3 C2-C3 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

TOP BLISTER TYPE

BOTTOM BLISTER TYPE EPT1 EPT1 IPT1 IPT1 EPT1 IPT1 EPT1 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1 EPT1 IPT1 IPT1 IPT1

DEVIATOR TYPE D1 D1

TOP TEMPORARY BLISTER TTBF3/TTB4S TTB4S TTB4S TTB7 TTB7 TTB7 TTB7 TTB7 TTB7S TTB7 TTB7S TTB7S TTB7 TTB7 TTB7 TTB7 TTB7 TTB4 TTB4 TTB4 TTB4 TTB4 STB1 STB1 TTB1 TTB1 TTB1 TTB1 TTB1 TTB4 TTB4 TTB4 STB4 STB4 STB7 TTB7 TTB7S TTB4

BOTTOM TEMPORARY BLISTER BTB1 BTB1 BTB1 BTB1 BTB1 BTB1S BTB1S BTB2S BTB2 BTB1 BTB1 BTB2 BTB2S BTB1S BTB1S BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB2 BTB2 BTB1

> OF PIER E9-B > OF PIER E8-B

BRIDGE E2-3B BRIDGE E2-2B


200 STITCH 200 STITCH 200 STITCH
150 STITCH 200 STITCH

200 STITCH M.J.


150 STITCH 150 STITCH
150 STITCH 150 STITCH
N2 N1 M2 M1 K4 K5 K6 K7 K8 K9 K15 200 STITCH
K10 K11 K12 K13 K13 K13 K12 K11
K8 K7
K14 K6
K5 K4 N2 N2
M1 M2 N1 N1 M2 M1 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13

MATCHLINE B-B
DIRECTION OF
UPCHAINAGE
MATCHLINE A-A

P9L- P9L- P8L- P8L- P8L- P8L- P8L- P8L- P8L-

SEGMENT NAME PU5 PU4 PU3 PU2 SD1 SD2 SD3 SD4 SD5 SD6 SD7 SD8 SD9 SD10 SD11 SD12 SU9 SU8 SU7 SU6 SU5 SU4 SU3 SU2 SU1 PD2 PD3 PD4 PD5 PU5 PU4 PU3 PU2 SD1 SD2 SD3 SD4 SD5 SD6 SD7 SD8 SD9 SD10

SEGMENT TYPE N2 N1 M2 M1 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13 K13 K13 K12 K11 K15 K14 K8 K7 K6 K5 K4 M1 M2 N1 N2 N2 N1 M2 M1 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13

SEGMENT LENGTH (m) 3.403 3.403 3.675 3.675 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.445 3.445 3.445 3.800 4.000 5.850 5.260 4.000 4.000 4.000 4.000 4.000 3.425 3.425 3.253 3.403 3.403 3.253 3.425 3.425 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 2.581

UPCHAINAGE RIGHT LENGTH (m) 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.952 7.953 7.953 7.953

UPCHAINAGE LEFT LENGTH (m) 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.582 7.583 7.583 7.583

CANTILEVER TYPE C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

TOP BLISTER TYPE

BOTTOM BLISTER TYPE EPT1 IPT1 IPT1 IPT1 EPT1 IPT1 IPT1 EPT1 IPT1 EPT1 IPT1 IPT1

DEVIATOR TYPE D1 D1

TOP TEMPORARY BLISTER TTB4S TTB7S TTB7 STB7 STB4 STB4 TTB4 TTB4 TTB4 TTB1 TTB1 TTB1 TTB1 TTB1 STB1 STB1 TTBF1 TTBF1/TTB4S TTB4 TTB4 TTB7 TTB7 TTB7S TTB4 TTB4S TTB7S TTB7 TTB7 TTB4 TTB4 TTB4 TTB4 TTB4S TTB1S TTB1S TTB1S

BOTTOM TEMPORARY BLISTER BTB1 BTB2 BTB2 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB2 BTB2 BTB1 BTB1 BTB2 BTB2 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
E FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

F ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0900 WKW 25/07/2014


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) DCKC 30/10/15


SUPERSTRUCTURE
$FI

G ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-1126 Checked Approved


Southern Connection Viaduct Section
(GCL REQUEST) DCKC 03/06/16
ELEVATIONS BRIDGE E2-2B, E2-3B
:

H ICE CERTIFICATION BASED ON EMAIL 14/09/2016 DCKC 23/09/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

J ICE CERTIFICATION BASED ON EMAIL 28/02/2017 DCKC 08/03/17 SHEET 1 OF 2


K1 GCL'S COMMENTS INCORPORATED DCKC 03/04/17 Scale
Drawing no. Rev.
NOT TO SCALE
J3518/P/TGP/30/3102 K1
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

BRIDGE E2-2B BRIDGE E2-1B


> OF PIER E7-B
REFER TO DRAWING NO.
> OF PIER E6-B
J3518/P/TGP/30/3114 & 3115

200 STITCH 200 STITCH


J

200 STITCH J
150 STITCH 150 STITCH 200 STITCH
150 STITCH 150 STITCH
200 STITCH

K13 K12 K11 K10 K9 K8 K7 K6 K5 M1 M2 N1 N2 N2 N1 M2 M1 K5 K6 K7 K8 K9 K10 K11 K12 K13 K13 K12 K11 K15

MATCHLINE B-B
DIRECTION OF
UPCHAINAGE

P7L- P7L- P7L- P7L- P7L- P6L-

SEGMENT NAME SU9 SU8 SU7 SU6 SU5 SU4 SU3 SU2 SU1 PD2 PD3 PD4 PD5 PU5 PU4 PU3 PU2 SD1 SD2 SD3 SD4 SD5 SD6 SD7 SD8 SD9 SU8 SU7 SU6 SU5

SEGMENT TYPE K13 K12 K11 K10 K9 K8 K7 K6 K5 M1 M2 N1 N2 N2 N1 M2 M1 K5 K6 K7 K8 K9 K10 K11 K12 K13 K13 K12 K11 K15
NOTE:
SEGMENT LENGTH (m) 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 2.925 2.925 2.241 2.391 2.3912.241 2.925 2.925 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.509 4.000 4.000 5.850

UPCHAINAGE RIGHT LENGTH (m) 7.953 7.953 7.954 7.953 7.953 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.9547.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 1. ALL SEGMENT LENGTHS ARE GIVEN ALONG DECK BOX CENTRELINES.

UPCHAINAGE LEFT LENGTH (m) 7.583 7.583 7.583 7.583 7.583 7.584 7.584 7.583 7.583 7.583 7.583 7.583 7.583 7.5837.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 2. ALL SEGMENT LENGTHS ARE THE ACTUAL DIMENSIONS.

CANTILEVER TYPE C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 3. REFER TO CONCRETE OUTLINES DRAWING SERIES J3518/P/TGP/30/4000 FOR FURTHER DETAILS.

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 4. REFER TO CASTING SCHEDULES (J3518/P/TGP/30/8000 SERIES) FOR FINAL REQUIREMENTS PER
TOP BLISTER TYPE
SEGMENT.
BOTTOM BLISTER TYPE IPT1 IPT1 IPT1 EPT1 IPT1 IPT1 IPT1 EPT1 IPT1 IPT1

DEVIATOR TYPE D1 D1

TOP TEMPORARY BLISTER TTB1 TTB1 TTB1S TTB4S TTB4S TTB4 TTB4 TTB4 TTB7 TTB7S TTB4 TTB4STTB7S TTB7 TTB4 TTB4 TTB4 TTB4S TTB4S TTB1S TTB1 TTB1 STB1 STB1 STB1 TTBF2

BOTTOM TEMPORARY BLISTER BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB2 BTB2 BTB1 BTB1 BTB2 BTB2 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
E FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

F ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0900 WKW 25/07/2014


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) DCKC 30/10/15


SUPERSTRUCTURE
$FI

G ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-1126 Checked Approved


Southern Connection Viaduct Section
(GCL REQUEST) DCKC 03/06/16
ELEVATIONS BRIDGE E2-2B, E2-3B
:

H ICE CERTIFICATION BASED ON EMAIL 14/09/2016 DCKC 23/09/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

J ICE CERTIFICATION BASED ON EMAIL 28/02/2017 DCKC 07/03/17 SHEET 2 OF 2


Scale
Drawing no. Rev.
NOT TO SCALE
J3518/P/TGP/30/3103 J
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

> OF PIER E14-D


> OF PIER E13-D
BRIDGE F
150 STITCH 150 STITCH
200 STITCH 200 STITCH
150 STITCH 150 STITCH
200 STITCH
200 STITCH

200 STITCH
200 STITCH
200 STITCH
M1-U M2-U N1-U N2-U N3-U N3-D N2-D N1-D M2-D M1-D
L2 L1
L6 L5-1 L4 L3
L26 L25 L24 L23 L22 L21
L28 L27
L30 L29
L31 L33
L18 L32
L18 L18
L19 L18 L18
L18 L19 L20
L35 L31 L32
M3 L36

DIRECTION OF
UPCHAINAGE
NOTE:

1. ALL SEGMENT LENGTHS ARE GIVEN ALONG DECK BOX CENTRELINES.

2. ALL SEGMENT LENGTHS ARE THE ACTUAL DIMENSIONS.

MATCHLINE A-A
3. REFER TO CONCRETE OUTLINES DRAWING SERIES J3518/P/TGP/30/4000 FOR FURTHER DETAILS.

4. REFER TO CASTING SCHEDULES (J3518/P/TGP/30/8000 SERIES) FOR FINAL REQUIREMENTS PER

SEGMENT.

P14L- P14L- P14L- P14L- P13L- P13L- P13L- P13L- P13L- P13L- P13L- P13L-

SEGMENT NAME P3D1 P3D2 P3D3 P3D4 P3D5 P3D6 P3D7 P3D8 P3D9 P3D10 P3D11 P3D12 S3U21 S3U20 S3U19 S3U18 S3U17 S3U16 S3U15 S3U14 S3U13 S3U12 S3U11 S3U10 S3U9 S3U8 S3U7 S3U6 S3U5 S3U4 S3U3 S3U2 S3U1 P3D2 P3D3 P3D4 P3D5 P3D6 P3U6 P3U5 P3U4 P3U3 P3U2

SEGMENT TYPE M3 L36 L35 L31 L32 L18 L19 L20 L19 L18 L18 L18 L18 L18 L32 L31 L33 L30 L29 L28 L27 L26 L25 L24 L23 L22 L21 L6 L5-1 L4 L3 L2 L1 M1-U M2-U N1-U N2-U N3-U N3-D N2-D N1-D M2-D M1-D

SEGMENT LENGTH (m) 3.500 3.651 3.651 3.651 3.651 3.651 3.651 3.250 3.651 3.651 3.651 3.631 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.800 3.250 3.250 3.250 3.250 3.925 3.925 3.232 3.231 3.232 3.232 3.232 3.232 3.925 3.925

UPCHAINAGE RIGHT LENGTH (m) 9.687 9.705 9.591 9.447 9.299 9.153 9.006 8.859 8.709 8.556 8.404 8.254 8.106 7.984 7.862 7.741 7.619 7.496 7.372 7.248 7.118 6.993 6.868 6.744 6.619 6.495 6.371 6.247 6.123 5.999 5.899 5.798 5.706 5.706 5.706 5.706 5.706 5.706 5.706 5.706 5.706 5.706 5.705

UPCHAINAGE LEFT LENGTH (m) 9.227 8.893 8.694 8.539 8.397 8.277 8.187 8.127 8.090 8.057 8.024 7.991 7.958 7.883 7.807 7.732 7.656 7.581 7.505 7.430 7.351 7.275 7.200 7.125 7.049 6.974 6.898 6.823 6.748 6.673 6.611 6.548 6.481 6.314 6.122 6.129 6.137 6.126 6.127 6.129 6.128 6.128 6.128

CANTILEVER TYPE C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C2-C3 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C1-C2 C1 C1 C1 C1 C1-C3 C3 C1-C3 C1 C1 C1

TOP SLAB TYPE S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S1-S2 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

TOP BLISTER TYPE TYPE 2* TYPE 2* TYPE 2* TYPE 2* EPT3 & TYPE 2* TYPE 1* EPT3 EPT3 & TYPE TYPE EPT3 & TYPE TYPE 2* EPT4 &

TYPE 2* TYPE 2E* 2D* 2C* TYPE 2B* 2A* TYPE 1*

BOTTOM BLISTER TYPE EPT2 IPT3 IPT3 IPT3 IPT3 IPT3 IPT3 IPT3 EPT2 IPT3 IPT3

DEVIATOR TYPE D3 D4

TOP TEMPORARY BLISTER TTB11 TTB11 TTB8 TTB8 TTB5 TTB5 TTB2 STB5 STB5 STB5 STB5A STB4A TTB7S TTB10 TTB10 STB10 STB10 TTB7 TTB7 STB7 STB7 STB7 STB7 STB7 STB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7

BOTTOM TEMPORARY BLISTER BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 TTB7S BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1S BTB1S BTB1S BTB1S BTB1S BTB2S BTB2 BTB1 BTB1 BTB1 BTB1 BTB2

* BLISTER TYPES REFERS TO PACKAGE ET34 DWG NO J3518/T/YWL/82/20521


J2

> OF PIER E12-D

150 STITCH 150 STITCH 200 STITCH


200 STITCH
200 STITCH
200 STITCH
150 STITCH
200 STITCH

L20 L20 L19 L18 L17 L16 L15 L14 L13 L12 L11 L10 L9 L8 L7 L6 L5 L4 L3 L2 L1 M1-U M2-U N1-U N2-U N3-U
L15 L16 L17 L18 L19 L20 L20 L20
L11 L12 L13 L14
L9 L10
L8
L5-1 L6 L7
L2 L3 L4
L1

MATCHLINE B-B
DIRECTION OF
UPCHAINAGE
MATCHLINE A-A

P13L- P13L- P13L- P12L- P12L- P12L- P12L-

SEGMENT NAME S3D1 S3D2 S3D3 S3D4 S3D5 S3D6 S3D7 S3D8 S3D9 S3D10 S3D11 S3D12 S3D13 S3D14 S3D15 S3D16 S3D17 S3D18 S3D19 S3D20 S3D21 S3D22 S3U21 S3U20 S3U19 S3U18 S3U17 S3U16 S3U15 S3U14 S3U13 S3U12 S3U11 S3U10 S3U9 S3U8 S3U7 S3U6 S3U5 S3U4 S3U3 S3U2 S3U1 P3D2 P3D3 P3D4 P3D5 P3D6

SEGMENT TYPE L1 L2 L3 L4 L5-1 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 L20 L20 L20 L20 L19 L18 L17 L16 L15 L14 L13 L12 L11 L10 L9 L8 L7 L6 L5 L4 L3 L2 L1 M1-U M2-U N1-U N2-U N3-U

SEGMENT LENGTH (m) 3.250 3.250 3.250 3.250 3.800 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.955 3.955 3.955 3.560 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.250 3.250 3.250 3.250 3.925 3.925 3.236 3.237 3.237

UPCHAINAGE RIGHT LENGTH (m) 5.705 5.705 5.705 5.705 5.706 5.706 5.706 5.706 5.706 5.706 5.706 5.706 5.706 5.706 5.706 5.706 5.706 5.706 5.706 5.706 5.706 5.706 5.705 5.705 5.705 5.705 5.357 5.248 5.168 5.116 5.098 5.111 5.160 5.132 5.108 5.081 5.053 5.026 4.999 4.972 4.950 4.928 4.906 4.883 4.857 4.830 4.808 4.787

UPCHAINAGE LEFT LENGTH (m) 6.128 6.128 6.128 6.128 6.128 6.128 6.128 6.128 6.128 6.128 6.128 6.128 6.128 6.128 6.127 6.128 6.128 6.128 6.128 6.127 6.130 6.127 6.120 6.200 6.327 6.471 6.534 6.479 6.419 6.322 6.190 6.114 6.129 6.128 6.128 6.129 6.129 6.130 6.130 6.130 6.130 6.130 6.130 6.130 6.130 6.130 6.130 6.130

CANTILEVER TYPE C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C3-C1 C3 C1-C3 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

TOP BLISTER TYPE EPT4 EPT3 EPT3 EPT3 EPT3 EPT3 EPT3 EPT3 EPT3 EPT4

BOTTOM BLISTER TYPE IPT3 EPT2 IPT3 IPT3 IPT3 IPT3 IPT3 IPT3 IPT3 IPT3 EPT2 IPT3

DEVIATOR TYPE D2 D2

TOP TEMPORARY BLISTER TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 STB1 STB1 STB1 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7S TTB7S TTB7S

BOTTOM TEMPORARY BLISTER BTB2S BTB1S BTB1S BTB1S BTB1S BTB1S BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1S BTB1S BTB1S BTB1S BTB1S BTB2S BTB2S BTB1S BTB1S

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
D FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

E ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0989 WKW 25/07/2014


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) DCKC 22/04/16


SUPERSTRUCTURE
$FI

F ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-1126 Checked Approved


Southern Connection Viaduct Section
(GCL REQUEST) DCKC 03/06/16
ELEVATIONS BRIDGE E5
:

G ICE CERTIFICATION BASED ON DANS NO. J3518-P3-1309 DCKC 08/03/17 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

H ICE CERTIFICATION BASED ON EMAIL 18/05/2017 DCKC 19/05/17 SHEET 1 OF 2


J1 GCL REQUEST - INCORPORATE PROPPED CANTILEVER TEMPORARY TENDONS DCKC 12/06/17 Scale
J2 GCL'S COMMENTS INCORPORATED DCKC 14/06/17 Drawing no. Rev.
NOT TO SCALE
J3518/P/TGP/30/3104 J2
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

> OF PIER E12-D > OF PIER E11-B

150 STITCH 200 STITCH 200 STITCH 150 STITCH 150 STITCH 200 STITCH
200 STITCH

200 STITCH
150 STITCH
200 STITCH 200 STITCH

N3-D N2-D N1-D M2-D M1-D L1 L2 L3 L4 L5-1 L6 L7 L16 L17 L18 L18
L8 L9 L10 L11 L13 L14 L15 L38 L37 L15
L12 L14 L13 L12 L11 L10 L9 L8 L7 M1-U M2-U N1-U N2-U N3-U

MATMHLINE M-M
MATMHLINE L-L
DIRECTION OF
UPCHAINAGE
NOTE:

1. ALL SEGMENT LENGTHS ARE GIVEN ALONG DECK BOX CENTRELINES.

2. ALL SEGMENT LENGTHS ARE THE ACTUAL DIMENSIONS.

3. REFER TO CONCRETE OUTLINES DRAWING SERIES J3518/P/TGP/30/4000 FOR FURTHER DETAILS.

4. REFER TO CASTING SCHEDULES (J3518/P/TGP/30/8000 SERIES) FOR FINAL REQUIREMENTS PER

SEGMENT.

P12L- P12L- P12L- P12L- P12L- P11L- P11L- P11L-

SEGMENT NAME P3U6 P3U5 P3U4 P3U3 P3U2 S3D1 S3D2 S3D3 S3D4 S3D5 S3D6 S3D7 S3D8 S3D9 S3D10 S3D11 S3D12 S3D13 S3D14 S3D15 S3D16 S3D17 S3D18 S3D19 S3D20 S3D21 S3U9 S3U8 S3U7 S3U6 S3U5 S3U4 S3U3 S3U2 S3U1 PD2 PD3 PD4 PD5 PD6

SEGMENT TYPE N3-D N2-D N1-D M2-D M1-D L1 L2 L3 L4 L5-1 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L18 L38 L37 L15 L14 L13 L12 L11 L10 L9 L8 L7 M1-U M2-U N1-U N2-U N3-U

SEGMENT LENGTH (m) 3.237 3.236 3.236 3.925 3.925 3.250 3.250 3.250 3.250 3.800 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 2.913 2.913 2.913 4.000 4.000 4.000 4.000 4.000 3.999 4.000 4.000 4.000 4.000 4.000 3.925 3.925 3.069 3.269 3.269

UPCHAINAGE RIGHT LENGTH (m) 4.764 4.741 4.720 4.697 4.672 4.645 4.624 4.602 4.581 4.559 4.534 4.508 4.482 4.457 4.431 4.405 4.379 4.352 4.325 4.299 4.273 4.248 4.229 4.211 4.192 4.167 4.141 4.116 4.091 4.066 4.089 4.014 3.942 3.898 3.848 8.380 8.380 8.380 8.380 8.380

UPCHAINAGE LEFT LENGTH (m) 6.131 6.131 6.131 6.131 6.131 6.131 6.131 6.132 6.132 6.132 6.132 6.132 6.132 6.132 6.133 6.133 6.133 6.133 6.134 6.134 6.135 6.135 6.136 6.136 6.137 6.138 6.139 6.140 6.141 6.142 6.096 6.147 6.193 6.213 6.242 10.573 10.468 10.358 10.276 10.189

CANTILEVER TYPE C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1-C2 C2 C2 C2 C2

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 REFER TO CONCRETE OUTLINE

TOP BLISTER TYPE EPT3 EPT3 EPT3 EPT3

BOTTOM BLISTER TYPE EPT2 IPT3 EPT6 EPT2 IPT3

DEVIATOR TYPE D6 D2 D2

TOP TEMPORARY BLISTER TTB7 TTB7S TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4S TTB4 TTB4S TTB4S TTB4S TTB4 TTB4 TTB4 TTB4 TTB7 REFER TO CONCRETE OUTLINE

BOTTOM TEMPORARY BLISTER BTB1S BTB1S BTB2S BTB2S BTB1S BTB1S BTB1S BTB1S BTB1S BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1S BTB2S REFER TO CONCRETE OUTLINE

> OF PIER E11-B

BRIDGE E2-3B

200 STITCH 200 STITCH 200 STITCH 150 STITCH

200 STITCH G
G
200 STITCH M.J.

N3-D N2-D N1-D M2-D M1-D K1 K2 K3 K4 K41 K42 K43 K44 K45 K46 K47 K12 K13 K13 K12 K11 K15
MATCHLINE C-C

DIRECTION OF
UPCHAINAGE

P11L- P11L- P11L- P11L- P10L-

SEGMENT NAME PU6 PU5 PU4 PU3 PU2 SD1 SD2 SD3 SD4 SD5 SD6 SD7 SD8 SD9 SD10 SD11 SD12 SU14 SU13 SU12 SU11 SU10

SEGMENT TYPE N3-D N2-D N1-D M2-D M1-D K1 K2 K3 K4 K41 K42 K43 K44 K45 K46 K47 K12 K13 K13 K12 K11 K15

SEGMENT LENGTH (m) 3.269 3.269 3.069 3.925 3.925 4.000 3.800 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.800 3.523 3.523 4.000 4.000 5.850

UPCHAINAGE RIGHT LENGTH (m) 8.380 8.380 8.380 8.380 8.380 8.379 8.380 8.343 8.324 8.305 8.287 8.268 8.249 8.231 8.212 8.194 8.175 8.155 8.139 8.123 8.104 8.085

UPCHAINAGE LEFT LENGTH (m) 10.097 10.004 9.917 9.830 9.725 9.618 9.510 9.444 9.357 9.269 9.181 9.093 9.005 8.917 8.829 8.741 8.653 8.561 8.483 8.406 8.318 8.230

CANTILEVER TYPE C3-C2 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C2-C3 C2

TOP SLAB TYPE REFER TO CONCRETE OUTLINE S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S1-S2 S1

TOP BLISTER TYPE EPT3 EPT3 EPT3

BOTTOM BLISTER TYPE IPT4 IPT4 IPT4a IPT6 IPT1 EPT2 IPT1 EPT2 IPT1 IPT1 IPT1

DEVIATOR TYPE D1

TOP TEMPORARY BLISTER REFER TO CONCRETE OUTLINE TTB8 TTB8 TTB8 TTB8S TTB11S TTB11S TTB11S STB8 STB2 TTB2S TTB2S STB2 STB2/TTBF2 TTBF3

BOTTOM TEMPORARY BLISTER REFER TO CONCRETE OUTLINE BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1

G G G G

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
D FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

E ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0989 WKW 25/07/2014


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) DCKC 22/04/16


SUPERSTRUCTURE
$FI

F ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-1126 Checked Approved


Southern Connection Viaduct Section
(GCL REQUEST) DCKC 03/06/16
ELEVATIONS BRIDGE E5
:

G ICE CERTIFICATION BASED ON EMAIL 28/02/2017 DCKC 07/03/17 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

SHEET 2 OF 2
Scale
Drawing no. Rev.
NOT TO SCALE
J3518/P/TGP/30/3105 G
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

> OF PIER E13-C


> OF PIER E14-C

200 STITCH 200 STITCH 150 STITCH


150 STITCH 150 STITCH
BRIDGE F4
200 STITCH
230 STITCH

L19 L18 L18 L32 L31 L33 L30 L29 L28 L27 L26 L25 L24 L23 L22 L21 L6 L5 L4 L3 L2 L1 M1-U M2-U N1-U N2-U N3-U N3-D N2-D N1-D M2-D M1-D
M3 L36 L35 L31 L32 L18 L19 L20 L20 L20

NOTE:
DIRECTION OF
1. ALL SEGMENT LENGTHS ARE GIVEN ALONG DECK BOX CENTRELINES. UPCHAINAGE

2. ALL SEGMENT LENGTHS ARE THE ACTUAL DIMENSIONS.

3. REFER TO CONCRETE OUTLINES DRAWING SERIES J3518/P/TGP/30/4000 FOR FURTHER DETAILS.

MATCHLINE A-A
4. REFER TO CASTING SCHEDULES (J3518/P/TGP/30/8000 SERIES) FOR FINAL REQUIREMENTS PER

SEGMENT.

