Calculation Form
Project: Mai Beni Hydropower Project
Component: Surge tank
Subject: Hydraulic design
Opening Condition
Complete opening from 0 to 100%
3
Design Discharge Qo 8.40 m /s
Headrace Tunnel
2
Length L 4267.70 m C/s Area Aht 3.46 m
Diameter D 2.10 m Wetted Perimeter Pht 6.60 m
Width W m Hydraulic Radius Rht 0.53 m
Height to spring level m Hydraulic Radius Rht 0.53 m
Manning's roughness coefficient 0.015 Flow velocity Vht 2.43 m/s
Frictional headloss hlt 9.14 m
Surge Shaft
Diameter 1 6.00 C/s Area As 28.27
2
Diameter Ds 6.00 m C/s Area As 28.27 m
Height Hs 18.00 m
Static water elevation 643.00 m
Calculations
1 . 1 fL
b b
2
1.71 s /m
2 gD
Headloss in the tunnel
y o bVht
2
yo 10.05 m
y1 0.00
Damping factor
2 gAs
m b m 0.06 /m
LAht
Transient Analysis
3
Initial discharge Q1 0.00 m /s
Q A
Dy o Dt ht Vi Dt Initial velocity V1 0.00 m/s
As As
Maximum downsurge 18.85 m
yi 1 yi Dy Minimum water elevation 624.15 masl
DV
g
L
Dt y i 1 b V 2