Вы находитесь на странице: 1из 32

Clipper Windpower, Inc.

Jason Degroot
Supply Chain Manager
GACCoM’s Renewables & Energy Efficiency Roadshow 2008
Agenda

• Industry
y Overview
• Clipper Snapshot
• Supply Chain Insight
• Supplier Partnership Expectations
• Photo Appendix

2
Clipper Windpower, Inc.
Industry Overview

3
Clipper Windpower, Inc.
Wind Energy – Rapid Expansion Globally
Cumulative Global Wind Power Development
Actual 1990-2007 Forecast 2008-2012 Prediction 2013-2017
700,000

600,000

500,000

400,000
MW

300,000

200,000

100,000

0
1990 2007 2012 2017

Source: BTM Consult ApS - March 2008 Prediction Forecast Existing capacity

4
Clipper Windpower, Inc.
Europe is the Largest Wind Market
Annual Wind Power Development
Actual 1990-2007 & Forecast 2008-2012
60,000

50,000

40 000
40,000
MW

30,000

20,000

10,000

0
1990 1995 2000 2007 2012

Source: BTM Consult ApS - March 2008 Europe USA Asia Rest of World Existing

5
Clipper Windpower, Inc.
Global Wind Power Market Growing Rapidly
The Global Wind Power Market in US$
Expected development 2008-2012
125,000 450,000

112,500 405,000

100,000 360,000

87,500 315,000

US$
umulative mill. U
75,000 270,000
mill. US$

62,500 225,000

50,000 180,000

Cu
37,500 135,000

25,000 90,000

12,500 45,000

0 0
2007 2008 2009 2010 2011 2012
Source: BTM Consult ApS - March 2008 Forecast offshore Offshore 2007 Onshore 2007
Forecast onshore Cumulative market

6
Clipper Windpower, Inc.
Cost of Wind is Very Competitive

Courtesy of Puget Sound Energy

7
Clipper Windpower, Inc.
Growing Popularity for U.S. Renewable
Portfolio Standards

Daniel M. Kammen. Renewable & Appropriate Energy Laboratory – UC Berkeley

8
Clipper Windpower, Inc.
Clipper Snapshot

9
Clipper Windpower, Inc.
Clipper Snapshot

• Formed in 2000
– WTG Design/Engineering (R&D)
– WTG Manufacturing g
– Project Development
• U.S Headquarters - Carpinteria, California, USA
• WTG Manufacturing g - Cedar Rapids,
p , Iowa,, USA
• European Headquarters - London, England, UK
• Publicly Traded on London AIM market – CWP
Ticker Symbol

10
Clipper Windpower, Inc.
Clipper Product Line

Liberty Onshore Britannia Offshore

• 2.5
2 5 MW • 7.5
7 5 MW
• Onshore • Offshore
• Clipper
Clipper’s
s First Commercial • Clipper
Clipper’s
s First Commercial
Onshore Wind Turbine Offshore Wind Turbine
• In Operation • In Development
• Manufacturing: Cedar Rapids, • Manufacturing: Blyth, England
IA, U.S. U.K.

11
Clipper Windpower, Inc.
Supply Chain Insight

12
Clipper Windpower, Inc.
Supply Chain Bottlenecks

• Supply base struggles to keep


up with industry demand and
growth

• Large
g components
p are
stretching current capabilities of
supply base

• Logistics: oversized loads, road


restrictions and high costs

13
Clipper Windpower, Inc.
Strength in Supply Chain from Overseas
European Suppliers Moving to the U
U.S.
S

• Overseas expertise in Wind


Energy

• Growth of U.S.

• State Incentives

• High Cost of Euro

14
Clipper Windpower, Inc.
State Support of Investment

• Provide tax credits/exemptions

• Provide state loan and grant


programs

• Support utility rebate programs

• Research and outlook


programs at State Universities

• P
Proactive
ti R Recruiting
iti

15
Clipper Windpower, Inc.
Supplier Partnership Expectations

16
Clipper Windpower, Inc.
We Strive to Build Long-Term Partnerships
High Performing
Suppliers Partner - Long-term Framework Contract

- Exceeds requirements in Quality, Cost, Delivery, Responsiveness


- Proven record of Value Improvement
- Provides innovation and technology support
- Provides full-time site support as required

Bid - Competitive Quote, Limited Order Duration

− Achieves required Quality, Cost, Delivery, Responsiveness


− Manages scope change without cost creep
− Provides on site support for delivery problems

Exit - No New Business

- Fails to achieve QCDR requirements


Poor Performing - High level of ‘cost creep’ post contract
- Exit if no performance improvement
Suppliers

17
Clipper Windpower, Inc.
Quality, Cost reduction, Technology…..

• No U
N Undeclared
d l d
Quality Defects

• Cost Reduction

• Technology

18
Clipper Windpower, Inc.
Delivery & Lead Time Are Critical Success Factors

On-time Delivery
• Late Delivery = Unhappy Customers
• Delivery Performance must improve
− Engineering changes impact schedules
− Steel crisis having impact, must be managed
− Effective capacity planning and production
• Right quantity
quantity, right time
time, right quality

Lead Time
• Continuous reduction of ‘supply
pp y time’
• Speed of delivery wins projects
• Accurate & Current Lead Times are Essential

Growth Potential

A Commitment Is A Commitment
Commitment…Stand
Stand By It!
19
Clipper Windpower, Inc.
In Summary

Wind Energy’s growth requires strong, committed


suppliers

Clipper’s commercial performance and technology


offer suppliers confidence in our financial and
future strength

Agility
g y and ppre-emptive
p actions are needed to
support an increasingly demanding marketplace

Delivery delays and undeclared quality defects are


unacceptable

20
Clipper Windpower, Inc.
Questions?

21
Clipper Windpower, Inc.
Appendix:
pp
- Liberty (Technical)
p
- Components, Project
j & Turbine Photos

22
Clipper Windpower, Inc.
Liberty Machine

• 3 Blade Horizontal Axis


• Upwind
• Variable Speed
• Individual pitch
• Active Yaw
• 75 to 80 m Hub Height
• 4 Rotor Options: 89m,
93m, 96m, 99m
• Tower Options:
Seismic, cold weather

23
Clipper Windpower, Inc.
Liberty
1 Hub
2 Nacelle
3 Gearbox 2
4 Main Shaft 11

5 Generators
6 3
6 P ki B
Parking Brakes
k 4
1
9
7 Yaw System
5
8 Machine Base 10

9 Turbine Control
C Unit ((TCU)
C )
10 Hydraulic Power Unit (HPU) 8

11
On-Board Hoist 7

Certifications:

- Germanischer Lloyd WindEnergie GmbH: Operation in extreme cold climate conditions (C93 and C96)
Temperatures down to -30° C, survival to -40˚C.
- Germanischer Lloyd WindEnergie GmbH: Statement of compliance for design assessment of the wind turbine:
WT 00 009A 2006 (C93) / WT
WT-00-009A-2006 WT-00-008A-2006
00 008A 2006 (C96) / WT-00-012A-2006
WT 00 012A 2006 (C89)
- USDOE’s NREL Accredited Lab 12/04-3/05 : Drivetrain dynamometer test

24
Clipper Windpower, Inc.
Cedar Rapids, IA

330,000+ sq. ft
Assembly/Manufacturing

25
Clipper Windpower, Inc.
26
Clipper Windpower, Inc.
27
Clipper Windpower, Inc.
28
Clipper Windpower, Inc.
29
Clipper Windpower, Inc.
30
Clipper Windpower, Inc.
31
Clipper Windpower, Inc.
32
Clipper Windpower, Inc.

Вам также может понравиться