H1

P14L- P13L- P13L- P13L- P13L- P13L- P13L- P13L-

SEGMENT NAME P4D1 P4D2 P4D3 P4D4 P4D5 P4D6 P4D7 P4D8 P4D9 P4D10 S4U22 S4U21 S4U20 S4U19 S4U18 S4U17 S4U16 S4U15 S4U14 S4U13 S4U12 S4U11 S4U10 S4U9 S4U8 S4U7 S4U6 S4U5 S4U4 S4U3 S4U2 S4U1 P4D2 P4D3 P4D4 P4D5 P4D6 P4U6 P4U5 P4U4 P4U3 P4U2

SEGMENT TYPE M3 L36 L35 L31 L32 L18 L19 L20 L20 L20 L19 L18 L18 L32 L31 L33 L30 L29 L28 L27 L26 L25 L24 L23 L22 L21 L6 L5 L4 L3 L2 L1 M1-U M2-U N1-U N2-U N3-U N3-D N2-D N1-D M2-D M1-D

SEGMENT LENGTH (m) 3.500 3.670 3.670 3.670 3.670 3.670 3.670 3.670 3.721 3.640 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.250 3.250 3.250 3.250 3.925 3.925 3.224 3.223 3.224 3.224 3.223 3.224 3.925 3.925

UPCHAINAGE RIGHT LENGTH (m) 7.450 7.483 7.450 7.451 7.451 7.452 7.452 7.452 7.483 7.521 7.562 7.604 7.647 7.689 7.731 7.773 7.816 7.856 7.904 7.887 7.800 7.734 7.672 7.598 7.518 7.433 7.353 7.281 7.212 7.150 7.088 7.067 6.957 6.859 6.816 6.753 6.691 6.616 6.605 6.606 6.606 6.606

UPCHAINAGE LEFT LENGTH (m) 7.424 7.393 7.424 7.423 7.424 7.424 7.413 7.469 7.559 7.648 7.707 7.676 7.627 7.587 7.544 7.502 7.460 7.418 7.376 7.331 7.289 7.245 7.199 7.154 7.111 7.068 7.023 6.977 6.938 6.903 6.867 6.785 6.796 6.786 6.714 6.679 6.646 6.611 6.598 6.598 6.598 6.598

CANTILEVER TYPE C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2-C1 C1 C1 C1 C1 C1

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

TOP BLISTER TYPE EPT3 EPT3 EPT3 EPT3

BOTTOM BLISTER TYPE IPT3 IPT3 IPT3 IPT3 IPT3 IPT3 EPT5 IPT3 EPT2 IPT3

DEVIATOR TYPE D4 D4 D5 D8

TOP TEMPORARY BLISTER TTB10 TTB10 TTB7 TTB7 TTB4 TTB4 TTB1 TTB1 TTB4S TTB4S TTB4S STB10 STB10 STB10 STB7 STB7 STB7 STB7 STB7 STB7 STB7 TTB7S TTB7S TTB7S TTB7S TTB7S TTB7 TTB7S TTB7

BOTTOM TEMPORARY BLISTER BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1S BTB1S BTB1S BTB1S BTB1S BTB2S BTB2S BTB1S BTB1S BTB1S BTB1S BTB2S

> OF PIER E12-C


> OF PIER E13-C

200 STITCH 150 STITCH 150 STITCH


200 STITCH
200 STITCH 200 STITCH
150 STITCH

L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 L20 L20 L20 L19 L18 L17 L16 L15 L14 L13 L12 L11 L10 L9 L8 L7 L6 L5-1 L4 L3 L2 L1 M1-U M2-U N1-U N2-U N3-U

DIRECTION OF
UPCHAINAGE
MATCHLINE A-A

MATCHLINE B-B
P13L- P13L- P12L- P12L- P12L- P12L- P12L-

SEGMENT NAME S4D1 S4D2 S4D3 S4D4 S4D5 S4D6 S4D7 S4D8 S4D9 S4D10 S4D11 S4D12 S4D13 S4D14 S4D15 S4D16 S4D17 S4D18 S4D19 S4D20 S4D21 S4D22 S4U20 S4U19 S4U18 S4U17 S4U16 S4U15 S4U14 S4U13 S4U12 S4U11 S4U10 S4U9 S4U8 S4U7 S4U6 S4U5 S4U4 S4U3 S4U2 S4U1 P4D2 P4D3 P4D4 P4D5 P4D6

SEGMENT TYPE L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 L20 L20 L20 L19 L18 L17 L16 L15 L14 L13 L12 L11 L10 L9 L8 L7 L6 L5-1 L4 L3 L2 L1 M1-U M2-U N1-U N2-U N3-U

SEGMENT LENGTH (m) 3.250 3.250 3.250 3.250 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.870 3.870 3.870 3.870 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.800 3.250 3.250 3.250 3.250 3.925 3.925 3.236 3.236 3.236

UPCHAINAGE RIGHT LENGTH (m) 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.553 6.492 6.431 6.382 6.332 6.283 6.231 6.171 6.109 6.059 6.010

UPCHAINAGE LEFT LENGTH (m) 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.598 6.344 6.175 6.008 5.838 5.669 5.494 5.327 5.157 5.078 4.996 4.916 4.836 4.810 4.791 4.772 4.757 4.742 4.727 4.711 4.692 4.673 4.657 4.642

CANTILEVER TYPE C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1-C3 C3 C3 C1-C3 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

TOP BLISTER TYPE EPT4 EPT3 EPT3 EPT3 EPT3 EPT3 EPT3 EPT3 EPT4

BOTTOM BLISTER TYPE IPT3 EPT2 IPT3 IPT3 IPT3 IPT3 IPT3 IPT3 IPT3 IPT3 IPT3 IPT3 EPT2 IPT3

DEVIATOR TYPE D2 D2

TOP TEMPORARY BLISTER TTB7 STB7 STB7 STB7 STB7 STB7 STB7 TTB4 TTB4 TTB4 TTB4 STB4 STB4 STB4 STB1 TTB1 TTB1 TTB4 TTB4 TTB4 STB4 STB4 TTB4 TTB4 TTB4 TTB4 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7S TTB7S TTB7S

BOTTOM TEMPORARY BLISTER BTB2S BTB1S BTB1S BTB1S BTB1S BTB1S BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1S BTB1S BTB1S BTB1S BTB1S BTB2S BTB2S BTB1S BTB1S

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
D FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

E ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0989 WKW 25/07/2014


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) DCKC 22/04/16


SUPERSTRUCTURE
$FI

F ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-1126 Checked Approved


Southern Connection Viaduct Section
(GCL REQUEST) DCKC 03/06/16
ELEVATIONS BRIDGE E6
:

G ICE CERTIFICATION BASED ON DANS NO. J3518-P3-1309 DCKC 08/03/17 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

H1 REVISE E14A/B/C END SPANS TO SUIT INTERFACE COORDINATES AS PER SHEET 1 OF 2


GCL REQUEST ON 16/6/17 DCKC 19/06/17 Scale
Drawing no. Rev.
NOT TO SCALE
J3518/P/TGP/30/3106 H1
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

> OF PIER E12-C > OF PIER E11-B

200 STITCH 200 STITCH F


200 STITCH
150 STITCH 150 STITCH BRIDGE E5
200 STITCH
200 STITCH
150 STITCH

N3-D N2-D N1-D M2-D M1-D L1 L2 L3 L4 L5-1 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L18 L38 L37 L15 L14 L13 L12

L11 L10 L9 L8 L7

DIRECTION OF
NOTE:
UPCHAINAGE
1. ALL SEGMENT LENGTHS ARE GIVEN ALONG DECK BOX CENTRELINES.
MATCHLINE B-B

2. ALL SEGMENT LENGTHS ARE THE ACTUAL DIMENSIONS.

3. REFER TO CONCRETE OUTLINES DRAWING SERIES J3518/P/TGP/30/4000 FOR FURTHER DETAILS.

4. REFER TO CASTING SCHEDULES (J3518/P/TGP/30/8000 SERIES) FOR FINAL REQUIREMENTS PER

SEGMENT.

P12L- P12L- P12L- P12L- P11L-

SEGMENT NAME P4U6 P4U5 P4U4 P4U3 P4U2 S4D1 S4D2 S4D3 S4D4 S4D5 S4D6 S4D7 S4D8 S4D9 S4D10 S4D11 S4D12 S4D13 S4D14 S4D15 S4D16 S4D17 S4D18 S4D19 S4D20 S4D21 S4U9 S4U8 S4U7 S4U6 S4U5 S4U4 S4U3 S4U2 S4U1

SEGMENT TYPE N3-D N2-D N1-D M2-D M1-D L1 L2 L3 L4 L5-1 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L18 L38 L37 L15 L14 L13 L12 L11 L10 L9 L8 L7

SEGMENT LENGTH (m) 3.236 3.236 3.236 3.925 3.925 3.250 3.250 3.250 3.250 3.800 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 2.925 2.925 2.925 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000

UPCHAINAGE RIGHT LENGTH (m) 5.957 5.905 5.856 5.804 5.744 5.682 5.632 5.583 5.533 5.480 5.422 5.361 5.300 5.239 5.178 5.116 5.055 4.993 4.928 4.867 4.805 4.744 4.699 4.654 4.609 4.547 4.483 4.422 4.361 4.299 4.238 4.177 4.116 4.057 3.936

UPCHAINAGE LEFT LENGTH (m) 4.625 4.609 4.593 4.576 4.557 4.537 4.521 4.506 4.489 4.472 4.454 4.434 4.414 4.394 4.374 4.353 4.333 4.313 4.292 4.272 4.252 4.232 4.217 4.202 4.187 4.167 4.146 4.125 4.105 4.085 4.064 4.043 4.021 4.000 4.037

CANTILEVER TYPE C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

TOP BLISTER TYPE EPT3 EPT3 EPT3

BOTTOM BLISTER TYPE EPT2 IPT3 EPT6 EPT2 IPT3

DEVIATOR TYPE D6 D2 D2

TOP TEMPORARY BLISTER TTB7 TTB7S TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4S TTB4 TTB4S TTB4S TTB4S TTB4 TTB4 TTB4 TTB4 TTB7

BOTTOM TEMPORARY BLISTER BTB1S BTB1S BTB2S BTB2S BTB1S BTB1S BTB1S BTB1S BTB1S BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1S BTB2S

F F F
F F

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
D FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

E ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0989 WKW 25/07/2014


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) DCKC 22/04/16


SUPERSTRUCTURE
$FI

F ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-1126 Checked Approved


Southern Connection Viaduct Section
(GCL REQUEST) DCKC 03/06/16
ELEVATIONS BRIDGE E6
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

SHEET 2 OF 2
Scale
Drawing no. Rev.
NOT TO SCALE
J3518/P/TGP/30/3107 F
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

> OF PIER E14-B > OF PIER E13-B

150 STITCH
200 STITCH 200 STITCH
150 STITCH
BRIDGE F16 200 STITCH 150 STITCH

200 STITCH

M2-D M1-D
200 STITCH N2-D N1-D
N3-U N3-D
N1-U N2-U
M1-U M2-U
L2 L1
L4 L3
L6 L5-1
K22 K21
K24 K23
K26 K25
K28 K27
K30 K29
K32 K31
K34 K33
K35 K35
K34 K35
K36 K36
K37 K33
M4 K37

MATCHLINE A-A
DIRECTION OF
NOTE: UPCHAINAGE

1. ALL SEGMENT LENGTHS ARE GIVEN ALONG DECK BOX CENTRELINES.

2. ALL SEGMENT LENGTHS ARE THE ACTUAL DIMENSIONS.

3. REFER TO CONCRETE OUTLINES DRAWING SERIES J3518/P/TGP/30/4000 FOR FURTHER DETAILS.

4. REFER TO CASTING SCHEDULES (J3518/P/TGP/30/8000 SERIES) FOR FINAL REQUIREMENTS PER

SEGMENT.

P14R- P13R- P13R- P13R- P13R- P13R- P13R- P13R- P13R-

SEGMENT NAME P5D1 P5D2 P5D3 P5D4 P5D5 P5D6 P5D7 P5D8 S5U22 S5U21 S5U20 S5U19 S5U18 S5U17 S5U16 S5U15 S5U14 S5U13 S5U12 S5U11 S5U10 S5U9 S5U8 S5U7 S5U6 S5U5 S5U4 S5U3 S5U2 S5U1 P5D2 P5D3 P5D4 P5D5 P5D6 P5U6 P5U5 P5U4 P5U3 P5U2

SEGMENT TYPE M4 K37 K37 K33 K36 K36 K34 K35 K35 K35 K34 K33 K32 K31 K30 K29 K28 K27 K26 K25 K24 K23 K22 K21 L6 L5-1 L4 L3 L2 L1 M1-U M2-U N1-U N2-U N3-U N3-D N2-D N1-D M2-D M1-D

SEGMENT LENGTH (m) 3.500 3.540 3.540 3.540 3.540 3.540 3.540 3.540 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.456 3.800 3.250 3.250 3.250 3.250 3.925 3.925 3.213 3.213 3.213 3.213 3.213 3.213 3.925 3.925

UPCHAINAGE RIGHT LENGTH (m) 6.426 6.426 6.374 6.349 6.327 6.286 6.361 6.449 6.554 6.620 6.616 6.616 6.616 6.616 6.616 6.616 6.616 6.617 6.617 6.617 6.617 6.617 6.617 6.617 6.618 6.618 6.618 6.618 6.618 6.641 6.627 6.647 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.660
H1
UPCHAINAGE LEFT LENGTH (m) 6.396 6.396 6.457 6.484 6.510 6.537 6.563 6.590 6.617 6.617 6.617 6.617 6.617 6.616 6.616 6.616 6.616 6.616 6.616 6.616 6.615 6.615 6.615 6.615 6.615 6.615 6.614 6.614 6.614 6.592 6.605 6.587 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.573

CANTILEVER TYPE C1 C1-C2 C2 C2 C2 C2 C2 C2-C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

TOP BLISTER TYPE EPT3 EPT3 EPT3

BOTTOM BLISTER TYPE IPT3 IPT3 IPT3 IPT3 IPT3 IPT3 EPT5 IPT3 EPT2 EPT5

DEVIATOR TYPE D4 D4 D5 D5

TOP TEMPORARY BLISTER TTB7 TTB7 TTB7 TTB4 TTB4 TTB1 TTB1S TTB1S TTB4 STB7 STB10 TTB10S TTB10S STB10 TTB7S TTB7 TTB7S TTB7S TTB7S TTB7S TTB7S TTB7 TTB7S TTB7S TTB7S TTB7 TTB7S TTB7

BOTTOM TEMPORARY BLISTER BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1S BTB1S BTB1S BTB1S BTB1S BTB2S BTB2S BTB1S BTB1S BTB1S BTB1S BTB2S

> OF PIER E13-B > OF PIER E12-B

200 STITCH 200 STITCH 150 STITCH 150 STITCH


200 STITCH
200 STITCH

150 STITCH L11 L10 L34 L22 L21 L6 L5-1 L4 L3 L2 L1 M1-U M2-U N1-U N2-U N3-U
L16 L15 L14 L13 L12
L20 L19 L18 L17
L20 L20 L20
L17 L18 L19
L14 L15 L16
L12 L13
L10 L11
L22 L34
L6 L21
L4 L5
L2 L3
L1

MATCHLINE B-B
DIRECTION OF
UPCHAINAGE
MATCHLINE A-A

P13R- P13R- P12R- P12R- P12R- P12R- P12R-

SEGMENT NAME S5D1 S5D2 S5D3 S5D4 S5D5 S5D6 S5D7 S5D8 S5D9 S5D10 S5D11 S5D12 S5D13 S5D14 S5D15 S5D16 S5D17 S5D18 S5D19 S5D20 S5D21 S5D22 S5U20 S5U19 S5U18 S5U17 S5U16 S5U15 S5U14 S5U13 S5U12 S5U11 S5U10 S5U9 S5U8 S5U7 S5U6 S5U5 S5U4 S5U3 S5U2 S5U1 P5D2 P5D3 P5D4 P5D5 P5D6

SEGMENT TYPE L1 L2 L3 L4 L5 L6 L21 L22 L34 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 L20 L20 L20 L19 L18 L17 L16 L15 L14 L13 L12 L11 L10 L34 L22 L21 L6 L5-1 L4 L3 L2 L1 M1-U M2-U N1-U N2-U N3-U

SEGMENT LENGTH (m) 3.250 3.250 3.250 3.250 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.153 4.152 4.153 4.152 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.800 3.250 3.250 3.250 3.250 3.925 3.925 3.235 3.235 3.235

UPCHAINAGE RIGHT LENGTH (m) 6.627 6.638 6.627 6.627 6.626 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.627 6.626 6.627 6.630 6.627 6.625 6.624 6.623 6.617 6.617 6.617 6.616 6.617 6.612 6.620 6.609 6.608 6.607

UPCHAINAGE LEFT LENGTH (m) 6.605 6.595 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.603 6.600 6.600 6.602 6.600 6.597 6.599 6.599 6.599 6.592 6.598 6.591 6.598 6.598 6.598

CANTILEVER TYPE C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

TOP BLISTER TYPE EPT3 EPT3 EPT3 EPT3 EPT3 EPT3

BOTTOM BLISTER TYPE IPT3 EPT5 IPT3 EPT2 IPT3 IPT3 IPT3 IPT3 IPT3 IPT3

DEVIATOR TYPE D5 D8 D4 D4 D7

TOP TEMPORARY BLISTER TTB7 TTB7S TTB7S STB7 STB7 TTB7 TTB7 STB4 STB4 STB4 STB4 STB4 TTB4 TTB1 STB1 STB1 STB1 STB4 STB4 STB4 STB4 STB4 TTB4 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7S TTB7S TTB7S

BOTTOM TEMPORARY BLISTER BTB2S BTB1S BTB1S BTB1S BTB1S BTB1S BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1S BTB1S BTB1S BTB1S BTB1S BTB2S BTB2S BTB1S BTB1S

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
C FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

D ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0989 WKW 25/07/2014


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) DCKC 22/04/16


SUPERSTRUCTURE
$FI

E ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-1126 Checked Approved


Southern Connection Viaduct Section
(GCL REQUEST) DCKC 03/06/16
ELEVATIONS BRIDGE E7
:

F ICE CERTIFICATION BASED ON DANS NO. J3518-P3-1309 DCKC 08/03/17 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G ICE CERTIFICATION BASED ON EMAIL 18/05/2017 DCKC 19/05/17 SHEET 1 OF 2


H1 REVISE E14A/B/C END SPANS TO SUIT INTERFACE COORDINATES AS PER Scale
GCL REQUEST ON 16/6/17 DCKC 19/06/17 Drawing no. Rev.
NOT TO SCALE
J3518/P/TGP/30/3108 H1
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

> OF PIER E12-B > OF PIER E11-A


200 STITCH 200 STITCH
200 STITCH F
150 STITCH 150 STITCH BRIDGE E8
200 STITCH
200 STITCH
150 STITCH

N3-D N2-D N1-D M2-D M1-D L1 L2 L3 L4 L5-1 L6 L21 L22 L34 L10 L11 L12 L13 L14 L15 L16 L17 L38 L37 L15 L14 L13 L12 L11 L10 L34 L22 L21

NOTE:
DIRECTION OF
1. ALL SEGMENT LENGTHS ARE GIVEN ALONG DECK BOX CENTRELINES.
UPCHAINAGE
2. ALL SEGMENT LENGTHS ARE THE ACTUAL DIMENSIONS.

MATCHLINE B-B
3. REFER TO CONCRETE OUTLINES DRAWING SERIES J3518/P/TGP/30/4000 FOR FURTHER DETAILS.

4. REFER TO CASTING SCHEDULES (J3518/P/TGP/30/8000 SERIES) FOR FINAL REQUIREMENTS PER

SEGMENT.

P12R- P12R- P12R- P12R- P12R- P11R-

SEGMENT NAME P5U6 P5U5 P5U4 P5U3 P5U2 S5D1 S5D2 S5D3 S5D4 S5D5 S5D6 S5D7 S5D8 S5D9 S5D10 S5D11 S5D12 S5D13 S5D14 S5D15 S5D16 S5D17 S5D18 S5D19 S5U9 S5U8 S5U7 S5U6 S5U5 S5U4 S5U3 S5U2 S5U1

SEGMENT TYPE N3-D N2-D N1-D M2-D M1-D L1 L2 L3 L4 L5-1 L6 L21 L22 L34 L10 L11 L12 L13 L14 L15 L16 L17 L38 L37 L15 L14 L13 L12 L11 L10 L34 L22 L21

SEGMENT LENGTH (m) 3.235 3.235 3.235 3.925 3.925 3.250 3.250 3.250 3.250 3.800 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.880 3.880 4.000 4.000 4.000 4.000 4.001 4.000 4.000 4.000 4.000 4.000

UPCHAINAGE RIGHT LENGTH (m) 6.606 6.606 6.606 6.606 6.606 6.606 6.606 6.648 6.354 6.234 6.118 5.996 5.874 5.752 5.630 5.508 5.386 5.258 5.136 5.014 4.891 4.769 4.651 4.535 4.406 4.275 4.154 4.070 4.020 3.985 3.952 3.919 3.986

UPCHAINAGE LEFT LENGTH (m) 6.598 6.599 6.599 6.599 6.599 6.598 6.598 6.557 6.506 6.430 6.332 6.227 6.123 6.019 5.915 5.811 5.706 5.597 5.493 5.389 5.285 5.181 5.079 4.978 4.869 4.765 4.661 4.557 4.452 4.348 4.244 4.144 3.936

CANTILEVER TYPE C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

TOP BLISTER TYPE EPT3 EPT3 EPT3

BOTTOM BLISTER TYPE IPT3 EPT6 EPT2 IPT3

DEVIATOR TYPE D7 D3 D2

TOP TEMPORARY BLISTER TTB7 TTB7S TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4S TTB4S TTB4S TTB4 TTB4 TTB7 TTB7 TTB7

BOTTOM TEMPORARY BLISTER BTB1S BTB1S BTB2S BTB2S BTB1S BTB1S BTB1S BTB1S BTB1S BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1S BTB2S

F F F
F

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
D FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

E ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0989 WKW 25/07/2014


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) DCKC 22/04/16


SUPERSTRUCTURE
$FI

F ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-1126 Checked Approved


Southern Connection Viaduct Section
(GCL REQUEST) DCKC 03/06/16
ELEVATIONS BRIDGE E7
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

SHEET 2 OF 2
Scale
Drawing no. Rev.
NOT TO SCALE
J3518/P/TGP/30/3109 F
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

> OF PIER E14-A > OF PIER E13-A

BRIDGE F1

200 STITCH 200 STITCH 200 STITCH 150 STITCH 150 STITCH 200 STITCH 200 STITCH 150 STITCH

M4 K37 K37 K33 K36 K36 K34 K35 K35 K35 K34 K33 K32 K31 K30 K29 K28 K27 K26 K25 K24 K23 K22 K21 L6 L5-1 L4 L3 L2 L1 M1-U M2-U N1-U N2-U N3-U N3-D N2-D N1-D M2-D M1-D

NOTE:

MATCHLINE A-A
DIRECTION OF
1. ALL SEGMENT LENGTHS ARE GIVEN ALONG DECK BOX CENTRELINES.
UPCHAINAGE
2. ALL SEGMENT LENGTHS ARE THE ACTUAL DIMENSIONS.

3. REFER TO CONCRETE OUTLINES DRAWING SERIES J3518/P/TGP/30/4000 FOR FURTHER DETAILS.

4. REFER TO CASTING SCHEDULES (J3518/P/TGP/30/8000 SERIES) FOR FINAL REQUIREMENTS PER

SEGMENT.

H1

P14R- P13R- P13R- P13R- P13R- P13R- P13R- P13R-

SEGMENT NAME P6D1 P6D2 P6D3 P6D4 P6D5 P6D6 P6D7 P6D8 S6U22 S6U21 S6U20 S6U19 S6U18 S6U17 S6U16 S6U15 S6U14 S6U13 S6U12 S6U11 S6U10 S6U9 S6U8 S6U7 S6U6 S6U5 S6U4 S6U3 S6U2 S6U1 P6D2 P6D3 P6D4 P6D5 P6D6 P6U6 P6U5 P6U4 P6U3 P6U2

SEGMENT TYPE M4 K37 K37 K33 K36 K36 K34 K35 K35 K35 K34 K33 K32 K31 K30 K29 K28 K27 K26 K25 K24 K23 K22 K21 L6 L5-1 L4 L3 L2 L1 M1-U M2-U N1-U N2-U N3-U N3-D N2-D N1-D M2-D M1-D

SEGMENT LENGTH (m) 3.500 3.598 3.598 3.598 3.598 3.598 3.598 3.719 3.830 3.830 3.830 3.830 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.456 3.800 3.250 3.250 3.250 3.250 3.925 3.925 3.216 3.217 3.216 3.216 3.216 3.216 3.925 3.925

UPCHAINAGE RIGHT LENGTH (m) 5.824 5.798 5.929 6.030 6.130 6.129 6.129 6.129 6.128 6.128 6.128 6.128 6.128 6.128 6.128 6.128 6.128 6.129 6.128 6.128 6.128 6.128 6.128 6.128 6.129 6.128 6.129 6.129 6.130 6.131 6.130 6.133 6.131 6.131 6.132 6.132 6.132 6.133 6.134 6.153

UPCHAINAGE LEFT LENGTH (m) 6.014 6.041 5.914 5.810 5.710 5.703 5.709 5.709 5.709 5.709 5.709 5.709 5.709 5.709 5.709 5.709 5.709 5.708 5.707 5.706 5.706 5.705 5.704 5.704 5.703 5.702 5.702 5.702 5.702 5.699 5.700 5.697 5.700 5.699 5.699 5.699 5.699 5.699 5.699 5.681

CANTILEVER TYPE C1 C1-C2 C2 C2 C2 C2 C2 C2-C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

TOP BLISTER TYPE EPT3 EPT3 EPT3

BOTTOM BLISTER TYPE IPT3 IPT3 IPT3 IPT3 IPT3 IPT3 EPT2 IPT3

DEVIATOR TYPE D4 D4 D8 D6

TOP TEMPORARY BLISTER TTB7 TTB7 TTB7 TTB4 TTB4 TTB1 STB1 STB1 TTB4 STB7 STB10 STB10 STB10 STB10 STB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7S TTB7S TTB7S TTB7 TTB7S TTB7

BOTTOM TEMPORARY BLISTER BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1S BTB1S BTB1S BTB1S BTB1S BTB2S BTB2S BTB1S BTB1S BTB1S BTB1S BTB2S

> OF PIER E13-A > OF PIER E12-A

150 STITCH 200 STITCH 200 STITCH


200 STITCH 200 STITCH 150 STITCH 150 STITCH 200 STITCH

L1 L2 L3 L4 L5-1 L6 L21 L22 L34 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 L20 L20 L20 L19 L18 L17 L16 L15 L14 L13 L12 L11 L10 L34 L22 L21 L6 L5 L4 L3 L2 L1 M1-U M2-U N1-U N2-U N3-U
MATCHLINE A-A

MATCHLINE B-B
DIRECTION OF
UPCHAINAGE

P13R- P13R- P12R- P12R- P12R- P12R-

SEGMENT NAME S6D1 S6D2 S6D3 S6D4 S6D5 S6D6 S6D7 S6D8 S6D9 S6D10 S6D11 S6D12 S6D13 S6D14 S6D15 S6D16 S6D17 S6D18 S6D19 S6D20 S6D21 S6D22 S6U20 S6U19 S6U18 S6U17 S6U16 S6U15 S6U14 S6U13 S6U12 S6U11 S6U10 S6U9 S6U8 S6U7 S6U6 S6U5 S6U4 S6U3 S6U2 S6U1 P6D2 P6D3 P6D4 P6D5 P6D6

SEGMENT TYPE L1 L2 L3 L4 L5-1 L6 L21 L22 L34 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 L20 L20 L20 L19 L18 L17 L16 L15 L14 L13 L12 L11 L10 L34 L22 L21 L6 L5 L4 L3 L2 L1 M1-U M2-U N1-U N2-U N3-U

SEGMENT LENGTH (m) 3.250 3.250 3.250 3.250 3.800 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.755 3.755 3.755 3.755 3.755 3.692 3.692 3.692 3.692 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.250 3.250 3.250 3.250 3.925 3.925 3.224 3.224 3.224

UPCHAINAGE RIGHT LENGTH (m) 6.135 6.148 6.136 6.137 6.137 6.138 6.139 6.139 6.138 6.139 6.138 6.137 6.139 6.138 6.138 6.139 6.139 6.138 6.139 6.138 6.138 6.139 6.139 6.138 6.139 6.139 6.138 6.139 6.138 6.138 6.140 6.137 6.137 6.137 6.137 6.137 6.136 6.135 6.141 6.135 6.137 6.140 6.136 6.142 6.136 6.136 6.136

UPCHAINAGE LEFT LENGTH (m) 5.698 5.685 5.699 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.698 5.699 5.741 5.798 5.854 5.910 5.966 6.022 6.078 6.098 6.098 6.098 6.095 6.098 6.093 6.098 6.098 6.098

CANTILEVER TYPE C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1

TOP BLISTER TYPE EPT3 EPT3 EPT3 EPT3 EPT3 EPT3

BOTTOM BLISTER TYPE IPT3 IPT3 IPT3 EPT2 IPT3 IPT3 IPT3 IPT3 IPT3

DEVIATOR TYPE D6 D8 D4 D4 D7

TOP TEMPORARY BLISTER TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB4 TTB4 TTB4 TTB4 TTB4S TTB4 TTB1 STB1 STB1 STB1 STB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7S TTB7S TTB7S

BOTTOM TEMPORARY BLISTER BTB2S BTB1S BTB1S BTB1S BTB1S BTB1S BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1S BTB1S BTB1S BTB1S BTB1S BTB2S BTB2S BTB1S BTB1S

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
C FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

D ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0989 WKW 25/07/2014


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) DCKC 22/04/16


SUPERSTRUCTURE
$FI

E ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-1126 Checked Approved


Southern Connection Viaduct Section
(GCL REQUEST) DCKC 03/06/16
ELEVATIONS BRIDGE E8
:

F ICE CERTIFICATION BASED ON DANS NO. J3518-P3-1309 DCKC 08/03/17 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G ICE CERTIFICATION BASED ON EMAIL 18/05/2017 DCKC 19/05/17 SHEET 1 OF 2


H1 REVISE E14A/B/C END SPANS TO SUIT INTERFACE COORDINATES AS PER Scale
GCL REQUEST ON 16/6/17 DCKC 19/06/17 Drawing no. Rev.
NOT TO SCALE
J3518/P/TGP/30/3110 H1
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

> OF PIER E12-A > OF PIER E11-A

200 STITCH

200 STITCH 150 STITCH 150 STITCH


200 STITCH
200 STITCH
150 STITCH 200 STITCH 200 STITCH

N3-D N2-D N1-D M2-D M1-D L1 L2 L3 L4 L5 L6 L21 L22 L34 L10 L11 L12 L13 L14 L15 L16 L17 L38 L37 L15 L14 L13 L12 L11 L10 L34 L22 L21 M1-U M2-U N1-U N2-U N3-U

MATCHLINE B-B

MATCHLINE C-C
NOTE:

DIRECTION OF 1. ALL SEGMENT LENGTHS ARE GIVEN ALONG DECK BOX CENTRELINES.

UPCHAINAGE 2. ALL SEGMENT LENGTHS ARE THE ACTUAL DIMENSIONS.

3. REFER TO CONCRETE OUTLINES DRAWING SERIES J3518/P/TGP/30/4000 FOR FURTHER DETAILS.

4. REFER TO CASTING SCHEDULES (J3518/P/TGP/30/8000 SERIES) FOR FINAL REQUIREMENTS PER

SEGMENT.

F
F

P12R- P12R- P12R- P12R- P12R- P11R- P11R- P11R-

SEGMENT NAME P6U6 P6U5 P6U4 P6U3 P6U2 S6D1 S6D2 S6D3 S6D4 S6D5 S6D6 S6D7 S6D8 S6D9 S6D10 S6D11 S6D12 S6D13 S6D14 S6D15 S6D16 S6D17 S6D18 S6D19 S6U9 S6U8 S6U7 S6U6 S6U5 S6U4 S6U3 S6U2 S6U1 PD2 PD3 PD4 PD5 PD6

SEGMENT TYPE N3-D N2-D N1-D M2-D M1-D L1 L2 L3 L4 L5 L6 L21 L22 L34 L10 L11 L12 L13 L14 L15 L16 L17 L38 L37 L15 L14 L13 L12 L11 L10 L34 L22 L21 M1-U M2-U N1-U N2-U N3-U

SEGMENT LENGTH (m) 3.226 3.226 3.226 3.925 3.925 3.250 3.250 3.250 3.250 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.399 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.999 4.000 3.925 3.925 3.069 3.269 3.269

UPCHAINAGE RIGHT LENGTH (m) 6.136 6.136 6.136 6.136 6.133 6.136 6.133 6.136 6.136 6.136 6.136 6.137 6.137 6.137 6.137 6.136 6.134 6.132 6.130 6.128 6.127 6.127 6.128 6.131 6.136 6.138 6.134 6.131 6.130 6.133 6.133 6.210 6.237 10.572 10.468 10.358 10.276 10.189

UPCHAINAGE LEFT LENGTH (m) 6.098 6.098 6.098 6.098 6.101 6.098 6.098 6.098 5.874 5.809 5.726 5.635 5.537 5.436 5.333 5.229 5.126 5.017 4.914 4.810 4.707 4.605 4.517 4.411 4.303 4.217 4.163 4.103 4.036 3.983 3.959 3.893 3.901 8.380 8.380 8.380 8.380 8.380

CANTILEVER TYPE C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1-C2 C2 C2 C2 C2

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 REFER TO CONCRETE OUTLINES

TOP BLISTER TYPE EPT3 EPT3 EPT3

BOTTOM BLISTER TYPE IPT3 EPT6 EPT2 IPT3

DEVIATOR TYPE D7 D2 D2

TOP TEMPORARY BLISTER TTB7 TTB7S TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB7 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4 TTB4S TTB4S TTB4S TTB4 TTB4 TTB7 TTB7 TTB7 REFER TO CONCRETE OUTLINES

BOTTOM TEMPORARY BLISTER BTB1S BTB1S BTB2S BTB2S BTB1S BTB1S BTB1S BTB1S BTB1S BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1S BTB2S REFER TO CONCRETE OUTLINES

> OF PIER E11-A

BRIDGE E2-3A

200 STITCH
200 STITCH 200 STITCH 200 STITCH 150 STITCH

200 STITCH

N3-D N2-D N1-D M2-D M1-D K1 K2 K3 K4 K41 K42 K43 K44 K45 K46 K47 K12 K13 K13 K12 K11 K15
MATCHLINE C-C

DIRECTION OF
UPCHAINAGE

P11R- P11R- P11R- P11R- P10R- P10R-

SEGMENT NAME PU6 PU5 PU4 PU3 PU2 SD1 SD2 SD3 SD4 SD5 SD6 SD7 SD8 SD9 SD10 SD11 SD12 SU14 SU13 SU12 SU11 SU10

SEGMENT TYPE N3-D N2-D N1-D M2-D M1-D K1 K2 K3 K4 K41 K42 K43 K44 K45 K46 K47 K12 K13 K13 K12 K11 K15

SEGMENT LENGTH (m) 3.269 3.269 3.069 3.925 3.925 4.000 3.800 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 3.800 3.523 3.523 4.000 4.000 5.850

UPCHAINAGE RIGHT LENGTH (m) 10.096 10.004 9.917 9.830 9.725 9.617 9.510 9.444 9.357 9.269 9.181 9.093 9.005 8.917 8.829 8.741 8.653 8.561 8.483 8.406 8.318 8.230

UPCHAINAGE LEFT LENGTH (m) 8.380 8.380 8.380 8.380 8.380 8.379 8.380 8.343 8.324 8.305 8.287 8.268 8.249 8.231 8.212 8.194 8.175 8.155 8.139 8.123 8.104 8.085

CANTILEVER TYPE C3-C2 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C2-C3 C2

TOP SLAB TYPE REFER TO CONCRETE OUTLINES S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S2 S1-S2 S1

TOP BLISTER TYPE EPT3 EPT3 EPT3

BOTTOM BLISTER TYPE IPT4 IPT4 IPT4a IPT6 IPT1 EPT2 IPT1 EPT2 IPT1 IPT1 IPT1

DEVIATOR TYPE D1

TOP TEMPORARY BLISTER REFER TO CONCRETE OUTLINES TTB8 TTB8 TTB8 TTB8S TTB11S TTB11S TTB11S STB8 STB2 TTB2S TTB2S STB2 STB2/TTBF2 TTBF3

BOTTOM TEMPORARY BLISTER REFER TO CONCRETE OUTLINES BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1

F F F F

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
C FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

D ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0989 WKW 25/07/2014


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) DCKC 22/04/16


SUPERSTRUCTURE
$FI

E ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-1126 Checked Approved


Southern Connection Viaduct Section
(GCL REQUEST) DCKC 03/06/16
ELEVATIONS BRIDGE E8
:

F ICE CERTIFICATION BASED ON DANS NO. J3518-P3-1309 DCKC 08/03/17 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

SHEET 2 OF 2
Scale
Drawing no. Rev.
NOT TO SCALE
J3518/P/TGP/30/3111 F
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

> OF PIER E6-A > OF PIER E5-A


BRIDGE E2-2A BRIDGE E2-1A
REFER TO DRAWING NO.
J3518/P/TGP/30/3100 & 3101

200 STITCH 200 STITCH

200 STITCH 200 STITCH 150 STITCH 200 STITCH


200 STITCH 200 STITCH 150 STITCH
150 STITCH 150 STITCH 150 STITCH 150 STITCH

K18 K9 K10 K11 K12 K13


M1 M2 N1 N2 N2 N1 M2 M1 K16 K7 K8 K9 K10 K11 K12 K13 K13 K12 K11 K10 K9 K18 K17 M1 M2 N1 N2 N2 N1 M2 M1 K17
K8 K7 K16
K14

MATCHLINE A-A
F F

DIRECTION OF
UPCHAINAGE

F
F

P6R- P6R- P6R- P6R- P6R- P6R- P5R- P5R- P5R- P5R- P5R-

SEGMENT NAME SU4 SU3 SU2 SU1 PD2 PD3 PD4 PD5 PU5 PU4 PU3 PU2 SD1 SD2 SD3 SD4 SD5 SD6 SD7 SD8 SU7 SU6 SU5 SU4 SU3 SU2 SU1 PD2 PD3 PD4 PD5 PU5 PU4 PU3 PU2 SD1 SD2 SD3 SD4 SD5 SD6 SD7

SEGMENT TYPE K14 K8 K7 K16 M1 M2 N1 N2 N2 N1 M2 M1 K16 K7 K8 K9 K10 K11 K12 K13 K13 K12 K11 K10 K9 K18 K17 M1 M2 N1 N2 N2 N1 M2 M1 K17 K18 K9 K10 K11 K12 K13

SEGMENT LENGTH (m) 5.260 4.000 4.000 4.000 2.925 2.925 2.250 2.400 2.400 2.250 2.925 2.925 4.000 4.000 4.000 4.000 4.000 4.000 4.000 2.603 4.000 4.000 4.000 4.000 4.000 4.000 4.000 2.925 2.925 2.400 2.400 2.400 2.400 2.925 2.925 4.000 4.000 4.000 4.000 4.000 4.000 4.000

UPCHAINAGE RIGHT LENGTH (m) 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.609 7.708 7.826 7.937 8.045 8.155 8.268 8.383

UPCHAINAGE LEFT LENGTH (m) 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954

CANTILEVER TYPE C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C3-C2 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1-S2 S2 S2 S2 S2 S2 S2

TOP BLISTER TYPE

BOTTOM BLISTER TYPE IPT6 IPT6 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1

DEVIATOR TYPE D1 D1 D1

TOP TEMPORARY BLISTER TTBF2/TTB4S TTB4 TTB7 TTB7S TTB7 TTB7S TTB7S TTB7 TTB4 TTB4 TTB4 TTB4 TTB1 TTB1S TTB1S TTB1S TTB1S TTB1 TTB4 TTB4 TTB7 TTB7 TTB7S TTB7 TTB7S TTB7S TTB8S TTB8S TTB5S TTB5S TTB2S TTB2S TTB2S

BOTTOM TEMPORARY BLISTER BTB1 BTB1 BTB2 BTB2 BTB1 BTB1 BTB2 BTB2 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB2 BTB2 BTB1 BTB1 BTB2 BTB2 BTB1 BTB1 BTB1 BTB1 BTB1

> OF PIER E4-A

SPAN A & B
REFER TO DRAWING NO.
J3518/P/TGP/30/3113
NOTE:

200 STITCH 150 STITCH 200 STITCH 200 STITCH 1. ALL SEGMENT LENGTHS ARE GIVEN ALONG DECK BOX CENTRELINES.

2. ALL SEGMENT LENGTHS ARE THE ACTUAL DIMENSIONS.

3. REFER TO CONCRETE OUTLINES DRAWING SERIES J3518/P/TGP/30/4000 FOR FURTHER DETAILS.

4. REFER TO CASTING SCHEDULES (J3518/P/TGP/30/8000 SERIES) FOR FINAL REQUIREMENTS PER


K13 K13 K13 K40 K39 K38 M1-U M2-U N1-U N2-U N2-D N1-D M2-D M1-D
SEGMENT.

DIRECTION OF
UPCHAINAGE
MATCHLINE A-A

MATCHLINE B-B

P4R- P4R- P4R- P4R-

SEGMENT NAME SU6 SU5 SU4 SU3 SU2 SU1 PD2 PD3 PD4 PD5 PU5 PU4 PU3 PU2

SEGMENT TYPE K13 K13 K13 K40 K39 K38 M1-U M2-U N1-U N2-U N2-D N1-D M2-D M1-D

SEGMENT LENGTH (m) 3.801 3.801 3.801 3.801 3.801 3.801 2.925 2.925 2.450 2.350 2.350 2.450 2.925 2.925

UPCHAINAGE RIGHT LENGTH (m) 8.505 8.616 8.726 8.834 8.943 9.052 9.166 9.252 9.337 9.412 9.483 9.546 9.618 9.713

UPCHAINAGE LEFT LENGTH (m) 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954

CANTILEVER TYPE C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 B-C3

TOP SLAB TYPE S2 S2 S2 S2 S2 S2 REFER TO CONCRETE OUTLINES

TOP BLISTER TYPE

BOTTOM BLISTER TYPE IPT2 IPT2 IPT2 IPT2

DEVIATOR TYPE D1

TOP TEMPORARY BLISTER TTB2S TTB2S TTB2S TTB5S TTB8S TTB11S REFER TO CONCRETE OUTLINES

BOTTOM TEMPORARY BLISTER BTB1 BTB1 BTB1 BTB1 BTB1 REFER TO CONCRETE OUTLINES

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
B FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

C ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0900 WKW 25/07/2014


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) WKW 30/10/15


SUPERSTRUCTURE
$FI

D ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-1126 Checked Approved


Southern Connection Viaduct Section
(GCL REQUEST) DCKC 03/06/16
ELEVATIONS BRIDGE E2-1A
:

E ICE CERTIFICATION BASED ON EMAIL 14/09/2016 DCKC 23/09/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

F ICE CERTIFICATION BASED ON EMAIL 28/02/2017 DCKC 07/03/17 SHEET 1 OF 2


Scale
Drawing no. Rev.
NOT TO SCALE
J3518/P/TGP/30/3112 F
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

SPAN A

> OF PIER E4-A > OF PIER E3-A

200 200

B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B3

DIRECTION OF
UPCHAINAGE

MATCHLINE B-B
NOTE:

1. ALL SEGMENT LENGTHS ARE GIVEN ALONG DECK BOX CENTRELINES.

2. ALL SEGMENT LENGTHS ARE THE ACTUAL DIMENSIONS.

3. REFER TO CONCRETE OUTLINES DRAWING SERIES J3518/P/TGP/30/4000 FOR FURTHER DETAILS.

4. REFER TO CASTING SCHEDULES (J3518/P/TGP/30/8000 SERIES) FOR FINAL REQUIREMENTS PER

P4R- P3R- P3R- SEGMENT.

SEGMENT NAME S1D1 S1D2 S1D3 S1D4 S1D5 S1D6 P1U8 P1U7 P1U6 P1U5 P1U4 P1U3 P1U2 P1U1

SEGMENT TYPE B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B3

SEGMENT LENGTH (m) 3.466 4.000 4.000 4.000 4.000 4.000 4.026 4.026 4.026 4.026 4.026 4.026 4.026 2.500

UPCHAINAGE RIGHT LENGTH (m) 5.837 5.828 5.830 5.832 5.833 5.835 5.837 5.839 5.841 5.842 5.844 5.846 5.964 6.172

UPCHAINAGE LEFT LENGTH (m) 3.488 3.711 3.939 4.151 4.345 4.522 4.689 4.830 4.955 5.061 5.150 5.221 5.161 5.001

CANTILEVER TYPE REFER TO CONCRETE OUTLINES

TOP SLAB TYPE REFER TO CONCRETE OUTLINES

TOP BLISTER TYPE GT1

BOTTOM BLISTER TYPE GS2 GS2 GS2 GS4 GS2 GS12 GS4 GS2 GS2 GS2

DEVIATOR TYPE GS4 GS4

TOP TEMPORARY BLISTER GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1

BOTTOM TEMPORARY BLISTER GTB1 GTB1 GTB1 GTB1 GTB1 GTB1 GTB1 GTB1 GTB1 GTB1 GTB2

D D D D D D

SPAN B

> OF PIER E4-A > OF PIER E3-B

200 200

B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2

DIRECTION OF
UPCHAINAGE
MATCHLINE B-B

P4R- P3R- P3R-

SEGMENT NAME S2D1 S2D2 S2D3 S2D4 S2D5 S2D6 P2U8 P2U7 P2U6 P2U5 P2U4 P2U3 P2U2 P2U1

SEGMENT TYPE B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B3

SEGMENT LENGTH (m) 4.000 4.000 4.000 4.000 4.000 4.000 4.004 4.004 4.004 4.004 4.004 4.004 4.004 2.500

UPCHAINAGE RIGHT LENGTH (m) 3.445 3.550 3.460 3.415 3.406 3.488 3.651 3.738 3.792 3.852 3.961 4.160 4.422 4.651

UPCHAINAGE LEFT LENGTH (m) 4.007 4.007 4.223 4.404 4.567 4.657 4.695 4.817 4.992 5.176 5.327 5.407 5.445 5.544

CANTILEVER TYPE REFER TO CONCRETE OUTLINES

TOP SLAB TYPE REFER TO CONCRETE OUTLINES

TOP BLISTER TYPE GT1

BOTTOM BLISTER TYPE GS2 GS2 GS2 GS4 GS2 GS12 GS4 GS2 GS2 GS2

DEVIATOR TYPE GS4 GS4

TOP TEMPORARY BLISTER GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1

BOTTOM TEMPORARY BLISTER GTB1 GTB1 GTB1 GTB1 GTB1 GTB1 GTB1 GTB1 GTB1 GTB1 GTB2

D D D D D

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
B FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

C ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0900 WKW 25/07/2014


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) DCKC 30/10/15


SUPERSTRUCTURE
$FI

D ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-1126 Checked Approved


Southern Connection Viaduct Section
(GCL REQUEST) DCKC 03/06/16
ELEVATIONS BRIDGE E2-1A
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

SHEET 2 OF 2
Scale
Drawing no. Rev.
NOT TO SCALE
J3518/P/TGP/30/3113 D
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

> OF PIER E6-B > OF PIER E5-B


BRIDGE E2-2B BRIDGE E2-1B
REFER TO DRAWING NO.
J3518/P/TGP/30/3102 & 3103

E
E 200 STITCH 200 STITCH

200 STITCH 200 STITCH 150 STITCH 200 STITCH


200 STITCH 200 STITCH 150 STITCH
150 STITCH 150 STITCH 150 STITCH 150 STITCH

K9 K10 K11 K12 K13


M2 N1 N2 N2 N1 M2 M1 K7 K8 K9 K10 K11 K12 K13 K13 K12 K11 K10 K9 K18 K17 M1 M2 N1 N2 N2 N1 M2 M1 K17 K18
K8 K7 K16 M1 K16
K14

DIRECTION OF
UPCHAINAGE

MATCHLINE A-A
P6L- P6L- P6L- P6L- P6L- P6L- P5L- P5L- P5L- P5L- P5L-

SEGMENT NAME SU4 SU3 SU2 SU1 PD2 PD3 PD4 PD5 PU5 PU4 PU3 PU2 SD1 SD2 SD3 SD4 SD5 SD6 SD7 SD8 SU7 SU6 SU5 SU4 SU3 SU2 SU1 PD2 PD3 PD4 PD5 PU5 PU4 PU3 PU2 SD1 SD2 SD3 SD4 SD5 SD6 SD7

SEGMENT TYPE K14 K8 K7 K16 M1 M2 N1 N2 N2 N1 M2 M1 K16 K7 K8 K9 K10 K11 K12 K13 K13 K12 K11 K10 K9 K18 K17 M1 M2 N1 N2 N2 N1 M2 M1 K17 K18 K9 K10 K11 K12 K13

SEGMENT LENGTH (m) 5.260 4.000 4.000 4.000 2.925 2.925 2.250 2.400 2.400 2.250 2.925 2.925 4.000 4.000 4.000 4.000 4.000 4.000 4.000 2.603 4.000 4.000 4.000 4.000 4.000 4.000 4.000 2.925 2.925 2.400 2.400 2.4002.400 2.925 2.925 4.000 4.000 4.000 4.000 4.000 4.000 4.000

UPCHAINAGE RIGHT LENGTH (m) 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.9547.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954

UPCHAINAGE LEFT LENGTH (m) 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.583 7.5837.583 7.583 7.603 7.701 7.829 7.950 8.067 8.179 8.290 8.398

CANTILEVER TYPE C2 C2 C3-C2 C3 C3-C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2-C3 C3 C3 C3 C3 C3 C3

TOP SLAB TYPE S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1-S2 S2 S2 S2 S2 S2 S2

TOP BLISTER TYPE

BOTTOM BLISTER TYPE IPT6 IPT6 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1 IPT1

DEVIATOR TYPE D1 D1 D1

TOP TEMPORARY BLISTER TTBF2/TTB4S TTB4 TTB7 TTB7S TTB7 TTB7S TTB7S TTB7 TTB4 TTB4 TTB4 TTB4 TTB1 TTB1S TTB1S TTB1S TTB1S TTB1 TTB4 TTB4 TTB7 TTB7 TTB7 TTB7 TTB7STTB7S TTB8S TTB8S TTB5S TTB5S TTB2S TTB2S TTB2S

BOTTOM TEMPORARY BLISTER BTB1 BTB1 BTB2 BTB2 BTB1 BTB1 BTB2 BTB2 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB1 BTB2 BTB2 BTB1 BTB1 BTB2 BTB2 BTB1 BTB1 BTB1 BTB1 BTB1

E E

> OF PIER E4-B

SPAN C & D
REFER TO DRAWING NO.
J3518/P/TGP/30/3115

200 STITCH 150 STITCH 200 STITCH 200 STITCH

K13 K13 K13 K40 K39 K38 M1-U M2-U N1-U N2-U N2-D N1-D M2-D M1-D
NOTE:

1. ALL SEGMENT LENGTHS ARE GIVEN ALONG DECK BOX CENTRELINES.

2. ALL SEGMENT LENGTHS ARE THE ACTUAL DIMENSIONS.

3. REFER TO CONCRETE OUTLINES DRAWING SERIES J3518/P/TGP/30/4000 FOR FURTHER DETAILS.

4. REFER TO CASTING SCHEDULES (J3518/P/TGP/30/8000 SERIES) FOR FINAL REQUIREMENTS PER

SEGMENT.
DIRECTION OF
UPCHAINAGE
MATCHLINE A-A

MATCHLINE B-B

P4L- P4L- P4L- P4L-

SEGMENT NAME SU6 SU5 SU4 SU3 SU2 SU1 PD2 PD3 PD4 PD5 PU5 PU4 PU3 PU2

SEGMENT TYPE K13 K13 K13 K40 K39 K38 M1-U M2-U N1-U N2-U N2-D N1-D M2-D M1-D

SEGMENT LENGTH (m) 3.801 3.801 3.801 3.801 3.801 3.801 2.925 2.925 2.450 2.350 2.350 2.450 2.925 2.925

UPCHAINAGE RIGHT LENGTH (m) 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954 7.954

UPCHAINAGE LEFT LENGTH (m) 8.513 8.617 8.723 8.832 8.943 9.054 9.171 9.257 9.342 9.418 9.491 9.557 9.625 9.704

CANTILEVER TYPE C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 B-C3

TOP SLAB TYPE S2 S2 S2 S2 S2 S2 REFER TO CONCRETE OUTLINES

TOP BLISTER TYPE

BOTTOM BLISTER TYPE IPT2 IPT2 IPT2 IPT2

DEVIATOR TYPE D1

TOP TEMPORARY BLISTER TTB2S TTB2S TTB2S TTB5S TTB8S TTB11S REFER TO CONCRETE OUTLINES

BOTTOM TEMPORARY BLISTER BTB1 BTB1 BTB1 BTB1 BTB1 REFER TO CONCRETE OUTLINES

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
B FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

C ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0900 WKW 25/07/2014


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) DCKC 30/10/15


SUPERSTRUCTURE
$FI

D ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-1126 Checked Approved


Southern Connection Viaduct Section
(GCL REQUEST) DCKC 03/06/16
ELEVATIONS BRIDGE E2-1B
:

E ICE CERTIFICATION BASED ON EMAIL 14/09/2016 DCKC 23/09/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

SHEET 1 OF 2
Scale
Drawing no. Rev.
NOT TO SCALE
J3518/P/TGP/30/3114 E
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

SPAN C

> OF PIER E4-B > OF PIER E3-C

200 200

B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B3

DIRECTION OF
UPCHAINAGE

NOTE:

MATCHLINE B-B
1. ALL SEGMENT LENGTHS ARE GIVEN ALONG DECK BOX CENTRELINES.

2. ALL SEGMENT LENGTHS ARE THE ACTUAL DIMENSIONS.

3. REFER TO CONCRETE OUTLINES DRAWING SERIES J3518/P/TGP/30/4000 FOR FURTHER DETAILS.

4. REFER TO CASTING SCHEDULES (J3518/P/TGP/30/8000 SERIES) FOR FINAL REQUIREMENTS PER

P4L- P3L- P3L- SEGMENT.

SEGMENT NAME S3D1 S3D2 S3D3 S3D4 S3D5 S3D6 P3U8 P3U7 P3U6 P3U5 P3U4 P3U3 P3U2 P3U1

SEGMENT TYPE B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B3

SEGMENT LENGTH (m) 4.000 4.000 4.000 4.000 4.000 4.000 4.002 4.002 4.002 4.002 4.002 4.002 4.002 2.500

UPCHAINAGE RIGHT LENGTH (m) 4.007 4.056 4.177 4.325 4.456 4.527 4.559 4.658 4.797 4.942 5.063 5.127 5.129 5.128

UPCHAINAGE LEFT LENGTH (m) 3.446 3.456 3.407 3.340 3.298 3.324 3.407 3.429 3.419 3.412 3.440 3.537 3.703 3.892 E

CANTILEVER TYPE REFER TO CONCRETE OUTLINES

TOP SLAB TYPE REFER TO CONCRETE OUTLINES

TOP BLISTER TYPE GT1

BOTTOM BLISTER TYPE GS2 GS2 GS2 GS4 GS2 GS12 GS4 GS2 GS2 GS2

DEVIATOR TYPE GS4 GS4

TOP TEMPORARY BLISTER GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1 GTT1

BOTTOM TEMPORARY BLISTER GTB1 GTB1 GTB1 GTB1 GTB1 GTB1 GTB1 GTB1 GTB1 GTB1 GTB2

SPAN D

> OF PIER E4-B > OF PIER E3-D

200 200 200

B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B4

DIRECTION OF
UPCHAINAGE
MATCHLINE B-B

E E

P4L- P3L- P3L-

SEGMENT NAME S4D1 S4D2 S4D3 S4D4 S4D5 S4D6 P4U8 P4U7 P4U6 P4U5 P4U4 P4U3 P4U2 P4U1

SEGMENT TYPE B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B2 B4 E

SEGMENT LENGTH (m) 3.691 4.000 4.000 4.000 4.000 4.000 3.808 4.008 4.008 4.008 4.008 4.008 4.008 2.500

UPCHAINAGE RIGHT LENGTH (m) 3.464 3.598 3.730 3.853 3.966 4.069 4.065 4.149 4.303 4.460 4.557 4.530 4.367 4.179

UPCHAINAGE LEFT LENGTH (m) 5.844 5.790 5.738 5.686 5.634 5.582 5.630 5.582 5.450 5.229 5.201 5.227 5.373 5.532

CANTILEVER TYPE REFER TO CONCRETE OUTLINES

TOP SLAB TYPE REFER TO CONCRETE OUTLINES

TOP BLISTER TYPE GT1

BOTTOM BLISTER TYPE GS2 GS2 GS2 GS4 GS2 GS12 GS4 GS2 GS2 GS2

DEVIATOR TYPE GS4 GS4

TOP TEMPORARY BLISTER GTT1 GTT1 GTT1 GTT1 GTT1 GTT2 GTT2 GTT2 GTT2 GTT2 GTT2 GTT2

BOTTOM TEMPORARY BLISTER GTB1 GTB1 GTB1 GTB1 GTB1 GTB1 GTB1 GTB1a GTB1 GTB1 GTB3

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
B FIRST ISSUE FOR DDA SUBMISSION WKW 17/12/14

C ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-0900 WKW 25/07/2014


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

(GCL REQUEST) DCKC 30/10/15


SUPERSTRUCTURE
$FI

D ICE CERTIFICATION BASED ON TRANSMITTAL J3518-PST-GCL-1126 Checked Approved


Southern Connection Viaduct Section
(GCL REQUEST) DCKC 03/06/16
ELEVATIONS BRIDGE E2-1B
:

E ICE CERTIFICATION BASED ON EMAIL 29/07/2016 DCKC 22/08/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

SHEET 2 OF 2
Scale
Drawing no. Rev.
NOT TO SCALE
J3518/P/TGP/30/3115 E
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
DIRECTION OF CASTING J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
DIRECTION OF CASTING
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
DIRECTION OF UP-CHAINAGE
DIRECTION OF DOWN-CHAINAGE THE CAST-IN ITEMS.
C
L PIER E3A

P3R-P1U1
P3R-P1U3 P3R-P1U2
P4R-S1D1 P4R-S1D2 P4R-S1D3 P4R-S1D4 P4R-S1D5 P4R-S1D6 P3R-P1U8 P3R-P1U7 P3R-P1U6 P3R-P1U5 P3R-P1U4
LEGEND
TCSS
TCSS
LIGHTING COLUMN ON THE SIDE BARRIER

G LIGHTING COLUMN ON THE MEDIAN BARRIER


G G G G G G

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

F C
L PIER E3A

P4R-S1D1 P4R-S1D2 P4R-S1D3 P4R-S1D4 P4R-S1D5 P4R-S1D6 P3R-P1U8 P3R-P1U7 P3R-P1U6 P3R-P1U5 P3R-P1U4 P3R-P1U3 P3R-P1U2 P3R-P1U1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E3A

P4R-S1D1 P4R-S1D2 P4R-S1D3 P4R-S1D4 P4R-S1D5 P4R-S1D6 P3R-P1U8 P3R-P1U7 P3R-P1U6 P3R-P1U5 P3R-P1U4 P3R-P1U3 P3R-P1U2 P3R-P1U1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 08/07/15

B MINOR REVISION KYT1 27/08/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL'S COMMENTS INCORPORATED KYT1 04/09/15


SUPERSTRUCTURE
$FI

D GCL REQUEST - E3 SEGMENTATION UPDATE DCKC 18/12/15 Checked Approved


Southern Connection Viaduct Section
E MINOR REVISION DCKC 15/01/16
SHOP DRAWING - CASTING SCHEDULE
:

F GCL'S COMMENTS INCORPORATED DCKC 07/03/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

VIADUCT E2-1A (PIER E3A TO E4A) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8000 F
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 08/07/15

B MINOR REVISION KYT1 27/08/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL'S COMMENTS INCORPORATED KYT1 04/09/15


SUPERSTRUCTURE
$FI

D MINOR REVISION KYT1 30/10/15 Checked Approved


Southern Connection Viaduct Section
E GCL REQUEST - SEGMENTATION UDPATE DCKC 04/12/15
SHOP DRAWING - CASTING SCHEDULE
:

F GCL REQUEST - SEGMENTATION UDPATE DCKC 18/12/15 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G MINOR REVISION DCKC 31/12/15 VIADUCT E2-1A (PIER E3A TO E4A) SHEET 2
H GCL'S COMMENTS INCORPORATED DCKC 07/03/16 Scale
I GCL REQUEST - ADDITIONAL STITCH AT L5 SEGMENT DCKC 22/03/16 Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8001 I
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.
DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE
DIRECTION OF CASTING
C
L PIER E3B
LEGEND
DIRECTION OF DOWN-CHAINAGE
P3R-P2U1
P3R-P2U2
P3R-P2U3 LIGHTING COLUMN ON THE SIDE BARRIER
P3R-P2U5 P3R-P2U4
P3R-P2U8 P3R-P2U7 P3R-P2U6
P4R-S2D1 P4R-S2D2 P4R-S2D3 P4R-S2D4 P4R-S2D5 P4R-S2D6
LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E3B

P4R-S2D1 P4R-S2D2 P4R-S2D3 P4R-S2D4 P4R-S2D5 P4R-S2D6 P3R-P2U8 P3R-P2U7 P3R-P2U6 P3R-P2U5 P3R-P2U4 P3R-P2U3 P3R-P2U2 P3R-P2U1

SOFFIT PLAN F
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E3B

P4R-S2D1 P4R-S2D2 P4R-S2D3 P4R-S2D4 P4R-S2D5 P4R-S2D6 P3R-P2U8 P3R-P2U7 P3R-P2U6 P3R-P2U5 P3R-P2U4 P3R-P2U3 P3R-P2U2 P3R-P2U1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 08/07/15

B MINOR REVISION KYT1 27/08/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL'S COMMENTS INCORPORATED KYT1 04/09/15


SUPERSTRUCTURE
$FI

D GCL REQUEST - E3 SEGMENTATION UPDATE DCKC 18/12/15 Checked Approved


Southern Connection Viaduct Section
E MINOR REVISION DCKC 15/01/16
SHOP DRAWING - CASTING SCHEDULE
:

F GCL'S COMMENTS INCORPORATED DCKC 07/03/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

VIADUCT E2-1A (PIER E3B TO E4A) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8002 F
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 08/07/15

B MINOR REVISION KYT1 27/08/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL'S COMMENTS INCORPORATED KYT1 04/09/15


SUPERSTRUCTURE
$FI

D GCL'S COMMENTS INCORPORATED DCKC 17/09/15 Checked Approved


Southern Connection Viaduct Section
E MINOR REVISION KYT1 30/10/15
SHOP DRAWING - CASTING SCHEDULE
:

F GCL REQUEST - SEGMENTATION UDPATE DCKC 04/12/15 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G GCL REQUEST - SEGMENTATION UDPATE DCKC 18/12/15 VIADUCT E2-1A (PIER E3B TO E4A) SHEET 2
H MINOR REVISION DCKC 31/12/15 Scale
I GCL'S COMMENTS INCORPORATED DCKC 07/03/16 Drawing no. Rev.

J GCL REQUEST - ADDITIONAL STITCH AT L5 SEGMENT DCKC 22/03/16


N.T.S.
J3518/P/TGP/30/8003 J
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

DIRECTION OF CASTING
NOTES
DIRECTION OF CASTING
DIRECTION OF UP-CHAINAGE
1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
DIRECTION OF DOWN-CHAINAGE C
L PIER E4A J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
P4R-PU4 P4R-PU3 P4R-PU2
P4R-PD4 P4R-PD5 P4R-PU5 INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
P4R-PD2 P4R-PD3 REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
TCSS
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

G
G

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

C DECK TOP PLAN


SCALE 1:100 DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

C
L PIER E4A
P4R-PU2
DIRECTION OF CASTING P4R-PU3
P4R-PU4
P4R-PU5
DIRECTION OF DOWN-CHAINAGE
P4R-PD5
P4R-PD4
P4R-PD3
P4R-PD2

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE


C
L PIER E4A

P4R-PD2 P4R-PD3 P4R-PD4 P4R-PD5 P4R-PU5 P4R-PU4 P4R-PU3 P4R-PU2

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 12/06/15

B MINOR REVISION KYT1 15/06/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL’S COMMENTS INCORPORATED KYT1 17/07/15


SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1A (PIER E4A) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8004 C
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 12/06/15

B GCL’S COMMENTS INCORPORATED KYT1 17/07/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL’S COMMENTS INCORPORATED KYT1 24/08/15


SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1A (PIER E4A) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8005 C
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES
DIRECTION OF CASTING
1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES

DIRECTION OF UP-CHAINAGE J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

DIRECTION OF CASTING
2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
DIRECTION OF DOWN-CHAINAGE REFER TO FREYSSINET DRAWINGS SERIES
P4R-SU2 P4R-SU1
P4R-SU4 P4R-SU3 J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
P4R-SU6 P4R-SU5
P5R-SD6 P5R-SD7
P5R-SD4 P5R-SD5
P5R-SD2 P5R-SD3 3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
P5R-SD1
THE CAST-IN ITEMS.

TCSS

G
G
G LEGEND
G
G
LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

P5R-SD1 P5R-SD2 P5R-SD3 P5R-SD4 P5R-SD5 P5R-SD6 P5R-SD7 P4R-SU6 P4R-SU5 P4R-SU4 P4R-SU3 P4R-SU2 P4R-SU1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

P5R-SD1 P5R-SD2 P5R-SD3 P5R-SD4 P5R-SD5 P5R-SD6 P5R-SD7 P4R-SU6 P4R-SU5 P4R-SU4 P4R-SU3 P4R-SU2 P4R-SU1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 09/06/15

KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1A (PIER E4A TO E5A) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8006 A
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 09/06/15

B GCL REQUEST- CROSS ROAD DUCT AND EXTERNAL JACKING HOLE DETAIL KYT1 04/09/15 KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C FRE INCORPORATED- TEMPORARY BLISTER UPDATED WITH BURSTING REBAR. KYT1 02/10/15
SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1A (PIER E4A TO E5A) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8007 C
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

DIRECTION OF CASTING DIRECTION OF CASTING


2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
C
L PIER E5A
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
P5R-PD2 P5R-PD3 P5R-PD4 P5R-PD5 P5R-PU5 P5R-PU4 P5R-PU3 P5R-PU2
THE CAST-IN ITEMS.

TCSS

LEGEND

G G
LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER


B B

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

B B

TCSS TCSS TCSS

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E5A

P5R-PD2 P5R-PD3 P5R-PD4 P5R-PD5 P5R-PU5 P5R-PU4 P5R-PU3 P5R-PU2

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E5A

P5R-PD2 P5R-PD3 P5R-PD4 P5R-PD5 P5R-PU5 P5R-PU4 P5R-PU3 P5R-PU2

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 09/06/15

B GCL REQUEST- DELETION OF LIFTING ANCHORAGE KYT1 04/09/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1A (PIER E5A) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8008 B
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 09/06/15

B GCL REQUEST- DELETION OF LIFTING ANCHORAGE KYT1 04/09/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C MINOR REVISION DCKC 21/12/15


SUPERSTRUCTURE
$FI

D GCL REQUEST - ADDITIONAL TEMPORARY OPENING DCKC 19/07/16 Checked Approved


Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1A (PIER E5A) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8009 D
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

DIRECTION OF CASTING
2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
DIRECTION OF UP-CHAINAGE REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


P5R-SU7 P5R-SU6 P5R-SU5 P5R-SU4 P5R-SU3 P5R-SU2 P5R-SU1 THE CAST-IN ITEMS.

LEGEND

G G G
LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P5R-SU7 P5R-SU6 P5R-SU5 P5R-SU4 P5R-SU3 P5R-SU2 P5R-SU1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P5R-SU7 P5R-SU6 P5R-SU5 P5R-SU4 P5R-SU3 P5R-SU2 P5R-SU1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1A (PIER E5A TO E6A) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8010 A
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B GCL REQUEST- EXTERNAL JACKING HOLE DETAIL KYT1 04/09/15 KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C MINOR REVISION DCKC 21/12/15


SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1A (PIER E5A TO E6A) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8011 C
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

DIRECTION OF CASTING DIRECTION OF CASTING


2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
DIRECTION OF DOWN-CHAINAGE DIRECTION OF DOWN-CHAINAGE REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


P6R-SD1 P6R-SD2 P6R-SD3 P6R-SD4 P6R-SD5 P6R-SD6 P6R-SD7 P6R-SD8 THE CAST-IN ITEMS.

C
TCSS

LEGEND

G G G
LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P6R-SD1 P6R-SD2 P6R-SD3 P6R-SD4 P6R-SD5 P6R-SD6 P6R-SD7 P6R-SD8

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P6R-SD1 P6R-SD2 P6R-SD3 P6R-SD4 P6R-SD5 P6R-SD6 P6R-SD7 P6R-SD8

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B MINOR REVISION DCKC 15/01/16 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL REQUEST - STITCH RELOCATION DCKC 27/09/16


SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1A (PIER E5A TO E6A) SHEET 3


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8012 C
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.
D D D D
2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B GCL REQUEST- EXTERNAL JACKING HOLE DETAIL KYT1 04/09/15 KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C MINOR REVISION DCKC 21/12/15


SUPERSTRUCTURE
$FI

D GCL REQUEST - STITCH RELOCATION DCKC 27/09/16 Checked Approved


Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1A (PIER E5A TO E6A) SHEET 4


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8013 D
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

DIRECTION OF CASTING DIRECTION OF CASTING


2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
C
L PIER E6A
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
P6R-PD2 P6R-PD3 P6R-PD4 P6R-PD5 P6R-PU5 P6R-PU4 P6R-PU3 P6R-PU2 THE CAST-IN ITEMS.

LEGEND

G G G
LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

C C

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E6A

P6R-PD2 P6R-PD3 P6R-PD4 P6R-PD5 P6R-PU5 P6R-PU4 P6R-PU3 P6R-PU2

C C

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E6A

P6R-PD2 P6R-PD3 P6R-PD4 P6R-PD5 P6R-PU5 P6R-PU4 P6R-PU3 P6R-PU2

C
ELEVATION C

SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B GCL REQUEST- DELETION OF LIFTING ANCHORAGE KYT1 04/09/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 21/06/16
SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1A (PIER E6A) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8014 C
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B GCL REQUEST- DELETION OF LIFTING ANCHORAGE KYT1 04/09/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C MINOR REVISION DCKC 22/12/15


SUPERSTRUCTURE
$FI

D GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 21/06/16 Checked Approved
Southern Connection Viaduct Section
E GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 28/06/16
SHOP DRAWING - CASTING SCHEDULE
:

F GCL REQUEST - ADDITIONAL TEMPORARY OPENING DCKC 19/07/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

VIADUCT E2-1A (PIER E6A) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8015 F
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

DIRECTION OF CASTING
2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
DIRECTION OF UP-CHAINAGE REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


P6R-SU4 P6R-SU3 P6R-SU2 P6R-SU1 THE CAST-IN ITEMS.

TCSS

LEGEND

G G
LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P6R-SU4 P6R-SU3 P6R-SU2 P6R-SU1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P6R-SU4 P6R-SU3 P6R-SU2 P6R-SU1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1A (PIER E6A TO E7A) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8016 A
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B MINOR REVISION DCKC 22/12/15 KYT1 26/08/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL'S COMMENTS INCORPORATED - MJ DETAILS ADDED DCKC 26/10/16


SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1A (PIER E6A TO E7A) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8017 C
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

DIRECTION OF CASTING DIRECTION OF CASTING DIRECTION OF CASTING


2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
B
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
P7R-SD1 P7R-SD2 P7R-SD3 P7R-SD4 P7R-SD5 P7R-SD6 P7R-SD7 P7R-SD8 P7R-SD9 P6R-SU8 P6R-SU7 P6R-SU6 P6R-SU5 THE CAST-IN ITEMS.

LEGEND

G G G G G G
LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P7R-SD1 P7R-SD2 P7R-SD3 P7R-SD4 P7R-SD5 P7R-SD6 P7R-SD7 P7R-SD8 P7R-SD9 P6R-SU8 P6R-SU7 P6R-SU6 P6R-SU5

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P7R-SD1 P7R-SD2 P7R-SD3 P7R-SD4 P7R-SD5 P7R-SD6 P7R-SD7 P7R-SD8 P7R-SD9 P6R-SU8 P6R-SU7 P6R-SU6 P6R-SU5

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B GCL'S COMMENTS INCORPORATED - ADDITIONAL STITCH INTRODUCED DCKC 07/09/16 KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-2A (PIER E6A TO E7A) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8018 B
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B MINOR REVISION DCKC 22/12/15 KYT1 26/08/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16


SUPERSTRUCTURE
$FI

D GCL'S COMMENTS INCORPORATED - ADDITIONAL STITCH INTRODUCED DCKC 07/09/16 Checked Approved
Southern Connection Viaduct Section
E GCL'S COMMENTS INCORPORATED - MJ DETAILS ADDED DCKC 26/10/16
SHOP DRAWING - CASTING SCHEDULE
:

F GCL'S COMMENTS INCORPORATED DCKC 21/04/17 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

VIADUCT E2-2A(PIER E6A TO E7A) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8019 F
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

DIRECTION OF CASTING DIRECTION OF CASTING


2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
C
L PIER E7A
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
P7R-PD2 P7R-PD3 P7R-PD4 P7R-PD5 P7R-PU5 P7R-PU4 P7R-PU3 P7R-PU2 THE CAST-IN ITEMS.

TCSS

LEGEND

G G
LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

D D D

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E7A

P7R-PD2 P7R-PD3 P7R-PD4 P7R-PD5 P7R-PU5 P7R-PU4 P7R-PU3 P7R-PU2

D D

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E7A

P7R-PD2 P7R-PD3 P7R-PD4 P7R-PD5 P7R-PU5 P7R-PU4 P7R-PU3 P7R-PU2

D
D
ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B MINOR REVISION KYT1 31/08/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL REQUEST- DELETION OF LIFTING ANCHORAGE KYT1 04/09/15


SUPERSTRUCTURE
$FI

D GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 21/06/16 Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-2A (PIER E7A) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8020 D
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B GCL REQUEST- DELETION OF LIFTING ANCHORAGE KYT1 04/09/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C MINOR REVISION DCKC 22/12/15


SUPERSTRUCTURE
$FI

D OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16 Checked Approved


Southern Connection Viaduct Section
E GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 21/06/16
SHOP DRAWING - CASTING SCHEDULE
:

F GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 28/06/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G GCL REQUEST - ADDITIONAL TEMPORARY OPENING DCKC 19/07/16 VIADUCT E2-1A (PIER E7A ) SHEET 2
H GCL'S COMMENTS INCORPORATED DCKC 03/10/16 Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8021 H
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

DIRECTION OF CASTING
2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
DIRECTION OF UP-CHAINAGE REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


P7R-SU9 P7R-SU8 P7R-SU7 P7R-SU6 P7R-SU5 P7R-SU4 P7R-SU3 P7R-SU2 P7R-SU1 THE CAST-IN ITEMS.

TCSS

LEGEND

G G G
LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P7R-SU9 P7R-SU8 P7R-SU7 P7R-SU6 P7R-SU5 P7R-SU4 P7R-SU3 P7R-SU2 P7R-SU1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P7R-SU9 P7R-SU8 P7R-SU7 P7R-SU6 P7R-SU5 P7R-SU4 P7R-SU3 P7R-SU2 P7R-SU1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-2A (PIER E7A TO E8A) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8022 A
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B MINOR REVISION DCKC 22/12/15 KYT1 26/08/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16


SUPERSTRUCTURE
$FI

D GCL'S COMMENTS INCORPORATED DCKC 03/10/16 Checked Approved


Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-2A(PIER E7A TO E8A) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8023 D
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

DIRECTION OF CASTING DIRECTION OF CASTING


2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
DIRECTION OF DOWN-CHAINAGE DIRECTION OF DOWN-CHAINAGE REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


P8R-SD1 P8R-SD2 P8R-SD3 P8R-SD4 P8R-SD5 P8R-SD6 P8R-SD7 P8R-SD8 P8R-SD9 P8R-SD10 THE CAST-IN ITEMS.

LEGEND

G G
LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING
DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE
DIRECTION OF DOWN-CHAINAGE

P8R-SD2 P8R-SD3 P8R-SD4 P8R-SD5 P8R-SD6 P8R-SD7 P8R-SD8 P8R-SD9 P8R-SD10


P8R-SD1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P8R-SD1 P8R-SD2 P8R-SD3 P8R-SD4 P8R-SD5 P8R-SD6 P8R-SD7 P8R-SD8 P8R-SD9 P8R-SD10

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B GCL REQUEST - STITCH RELOCATION DCKC 27/09/16 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-2A (PIER E7A TO E8A) SHEET 3


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8024 B
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

E E E E 1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B MINOR REVISION DCKC 22/12/15 KYT1 26/08/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16


SUPERSTRUCTURE
$FI

D GCL'S COMEMNTS INCORPORATED - CHANGE OF ERECTION METHOD DCKC 07/09/16 Checked Approved
Southern Connection Viaduct Section
E GCL REQUEST - STITCH RELOCATION DCKC 27/09/16
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-2A(PIER E7A TO E8A) SHEET 4


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8025 E
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

DIRECTION OF CASTING DIRECTION OF CASTING


2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
C
L PIER E8A
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
P8R-PD2 P8R-PD3 P8R-PD4 P8R-PD5 P8R-PU5 P8R-PU4 P8R-PU3 P8R-PU2 THE CAST-IN ITEMS.

TCSS

LEGEND

G G
LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

B B
DECK TOP PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E8A

P8R-PD2 P8R-PD3 P8R-PD4 P8R-PD5 P8R-PU5 P8R-PU4 P8R-PU3 P8R-PU2

B B

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E8A

P8R-PD2 P8R-PD3 P8R-PD4 P8R-PD5 P8R-PU5 P8R-PU4 P8R-PU3 P8R-PU2

B
ELEVATION B
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 21/06/16 KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-2A (PIER E8A) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8026 B
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B MINOR REVISION DCKC 22/12/15 KYT1 26/08/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16


SUPERSTRUCTURE
$FI

D GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 21/06/16 Checked Approved
Southern Connection Viaduct Section
E GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 28/06/16
SHOP DRAWING - CASTING SCHEDULE
:

F GCL REQUEST - ADDITIONAL TEMPORARY OPENING DCKC 19/07/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

VIADUCT E2-2A(PIER E8A) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8027 F
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

DIRECTION OF CASTING
2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
DIRECTION OF UP-CHAINAGE REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

B
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
P8R-SU6 P8R-SU5 P8R-SU4 P8R-SU3 P8R-SU2 P8R-SU1 THE CAST-IN ITEMS.

TCSS TCSS

LEGEND

G
LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P8R-SU6 P8R-SU5 P8R-SU4 P8R-SU3 P8R-SU2 P8R-SU1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P8R-SU6 P8R-SU5 P8R-SU4 P8R-SU3 P8R-SU2 P8R-SU1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B INCORPORATED WITH TCSS DESIGNER DCKC 08/07/16 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-2A (PIER E8A TO E9A) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8028 B
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B MINOR REVISION DCKC 22/12/15 KYT1 26/08/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16


SUPERSTRUCTURE
$FI

D INCORPORATED WITH TCSS DESIGNER DCKC 08/07/16 Checked Approved


Southern Connection Viaduct Section
E GCL'S COMMENTS INCORPORATED DCKC 03/10/16
SHOP DRAWING - CASTING SCHEDULE
:

F GCL'S COMMENTS INCORPORATED - MJ DETAILS ADDED DCKC 26/10/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

VIADUCT E2-2A(PIER E8A TO E9A) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8029 F
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

DIRECTION OF CASTING DIRECTION OF CASTING


1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.
DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE
2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
P8R-SU9 P8R-SU8 P8R-SU7 J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

G
LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P8R-SU9 P8R-SU8 P8R-SU7

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P8R-SU9 P8R-SU8 P8R-SU7

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B GCL'S COMMENTS INCORPORATED - ADDITIONAL STITCH INTRODUCED DCKC 07/09/16 KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3A (PIER E8A TO E9A) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8030 B
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B MINOR REVISION DCKC 31/12/15 KYT1 26/08/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL'S COMMENTS INCORPORATED - ADDITIONAL STITCH INTRODUCED DCKC 07/09/16


SUPERSTRUCTURE
$FI

D GCL'S COMMENTS INCORPORATED - MJ DETAILS ADDED DCKC 26/10/16 Checked Approved


Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3A(PIER E8A TO E9A) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8031 D
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES
DIRECTION OF CASTING
1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.
DIRECTION OF DOWN-CHAINAGE
2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
P9R-SD1 P9R-SD2 P9R-SD3 P9R-SD4 P9R-SD5 P9R-SD6 P9R-SD7 P9R-SD8 P9R-SD9 P9R-SD10 P9R-SD11 P9R-SD12 J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


TCSS THE CAST-IN ITEMS.

G G G
LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE

P9R-SD2 P9R-SD3 P9R-SD4 P9R-SD5 P9R-SD6 P9R-SD7 P9R-SD8 P9R-SD9 P9R-SD10 P9R-SD11 P9R-SD12
P9R-SD1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE

P9R-SD1 P9R-SD2 P9R-SD3 P9R-SD4 P9R-SD5 P9R-SD6 P9R-SD7 P9R-SD8 P9R-SD9 P9R-SD10 P9R-SD11 P9R-SD12

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3A (PIER E8A TO E9A) SHEET 3


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8032 A
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B MINOR REVISION DCKC 16/03/16 KYT1 26/08/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3A(PIER E8A TO E9A) SHEET 4


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8033 B
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES
DIRECTION OF CASTING DIRECTION OF CASTING
1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.
DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE
2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
C
L PIER E9A INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
P9R-PD2 P9R-PD3 P9R-PD4 P9R-PD5 P9R-PU5 P9R-PU4 P9R-PU3 P9R-PU2 J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

G G
LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

H H

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E9A

P9R-PD2 P9R-PD3 P9R-PD4 P9R-PD5 P9R-PU5 P9R-PU4 P9R-PU3 P9R-PU2

H H
SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E9A

P9R-PD2 P9R-PD3 P9R-PD2 P9R-PD5 P9R-PU5 P9R-PU4 P9R-PU3 P9R-PU2

H H

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 27/02/15

B MINOR REVISION KYT1 31/03/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C MINOR REVISION KYT1 24/04/15


SUPERSTRUCTURE
$FI

D MINOR REVISION KYT1 27/04/15 Checked Approved


Southern Connection Viaduct Section
E MINOR REVISION KYT1 29/04/15
SHOP DRAWING - CASTING SCHEDULE
:

F MINOR REVISION KYT1 12/08/15 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G GCL REQUEST- DELETION OF LIFTING ANCHORAGE KYT1 04/09/15 VIADUCT E2-3A (PIER E9A) SHEET 1
H GCL REQUEST - ADDITIONAL STITCH AT E9A (ECR 77) DCKC 28/06/16 Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8034 H
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 27/02/15

B TABLE REVISED KYT1 31/03/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C MINOR REVISION KYT1 24/04/15


SUPERSTRUCTURE
$FI

D MINOR REVISION KYT1 27/04/15 Checked Approved


Southern Connection Viaduct Section
E MINOR REVISION KYT1 29/04/15
SHOP DRAWING - CASTING SCHEDULE
:

F GCL REQUEST- DELETION OF LIFTING ANCHORAGE KYT1 04/09/15 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G MINOR REVISION DCKC 21/12/15 VIADUCT E2-3A (PIER E9A) SHEET 2


H GCL REQUEST - ADDITIONAL STITCH AT E9A (ECR 77) DCKC 28/06/16 Scale
I GCL REQUEST - ADDITIONAL TEMPORARY OPENING DCKC 19/07/16 Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8035 I
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

DIRECTION OF CASTING
1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.
DIRECTION OF UP-CHAINAGE
2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
P9R-SU12 P9R-SU11 P9R-SU10 P9R-SU9 P9R-SU8 P9R-SU7 P9R-SU6 P9R-SU5 P9R-SU4 P9R-SU3 P9R-SU2 P9R-SU1 J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


TCSS TCSS THE CAST-IN ITEMS.

G G G
LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

TCSS

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P9R-SU12 P9R-SU11 P9R-SU10 P9R-SU9 P9R-SU8 P9R-SU7 P9R-SU6 P9R-SU5 P9R-SU4 P9R-SU3 P9R-SU2 P9R-SU1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P9R-SU12 P9R-SU11 P9R-SU10 P9R-SU9 P9R-SU8 P9R-SU7 P9R-SU6 P9R-SU5 P9R-SU4 P9R-SU3 P9R-SU2 P9R-SU1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3A (PIER E9A TO E10A) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8036 A
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B MINOR REVISION DCKC 16/03/16 KYT1 26/08/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16


SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3A(PIER E9A TO E10A) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8037 C
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES
DIRECTION OF CASTING B
DIRECTION OF CASTING
1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.
DIRECTION OF DOWN-CHAINAGE DIRECTION OF DOWN-CHAINAGE
2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
B REFER TO FREYSSINET DRAWINGS SERIES
P10R-SD1 P10R-SD2 P10R-SD3 P10R-SD4 P10R-SD5 P10R-SD6 P10R-SD7 P10R-SD8 P10R-SD9 P10R-SD10 P10R-SD11 P10R-SD12 J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


TCSS TCSS THE CAST-IN ITEMS.

G G G
LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

TCSS TCSS

DECK TOP PLAN


SCALE 1:100

B
DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P10R-SD4 P10R-SD5 P10R-SD6 P10R-SD7 P10R-SD8 P10R-SD9 P10R-SD10 P10R-SD11 P10R-SD12


P10R-SD1 P10R-SD2 P10R-SD3

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P10R-SD1 P10R-SD2 P10R-SD3 P10R-SD4 P10R-SD5 P10R-SD6 P10R-SD7 P10R-SD8 P10R-SD9 P10R-SD10 P10R-SD11 P10R-SD12

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B GCL REQUEST - REVISED STITCHING LOCATION, EMAIL DATED 19-SEP-2016 DCKC 22/09/16 KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3A (PIER E9A TO E10A) SHEET 3


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8038 B
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


F F THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B GCL REQUEST- EXTERNAL JACKING HOLE DETAIL KYT1 04/09/15 KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C FRE INCORPORATED- TEMPORARY BLISTER UPDATED WITH BURSTING REBAR. KYT1 02/10/15
SUPERSTRUCTURE
$FI

D MINOR REVISION DCKC 31/12/15 Checked Approved


Southern Connection Viaduct Section
E GCL'S COMMENTS INCORPORATED DCKC 16/08/16
SHOP DRAWING - CASTING SCHEDULE
:

F GCL REQUEST - REVISED STITCHING LOCATION, EMAIL DATED 19-SEP-2016 DCKC 22/09/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

VIADUCT E2-3A (PIER E9A TO E10A ) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8039 F
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES
DIRECTION OF CASTING DIRECTION OF CASTING
1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.
DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE
2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
C
L PIER E10A INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
P10R-PD2 P10R-PD3 P10R-PD4 P10R-PD5 P10R-PU5 P10R-PU4 P10R-PU3 P10R-PU2 J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


TCSS THE CAST-IN ITEMS.

G G
LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER


B B

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

B B

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E10A

P10R-PD2 P10R-PD3 P10R-PD4 P10R-PD5 P10R-PU5 P10R-PU4 P10R-PU3 P10R-PU2

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E10A

P10R-PD2 P10R-PD3 P10R-PD4 P10R-PD5 P10R-PU5 P10R-PU4 P10R-PU3 P10R-PU2

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B GCL REQUEST- DELETION OF LIFTING ANCHORAGE KYT1 04/09/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3A (PIER E10A) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8040 B
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B (GCL REQUEST- DELETION OF LIFTING ANCHORAGE KYT1 04/09/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C MINOR REVISION DCKC 31/12/15


SUPERSTRUCTURE
$FI

D GCL REQUEST - ADDITIONAL TEMPORARY OPENING DCKC 19/07/16 Checked Approved


Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3A (PIER E10A ) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8041 D
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

DIRECTION OF CASTING
1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.
DIRECTION OF UP-CHAINAGE
2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
B P10R-SU9 P10R-SU8 P10R-SU7 REFER TO FREYSSINET DRAWINGS SERIES
P10R-SU6 P10R-SU5 P10R-SU4 P10R-SU3 P10R-SU2 P10R-SU1 J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

TCSS TCSS 3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

G
G
LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

DECK TOP PLAN


SCALE 1:100

B DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P10R-SU9 P10R-SU8 P10R-SU7 P10R-SU6 P10R-SU5 P10R-SU4 P10R-SU3 P10R-SU2 P10R-SU1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE
B

P10R-SU9 P10R-SU8 P10R-SU7 P10R-SU6 P10R-SU5 P10R-SU4 P10R-SU3 P10R-SU2 P10R-SU1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B MINOR REVISION KYT1 20/11/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3A (PIER E10A TO E11A) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8042 B
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B GCL REQUEST- CROSS ROAD DUCT AND EXTERNAL JACKING HOLE DETAIL KYT1 04/09/15 KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C FRE INCORPORATED- TEMPORARY BLISTER UPDATED WITH BURSTING REBAR. KYT1 02/10/15
SUPERSTRUCTURE
$FI

D INTERFACE DESIGNER INCORPORATED KYT1 06/11/15 Checked Approved


Southern Connection Viaduct Section
E MINOR REVISION DCKC 31/12/15
SHOP DRAWING - CASTING SCHEDULE
:

F OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G GCL'S COMMENTS INCORPORATED DCKC 03/10/16 VIADUCT E2-3A (PIER E10A TO E11A ) SHEET 2
H GCL'S COMMENTS INCORPORATED - MJ DETAILS ADDED DCKC 26/10/16 Scale
J GCL'S COMMENTS INCORPORATED DCKC 18/11/16 Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8043 J
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


DIRECTION OF CASTING THE CAST-IN ITEMS.

DIRECTION OF CASTING DIRECTION OF UP-CHAINAGE

G C
L PIER E3C
DIRECTION OF DOWN-CHAINAGE
LEGEND
P3L-P3U5 P3L-P3U4 P3L-P3U3 P3L-P3U2 H P3L-P3U1
P3L-P3U7 P3L-P3U6
P4L-S3D5 P4L-S3D6 P3L-P3U8
P4L-S3D3 P4L-S3D4 LIGHTING COLUMN ON THE SIDE BARRIER
P4L-S3D1 P4L-S3D2
TCSS TCSS TCSS
TCSS
LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E3C

P4L-S3D1 P4L-S3D2 P4L-S3D3 P4L-S3D4 P4L-S3D5 P4L-S3D6 P3L-P3U8 P3L-P3U7 P3L-P3U6 P3L-P3U5 P3L-P3U4 P3L-P3U3 P3L-P3U2 P3L-P3U1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E3C

P4L-S3D1 P4L-S3D2 P4L-S3D3 P4L-S3D4 P4L-S3D5 P4L-S3D6 P3L-P3U8 P3L-P3U7 P3L-P3U6 P3L-P3U5 P3L-P3U4 P3L-P3U3 P3L-P3U2 P3L-P3U1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 08/07/15

B MINOR REVISION KYT1 27/08/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL'S COMMENTS INCORPORATED KYT1 04/09/15


SUPERSTRUCTURE
$FI

D GCL REQUEST - E3 SEGMENTATION UPDATE DCKC 18/12/15 Checked Approved


Southern Connection Viaduct Section
E MINOR REVISION DCKC 15/01/16
SHOP DRAWING - CASTING SCHEDULE
:

F GCL'S COMMENTS INCORPORATED DCKC 07/03/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16 VIADUCT E2-1B (PIER E3C TO E4B) SHEET 1
Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8050 G
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 08/07/15 K MINOR REVISION DCKC 07/09/16

B MINOR REVISION KYT1 27/08/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL'S COMMENTS INCORPORATED KYT1 04/09/15


SUPERSTRUCTURE
$FI

D MINOR REVISION KYT1 30/10/15 Checked Approved


Southern Connection Viaduct Section
E GCL REQUEST - SEGMENTATION UDPATE DCKC 04/12/15
SHOP DRAWING - CASTING SCHEDULE
:

F GCL REQUEST - SEGMENTATION UDPATE DCKC 18/12/15 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G MINOR REVISION DCKC 31/12/15 VIADUCT E2-1B (PIER E3C TO E4B) SHEET 2
H GCL'S COMMENTS INCORPORATED DCKC 07/03/16 Scale
I GCL REQUEST - ADDITIONAL STITCH AT L5 SEGMENT DCKC 22/03/16 Drawing no. Rev.

J GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16
N.T.S.
J3518/P/TGP/30/8051 K
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
H
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

DIRECTION OF CASTING
DIRECTION OF CASTING
DIRECTION OF UP-CHAINAGE
LEGEND
DIRECTION OF DOWN-CHAINAGE
C
L PIER E3D
P3L-P4U6 P3L-P4U5 P3L-P4U4 P3L-P4U3
P3L-P4U7 P3L-P4U2 P3L-P4U1
LIGHTING COLUMN ON THE SIDE BARRIER
P4L-S4D5 P4L-S4D6 P3L-P4U8
P4L-S4D3 P4L-S4D4
P4L-S4D1 P4L-S4D2
LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

G G
G G G G
G

TCSS

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E3D

P4L-S4D1 P4L-S4D2 P4L-S4D3 P4L-S4D4 P4L-S4D5 P4L-S4D6 P3L-P4U8 P3L-P4U7 P3L-P4U6 P3L-P4U5 P3L-P4U4 P3L-P4U3 P3L-P4U2 P3L-P4U1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E3D

P4L-S4D1 P4L-S4D2 P4L-S4D3 P4L-S4D4 P4L-S4D5 P4L-S4D6 P3L-P4U8 P3L-P4U7 P3L-P4U6 P3L-P4U5 P3L-P4U4 P3L-P4U3 P3L-P4U2 P3L-P4U1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 08/07/15

B MINOR REVISION KYT1 27/08/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL'S COMMENTS INCORPORATED KYT1 04/09/15


SUPERSTRUCTURE
$FI

D GCL REQUEST - E3 SEGMENTATION UPDATE DCKC 18/12/15 Checked Approved


Southern Connection Viaduct Section
E MINOR REVISION DCKC 15/01/16
SHOP DRAWING - CASTING SCHEDULE
:

F GCL'S COMMENTS INCORPORATED DCKC 07/03/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G INCORPORATED WITH E3D INTERFACE DESIGNER DCKC 24/06/16 VIADUCT E2-1B (PIER E3D TO E4B) SHEET 1
H INCORPORATED WITH E3D CONSTRUCTION SEQUENCE DCKC 26/07/16 Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8052 H
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 08/07/15 K OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16

B MINOR REVISION KYT1 27/08/15 L FIRST ISSUE (GCL REQUEST - CONSTRUCTION METHOD UPDATE FOR KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL'S COMMENTS INCORPORATED KYT1 04/09/15 END SPAN E3D) DCKC 10/06/16
SUPERSTRUCTURE
$FI

D MINOR REVISION KYT1 30/10/15 M INCORPORATED WITH E3D INTERFACE DESIGNER DCKC 24/06/16 Checked Approved
Southern Connection Viaduct Section
E GCL REQUEST - SEGMENTATION UDPATE DCKC 04/12/15 N INCORPORATED WITH E3D CONSTRUCTION SEQUENCE DCKC 26/07/16
SHOP DRAWING - CASTING SCHEDULE
:

F GCL REQUEST - SEGMENTATION UDPATE DCKC 04/12/15 P GCL'S COMMENTS INCORPORATED - CAST-IN ITEMS ADDED DCKC 06/09/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G MINOR REVISION DCKC 31/12/15 Q MINOR REVISION DCKC 07/09/16 VIADUCT E2-1B (PIER E3D TO E4B) SHEET 2
H GCL'S COMMENTS INCORPORATED DCKC 07/03/16 Scale
I GCL REQUEST - ADDITIONAL STITCH AT L5 SEGMENT DCKC 22/03/16 Drawing no. Rev.

J OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16


N.T.S.
J3518/P/TGP/30/8053 Q
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

DIRECTION OF CASTING DIRECTION OF CASTING NOTES

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE 1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
C
L PIER E4B J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
P4L-PD2 P4L-PD3 P4L-PD4 P4L-PD5 P4L-PU5 P4L-PU4 P4L-PU3 P4L-PU2 INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
TCSS
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

TCSS

DECK TOP PLAN


SCALE 1:100 DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE
C
L PIER E4B
P4L-PU2
DIRECTION OF CASTING P4L-PU3
P4L-PU4
P4L-PU5
DIRECTION OF DOWN-CHAINAGE
P4L-PD5
P4L-PD4
P4L-PD3
P4L-PD2

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE


C
L PIER E4B

P4L-PD2 P4L-PD3 P4L-PD4 P4L-PD5 P4L-PU5 P4L-PU4 P4L-PU3 P4L-PU2

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 19/06/15

B GCL'S COMMENTS INCORPORATED KYT1 17/07/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL'S COMMENTS INCORPORATED DCKC 03/08/16


SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1B (PIER E4B) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8054 C
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 19/06/15

B GCL'S COMMENTS INCORPORATED KYT1 17/07/15 KYT1 29/04/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL'S COMMENTS INCORPORATED KYT1 24/08/15


SUPERSTRUCTURE
$FI

D GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16 Checked Approved
Southern Connection Viaduct Section
E GCL'S COMMENTS INCORPORATED DCKC 03/08/16
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1B (PIER E4B) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8055 E
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

DIRECTION OF CASTING DIRECTION OF CASTING NOTES

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE 1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.
D
2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
P5L-SD1 P5L-SD2 P5L-SD3 P5L-SD4 P5L-SD5 P5L-SD6 P5L-SD7 P4L-SU6 P4L-SU5 P4L-SU4 P4L-SU3 P4L-SU2 P4L-SU1 INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
TCSS TCSS TCSS TCSS
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

G
G
G
G
G
TCSS TCSS

DECK TOP PLAN D

SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P5L-SD1 P5L-SD2 P5L-SD3 P5L-SD4 P5L-SD5 P5L-SD6 P5L-SD7 P4L-SU6 P4L-SU5 P4L-SU4 P4L-SU3 P4L-SU2 P4L-SU1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P5L-SD1 P5L-SD2 P5L-SD3 P5L-SD4 P5L-SD5 P5L-SD6 P5L-SD7 P4L-SU6 P4L-SU5 P4L-SU4 P4L-SU3 P4L-SU2 P4L-SU1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 29/04/15

B MINOR REVISION KYT1 11/05/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C MINOR REVISION KYT1 22/05/15


SUPERSTRUCTURE
$FI

D INCORPORATED WITH TCSS DESIGNER DCKC 08/07/16 Checked Approved


Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1B (PIER E4B TO PIER E5B) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8056 D
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 29/04/15

B TABLE REVISED KYT1 11/05/15 KYT1 29/04/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C TABLE REVISED KYT1 13/05/15


SUPERSTRUCTURE
$FI

D TABLE REVISED KYT1 22/05/15 Checked Approved


Southern Connection Viaduct Section
E GCL REQUEST- CROSS ROAD DUCT AND EXTERNAL JACKING HOLE DETAIL KYT1 04/09/15
SHOP DRAWING - CASTING SCHEDULE
:

F FRE INCORPORATED- TEMPORARY BLISTER UPDATED WITH BURSTING REBAR. KYT1 02/10/15 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G INCORPORATED WITH TCSS DESIGNER DCKC 08/07/16 VIADUCT E2-1B (PIER E4B TO PIER E5B) SHEET 2
H GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16 Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8057 H
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

DIRECTION OF CASTING DIRECTION OF CASTING NOTES

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE 1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.
C
L PIER E5B
2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
P5L-PD2 P5L-PD3 P5L-PD4 P5L-PD5 P5L-PU5 P5L-PU4 P5L-PU3 P5L-PU2 INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
TCSS TCSS
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

D D LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING


D D

G G

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE

C
L PIER E5B

P5L-PD2 P5L-PD3 P5L-PD4 P5L-PD5 P5L-PU5 P5L-PU4 P5L-PU3 P5L-PU2

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE


C
L PIER E5B

P5L-PD2 P5L-PD3 P5L-PD4 P5L-PD5 P5L-PU5 P5L-PU4 P5L-PU3 P5L-PU2

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 29/04/15

B MINOR REVISION KYT1 11/05/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL’S COMMENTS INCORPORATED KYT1 17/07/15


SUPERSTRUCTURE
$FI

D GCL REQUEST- DELETION OF LIFTING ANCHORAGE KYT1 04/09/15 Checked Approved


Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1B (PIER E5B) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8058 D
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 29/04/15

B TABLE REVISED KYT1 11/05/15 KYT1 29/04/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C TABLE REVISED KYT1 13/05/15


SUPERSTRUCTURE
$FI

D TABLE REVISED KYT1 17/06/15 Checked Approved


Southern Connection Viaduct Section
E GCL'S COMMENTS INCORPORATED KYT1 17/07/15
SHOP DRAWING - CASTING SCHEDULE
:

F GCL REQUEST- DELETION OF LIFTING ANCHORAGE KYT1 04/09/15 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G MINOR REVISION DCKC 21/12/15 VIADUCT E2-1B (PIER E5B) SHEET 2


H GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16 Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8059 H
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

DIRECTION OF CASTING NOTES

DIRECTION OF UP-CHAINAGE 1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
P5L-SU7 P5L-SU6 P5L-SU5 P5L-SU4 P5L-SU3 P5L-SU2 P5L-SU1 INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
TCSS
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

G G G

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P5L-SU7 P5L-SU6 P5L-SU5 P5L-SU4 P5L-SU3 P5L-SU2 P5L-SU1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P5L-SU7 P5L-SU6 P5L-SU5 P5L-SU4 P5L-SU3 P5L-SU2 P5L-SU1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1B (PIER E5B TO E6B) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8060 A
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B MINOR REVISION DCKC 21/12/15 KYT1 26/08/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16
SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1B (PIER E5B TO E6B) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8061 C
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

DIRECTION OF CASTING DIRECTION OF CASTING NOTES

DIRECTION OF DOWN-CHAINAGE DIRECTION OF DOWN-CHAINAGE 1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
P6L-SD1 P6L-SD2 P6L-SD3 P6L-SD4 P6L-SD5 P6L-SD6 P6L-SD7 P6L-SD8 INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
TCSS
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

G G G

TCSS

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P6L-SD1 P6L-SD2 P6L-SD3 P6L-SD4 P6L-SD5 P6L-SD6 P6L-SD7 P6L-SD8

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P6L-SD1 P6L-SD2 P6L-SD3 P6L-SD4 P6L-SD5 P6L-SD6 P6L-SD7 P6L-SD8

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1B (PIER E5B TO E6B) SHEET 3


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8062 A
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B GCL REQUEST- EXTERNAL JACKING HOLE DETAIL KYT1 04/09/15 KYT1 29/04/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C MINOR REVISION DCKC 21/12/15


SUPERSTRUCTURE
$FI

D GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16 Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1B (PIER E5B TO E6B) SHEET 4


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8063 D
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

DIRECTION OF CASTING DIRECTION OF CASTING NOTES

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE 1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.
C
L PIER E6B
2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
P6L-PD2 P6L-PD3 P6L-PD4 P6L-PD5 P6L-PU5 P6L-PU4 P6L-PU3 P6L-PU2 INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
TCSS
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

G G

TCSS

B B

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE

C
L PIER E6B

P6L-PD2 P6L-PD3 P6L-PD4 P6L-PD5 P6L-PU5 P6L-PU4 P6L-PU3 P6L-PU2

B B

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE

C
L PIER E6B

P6L-PD2 P6L-PD3 P6L-PD4 P6L-PD5 P6L-PU5 P6L-PU4 P6L-PU3 P6L-PU2

B B
ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 21/06/16 KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1B (PIER E6B) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8064 B
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B MINOR REVISION DCKC 22/12/15 KYT1 26/08/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 21/06/16
SUPERSTRUCTURE
$FI

D GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 28/06/16 Checked Approved
Southern Connection Viaduct Section
E GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1B (PIER E6B) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8065 E
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

DIRECTION OF CASTING NOTES

DIRECTION OF UP-CHAINAGE 1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
P6L-SU4 P6L-SU3 P6L-SU2 P6L-SU1 INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
TCSS
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

G G

TCSS TCSS

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P6L-SU4 P6L-SU3 P6L-SU2 P6L-SU1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P6L-SU4 P6L-SU3 P6L-SU2 P6L-SU1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1B (PIER E6B TO E7B) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8066 A
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B MINOR REVISION DCKC 22/12/15 KYT1 26/08/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16
SUPERSTRUCTURE
$FI

D GCL'S COMMENTS INCORPORATED - MJ DETAILS ADDED DCKC 26/10/16 Checked Approved


Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-1B (PIER E6B TO E7B) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8067 D
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES
DIRECTION OF CASTING DIRECTION OF CASTING DIRECTION OF CASTING

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

C 2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
P7L-SD1 P7L-SD2 P7L-SD3 P7L-SD4 P7L-SD5 P7L-SD6 P7L-SD7 P7L-SD8 P7L-SD9 P6L-SU8 P6L-SU7 P6L-SU6 P6L-SU5 REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

TCSS TCSS
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

G G G G G G

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P7L-SD1 P7L-SD2 P7L-SD3 P7L-SD4 P7L-SD5 P7L-SD6 P7L-SD7 P7L-SD8 P7L-SD9 P6L-SU8 P6L-SU7 P6L-SU6 P6L-SU5

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P7L-SD1 P7L-SD2 P7L-SD3 P7L-SD4 P7L-SD5 P7L-SD6 P7L-SD7 P7L-SD8 P7L-SD9 P6L-SU8 P6L-SU7 P6L-SU6 P6L-SU5

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL'S COMMENTS INCORPORATED - ADDITIONAL STITCH INTRODUCED DCKC 07/09/16


SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-2B (PIER E6B TO E7B) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8068 C
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B MINOR REVISION DCKC 22/12/15 KYT1 26/08/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16


SUPERSTRUCTURE
$FI

D GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16 Checked Approved
Southern Connection Viaduct Section
E GCL'S COMMENTS INCORPORATED - ADDITIONAL STITCH INTRODUCED DCKC 07/09/16
SHOP DRAWING - CASTING SCHEDULE
:

F GCL'S COMMENTS INCORPORATED - MJ DETAILS ADDED DCKC 26/10/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

VIADUCT E2-2B (PIER E6B TO E7B) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8069 F
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES
DIRECTION OF CASTING DIRECTION OF CASTING
1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

D D C
L PIER E7B 2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
D
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
P7L-PD2 P7L-PD3 P7L-PD4 P7L-PD5 P7L-PU5 P7L-PU4 P7L-PU3 P7L-PU2 REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

TCSS TCSS TCSS


3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

TCSS

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E7B

P7L-PD2 P7L-PD3 P7L-PD4 P7L-PD5 P7L-PU5 P7L-PU4 P7L-PU3 P7L-PU2

SOFFIT PLAN
D SCALE 1:100 D

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E7B

P7L-PD2 P7L-PD3 P7L-PD4 P7L-PD5 P7L-PU5 P7L-PU4 P7L-PU3 P7L-PU2

D D
ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B GCL REQUEST- DELETION OF LIFTING ANCHORAGE KYT1 04/09/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16


SUPERSTRUCTURE
$FI

D GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 21/06/16 Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-2B (PIER E7B) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8070 D
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B GCL REQUEST- CROSS ROAD DUCT AND DELETION OF LIFTING ANCHORAGE KYT1 04/09/15 KYT1 29/04/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C MINOR REVISION DCKC 22/12/15


SUPERSTRUCTURE
$FI

D OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16 Checked Approved


Southern Connection Viaduct Section
E GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 21/06/16
SHOP DRAWING - CASTING SCHEDULE
:

F GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 28/06/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16 VIADUCT E2-1B (PIER E7B) SHEET 2
Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8071 G
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES
DIRECTION OF CASTING

B B 1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
B
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
P7L-SU9 P7L-SU8 P7L-SU7 P7L-SU6 P7L-SU5 P7L-SU4 P7L-SU3 P7L-SU2 P7L-SU1 REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

TCSS TCSS
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

G G G

TCSS TCSS

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P7L-SU9 P7L-SU8 P7L-SU7 P7L-SU6 P7L-SU5 P7L-SU4 P7L-SU3 P7L-SU2 P7L-SU1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P7L-SU9 P7L-SU8 P7L-SU7 P7L-SU6 P7L-SU5 P7L-SU4 P7L-SU3 P7L-SU2 P7L-SU1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-2B (PIER E7B TO E8B) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8072 B
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B MINOR REVISION DCKC 22/12/15 KYT1 26/08/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16


SUPERSTRUCTURE
$FI

D GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16 Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-2B (PIER E7B TO E8B) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8073 D
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES
DIRECTION OF CASTING DIRECTION OF CASTING

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


DIRECTION OF DOWN-CHAINAGE DIRECTION OF DOWN-CHAINAGE J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
P8L-SD1 P8L-SD2 P8L-SD3 P8L-SD4 P8L-SD5 P8L-SD6 P8L-SD7 P8L-SD8 P8L-SD9 P8L-SD10 REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

TCSS C
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

G G G

TCSS

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING
DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE
DIRECTION OF DOWN-CHAINAGE

P8L-SD2 P8L-SD3 P8L-SD4 P8L-SD5 P8L-SD6 P8L-SD7 P8L-SD8 P8L-SD9 P8L-SD10


P8L-SD1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P8L-SD1 P8L-SD2 P8L-SD3 P8L-SD4 P8L-SD5 P8L-SD6 P8L-SD7 P8L-SD8 P8L-SD9 P8L-SD10

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 31/05/16 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL REQUEST - STITCH RELOCATION DCKC 27/09/16


SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-2B (PIER E7B TO E8B) SHEET 3


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8074 C
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

F F F F
NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B MINOR REVISION DCKC 22/12/15 KYT1 26/08/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C OAP REQUEST - UPDATE ON UTILITY ITEMS DCKC 01/06/16


SUPERSTRUCTURE
$FI

D GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16 Checked Approved
Southern Connection Viaduct Section
E GCL'S COMEMNTS INCORPORATED - CHANGE OF ERECTION METHOD DCKC 07/09/16
SHOP DRAWING - CASTING SCHEDULE
:

F GCL REQUEST - STITCH RELOCATION DCKC 27/09/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

VIADUCT E2-2B (PIER E7B TO E8B) SHEET 4


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8075 F
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES
DIRECTION OF CASTING DIRECTION OF CASTING
1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

C
L PIER E8B 2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
P8L-PD2 P8L-PD3 P8L-PD4 P8L-PD5 P8L-PU5 P8L-PU4 P8L-PU3 P8L-PU2 REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

TCSS
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

TCSS

B B

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E8B

P8L-PD2 P8L-PD3 P8L-PD4 P8L-PD5 P8L-PU5 P8L-PU4 P8L-PU3 P8L-PU2

B B

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E8B

P8L-PD2 P8L-PD3 P8L-PD4 P8L-PD5 P8L-PU5 P8L-PU4 P8L-PU3 P8L-PU2

B B
ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 21/06/16 KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-2B (PIER E8B) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8076 B
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B MINOR REVISION DCKC 22/12/15 KYT1 26/08/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 21/06/16
SUPERSTRUCTURE
$FI

D GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 28/06/16 Checked Approved
Southern Connection Viaduct Section
E GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-2B (PIER E8B) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8077 E
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES
DIRECTION OF CASTING
1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
DIRECTION OF UP-CHAINAGE J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
P8L-SU6 P8L-SU5 P8L-SU4 P8L-SU3 P8L-SU2 P8L-SU1 REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

TCSS TCSS TCSS


3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

G G

TCSS TCSS

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P8L-SU6 P8L-SU5 P8L-SU4 P8L-SU3 P8L-SU2 P8L-SU1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P8L-SU6 P8L-SU5 P8L-SU4 P8L-SU3 P8L-SU2 P8L-SU1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B INCORPORATED WITH TCSS DESIGNER DCKC 08/07/16 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-2B (PIER E8B TO E9B) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8078 B
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/08/15

B MINOR REVISION DCKC 22/12/15 KYT1 26/08/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C INCORPORATED WITH TCSS DESIGNER DCKC 08/07/16


SUPERSTRUCTURE
$FI

D GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16 Checked Approved
Southern Connection Viaduct Section
E GCL'S COMMENTS INCORPORATED - MJ DETAILS ADDED DCKC 26/10/16
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-2B (PIER E8B TO E9B) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8079 E
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

DIRECTION OF CASTING DIRECTION OF CASTING NOTES

DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE 1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
P8L-SU9 P8L-SU8 P8L-SU7 INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE C

P8L-SU9 P8L-SU8 P8L-SU7

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P8L-SU9 P8L-SU8 P8L-SU7

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 03/06/15

B GCL'S COMMENTS INCORPORATED KYT1 06/07/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL'S COMMENTS INCORPORATED - ADDITIONAL STITCH INTRODUCED DCKC 07/09/16


SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3B (PIER E8B TO E9B) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8080 C
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 03/06/15

B GCL'S COMMENTS INCORPORATED KYT1 04/09/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16
SUPERSTRUCTURE
$FI

D GCL'S COMMENTS INCORPORATED - ADDITIONAL STITCH INTRODUCED DCKC 07/09/16 Checked Approved
Southern Connection Viaduct Section
E GCL'S COMMENTS INCORPORATED - MJ DETAILS ADDED DCKC 26/10/16
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3B (PIER E8B-E9B) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8081 E
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

DIRECTION OF CASTING NOTES

DIRECTION OF DOWN-CHAINAGE 1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
P9L-SD1 P9L-SD2 P9L-SD3 P9L-SD4 P9L-SD5 P9L-SD6 P9L-SD7 P9L-SD8 P9L-SD9 P9L-SD10 P9L-SD11 P9L-SD12 INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
TCSS TCSS
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

G G G

TCSS

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE

P9L-SD2 P9L-SD3 P9L-SD4 P9L-SD5 P9L-SD6 P9L-SD7 P9L-SD8 P9L-SD9 P9L-SD10 P9L-SD11 P9L-SD12
P9L-SD1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE

P9L-SD1 P9L-SD2 P9L-SD3 P9L-SD4 P9L-SD5 P9L-SD6 P9L-SD7 P9L-SD8 P9L-SD9 P9L-SD10 P9L-SD11 P9L-SD12

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 03/06/15

KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3B (PIER E8B TO E9B) SHEET 3


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8082 A
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 03/06/15

B GCL REQUEST- EXTERNAL JACKING HOLE DETAIL KYT1 04/09/15 KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C MINOR REVISION DCKC 16/03/16


SUPERSTRUCTURE
$FI

D GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16 Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3B (PIER E8B-E9B) SHEET 4


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8083 D
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES
DIRECTION OF CASTING DIRECTION OF CASTING
1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

C
L PIER E9B 2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
P9L-PD2 P9L-PD3 P9L-PD4 P9L-PD5 P9L-PU5 P9L-PU4 P9L-PU3 P9L-PU2 REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER


F F

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

F F

G G

TCSS

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E9B

P9R-PD2 P9R-PD3 P9R-PD4 P9R-PD5 P9R-PU5 P9R-PU4 P9R-PU3 P9R-PU2

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E9B

P9R-PD2 P9R-PD3 P9R-PD4 P9R-PD5 P9R-PU5 P9R-PU4 P9R-PU3 P9R-PU2

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 27/02/15

B MINOR REVISION KYT1 31/03/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C MINOR REVISION KYT1 24/04/15


SUPERSTRUCTURE
$FI

D MINOR REVISION KYT1 27/04/15 Checked Approved


Southern Connection Viaduct Section
E MINOR REVISION KYT1 29/04/15
SHOP DRAWING - CASTING SCHEDULE
:

F GCL REQUEST- DELETION OF LIFTING ANCHORAGE KYT1 04/09/15 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

VIADUCT E2-3B (PIER E9B) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8084 F
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 27/02/15

B MINOR REVISION KYT1 31/03/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C MINOR REVISION KYT1 24/04/15


SUPERSTRUCTURE
$FI

D MINOR REVISION KYT1 27/04/15 Checked Approved


Southern Connection Viaduct Section
E MINOR REVISION KYT1 29/04/15
SHOP DRAWING - CASTING SCHEDULE
:

F GCL REQUEST- DELETION OF LIFTING ANCHORAGE KYT1 04/09/15 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G MINOR REVISION DCKC 21/12/15 VIADUCT E2-3B (PIER E9B) SHEET 2


H GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16 Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8085 H
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

DIRECTION OF CASTING NOTES

DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE


1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
P9L-SU12 P9L-SU11 P9L-SU10 P9L-SU9 P9L-SU8 P9L-SU7 P9L-SU6 P9L-SU5 P9L-SU4 P9L-SU3 P9L-SU2 P9L-SU1 INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
TCSS TCSS TCSS
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

G G G

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P9L-SU12 P9L-SU11 P9L-SU10 P9L-SU9 P9L-SU8 P9L-SU7 P9L-SU6 P9L-SU5 P9L-SU4 P9L-SU3 P9L-SU2 P9L-SU1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P9L-SU12 P9L-SU11 P9L-SU10 P9L-SU9 P9L-SU8 P9L-SU7 P9L-SU6 P9L-SU5 P9L-SU4 P9L-SU3 P9L-SU2 P9L-SU1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 03/06/15

KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3B (PIER E9B TO E10B) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8086 A
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 03/06/15

B TABLE REVISED KYT1 17/06/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C GCL REQUEST- EXTERNAL JACKING HOLE DETAIL KYT1 04/09/15


SUPERSTRUCTURE
$FI

D MINOR REVISION DCKC 16/03/16 Checked Approved


Southern Connection Viaduct Section
E GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3B (PIER E9B-E10B) SHEET 2


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8087 E
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

DIRECTION OF CASTING DIRECTION OF CASTING NOTES

DIRECTION OF DOWN-CHAINAGE DIRECTION OF DOWN-CHAINAGE 1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
P10L-SD1 P10L-SD2 P10L-SD3 P10L-SD4 P10L-SD5 P10L-SD6 P10L-SD7 P10L-SD8 P10L-SD9 P10L-SD10 P10L-SD11 P10L-SD12 INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
TCSS TCSS
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

G G G

TCSS TCSS

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING
DIRECTION OF CASTING
DIRECTION OF DOWN-CHAINAGE
DIRECTION OF DOWN-CHAINAGE

P10L-SD4 P10L-SD5 P10L-SD6 P10L-SD7 P10L-SD8 P10L-SD9 P10L-SD10 P10L-SD11 P10L-SD12


P10L-SD1 P10L-SD2 P10L-SD3

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF DOWN-CHAINAGE

P10L-SD1 P10L-SD2 P10L-SD3 P10L-SD4 P10L-SD5 P10L-SD6 P10L-SD7 P10L-SD8 P10L-SD9 P10L-SD10 P10L-SD11 P10L-SD12

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3B (PIER E9B TO E10B) SHEET 3


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8088 A
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B GCL REQUEST- EXTERNAL JACKING HOLE DETAIL KYT1 04/09/15 KYT1 27/02/2015
Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C FRE INCORPORATED- TEMPORARY BLISTER UPDATED WITH BURSTING REBAR. KYT1 02/10/15
SUPERSTRUCTURE
$FI

D MINOR REVISION DCKC 31/12/15 Checked Approved


Southern Connection Viaduct Section
E GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3B (PIER E9B TO E10B ) SHEET 4


Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8089 E
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

DIRECTION OF CASTING DIRECTION OF CASTING NOTES

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE 1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.
C
L PIER E10B
2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
P10L-PD2 P10L-PD3 P10L-PD4 P10L-PD5 P10L-PU5 P10L-PU4 P10L-PU3 P10L-PU2 INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
TCSS
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

G G G

E E

DECK TOP PLAN


SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E10B

P10L-PD2 P10L-PD3 P10L-PD4 P10L-PD5 P10L-PU5 P10L-PU4 P10L-PU3 P10L-PU2

E E

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING DIRECTION OF CASTING

DIRECTION OF DOWN-CHAINAGE DIRECTION OF UP-CHAINAGE

C
L PIER E10B

P10L-PD2 P10L-PD3 P10L-PD4 P10L-PD5 P10L-PU5 P10L-PU4 P10L-PU3 P10L-PU2

E
ELEVATION E
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B GCL REQUEST- DELETION OF LIFTING ANCHORAGE KYT1 04/09/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C MINOR REVISION DCKC 20/01/16


SUPERSTRUCTURE
$FI

D GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 21/06/16 Checked Approved
Southern Connection Viaduct Section
E GCL REQUEST - STITCH REMOVAL (EMAIL DATED 22 SEP 2016) DCKC 03/10/16
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3B (PIER E10B) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8090 E
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
G REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 31/07/15

B GCL REQUEST- DELETION OF LIFTING ANCHORAGE KYT1 04/09/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C MINOR REVISION DCKC 31/12/15


SUPERSTRUCTURE
$FI

D GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 21/06/16 Checked Approved
Southern Connection Viaduct Section
E GCL REQUEST - ADDITIONAL STITCH AT E6, E7, E8 & E10B (ECR 77) DCKC 28/06/16
SHOP DRAWING - CASTING SCHEDULE
:

F GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G GCL REQUEST - STITCH REMOVAL (EMAIL DATED 22 SEP 2016) DCKC 03/10/16 VIADUCT E2-3B (PIER E10B ) SHEET 2
Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8091 G
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

DIRECTION OF CASTING NOTES

DIRECTION OF UP-CHAINAGE 1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES
J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
P10L-SU9 P10L-SU8 P10L-SU7 P10L-SU6 P10L-SU5 P10L-SU4 P10L-SU3 P10L-SU2 P10L-SU1 INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.
C
TCSS TCSS TCSS TCSS
3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH
THE CAST-IN ITEMS.

LEGEND

LIGHTING COLUMN ON THE SIDE BARRIER

LIGHTING COLUMN ON THE MEDIAN BARRIER

TCSS TRAFFIC CONTROL AND SURVEILLANCE SYSTEMS

G GULLY

H FIRE HYDRANT

TOWER CRANE OPENING

G
G

TCSS TCSS
TCSS

DECK TOP PLAN


SCALE 1:100

C DIRECTION OF CASTING

DIRECTION OF UP-CHAINAGE

P10L-SU9 P10L-SU8 P10L-SU7 P10L-SU6 P10L-SU5 P10L-SU4 P10L-SU3 P10L-SU2 P10L-SU1

SOFFIT PLAN
SCALE 1:100

DIRECTION OF CASTING

C DIRECTION OF UP-CHAINAGE

P10L-SU9 P10L-SU8 P10L-SU7 P10L-SU6 P10L-SU5 P10L-SU4 P10L-SU3 P10L-SU2 P10L-SU1

ELEVATION
SCALE 1:100

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 19/05/15

B MINOR REVISION KYT1 31/07/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C MINOR REVISION KYT1 21/08/15


SUPERSTRUCTURE
$FI

Checked Approved
Southern Connection Viaduct Section
SHOP DRAWING - CASTING SCHEDULE
:

CMY NJS Supervising Officer Contractor Originator


Printed by

Filename :

VIADUCT E2-3B (PIER E10B TO E11B) SHEET 1


Scale
Drawing no. Rev.
1:100 @ A1 / 1:200 @ A3
J3518/P/TGP/30/8092 C
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

NOTES

1. FOR SETTING OUT OF TENDONS, REFER TO PRESTRESS DRAWINGS SERIES


J3518/P/TGP/30/5000 AND ACCOMPANYING TENDON COORDINATE SHEET.

2. ITEMS SHOWN ON DECK TOP PLAN, SOFFIT PLAN, AND ELEVATION ARE
INDICATIVE LOCATIONS. NOT ALL ITEMS ARE SHOWN IN CLARITY.
REFER TO FREYSSINET DRAWINGS SERIES
J3518/P/FRE/91/007000 FOR DETAILED INFORMATION.

3. REINFORCEMENT TO BE ADJUSTED LOCALLY TO AVOID CLASHES WITH


THE CAST-IN ITEMS.

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing title
A FIRST ISSUE KYT1 19/05/15

B TABLE REVISED KYT1 31/07/15 KYT1 27/02/2015


Contract No. HY/2012/07 VIADUCT E ALTERNATIVE
$DATE$

Tuen Mun - Chek Lap Kok Link


LE$

C TABLE REVISED KYT1 21/08/15


SUPERSTRUCTURE
$FI

D GCL REQUEST - CROSS ROAD DUCT AND EXTERNAL JACKING HOLE DETAIL KYT1 04/09/15 Checked Approved
Southern Connection Viaduct Section
E FRE INCORPORATED- TEMPORARY BLISTER UPDATED WITH BURSTING REBAR. KYT1 02/10/15
SHOP DRAWING - CASTING SCHEDULE
:

F MINOR REVISION DCKC 31/12/15 CMY NJS Supervising Officer Contractor Originator
Printed by

Filename :

G GCL'S COMMENTS INCORPORATED - AVOID SEGMENT CLASH DURING ERECTION DCKC 19/07/16 VIADUCT E2-3B (PIER E10B TO E11B) SHEET 2
H GCL'S COMMENTS INCORPORATED - MJ DETAILS ADDED DCKC 26/10/16 Scale
Drawing no. Rev.
N.T.S.
J3518/P/TGP/30/8093 H
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

B1-E1-1

N FW-EJ

B1
E1

T T T T T T T
T T T
T T
T T
T T
T

01
IGNMENT LW
HIGHWAY AL 11 9 8 7 6 5 4 3 1
13 12
14
- S.O.L. 15
VIADUCT E 17 16

CH 0+400.443
PLAN - UPPER CH 0+340.177

E1
L L
B1 L

L DRAINAGE AND OTHER LEGEND VIADICT E1 - SEE ALSO DRGS


B1-E1-1 J3518/P/OAP/13/05011 TP 13/05021

LE02
DRAINAGE GULLY WITHOUT KERB OVERFLOW WEIR

D D D D D
D D D D D
D DRAINAGE GULLY WITH KERB OVERFLOW WEIR TYPE PR-450V
D D
D D D
D S
D
D D D DV
D D D D D D G DRAINAGE GULLY
D D D
D
- S.O.L. D
VIADUCT E V
D
V 9 8 7 6 5 4
D D 11 3 1
13 12
14 V 300 DIA. SOFFIT VENT
15
17 16

D 50 DIA. SOFFIT DRAIN

PLAN - LOWER
2 NOS. 75 DIA. SOFFIT DRAINS IN UTILITY TROUGH
T

B1-E1-1
S
800 DIA. SOFFIT ACCESS

SB 800 DIA. SOFFIT ACCESS AT PIER

17 16 15 14 13 12 11 9 8
DTT5 7 6 GENERAL NOTES
5 4 3 1
AT2

1.THE GANTRY, MAST, COLUMN & SIGN INFORMATION SHOWN ON DECK LAYOUT SHEETS 1-12 IS
AT2
SUBJECT TO DESIGN DEVELOPMENT AND DETAILS MAY BE SUBJECT TO REVISION.
DTT2
DTT3
2.THE DECK LAYOUT DRAWINGS CURRENTLY ONLY SHOW DECK FURNITURE THAT SIGNIFICANTLY

MATCHCAST FACE
IMPACTS ON SEGMENT DESIGN. OTHER FURNTITURE THAT MAY REQUIRE PLINTHS, BUT DOES

STOPEND FACE
NOT IMPACT ON THE SECTION DESIGN, APART FROM REQUIRING OMISSION OF STARTER BAR
REINFORCEMENT TO PARAPETS AND BARRIERS (EG. FOR DRAW PITS), HAS BEEN OMITTED AT
THIS STAGE WHILST IT UNDERGOES FINAL DESIGN DEFINITION.

3.FOR SUPERSTRUCTURE DECK LAYOUT LEGENDS SEE DRAWING NO.


J3518/P/OAP/14/01000 EXCEPT FOR DRAINAGE AND OTHER LEGEND FOR VIADUCT E1. SEE ABOVE.

L L
4.TYPICAL LOCATION OF VENT HOLE SHOWN IN DETAIL 1.

L 5.FOR DETAILS OF ELECTRICAL SERVICES INCLUDING LIGHTNING AND EARTHING LAYOUT PLANS,
E1 B1 650 ELECTRICAL LAYOUT AND ROAD LIGHTING, SEE 20/..... SERIES DRAWINGS.
dgn

VIADUCT ELEVATION SEGMENT AXIS


05010.

500

1540
6.FOR DETAILS OF TCSS CIVIL PROVISION INCLUDING SIGN GANTRIES, SPEED ENFORCEMENT
CAMERAS, HIGH MAST CCTV CAMERAS, CAR PARK SIGNS, VARIABLE SPEED LIMIT SIGNS AND
13-

(OR 1300 IF CLASH WITH


V BLISTER OR TENDONS)
OAP-

EQUIPMENT CABINETS SEE 02/..... & 14/..... SERIES DRAWINGS.


300
P-

7.LIFTING HOLES AND TEMPORARY PT BLISTERS INDICATIVE ONLY AND SUBJECT TO


J3518-

CO-ORDINATION WITH FREYSSINET.


ngs\

DETAIL 1
i

8.FOR DETAILS OF FIREMAIN PROVISION REFER TO 03/..... SERIES DRAWINGS.


13_Deck and Bear

TYPICAL PLAN LOCATION OF ’V CS200- CANTILEVER SLAB THICKENED BY 200mm. L-LEFT, R-RIGHT.

NTS CSS- CANTILEVER SLAB STRENGTHENED WITH ADDITIONAL REINFORCEMENT.


L L-LEFT, R-RIGHT.
L L
SEC- SPEED ENFORCEMENT CAMERA
SEGMENT SCHEDULE
ngs\

E1
awi

UPPER
00_Dr

E13
SEGMENTS SHADED ARE PIER DIAPHRAGM SEGMENTS
E14
ARUP\

E12 E1 B1 SEGMENTS SHADED ARE SEGMENTS WITH CANTILEVER THICKENING AND/OR STRENGTHENING
E2 D1
ngs\

E11 E10 E9 E8 E7 E6 E5 E4 E3
awi

LOWER SEGMENTS SHADED ARE SEGMENTS WITH ADDITIONAL DIAPHRAGMS OR RIB BEAMS
03 Dr

E14
a\4-

C1
ectDat

E12 E3 E2 E1 A1 0 2 4 6 8 10
TYPICAL SECTION E14 E13
oj

SEGMENT KEY PLAN


nalPr

NORMAL TO VIADUCT SETTING OUT LINE METRES


1 : 200
er

NTS
4I
00\ nt

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing Title
231499-

A DDA ISSUE PK 24/07/14 K DDA ISSUE CL 18/03/15

B DDA ISSUE PK 22/09/14 L DDA ISSUE SK 11/05/15 PK 07/14


Contract No. HY/2012/07 VIADUCT E
231000\
2015

C REVISED DDA ISSUE PK 17/10/14 Tuen Mun - Chek Lap Kok Link DECK LAYOUT
05/
12/

D REVISED DDA ISSUE CJ 25/11/14 Checked Approved


Southern Connection Viaduct Section
\
Z:

E DDA ISSUE CL 18/12/14


VIADUCT E1
Printed by :

F DDA ISSUE CL 09/01/15 IW GS Supervising Officer Contractor Originator


(SHEET 1 OF 12)
Filename :

G DDA ISSUE CL 20/01/15

H DDA ISSUE CL 03/02/15 Scale


I DDA ISSUE CL 19/02/15 Drawing no. Rev.

J DDA ISSUE CL 02/03/15


1:200 @ A1 / 1:400 @ A3
J3518/P/OAP/13/05010 L
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

E1-E2-1

N K
DAV
K

E2 M GV
E1

T T T T T T T T T T T T T T T T T T T T T T

HIGHWAY ALIGNMENT LW01

VIADUCT E - S.O.L.

18 17 16 15 14 13 12 11 9 8 7 6 5 4 3 1

CH 0+400.443
CH 0+460.306

E2
E1

K K
PLAN - UPPER
K

E1-E2-1

D D D D D D D D D D D
D D D D D D D D D D D
VIADUCT E - S.O.L. S

V V D D D D D D D D D V V D D
D D D D D D D D D D D

18 17 16 15 14 13 12 11 9 8 7 6 5 4 3 1

PLAN - LOWER
E1-E2-1

18 17 16 15 14 13 12 11 9 8 7 6 5 4 3 1
DTT5
AT2

AT2

DTT3

VIADUCT ELEVATION
E2 E1
K
dgn
05011.
13-

NOTES RELATED TO SCHEDULE


OAP-

K
* DETAIL PT-VS5-1 IN SEGMENT E1-E2-1-12 IS TO BE (i) DENOTES - PT-G5 WITH TC5C, TC5P & MT5.
P-

HANDED, SUCH THAT THE CROSS-DUCTS ARE LOCATED AS


J3518-

SHOWN ON THE PLAN (ii) DENOTES - NOSING E3 WITH GANTRY COLUMN SUPPORT,
ngs\

LC3, TC3C FOR GT419(1). SEE DRG /14/01018.


i
13_Deck and Bear

NOTES

1. FOR GENERAL NOTES SEE DRAWING J3518-P-OAP-13-05010.


ngs\

E1

SEGMENT SCHEDULE
awi

2. FOR SUPERSTRUCTURE DECK LAYOUT LEGEND EXCEPT


00_Dr

UPPER E13 DRAINAGE DETAILS, SEE DRAWING NO.


E14 J3518-P-OAP-14-01000.
ARUP\

E12 E1 B1
E2 D1
ngs\

E11 E10 E9 E8 E7 E6 E5 E4 E3
awi

LOWER
03 Dr

E14
4-

C1
a\
ectDat

E12 E3 E2 E1 A1
E14 0 2 4 6 8 10
TYPICAL SECTION E13
oj

SEGMENT KEY PLAN


nalPr

METRES
NORMAL TO VIADUCT SETTING OUT LINE 1 : 200
er

NTS
4I
00\ nt

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing Title
231499-

A DDA ISSUE PK 24/07/14 K DDA ISSUE SK 11/05/14

B DDA ISSUE PK 22/09/14 PK 07/14


Contract No. HY/2012/07 VIADUCT E
231000\
2015

C REVISED DDA ISSUE PK 17/10/14 Tuen Mun - Chek Lap Kok Link DECK LAYOUT
05/
12/

D AMENDMENT TO DRAINAGE SO 31/10/14 Checked Approved


Southern Connection Viaduct Section
\
Z:

E REVISED AS SHOWN DC 25/11/14


VIADUCT E1
Printed by :

F DDA ISSUE CL 18/12/14 IW GS Supervising Officer Contractor Originator


(SHEET 2 OF 12)
Filename :

G DDA ISSUE CL 20/01/15

H DDA ISSUE CL 19/02/15 Scale


I DDA ISSUE CL 02/03/15 Drawing no. Rev.

J DDA ISSUE CL 18/03/15


1:200 @ A1 / 1:400 @ A3
J3518/P/OAP/13/05011 K
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

N E2-E3-1

FW-EJ E2
E3 M

T T T T T T T
T T T T T T
T T T T T T T T T

VIADUCT E S
.O.L.

19
17
16 15 14 13 12 9 4 3 1
10 8 7 6 5
HIGHWAY ALIGNMENT LW01

LONGITUDINAL STITCH

CH 0+520.328 PLAN - UPPER

CH 0+460.306

E2
E3

E2-E3-1

VIADUCT E S D D D
.O.L. V
R2 D D D D D D D
D D D D D D
D D
D D D D
D S
D D V D D D
D V D
D D D D V D
D D D D D D D
D D
19 17 16 15 14 13 1
12 10 9 8 7 6 5 4 3

PLAN - LOWER

E2-E3-1

19 17 16 15 14 13 12 10 9 8 7 6 5 4 3 1

AT2 AT2

DTT3

VIADUCT ELEVATION

E3 E2
K
dgn

NOTES RELATED TO SCHEDULE


05012.

J
(i) DENOTES - PT-G5 WITH TC5C, TC5P & MT5
13-
OAP-

(ii) DENOTES - NOSING E3 WITH GANTRY COLUMN SUPPORT,


P-

LC3, TC3C FOR GT419(1). SEE DRG /14/01018.


i
13_Deck and Bear J3518-
ngs\

NOTES

1. FOR GENERAL NOTES SEE DRAWING J3518-P-OAP-13-05010.

2. FOR SUPERSTRUCTURE DECK LAYOUT LEGEND EXCEPT


ngs\

DRAINAGE DETAILS, SEE DRAWING NO.


awi

J3518-P-OAP-14-01000.
E1
00_Dr

UPPER
SEGMENT SCHEDULE E13
ARUP\

E14
ngs\

E12 E1 B1
E2 D1
awi

E11 E10 E9 E8 E7 E6 E5 E4 E3
03 Dr

LOWER
E14
a\
ectDat 4-

C1 0 2 4 6 8 10

TYPICAL SECTION E12 E3 E2 E1 A1


oj

E14 E13
nalPr

METRES
NORMAL TO VIADUCT SETTING OUT LINE SEGMENT KEY PLAN 1 : 200
er
nt

NTS
4I
00\

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing Title
231499-

A DDA ISSUE PK 24/07/14 K GULLEY TYPES IN SEGMENTS E2-E3-1-16 & -17 MODIFIED TO BE TYPE GR-B6 CL 15/02/16

B DDA ISSUE PK 22/09/14 PK 07/14


Contract No. HY/2012/07 VIADUCT E
231000\
2016

C REVISED DDA ISSUE PK 17/10/14 Tuen Mun - Chek Lap Kok Link DECK LAYOUT
02/
15/

D AMENDMENT TO DRAINAGE SO 31/10/14 Checked Approved


Southern Connection Viaduct Section
\
Z:

E REVISED DDA ISSUE CJ 25/11/14


VIADUCT E1
Printed by :

F DDA ISSUE CL 18/12/14 IW GS Supervising Officer Contractor Originator


(SHEET 3 OF 12)
Filename :

G DDA ISSUE CL 20/01/15

H DDA ISSUE CL 19/02/15 Scale


I DDA ISSUE CL 18/03/15 Drawing no. Rev.

J DDA ISSUE SK 11/05/15


1:200 @ A1 / 1:400 @ A3
J3518/P/OAP/13/05012 K
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

D1-E1-2

E1 D1
CH 0+400.443 CH 0+340.450

HIGHWAY ALIGNMENT LE02

VIADUCT E - S.O.L.

17 16 15 14 13 12 11 9 8 7 6 5 4 3 1

PLAN - UPPER

A
A

E1 J J
D1

D1-E1-2

D D D D D D D D
D D D D D D D D D
VIADUCT E - S.O.L. S

V V D D D D D D D D D D V
D D D D D D D

17 16 15 14 12 11 9 8 7 6 5 4 3 1
13

PLAN - LOWER

D1-E1-2

3 1
5 4
7 6
9 8
12 11
14 13 AT2
16 15
17
dgn
05013.
13-

VIADUCT ELEVATION
P-
J3518- OAP-

E1 D1
i
13_Deck and Bearngs\

# FEATURES IN BRACKETS ARE ATTACHED TO A * FEATURES MARKED WITH AN ASTERISK (*) NOTES

SEGMENT ON AN ADJACENT DECK, BUT REQUIRE WILL REQUIRE THE PRECAST CONCRETE PROFILE
1. FOR GENERAL NOTES SEE DRAWING J3518-P-OAP-13-05010.
ngs\

AMENDMENTS TO THIS SEGMENT’S PROFILE OF THE SEGMENTS EITHER SIDE OF THE MEDIAN
BARRIER TO BE MODIFIED BEFORE THEY ARE
awi

AND/OR STARTER BAR ARRANGEMENT. ANY


DIMENSION GIVEN REPRESENTS AN APPROXIMATE CAST. FOR DETAILS REFER TO THE RELEVANT 2. FOR SUPERSTRUCTURE DECK LAYOUT LEGEND EXCEPT
00_Dr

LEVEL DIFFERENCE OF THE ADJACENT DECK. DETAIL DRAWINGS FOR THAT FEATURE. DRAINAGE DETAILS, SEE DRAWING NO.
ARUP\

J3518-P-OAP-14-01000.
03 Dr
4- ngs\
awi

UPPER
SEGMENT SCHEDULE
a\

E1
ectDat

E13
oj
nalPr

E14
er

LOWER E12 E1 B1
nt

E2 D1
E11 E9 E8 E5 E3
4I

E10 E7 E6 E4
00\
231499-

E14
231000\

C1
TYPICAL SECTION E14 E13
E12 E3 E2 E1 A1
0 2 4 6 8 10
obs\

NORMAL TO VIADUCT SETTING OUT LINE SEGMENT KEY PLAN


j
ands\

NTS METRES
1 : 200
Mi
ope\
eur dl

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing Title
com \

A DDA ISSUE PK 24/07/14


Contract No. HY/2012/07 VIADUCT E
up.

B DDA ISSUE PK 22/09/14 PK 07/14


2015

ar

Tuen Mun - Chek Lap Kok Link


.
obal

C REVISED DDA ISSUE PK 17/10/14


DECK LAYOUT
05/
13/

gl

D REVISED DDA ISSUE CJ 25/11/14 Checked Approved


Southern Connection Viaduct Section
\
\

E DDA ISSUE CL 18/12/14


VIADUCT E1
Printed by :

F DDA ISSUE CL 20/01/15 IW GS Supervising Officer Contractor Originator


(SHEET 4 OF 12)
Filename :

G DDA ISSUE CL 19/02/15

H DDA ISSUE CL 02/03/15 Scale


I DDA ISSUE CL 18/03/15 Drawing no. Rev.

J DDA ISSUE SK 11/05/15


1:200 @ A1 / 1:400 @ A3
J3518/P/OAP/13/05013 J
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

E1-E2-2

N
J

E2 E1
NOSING E3 (ii)

HIGHWAY ALIGNMENT LE02

VIADUCT E - S.O.L

18 17 16 15 14 13 12 11 9 8 7 6 5 4 3 1

CH 0+400.443
CH 0+460.306

E2 E1
A
A A

PLAN - UPPER

D D D D D D D D D D D D D
D D D D D D D D
S VIADUCT E - S.O.L

V V D D D D D D V V
D D D D D D D D D D D D D
D D

18 17 16 15 14 13 12 11 9 8 7 6 5 4 3 1

PLAN - LOWER

E1-E2-2

4 3 1
7 6 5
13 12 11 9 8
18 17 16 15 14

VIADUCT ELEVATION
E2 E1

# FEATURES IN BRACKETS ARE ATTACHED TO A * FEATURES MARKED WITH AN ASTERISK (*)


SEGMENT ON AN ADJACENT DECK, BUT REQUIRE WILL REQUIRE THE PRECAST CONCRETE PROFILE
NOTES RELATED TO SCHEDULE
AMENDMENTS TO THIS SEGMENT'S PROFILE OF THE SEGMENTS EITHER SIDE OF THE MEDIAN
AND/OR STARTER BAR ARRANGEMENT. ANY BARRIER TO BE MODIFIED BEFORE THEY ARE
dgn

(i) DENOTES - PT-G7 WITH TC3C, LC3


DIMENSION GIVEN REPRESENTS AN APPROXIMATE CAST. FOR DETAILS REFER TO THE RELEVANT
05014.

LEVEL DIFFERENCE OF THE ADJACENT DECK. DETAIL DRAWINGS FOR THAT FEATURE.
(ii) DENOTES - NOSING E3 WITH GANTRY COLUMN SUPPORT,
13-

TC3C FOR GT419(2) SEE 14/01018


P-
J3518- OAP-

NOTES
J
ngs\

J 1. FOR GENERAL NOTES SEE DRAWING J3518-P-OAP-13-05010.


i
13_Deck and Bear

SEGMENT SCHEDULE
E1

UPPER 2. FOR SUPERSTRUCTURE DECK LAYOUT LEGEND EXCEPT


4

DRAINAGE DETAILS, SEE DRAWING NO.


E13
J3518-P-OAP-14-01000.
E14

E1 B1
ngs\

E12
E2 D1
E11 E10 E9 E8 E7 E6 E5 E4 E3
LOWER
awi
00_Dr

E14
ARUP\

C1
TYPICAL SECTION E12 E3 E2 E1 A1 0 2 4 6 8 10
ngs\

E14 E13
SEGMENT KEY PLAN
awi

NORMAL TO VIADUCT SETTING OUT LINE METRES


03 Dr

NTS 1 : 200
a\
ectDat 4-

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing Title
oj

A DDA ISSUE PK 24/07/14


nalPr

B DDA ISSUE PK 22/09/14 PK 07/14


Contract No. HY/2012/07 VIADUCT E
2015

er

C REVISED DDA ISSUE PK 17/10/14 Tuen Mun - Chek Lap Kok Link
nt

DECK LAYOUT
05/

4I
13/

D REVISED DDA ISSUE DC 25/11/14 Checked Approved


Southern Connection Viaduct Section
\
K:

E DDA ISSUE CL 18/12/14


VIADUCT E1
Printed by :

F DDA ISSUE CL 20/01/15 IW GS Supervising Officer Contractor Originator


(SHEET 5 OF 12)
Filename :

G DDA ISSUE CL 19/02/15

H DDA ISSUE CL 02/03/15 Scale


I DDA ISSUE CL 18/03/15 Drawing no. Rev.

J DDA ISSUE CL 13/05/15


1:200 @ A1 / 1:400 @ A3
J3518/P/OAP/13/05014 J
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

E1
E2-E3-2

4
E13
N E14
E2
E12 E1 B1
E2 D1
E11 E10 E9 E8 E7 E6 E5 E4 E3

T E14
T
T
T
T C1
T E12 E3 E2 E1 A1
T E14 E13
E3 T
T
T
T
T
T
T
T
T
T SEGMENT KEY PLAN
T T
T T
T T

NOSING E3 (ii)

UPPER

LONGITUDINAL STITCH

LOWER

HIGHWAY ALIGNMENT LE02

VIADUCT E - S.O.L.
9 8 7 6 5 4 3 1
17 16
15 14 13 12 10
TYPICAL SECTION
19

NORMAL TO VIADUCT SETTING OUT LINE


CH 0+460.306 NTS

CH 0+520.328

PLAN - UPPER
A A

E3
D
J D
D
D
D
D J
D D
D
D D V D
D
D D S V
D D
D D
D D D
D D D
D V D D
D
D D R2 D D
D
D
D D D
V D D D
D D D

E2

D D D
D D D D D
D D D D D D D D
D D D D D S
D D
VIADUCT E - S.O.L.
V V D D
D D D D D
D D D
dgn

V D D D D D D
D D D D
05015.

D V D

6 5 4 3 1
14 13 12 10 9 8 7
15
13-

17 16
19
OAP-

PLAN - LOWER
P-
J3518-

E2-E3-2
i
13_Deck and Bearngs\

12 10 9 8 7 6 5 4 3 1
M.J. 19 17 16 15 14 13

NOTES RELATED TO SCHEDULE


ngs\
awi

(i) DENOTES - PT-G7 WITH TC3C, LC3


00_Dr

(ii) DENOTES - NOSING E3 WITH GANTRY COLUMN SUPPORT


ARUP\

TC3C FOR GT419(2) SEE 14/01018

VIADUCT ELEVATION
ngs\
awi

E3 E2
03 Dr

NOTES
4-

1. FOR GENERAL NOTES SEE DRAWING J3518-P-OAP-13-05010.


a\
ectDat

J
2. FOR SUPERSTRUCTURE DECK LAYOUT LEGEND EXCEPT
oj

DRAINAGE DETAILS, SEE DRAWING NO.


nalPr

J3518-P-OAP-14-01000.
4I
00\ er
nt

# FEATURES IN BRACKETS ARE ATTACHED TO A * FEATURES MARKED WITH AN ASTERISK (*)


231499-

SEGMENT ON AN ADJACENT DECK, BUT REQUIRE WILL REQUIRE THE PRECAST CONCRETE PROFILE
AMENDMENTS TO THIS SEGMENT’S PROFILE OF THE SEGMENTS EITHER SIDE OF THE MEDIAN
AND/OR STARTER BAR ARRANGEMENT. ANY BARRIER TO BE MODIFIED BEFORE THEY ARE
231000\

DIMENSION GIVEN REPRESENTS AN APPROXIMATE CAST. FOR DETAILS REFER TO THE RELEVANT
LEVEL DIFFERENCE OF THE ADJACENT DECK. DETAIL DRAWINGS FOR THAT FEATURE. 0 2 4 6 8 10
j
ands\obs\

METRES
1 : 200
dl

SEGMENT SCHEDULE
Mi
ope\
eur

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing Title
com \

A DDA ISSUE PK 24/07/14


Contract No. HY/2012/07 VIADUCT E
up.

B DDA ISSUE PK 22/09/14 PK 06/14


2015

ar

Tuen Mun - Chek Lap Kok Link


.
obal

C REVISED DDA ISSUE PK 17/10/14


DECK LAYOUT
05/
13/

gl

D REVISED DDA ISSUE DC 25/11/14 Checked Approved


Southern Connection Viaduct Section
\
\

E DDA ISSUE CL 18/12/14


VIADUCT E1
Printed by :

F DDA ISSUE CL 20/01/15 IW GS Supervising Officer Contractor Originator


(SHEET 6 OF 12)
Filename :

G DDA ISSUE CL 19/02/15

H DDA ISSUE CL 02/03/15 Scale


I DDA ISSUE CL 18/03/15 Drawing no. Rev.

J DDA ISSUE SK 13/05/15


1:200 @ A1 / 1:400 @ A3
J3518/P/OAP/13/05015 J
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

C1-E1-3

E1 A A C1

17 16 15 14 13 12 11 9 8 7 6 5 4 3 1

VIADUCT E - S.O.L.

HIGHWAY ALIGNMENT LW02

1485 1698 1721

800
569 826
TS2642(9)

CH 0+400.443
O
1238
1238

PLAN - UPPER O
LW02
CH 0+340.450

UPPER

PREVIOUS OPENINGS IN UTILITY TROUGH


E1 FLOOR FOR THE ROUTING OF CABLES C1
BETWEEN THE TROUGH AND NOW DELETED
UTILITY TRUSS TO BE CLOSED OVER
USING COVER PLATES SEE DRG /13/05386.
LOWER

C1-E1-3

D D
D V V D
D D D
D D D D
D D D D
S
D D
D
V
TYPICAL SECTION WITH UTILITY TROUGH
D D
D D
D D D
D
D D
VIADUCT E - S.O.L.
NORMAL TO VIADUCT SETTING OUT LINE
D D D D D
D D D NTS
17 16 15 14 13 12 11 9 8 7 6 5 4 3 1

C1-E1-3

UPPER

11 9 8 7 6 5 4 3 1
17 16 15 14 13 12

LOWER
dgn
05016.

TYPICAL SECTION WITHOUT UTILITY TROUGH


13-

NORMAL TO VIADUCT SETTING OUT LINE


OAP-

NTS
P-

E1 VIADUCT ELEVATION C1
i
13_Deck and Bear J3518-
ngs\

# FEATURES IN BRACKETS ARE ATTACHED TO A * FEATURES MARKED WITH AN ASTERISK (*)


SEGMENT ON AN ADJACENT DECK, BUT REQUIRE WILL REQUIRE THE PRECAST CONCRETE PROFILE
AMENDMENTS TO THIS SEGMENT'S PROFILE OF THE SEGMENTS EITHER SIDE OF THE MEDIAN
ngs\

(i) DENOTES - NOSING C1 (SEE 14/01017)


AND/OR STARTER BAR ARRANGEMENT. ANY BARRIER TO BE MODIFIED BEFORE THEY ARE
awi

DIMENSION GIVEN REPRESENTS AN APPROXIMATE CAST. FOR DETAILS REFER TO THE RELEVANT
00_Dr

LEVEL DIFFERENCE OF THE ADJACENT DECK. DETAIL DRAWINGS FOR THAT FEATURE.
ARUP\
ngs\
awi

NOTES
03 Dr
4-

1. FOR GENERAL NOTES SEE DRAWING J3518-P-OAP-13-05010.


a\
ectDat

SEGMENT SCHEDULE O
E1
4

2. FOR SUPERSTRUCTURE DECK LAYOUT LEGEND EXCEPT


oj

E13 DRAINAGE DETAILS, SEE DRAWING NO.


nalPr

E14 J3518-P-OAP-14-01000.
er
nt

E12 E1 B1
4I

E2 D1
E11 E10 E9 E8 E7 E6 E5 E4 E3
00\
231499-

E14
231000\

C1
E12 E3 E2 E1 A1
E14 E13
obs\

0 2 4 6 8 10
j

SEGMENT KEY PLAN


ands\

METRES
Midl

1 : 200
ope\
eur

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing Title
com \

A DDA ISSUE PK 24/07/14 K DDA ISSUE CL 18/03/15


Contract No. HY/2012/07 VIADUCT E
up.

B DDA ISSUE PK 22/09/14 L DDA ISSUE CL 12/05/15 PK 07/14


2016

ar

Tuen Mun - Chek Lap Kok Link


.
obal

C REVISED DDA ISSUE PK 17/10/14 M DDA ISSUE CL 03/06/15


DECK LAYOUT
01/
21/

gl

D AMENDMENT TO DRAINAGE SO 31/10/14 N DDA ISSUE CL 09/07/15 Checked Approved


Southern Connection Viaduct Section
\
\

E REVISED AS SHOWN DC 25/11/14 O REVISED AS SHOWN CL 08/01/16


VIADUCT E1
Printed by :

F DDA ISSUE CL 18/12/14 IW GS Supervising Officer Contractor Originator


(SHEET 7 OF 12)
Filename :

G DDA ISSUE CL 09/01/15

H DDA ISSUE CL 20/01/15 Scale


I DDA ISSUE CL 19/02/15 Drawing no. Rev.

J DDA ISSUE CL 02/03/15


1:200 @ A1 / 1:400 @ A3
J3518/P/OAP/13/05016 O
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

E1-E2-3

E1
4
E2
N A A A E1 E13
A E14
CH 0+400.443
CH 0+460.306 E1
E12 B1
E2 D1
E11 E10 E9 E8 E7 E6 E5 E4 E3

E14

C1
E12 E3 E2 E1 A1
E14 E13

4
SEGMENT KEY PLAN
VIADUCT E - S.O.L. 7 5 1
9 8 6 3
14 13 12 11
18 17 16 15

HIGHWAY ALIGNMENT
LW02

UPPER

LOWER

TYPICAL SECTION
PLAN - UPPER NORMAL TO VIADUCT SETTING OUT LINE
E2
E1 NTS

E1-E2-3

D D D D D D D D
D D D DV D
D D D V
D D D D D
V S

VIADUCT E - S.O.L.
D D D D
D D D D
V D D D D D D D D
D D D
D D

7 6 5 4 3 1
12 11 9 8
18 17 16 15 14 13

D D D D D D D
D D D
D D
D D D D S D D
D D
D

D D D
D D D D D D D V
V D D D D V
V D D D
D D D
D

PLAN - LOWER

E1-E2-3
dgn
05017.

14 13 12 11 9 8 7 6 5 4 3 1
18 17 16 15
13-
OAP-

AT2
ngs\
awi i
13_Deck and Bear P-
J3518-
ngs\

E2 E1
00_Dr

VIADUCT ELEVATION
awi
03 Dr ARUP\
ngs\

NOTES
4-

1. FOR GENERAL NOTES SEE DRAWING J3518-P-OAP-13-05010.


a\

# FEATURES IN BRACKETS ARE ATTACHED TO A * FEATURES MARKED WITH AN ASTERISK (*)


ectDat

SEGMENT ON AN ADJACENT DECK, BUT REQUIRE WILL REQUIRE THE PRECAST CONCRETE PROFILE
2. FOR SUPERSTRUCTURE DECK LAYOUT LEGEND EXCEPT
AMENDMENTS TO THIS SEGMENT'S PROFILE OF THE SEGMENTS EITHER SIDE OF THE MEDIAN
oj

DRAINAGE DETAILS, SEE DRAWING NO.


nalPr

AND/OR STARTER BAR ARRANGEMENT. ANY BARRIER TO BE MODIFIED BEFORE THEY ARE
J3518-P-OAP-14-01000.
DIMENSION GIVEN REPRESENTS AN APPROXIMATE CAST. FOR DETAILS REFER TO THE RELEVANT
er
nt

LEVEL DIFFERENCE OF THE ADJACENT DECK. DETAIL DRAWINGS FOR THAT FEATURE.
231499-
231000\ 4I
00\

0 2 4 6 8 10
j
ands\obs\

METRES
SEGMENT SCHEDULE 1 : 200
Mi
ope\
eur dl

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing Title
com \

A DDA ISSUE PK 24/07/14 K REVISED AS SHOWN CL 08/01/16


Contract No. HY/2012/07 VIADUCT E
up.

B DDA ISSUE PK 22/09/14 PK 07/14


2016

ar

Tuen Mun - Chek Lap Kok Link


.
obal

C REVISED DDA ISSUE PK 17/10/14


DECK LAYOUT
01/
21/

gl

D REVISED DDA ISSUE DC 25/11/14 Checked Approved


Southern Connection Viaduct Section
\
\

E DDA ISSUE CL 18/12/14


VIADUCT E1
Printed by :

F DDA ISSUE CL 20/01/15 IW GS Supervising Officer Contractor Originator


(SHEET 8 OF 12)
Filename :

G DDA ISSUE CL 19/02/15

H DDA ISSUE CL 02/03/15 Scale


I DDA ISSUE CL 18/03/15 Drawing no. Rev.

J DDA ISSUE CL 14/05/15


1:200 @ A1 / 1:400 @ A3
J3518/P/OAP/13/05017 K
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

E2-E3-3

E1
K

4
E13
N K
A E2 E14

E12 E1 B1
E2 D1
E11 E10 E9 E8 E7 E6 E5 E4 E3
E3
E14
H
C1
E12 E3 E2 E1 A1
E14 E13

3 1
4
14 13 12 10 9 8 7 6 5
SEGMENT KEY PLAN
17 16 15
19

VIADUCT E - S.O.L.

HIGHWAY ALIGNMENT LW02


LONGITUDINAL STITCH
UPPER

LOWER

T T T T T T T T T
T T T T T T T T
T T T T

TYPICAL SECTION
NORMAL TO VIADUCT ALIGNMENT
CH 0+520.328 CH 0+460.306
NTS
PLAN - UPPER

E2

E3
E2-E3-3

D D
D D
D D V
D D D D D D
D D D
D D D S
V D
D
VIADUCT E - S.O.L. D V
D D D D D
D D D
V D D D
D D D D
D D D
D
3 1
6 5 4
9 8 7
14 13 12 10
17 16 15
19

D D
D D
D D D D D
D D D D D
D D
D D D S
D
V V
D D D D
D D D D
D D D
V D D D D D D
D V D
D

PLAN - LOWER

E2-E3-3
dgn
05018.

19 17 16 15 14 13 12 10 9 8 7 6 5 4 3 1
13-

AT2
i
13_Deck and Bear
ngs\ ngs\ P-
J3518- OAP-

VIADUCT ELEVATION
awi

E3 E2
00_Dr
ARUP\

K
ngs\
awi

NOTES
03 Dr
4-

# FEATURES IN BRACKETS ARE ATTACHED TO A * FEATURES MARKED WITH AN ASTERISK (*) 1. FOR GENERAL NOTES SEE DRAWING J3518-P-OAP-13-05010.
a\
ectDat

SEGMENT ON AN ADJACENT DECK, BUT REQUIRE WILL REQUIRE THE PRECAST CONCRETE PROFILE
AMENDMENTS TO THIS SEGMENT’S PROFILE OF THE SEGMENTS EITHER SIDE OF THE MEDIAN 2. FOR SUPERSTRUCTURE DECK LAYOUT LEGEND EXCEPT
oj

AND/OR STARTER BAR ARRANGEMENT. ANY BARRIER TO BE MODIFIED BEFORE THEY ARE DRAINAGE DETAILS, SEE DRAWING NO.
nalPr

DIMENSION GIVEN REPRESENTS AN APPROXIMATE CAST. FOR DETAILS REFER TO THE RELEVANT J3518-P-OAP-14-01000.
LEVEL DIFFERENCE OF THE ADJACENT DECK. DETAIL DRAWINGS FOR THAT FEATURE.
4I
00\ er
nt

** THERE ARE ALSO FIRE MAIN SUPPORT


231499-

MOUNTINGS TO DECKFLANGE/WEB/SOFFIT, K
REFER TO DRAWING No’S
231000\

J3518/P/OAP/03/03441SERIES.

SEGMENT SCHEDULE 0 2 4 6 8 10
j
ands\obs\

METRES
1 : 200
Mi
ope\
eur dl

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing Title
com \

A DDA ISSUE PK 24/07/14 K DDA ISSUE CL 14/05/15


Contract No. HY/2012/07 VIADUCT E
up.

B DDA ISSUE PK 22/09/14 PK 07/14


2015

ar

Tuen Mun - Chek Lap Kok Link


.
obal

C REVISED DDA ISSUE PK 17/10/14


DECK LAYOUT
05/
14/

gl

D REVISED DDA ISSUE DC 25/11/14 Checked Approved


Southern Connection Viaduct Section
\
\

E DDA ISSUE CL 18/12/14


VIADUCT E1
Printed by :

F DDA ISSUE CL 20/01/14 IW GS Supervising Officer Contractor Originator


(SHEET 9 OF 12)
Filename :

G DDA ISSUE CL 03/02/15

H DDA ISSUE CL 19/02/15 Scale


I DDA ISSUE CL 02/03/15 Drawing no. Rev.

J DDA ISSUE CL 18/03/15


1:200 @ A1 / 1:400 @ A3
J3518/P/OAP/13/05018 K
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

A1-E1-4

N O

A1
E1 TS2644(11)

STITCH
UDINAL
LONGIT

12 11 9 8 7 6
13 5 4
14 3
15
16 1
17

01
T LE
NMEN
ALIG

LE01
AY
HIGH
W O.L.
E - S. T
UCT T T
VIAD T
T CH 0+340.575
T
T
T
T
T O O
T
T

CH 0+400.443

PLAN - UPPER

A1
E1
O O

D D D D D
D D D D D
D D
D
D D
D D S

D D D D D D
D D D D D D
D D V
D D D
D D
D V D 9 8
12 11 7 6 5
D V 13 4
15 3
D 1
16 14
L.
S.O. D 17
CT E - D
U
VIAD

PLAN - LOWER

A1-E1-4

7 6 5 4 3 1
17 16 15 14 13 12 11 9 8
DTT5

AT2
UPPER
AT2

O LOWER

TYPICAL SECTION
E1 A1
VIADUCT ELEVATION NORMAL TO VIADUCT SETTING OUT LINE
NTS

O O
dgn
05019.
13-

(i) DENOTES - NOSING C1 (SEE 14/01017)


i
13_Deck and Bearngs\ P-
J3518- OAP-

O
NOTES

SEGMENT SCHEDULE
E1

1. FOR GENERAL NOTES SEE DRAWING J3518-P-OAP-13-05010.


ngs\

4
awi

E13 2. FOR SUPERSTRUCTURE DECK LAYOUT LEGEND EXCEPT


00_Dr

E14 DRAINAGE DETAILS, SEE DRAWING NO.


J3518-P-OAP-14-01000.
E1
ARUP\

E12 B1
E2 D1
E11 E10 E9 E8 E7 E6 E5 E4 E3
ngs\

E14
awi
03 Dr

C1
E3
4-

E12 E2 E1 A1
a\

E14 E13
ectDat

0 2 4 6 8 10

SEGMENT KEY PLAN


oj
nalPr

METRES
1 : 200
4I
00\ er
nt

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing Title
231499-

A DDA ISSUE PK 24/07/14 K DDA ISSUE DC 18/03/15

B DDA ISSUE PK 22/09/14 L DDA ISSUE CL 14/05/15 PK 07/14


Contract No. HY/2012/07 VIADUCT E
231000\
2016

C REVISED DDA ISSUE PK 17/10/14 M DDA ISSUE CL 03/06/15 Tuen Mun - Chek Lap Kok Link DECK LAYOUT
08/
03/

D AMENDMENT TO DRAINAGE SO 31/10/14 N REVISED AS SHOWN CL 08/01/16 Checked Approved


Southern Connection Viaduct Section
\
Z:

E REVISED AS CLOUDED DC 25/11/14 O REVISED AS P2-0355 AND GULLY TYPE AS SHOWN CL 25/07/16
VIADUCT E1
Printed by :

F DDA ISSUE CL 18/12/14 IW GS Supervising Officer Contractor Originator


(SHEET 10 OF 12)
Filename :

G DDA ISSUE DC 09/01/15

H DDA ISSUE DC 20/01/15 Scale


I DDA ISSUE DC 19/02/15 Drawing no. Rev.

J DDA ISSUE DC 03/03/15


1:200 @ A1 / 1:400 @ A3
J3518/P/OAP/13/05019 O
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

E1-E2-4

E1
4
N E1 E13
E14
E2
E12 E1 B1
E2 D1
E11 E10 E9 E8 E7 E6 E5 E4 E3

E14

C1
E12 E3 E2 E1 A1
E14 E13

SEGMENT KEY PLAN

LONGITUNINAL STITCH

HIGHWAY ALIGNMENT
LE01 13 12 11 9 8 7 6 5 4 1
15 14 3
18 17 16

UPPER
VIADUCT E - S.O.L.

LOWER
T T T T T T T T T T T T T T T T T T T T T T

CH 0+460.306
CH 0+400.443

M TYPICAL SECTION
NORMAL TO VIADUCT ALIGNMENT
E1 NTS

E2 PLAN - UPPER
E1-E2-4

D D D D D D D D
D D D DV D
D D D V D
D D D D D
V S

D D D D D
D D D D
V D D D D D D D D
D D D
D D

D D D D M D D
D D D
D D D
D D D D S M D D
D D
D
D
D D D
D D D D D D D V
VIADUCT E - S.O.L. V D D D D V
V D D D
D D D
D D

18 17 16 15 14 13 12 11 9 8 7 6 5 4 3 1

PLAN - LOWER

E1-E2-4

DTT5

15 14 13 12 11 9 8 7 6 5 4 3 AT2 1
AT2 18 17 16

DTT3
DTT2
M
M M
dgn

VIADUCT ELEVATION
05020.

E2 E1
i P-
J3518-
ngs\ 13-
OAP-

M NOTES
13_Deck and Bear

1. FOR GENERAL NOTES SEE DRAWING J3518-P-OAP-13-05010.

2. FOR SUPERSTRUCTURE DECK LAYOUT LEGEND EXCEPT


DRAINAGE DETAILS, SEE DRAWING NO.
ngs\

J3518-P-OAP-14-01000.
a\
ectDat 4- awi
03 Dr ARUP\
ngs\ awi
00_Dr

0 2 4 6 8 10
oj
nalPr

METRES
1 : 200
er

SEGMENT SCHEDULE
4I
00\ nt

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing Title
231499-

A DDA ISSUE PK 24/07/14 K DDA ISSUE CL 14/05/15

B DDA ISSUE PK 22/09/14 L DDA ISSUE CL 03/06/15 PK 07/14


Contract No. HY/2012/07 VIADUCT E
231000\
2016

C REVISED DDA ISSUE PK 17/10/14 M REVISED AS SHOWN CL 08/01/16 Tuen Mun - Chek Lap Kok Link DECK LAYOUT
01/
22/

D AMENDMENT TO DRAINAGE SO 31/10/14 Checked Approved


Southern Connection Viaduct Section
\
Z:

E REVISED DDA ISSUE DC 25/11/14


VIADUCT E1
Printed by :

F DDA ISSUE CL 18/12/14 IW GS Supervising Officer Contractor Originator


(SHEET 11 OF 12)
Filename :

G DDA ISSUE CL 20/01/15

H DDA ISSUE CL 19/02/15 Scale


I DDA ISSUE CL 02/03/15 Drawing no. Rev.

J DDA ISSUE CL 18/03/15


1:200 @ A1 / 1:400 @ A3
J3518/P/OAP/13/05020 M
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

E2-E3-4

E1
4
E13
N E14

E12 E1 B1
D1
E2 E11 E10 E9 E8 E7 E6 E5 E4 E3 E2

E3
E14
H
C1
E12 E3 E2 E1 A1
E14 E13

SEGMENT KEY PLAN

LONGITUDINAL STITCH

HIGHWAY ALIGNMENT
1
LE01 6 5 4 3
10 9 8 7
14 13 12
19 17 16 15 UPPER
VIADUCT E - S.O.L.

M M

LOWER
T T T T T T T T T T
T T T T T T T T
T T T T

OPENING FOR HYDRANT CONNECTION

CH 0+520.328 CH 0+460.306

TYPICAL SECTION
DAV GV WOV2 WOV2 FS
NORMAL TO VIADUCT SETTING OUT LINE
FS-EJ
FS FS FS FS E2 NTS
E3
PLAN - UPPER
E2-E3-4

D D D
D D D
D D V
D D D D D D
D D D
D D D S
V D
D
D D
D V
D D D D D
D D D
V D D D
D D D D
D D D
D

D D D D
D D
D D D D D
D D D D D
D D
D D D S
D
V D D
VIADUCT E - S.O.L. V D D
D D D D
D D
D D D
V D D D D D D
D V D
D
4 3 1
7 6 5
12 10 9
15 14 13 8
19 17 16

PLAN - LOWER

E2-E3-4

13 12 10 9 8 7 6 5 4 3 1
19 17 16 15 14

AT2

AT2
13-
OAP- dgn
05021.

VIADUCT ELEVATION
P-
J3518-

E3 E2
i
13_Deck and Bearngs\

NOTES

1. FOR GENERAL NOTES SEE DRAWING J3518-P-OAP-13-05010.

2. FOR SUPERSTRUCTURE DECK LAYOUT LEGEND EXCEPT


ngs\

DRAINAGE DETAILS, SEE DRAWING NO.


awi

J3518-P-OAP-14-01000.
M M
ngs\
awi
03 Dr 00_Dr
ARUP\

** THERE ARE ALSO FIRE MAIN SUPPORT MOUNTINGS TO DECK FLANGE/WEB/SOFFIT.


a\4-

REFER TO DRAWING NOS. J3518/P/OAP/03/03441 SERIES.


ectDat

0 2 4 6 8 10
oj
nalPr

SEGMENT SCHEDULE METRES


1 : 200
4I
00\ er
nt

Rev Description By Date Rev Description By Date Drawn Date Client Project Title Drawing Title
231499-

A DDA ISSUE PK 24/07/14 K DDA ISSUE CL 18/03/15

B DDA ISSUE PK 22/09/14 L DDA ISSUE CL 14/05/15 PK 07/14


Contract No. HY/2012/07 VIADUCT E
231000\
2016

C REVISED DDA ISSUE PK 17/10/14 M REVISED AS PER P2-0356 CL 16/06/16 Tuen Mun - Chek Lap Kok Link DECK LAYOUT
06/
16/

D AMENDMENT TO DRAINAGE SO 31/10/14 Checked Approved


Southern Connection Viaduct Section
\
Z:

E REVISED DDA ISSUE DC 25/11/14


VIADUCT E1
Printed by :

F DDA ISSUE CL 18/12/14 IW GS Supervising Officer Contractor Originator


(SHEET 12 OF 12)
Filename :

G DDA ISSUE CL 20/01/15

H DDA ISSUE CL 03/02/15 Scale


I DDA ISSUE CL 19/02/15 Drawing no. Rev.

J DDA ISSUE CL 02/03/15


1:200 @ A1 / 1:400 @ A3
J3518/P/OAP/13/05021 M

Вам также может понравиться